O'Q41FOVtON City Council Staff Report
CITY COUNCIL NOVEMBER 2, 2005
CONSENT CALENDAR
Subject: APPROVAL OF CHANGE ORDER NO. 2 TO INTERNATIONAL
PAVEMENT SOLUTIONS, INC. (IPS) FOR CITY PROJECT NO.
04-01, 2004 CITYWIDE ARHM OVERLAY
From: David H. Ready, City Manager
Initiated by: Public Works and Engineering Department
SUMMARY
City Project 04-01 ARHM Overlay initially began work in January of 2005. Prior to
the start of the project, the Engineering Department was informed by Desert
Water Agency (DWA) that some of the intended overlay areas were scheduled
to have a reclaimed water line installed. This included the areas in bid schedules
A and B (Araby Drive, Barona Road and Anza Trail). Due to the proposed
construction, these areas were not paved as part of the original project. The
contractor was asked if they would be willing to hold the contract open until after
the DWA water line work was completed and they agreed. Over the past several
months the cost of Asphalt-Rubber Hot Mix material has increased significantly.
The delay in the construction of Bid Schedules A and B was due to the above
mentioned DWA work and was not the fault of the Contractor. Therefore, the
Contractor is entitled to compensation for the difference in cost from when the
work was originally to be performed and today.
RECOMMENDATION:
1) Adopt Minute Order No. "AUTHORIZING CHANGE ORDER NO. 2
TO AGREEMENT NO. 4989 WITH INTERNATIONAL PAVEMENT
SOLUTIONS, INC., FOR THE 2004 CITYWIDE ARHM OVERLAY
PROJECT, CITY PROJECT NO. 04-01, IN THE AMOUNT OF $24,685.96
FOR A TOTAL REVISED CONTRACT AMOUNT OF $358,425.96.
2) Authorize the City Manager to execute all necessary documents.
Item No. 2 . K .
City Council Staff Report
November 2, 2005- Page 2
CCO#1 2004 ARHM Overlay(CP 04-01)
STAFF ANALYSIS:
City Council approved an agreement with IPS for Asphalt Rubber Hot Mix Overlay of
city streets on November 3, 2004. The Public Works Department oversees the
maintenance of the City's street system. Each year, the Department assembles a
capital project to continue its ARHM Overlay Program on various City streets. The
approval of this Change Order would allow the 2004 project to finish without once again
putting the work out to bid.
DWA originally informed staff that their waterline work was scheduled to be complete in
September 2005. At this time, the DWA waterline work is continuing and they have now
informed us that they are expected to complete construction in early November 2005.
Approval of Change Order No. 2 would allow the continuation of the overlay work to
begin shortly after the completion of the DWA work.
FISCAL IMPACT: IFinance Director Review
The original bid price for this work was $0.86/SF. The ,td al increase in price per this
change order would be $0.30/SF and is inclusive of increases in the cost of ARHM
material, tack oil and additional overhead. Including some corrections in the original
contract quantities, the total estimated increase in cost is $45,902.20. When combined
with savings of $21,216.24 from the initial phase of the work (Movie Colony area), the
net increase is estimated at $24,685.96.
Change Order No. 1 was approved during the original phase of the work and included
additional grinding and base paving to Alejo Road between Indian Canyon Drive and
Palm Canyon Drive. This Change Order totaled $7,848.00.
'The net result of Change Orders 1 and 2 is an increase of $32,533.96 to the original
contract amount of $325,892.00 for a total of $358,425.96; an approximate increase of
10%.
Funding for this project will be available through local Measure A revenue, in an account
budgeted as part of the 2004 Citywide ARHM Overlay capital improvement project,
account 134-4 98-50225 (ARHM Overlay).
0J-"- AAQ
David J. Barakian Thomas J. Wil n
Director of Public Works/City Engineer Assistant City Manager
David H. Ready, Ci y I n e�r
ATTACHMENTS:
1. Minute Order
MINUTE ORDER NO,
AUTHORIZING CHANGE ORDER NO. 2 TO
AGREEMENT NO. 4989 WITH INTERNATIONAL
PAVEMENT SOLUTIONS, INC., FOR THE 2004
CITYWIDE ARHM OVERLAY PROJECT, CITY
PROJECT NO. 04-01, IN THE AMOUNT OF
$24,685.96 FOR A TOTAL REVISED CONTRACT
AMOUNT OF $358,425.96
I, James Thompson, City Clerk of the City of Palm Springs, hereby certify that
this Minute Order Authorizing Change Order No. 2 To Agreement No. 4989 with
International Pavement Solutions, Inc., for the 2004 Citywide ARHM Overlay
Project, City Project No. 04-01, in the amount of $24,685.96 for a total revised
contract amount of $358,425.96, was adopted by the City Council of the City of
Palm Springs, California, in a meeting thereof held on the day of
, 2005.
James Thompson, City Clerk
CITY OF PALM SPRINGS
CONTRACT CHANGE ORDER
To: IPS,Inc. Date: October 18,2005
P.O.Box 10458 Project No.: 04.01
San Bernardino,CA 92423 Project: ARHM Overlay
Change Order No.: Two (2)
Contract Purchase No.: 516586
Account Numbers: 134.4498.50225
261.4491.50235
420-6800-50000
Minute Order No.: 7581
Agreement No.: 4989
CHANGES IN WORK/COST:
DECREASE TO CONTRACT QUANTITIES
Bid Schedule C Item No.:
4. 1.5"ARHM Overlay 6211 SF @ $0.75/SF ($4,658.25)
6. Adjust Sewer Manhole 2 EA @ $450/EA ($900.00)
Bid Schedule D Item No.:
4. 1.5"ARHM Overlay 6240 SF @ $0.75/SF ($4,680.00)
6. Adjust Sewer Manhole 1 EA @ $450.00/EA ($450.00)
Bid Schedule E Item No.:
3. Cold Planing 7614 SF @$0.20/SF ($1,522.80)
4. 1.5"ARHM Overlay 6902 SF @ $0.75/SF ($5,176.50)
.5. Adjust Water Valve 10 EA @$120.00/EA ($1200.00)
]Bid Schedule F Item No.:
3. Cold Planing 1518 SF @ $0.35/SF ($531.30)
4. 1.5" ARAM Overlay 1851 SF @ $0.89/SF ($1,647.39)
]Bid_ Schedule G Item No.:
3. Adjust Sewer Manhole 1 EA @ $450.00/EA ($450.00)
SUBTOTAL OF DECREASES TO THE CONTRACT ($21,216.24)
INCREASE TO CONTRACT QUANTITIES
:Bid Schedule B Item No.:
4. 1.5"ARHM Overlay 14920 SF @$0.86/SF $12,831.20
New Item
A. Bid Correction 1 LS @$800.00 $800.00
B. Increase Material Cost 107570 SF @ $0.30/SF $32,271.00
SUBTOTAL OF INCREASES TO THE CONTRACT $45,902.20
TOTAL (NET INCREASE AMOUNT) $24,685.96
Contract Change Order No.2
International Pavement Solutions,Inc.
City Project#04-01,2004 Citywide ARIIM Overlay
Page 2 of 3
REASONS FOR CHANGES:
The increase to Bid Schedule B, Item No. 4, is required in order to complete the overlay of Barona
Rd. as indicated on the approved contract drawings. Following the award of the contract and after
the project had begun,it was discovered that a portion of the work was not included in the original
quantity estimate. This increase allows for the payment of the additional quantity as indicated on the
project drawings and in accordance with the originally intended scope of work.
Item A above corrects a math error in the original bid/contract.
This overlay project initially began work in January of 2005. Prior to the start of work, The
Engineering Department was informed by Desert Water Agency that some of the intended overlay
areas were scheduled to have a reclaimed water line installed. This included the areas in bid
schedules A and B (Araby Drive,Barona Rd. and Anza Trail). Due to the proposed construction,
these areas were not paved as part of the original project. The Contractor was asked if they would be
willing to hold the contract open until after the waterline work was completed. Item B represents
an increase in the square footage price for the placement of the overlay material. Over the past
several months the cost of Asphalt-Rubber Hot Mix material has increased significantly.The delay in
the construction of Bid Schedules A and B was due to the above mentioned D WA work and was not
the fault of the Contractor. Therefore,the Contractor is entitled to compensation for the difference in
cost from when the work was originally to be performed and today. This item is inclusive of the
additional costs of tack oil,trucking,and Contractor's overhead and is considered an agreed price per
square foot. The total square footage indicated in this item is an estimate and the Contractor is aware
that the final quantity could be higher or lower than what is indicated. In either case the Contractor
will only be entitled to the increase in price per square foot for the actual quantity placed.
All decreases indicated above are due to savings in the work that has been completed to date. These
result from the actual quantifies placed in the field being less than the original estimate.
Contract time on this project has been deferred. Start date for bid schedules A and B is to be
determined at a future date.
No additional mark ups will be added to any item on this Change Order.All costs are final.
SOURCE OF FUNDS
Funds are available in the following account:
Account No. 134-4498-50225 ARHM Overlay/Measure A
Contract Change Order No.2
International Pavement Solutions,Inc.
City Project#04-01,2004 Citywide ARHM Overlay
Page 3 of 3
Summary of Costs _ Contract Time
Original Contract Amount: $325,892.00 Original Completion Date: March 18,2005
This Change Order: $24,685.96 Days Added for this C.C.O.: --0--
Previous Change Order(s): $7,848.00 Previous Days Added: —2--
Revised Contract Amount: $358,425.96 Revised Completion Date: to be determined
I have received a copy of this Change City Approval:
Order and the above AGREED PRICES
are acceptable to the Contractor. Submitted by Date
Field Engineering Manager
By Approved by"/ Date
City-Engineer
Date Approved by Date
City-Manager
Distribution:
Original Conformed Copies Conformed-File Coov
Contractor (1) Engineering File (1)
City Clerk (1) Engineering Field Inspector (1)
Engineering Field Supervisor (1)
Purchasing Agent (1)
Engineering (1)
Finance (1)