Loading...
HomeMy WebLinkAbout11/16/2005 - STAFF REPORTS (16) { �pALM S.0 �2 U N t w + HC�Ap K aRAiEO ,3, City Manager Staff Report DATE: November 1, 2005 SUBJECT: Amado Road Cross Gutter Installation Trade Contract#40 'TO: David H. Ready, City Manager FROM: Convention Center Project Team RECOMMENDATION: 1. It is recommended that City Manager award Trade Bid #40 for Amado Road Cross Gutter Installation to Contreras Construction for the convention center project in the amount of $30,392 utilizing authority granted by City Council by Resolution No. 20766 dated October 15, 2003. STAFF ANALYSIS: Under the informal bidding procedures for public construction authorized by Municipal. Code Section 7.03.030, the Convention Center project team competed the requirement for Trade Bid 40, Amado Road Cross Gutter Installation. 'Two firms bid on the project as follows: Contreras Construction $30,392 Tri-Star Construction $36,450 Bids were solicited from three additional trade contractors, but they declined to bid. 'These firms indicated that the project was too small, or that they were too busy with other projects. 'The City Council, via Resolution No. 20766 dated October 15, 2003, grants authority to the City Manager to award trade bids under $100,000. The Project Team recommends the City Manager award Trade Bid 40 to Contreras Construction in the amount of$30,392. Item No. 2 . f ` . City Manager Staff Report October 31, 2005 -- Page 2 Amado Road Cross Gutter—Trade Contract#40 FISCAL IMPACT: Finance Director Review: r - .� Funds for this trade contract are available in account 4283-50003 Convention Center, Phase 2, Building & Equipment Account. -1 Allen F. Smoot, Project Administrator (,Bruce_I). J hnson Procurement & Contracting Manager AWARD APPROVED: CITY MANAGER Attachment:: Resolution 20766 October 31, 2005 To: Bruce Johnson From: Al Smoot Subject: Amado Cross Gutter- Trade Contract#40 Bruce we have completed our effort to find quotes for the above mentioned Trade Contract. After our last conversation I reached out to three more firms for quotes, all were evidently to busy and were not interested in quoting. We did receive: Contreras $30,392 Tri-Star $36,450 We would like to proceed with the award to Contreras. Thanks, Al Snioit� Project Administrator Contreras Construction Co. Quotation General Contractor DATE August 4, 2005 P.O. Box 1808 Quotation# 1217 Indio, Ca 92202 Customer# Phone (760) 347-6070 Fax (760) 347-5591 Ship To: Quotation valid until: Open City of Palm Springs Prepared by. Lupe Perez Attn: Michael Lytar 3200 E. Tahquitz Canyon Way Project Name : Street Improvements Palm Springs, Ca 92263 Comments or special instructions: Price includes saw cutting, removals, disposals, grading, and traffic control. Road to be closed for 4 days. Price excludes permit, compacting test, lay-out , or surveyer. Description 1. Construct cross gutter per plan atAvenica Caballeros &Amado Rd. Place 3" of ac pavement over 6" of class II base per plan. 1 LS $ 30,392.00 TOTAL $ 30,392.00 ACCEPTED FOR BUYER CONTRERAS CONSTRUCTION CO. BY: Approve By: Henry Contreras Title Date Title Owner& Partner Date CONTRERAS CONSTRUCTION CO. All material guaranteed to be as specified.All work to be completed in a substantial workmanlike manner according to specification ACCEPTANCE OF PROPOSAL submitted per standard practices.Any alteration or deviation from The above price,specification and condition are above specification involving extra cost will execute only upon satisfactory and are hereby accepted.You are written orders,and will become an extra charge over and above authorized to do work as specified.Payment will the estimate.All agreements contingent upon strike,accidents,or be made as outline above. delays beyond our control.Owner to carry fire,tornado and other necessary insurance.Our workers are fully covered by Workers Compensation Insurance. When signed by the Buyer and approved by Managing Officer of this Company,this will cons[!lute a fine contract between both parties,hereto,for all labor and For all materials herein referred to,according to tens and condition. OOT,11_2005 TUE 10:54 AM FAX N0, 760 251 5458 P. 03 PROPOSAL, Contracting -Excavation - Grafting Tri-Star "We dig the Coachella Valley" I �( 15-501LITTLEAfORONGORDAD � r ?�� DESERTH0T SPR.GVGS CA 92240 Proposal Date: October 6,2005 ° Sus:(760)251-5454 Faa:(760)251-5458 Date of plans: Licansa Nurnber:47551s A") 'TURNER CUI�S7FxUC fl �0. __._w,, Job Na­1111me_PS Convention Center.Pro al Submitted To: Ci of— —___,._.,_...___—.,_.,.�..-....._.--. Address: Address,: I Contact Cell#: —.......,..,._--.............._ . .,,. _.._-- _.......—__._.. - --- _a_....,,,_—...w ., —.......,,_.— . ._. — We hereby submit an estimate for equipment, labor 8 material to: Cross gutter installation at Amadc $36,460.00 includes removal of AC replace AC traffic control E"als memo To,E__ Co. PMDBW—I Exclusions(unless listed above):state,city and Willy permits,inspections,fees,bonding,water,water meter,engineering,surveying,tests,traffic control, drainage in areas of less than 1%grade. contractor is under no duty to investigate the project site,analyze,compare and/or correct the plans and specifications. Tri-Star is not responsible for undisclosed site conciltions including utilities,rocks,pipes,or saptle tanks. Work necessary as a result of these -,_ work is necessary as a result,—_ k II be billed as an extra. ...,._, , such work will unknown con ens,are the Wooer's res nsiblll and i additional _� Total proposal: $36,460.00 THIRTY SIX THOUSAND FOUR HUNDRED AND FIf79f DOLLARS sumswa UGG-WAlIPAYRIniliasSolt6d. nyunpar sums new n ere a e as Payment is to be made as follows: Due upon completion per mWfh from the date Saki sum Ia due. Ifany installment payment tlua hereunder Is peat due.or if Buyer(Jl-±oalea an axrm chains hereunder.Td-Star may 3ta0 work. _ Respectfully PROPOSAL IS VALID POR 30 PAYS S Submitted WORK MUST START WITHIN 120 DAY John Tarifa,Operations Manager IF WAIVER OF SUSR06ATION IS NEEDED AD03 h TO PROPOSAL _ Gonenal Provisions Any ahemUon a deviation from above speolAratlons,including any such alterations or deviations Involving additional material andldr labor cost will be executed only upon written order for sama,signed by Owner and Tn%Star,and if(here in any charge for such alisratlon or deviation,the additional charge will be added to this Contract. If payment is net made when due,76Star may suspend work on he job ad)such time as all payments due have been made. A failure to make payments from the due date shall be deemed a breach of this Contract. In addition the fdlrwrinrd general provisions apply: 1 All Work small be compleied in a workrnArHike manner and in compliance With all puliding cades and other applicable laws. 2, To the extent required by law all work shall be performed by individuals duly licensed and authohzed to perform said work. 3, rd-Star may at its discretion engage sub.contrseters to perform work hereunder,provided•Trl-Star shall bully pay said subrconlu=lar and in all instances remain reswmsibla for the proper completion of this Contract. 4. TriStar shall fumish Omer appmpnets raleases or wavers of Ilion for all work preformed or materials provided at the time the next periodic payment shall be due. 5. All charge eilars shall be in willing and signed both by Owner and Tri-Star,and shall pe Incorporated in,and become a pad of cols Contract. 6, In the event Owner shall fall to pay any periodic w installment payment due hereunder,Tri-Star may cease work without breach of pending payment or resolution of any dispute. 7. All disputes hereunder shall be resolved by binding arbitration in accordance with the rules of the American Arbitration Assoclat on. The orbitration venue shall be in Palm Desert CoVomia. The prevailing party shall be anti ted to all arbitration and court costs,as well as reasonable ahomeys fees. S. Tri-Star shall not be liable for any delay due to circumstances beyond its control,Including but not Ilmitad to,acts by Omer andlor gonMactnm,acts or God,weather; governmental authority or litigation. It shall also acknowledge that any changes in the plans and specifications made by the owner as well as the contractor, agents,architects,engineers,or govemmant agency which yrill extend or change the scope of work may he charged as an extra under Ihls Contract, a. Tri-Star warrants all work far a period of 12 months fallowing completer. The above prices.Specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. It is understood and agreed that this work is not provided for in any other agreement and no contractual rights arise until this proposal is accepted in writing. Acceptance Date MINUTE ORDER NO. AUTHORIZING THE CITY MANAGER TO AWARD TRADE BID NO. 40 TO CONTRERAS CONSTRUCTION FOR THE AMADO ROAD CROSS GUTTER IN THE AMOUNT OF $30,392 UTILIZING AUTHORITY GRANTED BY RESOLUTION 20766 ON OCTOBER 13, 2003 A I HEREBY CERTIFY that this Minute Order, authorizing the City Manager to award Trade Bid No. 40 to Contreras Construction for the Amado Road Cross Gutter in the Amount of $30,392 utilizing authority granted by Resolution 20766 on October 13, 2003; and authorize the City Manager to execute all necessary documents, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 16'h day of November, 2005. James Thompson City Clerk