City Manager Staff Report
DATE: November 1, 2005
SUBJECT: Amado Road Cross Gutter Installation Trade Contract#40
'TO: David H. Ready, City Manager
FROM: Convention Center Project Team
RECOMMENDATION:
1. It is recommended that City Manager award Trade Bid #40 for Amado Road
Cross Gutter Installation to Contreras Construction for the convention center
project in the amount of $30,392 utilizing authority granted by City Council by
Resolution No. 20766 dated October 15, 2003.
STAFF ANALYSIS:
Under the informal bidding procedures for public construction authorized by Municipal.
Code Section 7.03.030, the Convention Center project team competed the requirement
for Trade Bid 40, Amado Road Cross Gutter Installation.
'Two firms bid on the project as follows:
Contreras Construction $30,392
Tri-Star Construction $36,450
Bids were solicited from three additional trade contractors, but they declined to bid.
'These firms indicated that the project was too small, or that they were too busy with
other projects.
'The City Council, via Resolution No. 20766 dated October 15, 2003, grants authority to
the City Manager to award trade bids under $100,000.
The Project Team recommends the City Manager award Trade Bid 40 to Contreras
Construction in the amount of$30,392.
Item No. 2 . f ` .
City Manager Staff Report
October 31, 2005 -- Page 2
Amado Road Cross Gutter—Trade Contract#40
FISCAL IMPACT: Finance Director Review: r - .�
Funds for this trade contract are available in account 4283-50003 Convention Center,
Phase 2, Building & Equipment Account.
-1
Allen F. Smoot, Project Administrator (,Bruce_I). J hnson
Procurement & Contracting Manager
AWARD APPROVED:
CITY MANAGER
Attachment:: Resolution 20766
October 31, 2005
To: Bruce Johnson
From: Al Smoot
Subject: Amado Cross Gutter- Trade Contract#40
Bruce we have completed our effort to find quotes for the above mentioned Trade Contract.
After our last conversation I reached out to three more firms for quotes, all were evidently to
busy and were not interested in quoting. We did receive:
Contreras $30,392
Tri-Star $36,450
We would like to proceed with the award to Contreras.
Thanks,
Al Snioit�
Project Administrator
Contreras Construction Co. Quotation
General Contractor
DATE August 4, 2005
P.O. Box 1808 Quotation# 1217
Indio, Ca 92202 Customer#
Phone (760) 347-6070 Fax (760) 347-5591
Ship To: Quotation valid until: Open
City of Palm Springs Prepared by. Lupe Perez
Attn: Michael Lytar
3200 E. Tahquitz Canyon Way Project Name : Street Improvements
Palm Springs, Ca 92263
Comments or special instructions: Price includes saw cutting, removals, disposals, grading, and traffic control.
Road to be closed for 4 days. Price excludes permit, compacting test, lay-out , or surveyer.
Description
1. Construct cross gutter per plan atAvenica Caballeros &Amado Rd. Place 3" of
ac pavement over 6" of class II base per plan. 1 LS $ 30,392.00
TOTAL $ 30,392.00
ACCEPTED FOR BUYER CONTRERAS CONSTRUCTION CO.
BY: Approve By:
Henry Contreras
Title Date Title Owner& Partner Date
CONTRERAS CONSTRUCTION CO. All material guaranteed to be as specified.All work to be completed
in a substantial workmanlike manner according to specification
ACCEPTANCE OF PROPOSAL submitted per standard practices.Any alteration or deviation from
The above price,specification and condition are above specification involving extra cost will execute only upon
satisfactory and are hereby accepted.You are written orders,and will become an extra charge over and above
authorized to do work as specified.Payment will the estimate.All agreements contingent upon strike,accidents,or
be made as outline above. delays beyond our control.Owner to carry fire,tornado and other
necessary insurance.Our workers are fully covered by Workers
Compensation Insurance.
When signed by the Buyer and approved by Managing Officer of this Company,this will cons[!lute a fine contract between both parties,hereto,for all labor and For all materials
herein referred to,according to tens and condition.
OOT,11_2005 TUE 10:54 AM FAX N0, 760 251 5458 P. 03
PROPOSAL,
Contracting -Excavation - Grafting
Tri-Star "We dig the Coachella Valley" I �(
15-501LITTLEAfORONGORDAD � r ?��
DESERTH0T SPR.GVGS CA 92240 Proposal Date: October 6,2005 °
Sus:(760)251-5454 Faa:(760)251-5458 Date of plans:
Licansa Nurnber:47551s A") 'TURNER CUI�S7FxUC fl �0.
__._w,, Job Na1111me_PS Convention Center.Pro al Submitted To: Ci of— —___,._.,_...___—.,_.,.�..-....._.--.
Address: Address,:
I Contact Cell#: —.......,..,._--.............._ . .,,. _.._--
_.......—__._.. - --- _a_....,,,_—...w ., —.......,,_.— . ._. —
We hereby submit an estimate for equipment, labor 8 material to:
Cross gutter installation at Amadc $36,460.00
includes removal of AC
replace AC
traffic control
E"als memo
To,E__
Co. PMDBW—I
Exclusions(unless listed above):state,city and Willy permits,inspections,fees,bonding,water,water meter,engineering,surveying,tests,traffic control,
drainage in areas of less than 1%grade. contractor is under no duty to investigate the project site,analyze,compare and/or correct the plans and
specifications. Tri-Star is not responsible for undisclosed site conciltions including utilities,rocks,pipes,or saptle tanks. Work necessary as a result of these
-,_ work is necessary as a result,—_ k II be billed as an extra.
...,._, , such work will
unknown con ens,are the Wooer's res nsiblll and i additional _�
Total proposal: $36,460.00
THIRTY SIX THOUSAND FOUR HUNDRED AND FIf79f DOLLARS
sumswa UGG-WAlIPAYRIniliasSolt6d. nyunpar sums new n ere a e as Payment is to be made as follows: Due upon completion
per mWfh from the date Saki sum Ia due. Ifany installment payment tlua hereunder Is peat
due.or if Buyer(Jl-±oalea an axrm chains hereunder.Td-Star may 3ta0 work. _
Respectfully PROPOSAL IS VALID POR 30 PAYS S
Submitted WORK MUST START WITHIN 120 DAY
John Tarifa,Operations Manager IF WAIVER OF SUSR06ATION IS NEEDED AD03 h TO PROPOSAL _
Gonenal Provisions
Any ahemUon a deviation from above speolAratlons,including any such alterations or deviations Involving additional material andldr labor cost will be executed only
upon written order for sama,signed by Owner and Tn%Star,and if(here in any charge for such alisratlon or deviation,the additional charge will be added to this Contract.
If payment is net made when due,76Star may suspend work on he job ad)such time as all payments due have been made. A failure to make payments from the
due date shall be deemed a breach of this Contract.
In addition the fdlrwrinrd general provisions apply:
1 All Work small be compleied in a workrnArHike manner and in compliance With all puliding cades and other applicable laws.
2, To the extent required by law all work shall be performed by individuals duly licensed and authohzed to perform said work.
3, rd-Star may at its discretion engage sub.contrseters to perform work hereunder,provided•Trl-Star shall bully pay said subrconlu=lar and in all instances remain
reswmsibla for the proper completion of this Contract.
4. TriStar shall fumish Omer appmpnets raleases or wavers of Ilion for all work preformed or materials provided at the time the next periodic payment shall be due.
5. All charge eilars shall be in willing and signed both by Owner and Tri-Star,and shall pe Incorporated in,and become a pad of cols Contract.
6, In the event Owner shall fall to pay any periodic w installment payment due hereunder,Tri-Star may cease work without breach of pending payment or resolution
of any dispute.
7. All disputes hereunder shall be resolved by binding arbitration in accordance with the rules of the American Arbitration Assoclat on. The orbitration venue shall be
in Palm Desert CoVomia. The prevailing party shall be anti ted to all arbitration and court costs,as well as reasonable ahomeys fees.
S. Tri-Star shall not be liable for any delay due to circumstances beyond its control,Including but not Ilmitad to,acts by Omer andlor gonMactnm,acts or God,weather;
governmental authority or litigation. It shall also acknowledge that any changes in the plans and specifications made by the owner as well as the contractor,
agents,architects,engineers,or govemmant agency which yrill extend or change the scope of work may he charged as an extra under Ihls Contract,
a. Tri-Star warrants all work far a period of 12 months fallowing completer.
The above prices.Specifications and conditions are satisfactory and are hereby accepted. You are authorized to
do the work as specified. Payment will be made as outlined above. It is understood and agreed that this work is
not provided for in any other agreement and no contractual rights arise until this proposal is accepted in writing.
Acceptance Date
MINUTE ORDER NO.
AUTHORIZING THE CITY MANAGER TO AWARD
TRADE BID NO. 40 TO CONTRERAS
CONSTRUCTION FOR THE AMADO ROAD
CROSS GUTTER IN THE AMOUNT OF $30,392
UTILIZING AUTHORITY GRANTED BY
RESOLUTION 20766 ON OCTOBER 13, 2003
A
I HEREBY CERTIFY that this Minute Order, authorizing the City Manager to
award Trade Bid No. 40 to Contreras Construction for the Amado Road Cross
Gutter in the Amount of $30,392 utilizing authority granted by Resolution 20766
on October 13, 2003; and authorize the City Manager to execute all necessary
documents, was adopted by the City Council of the City of Palm Springs,
California, in a meeting thereof held on the 16'h day of November, 2005.
James Thompson