Loading...
HomeMy WebLinkAbout4/6/2011 - STAFF REPORTS - 00 (2) Palm Springs City Council Whitewater Groundwater Replenishment CVWD i DWA March r 17ESER7+WATER Purpose of the Project Recharge up to 400,000 acre-feet per year to reduce Upper Whitewater River Subbasin groundwater overdraft Groundwater ■Aquifer(Ak-wuh-fer)-a geologic formation containing groundwater ■ Unconfined&Confined Aquifer Whitewater River Subbasin-30 million acre-feet capacity and currently contains 25 million acre-feet ■ Percolation Rate-2 to 3 feet per day 1 aUuir'pn .o ntl1M.�w� Recharge mLL J1711-1 ,. ti History *1963-CVWD$c DWA Become SWP Contractors But No Direct Connection To SWP *CVWD-23,100acre•feet/year(AFY) * DWA-38,1oo AFY *1967-1983.2oo3-CVWD,DWA&MWD Execute Exchange Agreements *1984-CVWD,DWA&MWD-Advanced Delivery Agreement *2cno-Total SWP Table A Amount=194,100 AFY *CVWD•138,35oAFY * DWA•55r75o AFY Recharge *SWP Reliability&Allocation *Current SWP Reliability-W(was 77%) *Current Allocation-607(wet weather) *Upper Whitewater River Subbasin Status * 2,371,583 AF recharged since 1973 *796,138 AF of cumulative overdraft * 2009-57,024 AF recharged n 2010-228,330 AF recharged Recharge Facilities * Facility Capacity *7oo cubic feet per second(cfs)or 1,390 AFD or 452 million gallons per day * MWD Turnout-4 outlets into Whitewater River Just North of 1-10 a: z-Diversion Channels&z Diversion Structures Recharge Basins * i9 Basins-70z acres-15 acres to 58 acres * Percol2te-2-3feet per day Turn-outWhitewater Recharge Facility {1. s,1 , p, 3 Recharge From 10,000 feet I li I II � USG S Gauging Station-Pre-Storm ° r dr USGS Gaining Station-Post Storm-'lo � P gr 4t�.Airi!`4si�� ip(�rj Monitoring Well Results Thanks : . 5