Loading...
HomeMy WebLinkAbout6/1/2011 - STAFF REPORTS - 2I n�,PALM$40 A. `2 * A 1 ~CO T93 A �'ORATEO c�`'�°RN�P CITY COUNCIL STAFF REPO RT DATE: June 1, 2011 CONSENT AGENDA SUBJECT: AMENDMENT NO. 3 TO AGREEMENT 5348 WITH RS&H CALIFORNIA, INC. FOR AVIATION CONSULTING SERVICES FROM: David H. Ready, City Manager BY: AIRPORT DEPARTMENT SUMMARY This action will provide an amendment to the scope of design work for the airport perimeter security fence project and integrate several additional enhanced security features into the project. RECOMMENDATION: 1. Approve Amendment No. 3 to Agreement 5348 with RS&H California, Inc. for Aviation Consulting Services in the amount of$47,503. 2. Authorize the City Manger to execute all necessary documents STAFF ANALYSIS The Airport's consulting engineer firm RS&H California, Inc. was awarded a contract by City Council last September 2010 for the design of a perimeter security fencing enhancement project at Palm Springs International Airport. Since the commencement of this design phase, schematics have undergone an extensive review by Airport, FAA and the TSA personnel and this process subsequently identified additional elements that need to be incorporated into the project to accomplish the security objectives. These elements are: 1. An additional SIDA Control Gate 2. A state of the art Perimeter Intrusion Detection System 3. Additional CCTV Security Cameras 4. VGSI Survey of certain airfield locations ITEM i;iO-��. City Council Staff Report June 1, 2011 -- Page 2 RSH California, Amendment 3 to A5348 Because these components were not part of the original contract with the design firm RS&H, it will require a contract amendment to integrate these components in the scope and project. The scope of work for these items has been negotiated with very specific tasks and hours and the amount totals $47,503. Item number 2 requires majority of the design effort ($27,320) because it involves the integration of a new, technologically advanced Perimeter Intrusion Detection System. This system will provide the Airport with significantly enhanced monitoring and control of its approximate seven miles of perimeter fence line. Amendment No. 3 was recommended for approval by the Airport Commission at their May 18, 2011 meeting. FISCAL IMPACT The current contract amount for design services is $233,560 and an FAA Airport Improvement Project grant is funding $202,001 (95%). The additional design services will bring the total design for the security fence project to $249,504 and will remain 95% funded by the FAA. The additional non-reimbursable expense from the airport fund for Amendment No. 3 is $2,375. The estimated total construction cost of the security fencing project is about $2 million and the new state of the art PIDS system represents about 20% of the project. Because of the expense of the system, it will intentionally be submitted as an alternate item in the bid to allow for affordability considerations in case the actual bid figures deviate significantly more than projected. Thamas a an Executive Director, Airport David H. Ready, anager Attachment (1) Amendment No. 3 to Agreement 5348 2 AMENDMENT NO. 3 AGREEMENT NO. 5348 —AVIATION CONSULTING SERVICES THIS THIRD AMENDMENT to Agreement No. 5348 for Aviation Consulting Services, (herein "Amendment") made and entered into this day of , 2011, by and between the CITY OF PALM SPRINGS (herein "City") and RS&H California, Inc., (herein "Consultant") is hereby amended effective as follows: RECITALS WHEREAS, City and Consultant entered into that certain Consulting Services Agreement No. 5348 for Aviation Consulting Services ("Agreement"), as duly amended from time to time; and WHEREAS, the parties wish to amend the Agreement to increase work assignments. NOW, THEREFORE, for good and sufficient consideration, the parties agree as follows: 1. Exhibit "A-1" is hereby amended to add the following sub-tasks related to the Perimeter Fence Improvements: a. Perimeter Fence sub-tasks: 1. New SIDA Gate 2. Perimeter Intrusion Detection System 3. Additional Security Cameras 4. VGSI Survey Data 2. Exhibit "C Schedule of Compensation is hereby amended as follows and as detailed on the attached Exhibit "C-1 b: a. New SIDA Gate $12,622 b. Perimeter Intrusion Detection System $27,320 c. Additional Security Cameras $ 5,218 d. VGSI Survey Data $ 2,343 Total = $47,503 3. Exhibit "D" Schedule of Performance will not change with the addition of these sub-tasks. Except as previously modified herein, all other provisions of the Agreement shall remain unmodified in full force and effect. RS&H Amendment 3 3 IN WITNESS WHEREOF, the parties have executed and entered into this Agreement as of the date first written above. ATTEST: CITY OF PALM SPRING a municipal corporation By: By: City Clerk City Manager APPROVED AS TO F RM: By: ity Attorn y ,CONTRACTOR: Check one: Individual Partnership Corporation Corporations require two notarized signatures: One from each of the following: A. Chairman of Board, President,or any Vice President:AND B. Secretary,Assistant Secretary,Treasurer,Assistant Treasurer, or Chief Financial Officer. By: By: Signature(notarized) Signature(notarized) Name: Name: Title: Title: www*ww�ww*wwwww�wwwrww,rwwrrrwwwwwwwwwwwwwwwwwwwrwwwwrrwwwwwwwwwwwwwwwwwwwwwwwwwxwwwwwwwww+*r+wwwwrwwwwwwwww*w,t++ww**rrwwwwww State of State of County of County of On before me, On before me, personally appeared personally appeared who proved to me on the basis of satisfactory who proved to me on basis of satisfactory evidence to be the person(s)whose name(s) evidence to be the person(s)whose name(s) is/are subscribed to the within instrument is/are subscribed to the within instrument and acknowledged to me that he/she/they and acknowledged to me that he/she/they executed the same in his/her/their authorized executed the same in his/her/their authorized capacity(ies),and that by his/her/their capacity(ies),and that by his/her/their signature(s)on the instrument the person(s), signatures(s)on the instrument the person(s) or the entity upon behalf of which the or the entity upon behalf of which the person(s) acted,executed the instrument. person(s)acted,executed the instrument. I certify under PENALTY OF PERJURY I certify under PENALTY OF PERJURY under the laws of the State of California that under the laws of the State of California that the foregoing paragraph is true and correct, the foregoing paragraph is true and correct. WITNESS my hand and official seal. WITNESS my hand and official seal. Notary Signature: Notary Signature: Notary Seal: Notary Seal: RS&H Amendment 3 Exhibit "C-1 b" Schedule of Compensation See Attached RS&H Amendment 3 5 ExhibitC-1bPage1 of4 PALM SPRINGS INTERNATIONAL AIRPORT -Aw � ADDITIONAL SERVICES FEE PROPOSAL IrMPROWN0 YOUR DYOEtW PERIMETER FENCE IMPROVEMENTS&CAPITAL IMPROVEMENT PROGRAM(CIP)DEVELOPMENT PROJECT Pita;cT BR,ELECTI CIVIL SR. CIVIL t•DMN SCOPE/TASK TITLE OFFICER W-MR ELECn UWR ENGMEER III PLANTER ENCINEERI ABET TOTAL BASIC SERVICES New SIDA Gate Task 9.3 60%Design Plans,Specs,Report 1 Fence Installation Plans 1 0.5 1 2 3.5 __L Fence Details 1 0,5 2 1 2 5.5 2 Total Drawings Technical S fication 0.5 1 2 3.5 Engineers Report 0.5 1 2 3.5 Quantities and Cost Estimate 1 1 Task 10.2 90%Design Plans,Specs,Report 1 Fence Installation Plans(1). 0.5 1 2 3.5 1 Fence Details 1 0.5 2 1 2 5.5 2 Total Drawings Technical Specification 0.5 1 2 3.5 Engineers Report 0.5 0.5 1 2 Quantities and Cost Estimate 1 1 Task 11.2 100% Bid Set Design Plans,Specs,Report 1 Fence Installation Plans 1 0.5 1 2 3.5 1 Fence Details 1 0.5 2 1 2 5.5 2 Total Drawings Technical S ecihcation 0.5 1 2 3.5 Engineers Re ort 0.5 1 0.5 1 2 Quantities and Cost Estimate I 1 1 Task 12.4 Conformed Documents 0.5 1 1 2 3.5 Task 13.1 Construction Administration 1 2 3 Task 13.2 Part Time Resident Project Representative 20 20 10 hrsAveek x 2 weeks Task 13.3 Record Drawings and Pro ect Closeout 0.5 1 2 3.5 TOTAL HOURS 0 8 6 35 0 29 0 78 RATE $82.00 $65.00 $63.00 $42.00 $62.00 $29.00 1 $20.00 $41.14 TOTAL DIRECT LABOR$ $0 $52.0 $378 1 $1 470 $0 $841 $0 $3 209 OVERHEAD0 182.59% $5 859 PROFIT @ 12.0% $1 088 TOTAL BURDENED LABOR 3.17 $10 157 OTHER DIRECT NON-SALARY COSTS Plans Specs Reports REPRODUCTION $1.00 $0.50 $0.50 #SETS 60%Plans Specs&Reports 2 10 1 3 $23 90%Plans Specs&Reports 2 10 1 4 $30 100%Plans S cs&Rep2rts 2 10 1 11 $83 Conformed Plans&Specs 2 10 9 $63 Construction Phase Plans&Specs 2 10 11 $77 TOTAL REPRODUCTION $135 TRAVEL Task 13.2 Resident Pro ect Representative 2 trips @$0.50/mile x 50 miles $60 SUBCONSULTANTS Task 9.1 SURVEY(RBF) $2 Y80 2 280 TOTAL ODC's $2,465 Total Proposed Fee for: New SIDA Gate $12,622 6 1 Exhibit C-1 b Page 2 of 4 R80 PALM SPRINGS INTERNATIONAL AIRPORT ADDITIONAL SERVICES FEE PROPOSAL 1/1WROWNG rouR wOR1.0 PERIMETER FENCE IMPROVEMENTS&CAPITAL IMPROVEMENT PROGRAM(CIP)DEVELOPMENT PROJECT w ECT I SR.EIELTI -k SR. CIVIL ACMIN SCOPE/TASK TITLE OFFICER I.IAn�OER EUGTi EN R EM".MEER IN PVfa{R ENOMIEERI MST TOTAL Perimeter Intrusion Detection System Task 9.3 60%Design Plans Specs,Report Site Visit 8 16 24 1 Location Plan 0.5 4 8 12.5 1 Site Plans 0.5 4 8 12.5 2 Utilit Plans 1 4 8 13 2 Details 1 4 8 13 6 Total Drawin s Technical Specificetion 1 q 5 Engineers Report 1 4 5 Quantities and Cost Estimate 0.5 1 2. 3.5 Task 9.4 60%Quality Review 2 2 Task 10.2 90%Design Plans,Specs,Report 1 Location Plan 0.5 2 4 6.5 1 Site Plans 0.5 2 4 6.5 2 Utility Plans 0.5 2 4 6.5 2 Details 0.5 2 4 6.5 6 Total Drawings Technical Specification 0.5 2 2.5 Engineers Report 0,5 2 2 5 Quantities and Cost Estimate 0.5 1 2 3.5 Task 10.3 Quality Review 2 2 Task 11.2 100% Bid Set Design Plans,Specs,Report 1 Location Plan 0.5 2 4 6.5 1 Site Plans 0.5 2 4 6.6 2 Utility Plans 0.5 2 4 6.5 2 Details 0.5 2 4 6.5 6 Total Drawings Technical Specification 0.5 2 2.5 Quantities and Cost Estimate 0.5 1 2 3.5 Task 11.3 Final Engineers Report 0,5 2 2.5 Task 11.4 Quality Review 2 2 Task 12.4 Conformed Documents 0.5 1 2 3.5 Task 13.1 Construction Administration 1 2 4 7 Task 13.3 Record Drawings and Project Closeout 0.5 1 2 3.5 TOTAL HOURS 6 22.5 55 0 0 94 0 1 178 RATE $82.00 $65.00 1 $63.00 $42.00 $62,00 $29,00 $20.00 $45.89 TOTAL DIRECT LABOR$ $492 $1 463 1 $3 465 $0 $0 $2 726 $0 $8 146 OVERHEAD 182.59% $14 873 PROFIT @ 12.0% $2 762 TOTAL BURDENED LABOR 0 3.17 $25,781 OTHER DIRECT NON-SALARY COSTS Plans Secs Reports REPRODUCTION $1.00 $0.50 $0.50 #SETS 60%Plans Secs&Report 5 10 1 3 $32 90%Plans Specs&Reports 5 10 1 4 $42 100%Plans Specs&Reports 5 10 1 11 $116 Conformed Plans&S ecs 5 10 9 $90 Construction Phase Plans&Secs 5 10 11 $110 TOTAL REPRODUCTION $389 TRAVEL Air Car Hotel @ Meals #People #Days $400 $150 $150 $75 Task 9.3 Site Visit 1 2 $400 $300 $300 $150 $1 150 $1 150 TOTAL ODC's $1 539 Total Proposed Fee for: Perimeter Intrusion Detection S tem $27,320 2 7 Cdurum%, iurdyeauiv RSW PALM SPRINGS INTERNATIONAL AIRPORT ADDITIONAL SERVICES FEE PROPOSAL IMPROVING YOUR WORLD PERIMETER FENCE IMPROVEMENTS&CAPITAL IMPROVEMENT PROGRAM(CIP)DEVELOPMENT PROJECT PRQrtLr SR E 2 gR p H . ER ET•E SCOPE/TASK TITLE PtANWA /SST TOTAL Additional Security Cameras Task 9.3 60%Design Plans,Specs,Report 1 Security Camera Site Plan 1 4 4 9 1 Total Drawings Task 10.2 90%Desi n Plans,Specs,Report 1 Security Camera Site Plan 0.5 4 4 8.5 1 Total Drawings Task 11.2 100%Design Plans,Specs,Report 1 ISecurity Camera Site Plan 0.5 4 4 8.5 1 Total Drawings Task 12.4 Conformed Documents 1 Security Camera Site Plan 1 2 3 1 Total Dramas Task 13.1 Construction Administration 1 2 3 Task 13.3 Record Drawings and Project Closeout 0.5 1 2 3.5 TOTAL HOURS 0 3.5 13 3 0 18 0 36 RATE $82.00 $65.00 $63.00 $42.00 $62,00 $29,00 $20.00 $46,10 TOTAL DIRECT LABOR$ $0 $228 $819 $126 $0 $464 $0 $1,637 OVERHEAD 0 182-59% $2 988 PROFIT @ 12.0% $555 TOTAL BURDENED LABOR a 3-171 $5 180 OTHER DIRECT NON-SALARY COSTS Plans Soecs Re rts REPRODUCTION $1.00 $0.50 $0.50 #SETS 60%Plans Speas&Reports 1 3 $3 90%Plans Specs&Reports 1 4 $4 100%Plans Specs&Repqrts 1 11 $11 Conformed Plans&Specs 1 9 $9 Construction Phase Plans&S ers 1 11 $11 TOTAL REPRODUCTION $38 TOTAL ODC's $38 Total Proposed Fee for: Additional Security Cameras $6 218 3 8 CAIOUR� iuraysNulN PALM SPRINGS INTERNATIONAL AIRPORT RSN, AOOITIONAL SERVICES FEE PROPOSAL !MPROVCAIG YOUR WORLD PERIMETER FENCE IMPROVEMENTS&CAPITAL IMPROVEMENT PROGRAM(CIP)DEVELOPMENT PRO.IECT PROJECT S.EUCT/ CWIL GR. CWK IpNN SCOPE/TASK TITLE ItER NMJ+�e ELECT+ENCR ENGINEER NI PUHNER ENI.REERI J T TOTAL VLSI Data VGSI Form and Calculations 2 4 6 TOTAL HOURS 0 2 0 4 0 0 0 6 RATE $82.00 $65.00 $63.00 $42.00 $62.00 $29.00 $20.00 $49.67 TOTAL DIRECT LABOR$ $0 $130 $p $168 $0 $0 $0 $298 OVERHEAD @ 182,59% $544 PROFIT @ 12.0% $101 TOTAL BURDENED LABOR 0 3.17 $943 OTHER DIRECT NON-SALARY COSTS Plans SDecs Reports REPRODUCTION $1,00 $0.50 $0.50 #SETS $0 0 $0 $0 $0 TOTAL REPRODUCTION $0 SUBCONSULTANTS Task 9.1 SURVEY RBF 1 400 $1 400 TOTAL ODC's $1,400 Total Proposed Fee for: VGSI Data $2,343 4