SUMMARY
Federal Aviation Administration (FAA) has made approximately $7,500,000 in
discretionary funding available to the Airport for airfield improvements. To receive this
funding, project bids must be forwarded to the FAA by July 31, 2006. In order to meet
the compressed time schedule, the Airport is recommending Amendment No. 8 to the
VSA Airport Agreement. Amendment No. 8 will provide for design and engineering
services for airfield pavement rehabilitation and lighting projects. The airfield pavement
rehabilitation and lighting replacement will be accomplished in the later part of 2006.
The cost of $920,000 (minus the local share of 5% or $46,000) is eligible for FAA
funding when the grant is issued in the later part of August 2006.
Therefore, a budget amendment of $920,000, representing the total amount of
Amendment No. 8 is requested to be transferred from the Airport Fund's Retained
Earnings Account to Airport account No. 6400-XX-XXX so that the design and
engineering work can begin immediately. When FAA reimburses 95% of Amendment
No. 8 ($874,000) those funds will then be transferred back into the Airport Fund's
Retained Earnings Account.
RECOMMENDATION:
1. Approve Minute Order No. authorizing Amendment No. 8 to Agreement
No. A-4487 with VSA Airports, Inc. to provide design and engineering services
for airfield pavement rehabilitation projects in the amount of $920,000, FAA AIP
Project No. 3-06-0181-40.
2. Approve Resolution No. of the City Council of the City of Palm Springs,
California, amending the budget for fiscal year 2005-2006.
3. Authorize the City Manager to execute all necessary documents.
Item No. G . O .
City Council Staff Report
March 1, 2006 -- Page 2
Amendment No. 9—VSA Airports, Inc.
STAFF ANALYSIS:
In accordance with our pavement maintenance program, certain airfield aircraft
operating pavements require rehabilitation; taxiway lights and cabling require
replacement and the operating safety areas of Runway 13L/31 R require modifying.
The $7,500,000 in funding that will be available for the Airport in August will fund the
engineering, design and construction of taxiway C, A and B rehabilitation, and
replacement of current taxiway edge lights with LED lighting that will allow the Airport
substantial power savings. This funding will also fund the replacement of a section of
underground cabling, that will also save the Airport's power consumption, and
modification of Runway 13L/31R safety areas — this being a requirement of the FAA
Airport Inspector. The bids based upon design are due to the FAA no later than 31 July
2006, therefore the design work must be started as soon as possible to meet this
deadline.
FISCAL IMPACT:
There are sufficient funds in the Airport Fund's Retain Earnings Account 29302 to cover
this transfer.
Craig Graves — Finance Director
lQ-X ..✓,� 6P,�
AA
Richard-S.-Walsh, A.A.e' EEDirector of Aviation Tro Butzlaff, Ts nt City Manager
David H. Ready,c anager
Attachment:
Amendment No. 8 to the VSA Agreement
MINUTE ORDER NO,
AUTHORIZING AMENDMENT NO. 8 TO VSA AIRPORT AGREEMENT
NO.A4487 TO PROVIDE AIRPORT DESIGN AND ENGINEERING SERVICES
FOR AIRFIELD PAVEMENT REHABILITATION PROJECTS IN THE AMOUNT
OF $920,000, FAA AIP PROJECT NO. 3-06-0181-40.
1 HEREBY CERTIFY that this Minute Order, authorizing Amendment No. 8 to
Agreement No. A-4487 with VSA Airports, Inc. to provide design and engineering
services for airfield pavement rehabilitation projects in the amount of $920,000,
FAA AIP Project No. 3-06-0181-40, was approved by the City Council of the City
of Palm Springs, California, in a meeting thereof held on the 1st day of March,
2006.
JAMES THOMPSON
City Clerk
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF PALM SPRINGS, CALIFORNIA,
AMENDING THE BUDGET FOR FISCAL YEAR
2005-2006
WHEREAS, Resolution 21283 approving the budget for the fiscal year 2005-06
was adopted on June 8, 2005; and
WHEREAS the City Manager has recommended, and the City Council desires to
approve, certain amendments to said budget.
THE CITY COUNCIL OF THE CITY OF PALM SPRINGS DOES HEREBY
RESOLVE AS FOLLOWS:
SECTION 1. ADDITIONS
Fund Activity Account Amount
415 Airport 6400 Airport XX-XXX AIP 40 $920,000
Development
Purpose: To amend FY 2005-06 budget
SECTION 2. SOURCE
Fund Activity Account Amount
415 Airport N/A 29302 Retained $920,000
Earnings
ADOPTED THIS 1st day of March 2006.
David H. Ready, City Manager
ATTEST:
James Thompson, City Clerk
Resolution No.
Page 2
CERTIFICATION
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.
CITY OF PALM SPRINGS )
I, JAMES THOMPSON, City Clerk of the City of Palm Springs, hereby certify that
Resolution No. is a full, true and correct copy, and was duly adopted at a
regular meeting of the City Council of the City of Palm Springs on March 1, 2006,
by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
James Thompson, City Clerk
City of Palm Springs, California
t
AMENDMENT #8
AGREEMENT NO. 4487, AIRPORT ENGINEERING SERVICES
THIS EIGHTH AMENDMENT TO AGREEMENT NO. 4487 FOR CONTRACT
SERVICES, (herein "Amendment") is made and entered into on the _ day of
2006, by and between the CITY OF PALM SPRINGS (herein "City') and VSA AIRPORTS, Inc.
(herein "Contractor"). (The term Contractor includes professionals performing in a consulting
capacity.), is hereby effective _, 2006 as follows:
RECITALS
A. The City and Contractor entered into that certain Contract Services Agreement No. 4487
fDr Airport Engineering Services ("Agreement"), as duly amended from time to time.
B. The parties wish to amend the Agreement pursuant to the terms of this Amendment to
add additional services to be performed by Contractor and increase the Contract Sum to
authorize payment for such additional services.
NOW, THEREFORE, the parties hereto agree as follows:
Section 1: Section 2.1 of the Agreement entitled "Contract Sum" shall be amended as to the
reference to the Contract Sum to include the fees added with this Amendment, as described in
the revision to Exhibit "C" below (for $920,000.00), so that the revised Contract Sum shall read
"Three Million Five Hundred Twenty Thousand and 00/100 Dollars ($3,520,000.00)", with all
other provisions of Section 2.1 remaining unmodified and in full force and effect.
Section 3: Exhibit "A" Scope of Services, Part V — Project Specific Scopes, is hereby
amended by adding Project No. 9, with all other provisions of Exhibit "A" remaining unmodified
and in full force and effect:
Project# Project Title/Description Task Assignments*
9 Construct Miscellaneous Taxiway Improvements
a. Runway °13L/31 R" Safety Improvements C, G, K
b. Taxiways "A", "B" Pavement Rehabilitation C, D, G, K
c. Taxiway "C" Pavement Rehabilitation C, D, G, K
d. Taxiway Lighting Conversion to L.E.D. Lights A, G, K
*tasks as defined in the original contract
Section 4: Exhibit "C" Schedule of Compensation, Part II — Project Specific
Compensations is hereby amended by adding Project No. 9a, 9b, 9c, and 9d with all other
provisions of Exhibit"C" remaining unmodified and in full force and effect:
Project# Project Title/Description Compensation(Not To Exceed)
9 Construct Miscellaneous Taxiway Improvements
a. RM 13L/31 R" Safety Improvements $45,000.00
b. Taxiways "A", "B" Pavement Rehabilitation $165,000.00
c. Taxiway "C" Pavement Rehabilitation $685,000.00
d. Taxiway Lighting Conversion to L.E.D. Lights (all taxiways) $25,000.00
(Exhibit C-1 Breakdown attached)
VSA AIRPORTS,Inc.,Agreement 4487,Amendment#8 5�r1"0 tl�
Section 5: Exhibit "D" Schedule of Performance is hereby amended by adding the dates for
Project No. 9, with all other provisions of Exhibit "D" remaining unmodified and in full force and
effect:
Project# Project Title/Description Commence Complete
9 Construct Miscellaneous Taxiway Improvements
a. RNV 13Li31 R" Safety Improvements March , 2006 March 31, 2007
b. Taxiways "A", "B" Pavement Rehabilitation March , 2006 March 31, 2007
c. Taxiway "C" Pavement Rehabilitation March , 2006 March 31, 2007
d. Taxiway Lighting Conversion to L.E.D. Lights March , 2006 March 31, 2007
Section 6: Full Force and Effect. Except as expressly modified herein all other provisions of the
Agreement shall remain unmodified and in full force and effect.
Section 7: Corporate Authority. The persons executing this Amendment on behalf of the
parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly
authorized to execute and deliver this Amendment on behalf of said part, (iii) by so executing
this Amendment, such party is formally bound to the provisions of this Amendment, and (iv) the
entering into this Amendment does not violate any provision of any other agreement to which
said party is bound.
(Signature Page Follows)
VSA AIRPORTS,Inc.,Agreement 4487,Amendment#8 2' ,_ �
r ,
IN WITNESS WHEREOF, the parties have executed and entered into this Agreement as of the date first
written above.
ATTEST: CITY OF PALM SPRING
a municipal corporation
By: By:
City Clerk City Manager
APPROVED AS TO FORM:
Ely:
City Attorney
CONTRACTOR: Check one: _Individual ,Partnership_Corporation
Corporations require two notarized signatures: One from each of the following: A. Chairman of Board,
President, or a Vice President:AND B. Secretary, Assistant Secretary, Treasurer, Assistant Treasurer,
or Chief Fin ci Officer
� . >
e (notarized) / Signature (notarized)
Name: o k Name: . ,)C�� �� /-✓-�fl
Title: f��`��" t Title: ,:S --c'i+z 7fki"t,/
State of Cc, V �v+-h t u State of C.o%/-a
o
County of Q i Vc'�S r`d e County of lrao o, y�
On,, before me,Qrxr (( q On-before me,
personally appeared Ki'txfioy Skeri personally appeared
perseaaity known fn�(proved to me on personally known to me (or proved to me on
the basis of satisfactory evidence) to be the the basis of satisfactory evidence) to be the
person(gwhose name0 is/M&subscribed person(s) whose name(s) is/are subscribed
to the within instrument and acknowledged to the within instrument and acknowledged
to me thhgfsheAhey executed the same to me that he/she/they executed the same
s/in r authorized capacity(i")�and in his/her/their authorized capacity(ies), and
that by NSF iegtheir signaturesP4,on the that by his/her/their signatures(s) on the
instrument the person( or entity upon instrument the person(s), or entity upon
behalf of which the personKacted, behalf of which the person(s) acted,
executed the instrument. executed the instrument.
WITNESS my han and official seal. / %�/� WITNESS my hand and official seal.
Notary Signature: C �yl/1 (�1//GL//jd�� Notary SignatuF _` C` Jali
Notary Seal: Notary Seal:
(}� SARRAH K.WALTON
Commission#1532125
zz` "y"ee _ Notary Public•California .
� San Bernardino County
My Comm.Expires Dec 5,2008
VSA AIRPORTS,Inc.,Agreement 4487,Amendment$8 $
Amendment#8
Agreement No. 4487,Airport Engineering Services
Exhibit C-1
Compensation Table
Task Project
Project Description Task Type Amount Amount
9a R/W "13U31R" Safety Improvements C Fixed Fee 8,000.00
G.A. R/W move Hold Lines to FAA Standard Distance G Fixed Fee 27,000.00
from R/W CL, Move Signs and RGLs; Install In-Pavement K T&E 1.) 10,000.00
RGLs; Return Markings (CL, edge radii) to original position 45,000.00
9b Taxiways W', "B" Pavement Rehabilitation C Fixed Fee 20,000.00
3-inch (AC20R) overlay from Ramp to R/W"31L"H.L. D Fixed Fee 15,000.00
Grind, pave, markings, adjust signs and lights, G Fixed Fee 90,000.00
in-fill and grade rock areas K T&E 1.) 40,000.00
165,000.00
9c Taxiway "C" Pavement Rehabilitation C Fixed Fee 32,000.00
3-inch (AC20R) overlay from TWA to W" D Fixed Fee 35,000.00
Grind, pave, markings, adjust signs and lights, G Fixed Fee 428,000.00
rewire the south circuit, in-fill and grade rock areas K T&E 1.) 190,000.00
685,000.00
9d Taxiway Lighting Conversion to L.E.D. Lights(all taxiways) A Fixed Fee 5,000.00
Convert all Taxiway Lights to LED G Fixed Fee 10,000.00
K T&E 1.) 10,000.00
25,000,00
1.) Time& Expense-Not To Exceed