Loading...
HomeMy WebLinkAbout2006-04-05 STAFF REPORTS 2P OtQNLM S,p10 i2 u m CgOFORN'% City Council Staff Report DATE: April 5, 2005 CONSENT AGENDA SUBJECT: APPROVE AMENDMENT NO. 1 TO AGREEMENT NO. A-5167, WITH SOUTHERN CALIFORNIA SOILS & TESTING, INC. TO PROVIDE ADDITIONAL CONSTRUCTION MATERIAL TESTING FOR THE EXPAND TERMINAL/SECURITY CHECKPOINT CITY PROJECT CP2005-01 AND REQUIRED MATERIAL TESTING FOR EXPANSION/HOLDROOM CITY PROJECT 2005-10 (AIP 3-06-0181-37 AND 38). FROM: David H. Ready BY: Aviation Department SUMMARY Recommend City Council approve Amendment No. 1 with Southern California Soils & Testing to provide additional material testing services for the Expand Terminal/Security Checkpoint project and the required material testing services during the construction of the new Regional Terminal Holdroom. RECOMMENDATION: 1. Approve Minute Order No. to approve Amendment No. 1 to Southern California Soils & Testing to for additional materials testing for the Expand Terminal/Security Checkpoint City Project CP2005-01 and the required materials testing services for the Expand Term inal/Hold room City Project No. CP2005-10 in the amount of $99,365. 2. Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS: Due to unknown conditions, difficulties of integrating a new structure with the existing terminal building and scheduling changes caused by the general contractor during the construction of the Security Checkpoint, an additional amount of material testing was required. Material testing will also be required throughout the course of the Regional Holdroom construction period. It is recommended that Amendment No. 1 to Southern Item No. 2 . r . City Council Staff Report (April 5, 2006) -- Page 2 (SoCal Amendment No. 1) California Soils & Testing's existing contract be approved in the amount of$99,365 to include this additional work. At its regularly scheduled meeting on April 5, 2006, the Airport Commission voted to recommend to the City Council to approve Amendment No. 1. FISCAL IMPACT: V '� The testing will be funded through the two 95% FAA Airport Improvement Grants during fiscal years 2005 through 2008. The local portion (5%) has been budgeted and will be paid from the Airport's general fund. Richard S. Walsh, A.A.E.,gDirector of Aviation David H. Ready,,,Git anager Attachments: Mlinute Order Amendment No. 1 MINUTE ORDER NO. AUTHORIZING AMENDMENT NO. 1 TO AGREEMENT NO. A-5167, WITH SOUTHERN CALIFORNIA SOILS & TESTING, INC. TO PROVIDE ADDITIONAL CONSTRUCTION MATERIALS TESTING FOR THE EXPAND TERMINAL/ SECURITY CHECKPOINT CITY PROJECT NO. 2005-01(AIP 3-06-0181-37 AND 38) AND REQUIRED MATERIALS TESTING FOR EXPAND TERMI NAL/HOLD ROOM CITY PROJECT 2005-10 (AIP 3-06-0181-38) IN THE AMOUNT OF $99,365. I HEREBY CERTIFY that this Minute Order, authorizing Amendment No. 1 to Agreement No. A-5167, with Southern California Soils & Testing, Inc. to provide additional construction materials testing for the Expand Terminal/Security Checkpoint City Project No. 2005-01 (AIP 3-06-0181-37 and 38) and required materials testing for the Expand Terminal/Hold room City Project No. 2005-10 (AIP 3-06-0181-38) in the amount of$99,365 was approved by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 5th day of April, 2006. JAMES THOMPSON City Clerk AMENDMENT NO. 1 AGREEMENT NO 5167—SPECIAL TESTING& INSPECTION SERVICES THIS FIRST AMENDMENT to Agreement No. 5167 for contract services, (herein "Amendment")made and entered into on the day of 200_, by and between the CITY OF PALM SPRINGS (herein "City") and SOUTHERN CALIFORNIA SOIL&TESTING, INC. (herein"CONSULTANT")is hereby amended effective as follows: RECITALS The City and Consultant entered into that certain Contract Services Agreement No 5167 for Special Testing& Inspection Services("Agreement"), as duly amended from time to time. The parties wish to amend the Agreement pursuant to the terms of this Amendment to add additional services to be performed by the Consultant and increase the Contract Sum to authorize payment for such additional services. NOW, THEREFORE,the parties hereto agree as follows: Section I Exhibit"A"Scone of Services, is hereby amended by adding the attachments `A' and `13' defining the additional work included in this amendment.Attachment`A' is additional services for City Project 2005-01 and Attachment'13' is the scope of services for City Project 2005-10. Section 2 Compensation: 2.1. Contract Sum—The contract sum is amended to reflect total compensation for initial agreement amount($23,500), Change Order#1 ($11,540)and the additional amounts for Attachment 'A' ($26,404), Attachment `13' ($72,961).New contract amount is NTE$134,405.00 Exhibit"C"Schedule of Compensation,is amended by adding the following: • Attachment `A' (Security Checkpoint)shall be a lump sum, not to exceed $26,404. Actual compensation shall be based on hours worked times the hourly rate(see Exhibit C),but not exceeding the$26,404. Consultant shall submit invoices monthly based on the actual number of hours worked in completion of Work for reimbursement. s Attachment `13' (Passenger Holdroom)shall be a lump sum, not to exceed $72,961. Actual compensation shall be based on hours worked times the hourly rate(see Exhibit C), but not exceeding the$72,961. Consultant shall submit invoices monthly based on the actual number of hours worked in completion of Work for reimbursement. Section 3 Exhibit"D"Schedule of Performance, is amended by adding the following: 1. Work performed for Exhibit `A' will be conducted NLT 1 March 2006. 2. Work performed for Exhibit `B' will be conducted between the months 1 May 2006 and I May 2007. Progress payments shall be made as invoiced by the Consultant and shall be based on the actual work completed for services provided during the billing cycle. Section 4 1. Full Force and Effect. Except as previously modified herein, all other provisions of the Agreement shall remain unmodified in full force and effect. Section 5 Corporate Authority. The persons executing this Amendment on behalf of the parties hereto warrant that(i)such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Amendment on behalf of said party, (iii)by so executing this Amendment, such party is formally bound to the provisions of this Amendment, and(iv)the entering into this Amendment does not violate any provision of any other agreement to which said party is bound. SIGNATURES ON NEXT PAGE IN WITNESS WHEREOF,the parties have executed and entered into this Agreement as of the date first written above. CITY OF PALM SPRINGS ATTEST: a municipal corporation By: _ By: City Clerk City Manager APPROVED AS TO FORM: By: City Attorney CONSULTANT: Southern California Soil&Testing Inc.Check one:_Individual_Partnership ecorporation 83-740 Citrus Avenue,Suite G Indio,CA 92201 Corporations require two notarized signatures: One from each of the following. A. Chairman of Board, Presidenk or any Vice President:AND B.Secretary,Assistant Secretary,Treasurer,Assistant Treasurer,or Chief Financial Olicer). t _ __� } signature(notariz, d) Signature(notarized) Name: f?3"i.r3rtrE'u7 'i�s.� Name: + 9.2rCJ t�„�,�.*d.3r'1 ` � 4z � Title: -"'�i'c f d?�yJc� Title: ir.lD ^ pr-f a4•-T^wa^,.,�#.1C.s ,�{� _ Address:�/(.'1-774 �-yti'�"R-LES //t,IC �--1",- Address: �a'..`-7'K I�( 'S Au -a ( at `T �L,`2:� � �1-/I""tnJ�Lc'1 I b`.�4,r 1404,-V,A '?Z4 13/ Stale of AuFO,eruA State of (�AC19"IA County of c5A 1))66 0 Is County of AAI/5660 ss h 1�M�erpc m �✓anrFlE/ L fyj 4s-C 'A"°� /�it eCNz�fxf�me.%NA >ak1EA.(81r0rjj Y4 ' OZAA146L1C personaly appeared NoW ti) /CATZ personally appeared (`�(,)A.0 e /Z4,504A-5 personally known to me personally known to me f -eywexce)to be the persons;whose nameF()isA r subscribed to the -evidenm)to be the personNwhose name74 is/nr,subscribed to the within instrument and acknowledged to me that he/ahe/they within instrument and acknowledged to me that hGaMkMy executed the same in his/Mer/theiraulhorized capacity(hmL and that executed the same in his/herltMir audronzed capacaytim),and that by hisPo*49iek signature@),on the instrument the persontsL or the by his/her/their signamroN on the instrument the personts),or the entity upon behalf of which the personN acted, executed the entity upon behalf of which the person( acted, executed the instrument. instrument. WITNESS my hand and off ial al. WITNESS my hand and offim cal. Notary Signature: Notary Signature: Notary Seal: Notary Seal: TINA MA 11 A,C.BARC��Y�r MINA MARIE A.C.BARCIAY (} cot vaatitzloi U Cott d'ta12101 (j- _ NOTARY PUBUCCAUFORNIAD (tf NOTARY PUBLIC-CAl1tORNUp 2 SACRAMENTO COUNTY I7 SACRAMENTO COUNTY 0 k COMM I�CP.MAY ib.2007 + COMM.EXP.MAY IG,2007� ATTACHMENT `A' SECURITY CHECKPOINT Special Inspection by SCS&T(Includes $75 per hour 270 hours inspection of the following items): reinforcing steel; structural and site concrete placement; reinforced masonry, mortar and grout placement; structural steel, steel joists, metal decking, clod formed metal framing, metal fabrications, and field welding, high-strength bolting;fireproofing; bolts and embeds; and mechanical connectors . Special Inspection by Simon and Wong: Bolts in concrete (Drilled anchors, i.e. Epoxy ad Expansion Anchors) Geotechnical Services $75 per hour 20 hours Compressive Strength of Concrete $21 per cylinder 10 cylinders Compressive Strength of Grout $21 per cylinder 20 cylinders Interim Verification of Special Inspection Report $512 2 added Report (for COO) Project Engineer I Project Manager $150 per hour 20 hours Added Costs for Special Inspection and Materials Testing (Security Checkpoint) $26,404.00 ATTACHMENT `B' PASSENGER HOLDROOM Materials Engineering Special Inspection $75 per hour 270 hours Services (Includes inspection of the following items): reinforcing steel; structural and site concrete placement; reinforced masonry, mortar and grout placement; structural steel, steel joists, metal decking, clod formed metal framing, metal fabrications, and field welding, high-strength bolting; fireproofing; bolts and embeds; and mechanical connectors. Materials Engineering professional Staff services includes: Project management— $150 per hour 12 hours Principle Engineer Client meetings $75 per hour 4 hours Materials Engineering plan review and reports includes: Concrete mix design $150 per review 3 reviews Final report $500 per repo 1 report Materials Engineering Laboratory testing includes: Tension proof load on anchors and dowels $75 per test 8 tests Base plate grout compression tests $21 per test 6 tests Concrete cylinder compression tests $21 per test 27 tests Grout prism compression tests $21 per test 12 tests Mortar cylinder compression tests $21 per test 12 tests Masonry prism compression tests $124 per test 6 tests Fireproofing density/cohesion tests $50 per test 12 tests Bolt assembly—hardness test $25 per test 8 tests Bollt assembly—tensile test $25 pertest 8 tests Geotechnical Field Technician Services $75 per hour 48 hours includes inspection and testing of grading, utility trench, and subgrade/base. Geotechnical Professional Staff includes: Site observation $92 per hour 2 hours Grading observation $92 per hour 2 hours Footing observation $92 per hour 2 hours Protect management $150 per hour 4 hours Pre-grade meeting $150 per meeting 1 Meeting Geotechnical plan review and reports includes: Plan review grading and foundations $450 1 report Grading report $1,000 1 report Site improvement report $500 1 report Final letter- Geotechnical $150 1 letter Geotechnical Laboratory Testing includes: Maximum density test(Method A) $158 1 test Maximum density test(Method C) $175 1 test Resistance value $230 2 tests Added Costs for Special Inspection and Materials Testing (Passenger Holdroom) $72,961.00