HomeMy WebLinkAbout6/6/2012 - STAFF REPORTS - 2.G. PALM SA�- City of Palm Springs
Department of Public Works and Engineering
3200 E.Tahquitz Canyon Way • Palm Springs,California 92262
* ' Tel: (760)323-8253 • Fax:(760) 322-8360 • Web: www.palmspringsca.gov
°Qti
May 9, 2012 M4y l
Ms. Theresia Trevino
Chief Financial Officer
Riverside County Transportation Commission
4080 Lemon Street, 3`d Floor
Riverside, CA 92502-22083
Re: Fiscal Year 2013-2017, 5-Year Measure "A" Local Street& Road Program
Proposed City of Palm Springs Annual 5-Year Measure "A" Plan
(Fiscal Year 2012/2013 - 201612017)
Dear Ms. Trevino:
Enclosed, at RCTC's request, is the City's proposed Local Measure "A" (Local Streets & Roads)
5-year Plan for Fiscal Year 2012/2013 through 2016/2017.
The 2013-2017 Plan includes projects carried overfrom the current Fiscal Year 2011/2012 to Fiscal
Year 2012/2013. If you have any questions, please call me at (760) 323-8253, extension 8732.
Sincerely,4w
David J. Barakian
Director of Public Works/City Engineer
enc
cc: David H. Ready, City Manager
Tom KriIson,Assistant City Manager
Geoffrey Kiehl, Director of Finance/Treasurer
Nancy Klukan,Asst. Director of Finance
Marcus Fuller,Asst. Director of Public Works/Asst. City Engineer
ITEM NO.
Post Office Box 2743 • Palm Springs, California 92263-2743
RIVERSIDE COUNTY TRANSPORTATION COMMISSION
MEASURE "A" LOCAL FUNDS PROGRAM
Agency: City of Palm Springs
Prepared by: David J. Barakian, Director of Public Works/City Engineer
(by Marcus L. Fuller, Assistant Director of Public Works/Assistant City Engineer)
Date t May 8, 2012
Fiscal Year 2013-2017, 5-Year Measure "A" Local Street & Roads Program
Fiscal Year 2011/2012 continued to 2012/2013
ITEM TOTAL MEASURE "A"
NO. PROJECT NAME/LIMITS PROJECT TYPE COST FUNDS
1. Bridge Repairs Bridge Maintenance $204,042 $204,042
Belardo Road Bridge Roadway and Bridge Construction $4,400,000 $252,073
3. Indian Canyon Drive Widening Roadway and Bridge Widening $21,250,000 $445,032
(UPRR to Garnet Ave including UPRR Bridge Widening)
4. Gene Autry Trail/1-10 Interchange Expanded Freeway Interchange $18,000,000 $1,305,867
5. Bogert Trail Bridge Rehabilitation Bridge Widening/Rehabilitation $5,000,000 $360,999
6. Ramon Widening Study Planning Study $100,000 $55,195
/. Safe Routes to School Local Match Sidewalk Improvements $400,000 $15,147
Citywide Traffic Signal Interconnect Upgrade/Traffic Traffic Signal Improvements $2,100,000 $39,085
9. Vista Chino Bridge at Whitewater River New Bridge $1,700,000 $98,397
10. Slurry Seal Program Road Maintenance $508,733 $508,733
11. Annual Overlay Road Maintenance $1,500,000 $982,903
12. Ramon Road / 1-10 Interchange Expanded Freeway Interchange $15,000,000 $87,958
13. Unscheduled capital projects Various $354,677 $354,677
TOTAL 2011/2012 CONTINUED TO 2012/2013 $70,517,452 $4,710,108
0
�' Page 1 of 1
RIVERSIDE COUNTY TRANSPORTATION COMMISSION
MEASURE "A" LOCAL FUNDS PROGRAM
Agency: City of Palm Springs
Prepared by: David J. Barakian, Director of Public Works/City Engineer
(by Marcus L. Fuller, Assistant Director of Public Works/Assistant City Engineer)
Date: May 8, 2012
Fiscal Year 2013-2017, 5-Year Measure "A" Local Street& Roads Program
Fiscal Year 2011/2012 Status Report
ITEM PROJECT NAME/LIMITS PROJECT STATUS
NO.
1- ARHM Overlays (Various Streets) This project is under construction.
2. Annual Street Slurry Seals (Various Streets) This project is under construction.
S. Bogert Trail Bridge Rehabilitation This project is in final design.
4. Farrell Drive at Ramon Road Traffic Signal Modification This project is under construction.
5 Indian Canyon Drive at Vista Chino (SR111) Traffic Signal This project is complete.
Modification/ Upgrade
6. Ramon Road Widening (including bridge widening) This project is in environmental /design phase.
Landau Blvd to San Luis Rey Dr
Mid Valley Parkway Reimbursement (CVAG) This is an on-going annual reimbursement to CVAG.
8. Indian Canyon Drive Widening (UPRR to Garnet Ave) This project is completing right-of-way and final design phase.
9. Indian Canyon Drive Widening (Tramview Road to UPRR) This project is complete.
10. Bridge Repairs Consultant selection for engineering design to be scheduled.
1,1. Belardo Road Bridge This project is under construction.
112. Sunrise Way at Ramon Road Traffic Signal Upgrade This project is under construction.
13. Indian Canyon Dr/ Interstate 10 Interchange This project is complete.
14. Gene Autry Trail / Interstate 10 Interchange This project is complete.
IF-15 Traffic Signal Interconnect Communication Upgrade This project is in environmental /design phase.
0
w
Page 1 of 1
RIVERSIDE COUNTY TRANSPORTATION COMMISSION
MEASURE "A" LOCAL FUNDS PROGRAM
Age cy: City of Palm Springs
Prepred by: David J. Barakian, Director of Public Works/City Engineer
(by Marcus L. Fuller, Assistant Director of Public Works/Assistant City Engineer)
Datej May 8, 2012
Fiscal Year 2013-2017, 5-Year Measure "A" Local Street & Roads Program
Fiscal Year 2012/2013
ITEM TOTAL MEASURE "A"
N PROJECT NAME/LIMITS PROJECT TYPE COST FUNDS
Araby Drive at Palm Canyon Wash
1. Low Water Crossing Bridge Replacement New Bridge Construction $1,352,000 $155,074
(Environmental/Design Phase)
2. Bogert Trail Bridge Rehabilitation Bridge Widening/Rehabilitation *Included on $240,504
previous sheet
3. Date Palm Drive/ 1-10 Interchange Widening Expanded Freeway Interchange $800,000 $800,000
4. Traffic Safety Projects Traffic Improvements $190,000 $40,000
Sunrise Way at Ralph's Shopping Center Traffic Signal Installation $300,000 $300,000
6. Mid-Valley Parkway Reimbursement - CVAG Street Improvements $10,422 $10,422
TOTAL Fiscal Year 2012/2013 $2,6521422 $1,546,000
0
&'! Page 1 of 1
RIVERSIDE COUNTY TRANSPORTATION COMMISSION
MEASURE "A" LOCAL FUNDS PROGRAM
Age cy: City of Palm Springs
Prepared by: David J. Barakian, Director of Public Works/City Engineer
(by Marcus L. Fuller, Assistant Director of Public Works/Assistant City Engineer)
Datef May 8, 2012
Fiscal Year 2013-2017, 5-Year Measure "A" Local Street& Roads Program
Fiscal Year 2013/2014
IT M TOTAL MEASURE "A"
N PROJECT NAME/LIMITS PROJECT TYPE COST FUNDS
I. Annual Slurry Seal Street Maintenance $900,000 $900,000
Bridge Repairs Bridge Maintenance $100,000 $100,000
Citywide Traffic Signal Interconnect Upgrade Traffic Signal Improvements "Included on $220,000
previous sheet
4. SB 821 Sidewalk Project (FY 13/14) Sidewalk Construction $90,000 $30,000
$. Alejo Road at Avenida Caballeros Traffic Signal (Design) Traffic Improvements $300,000 $50,000
i
6. Vista Chino at Farrell Drive, Right Turn Lane (CMAQ) Intersection Improvements $450,000 $50,000
7. Traffic Calming Program Traffic Improvements $50,000 $50,000
$. Traffic Safety Projects Traffic Improvements $40,000 $40,000
Mid-Valley Parkway Reimbursement - CVAG Street Improvements $10,422 $10,422
TOTAL Fiscal Year 2 01 312 01 4 $1,940,422 $1,450,422
o
�^' Page 1 of 1
RIVERSIDE COUNTY TRANSPORTATION COMMISSION
MEASURE "A" LOCAL FUNDS PROGRAM
Agency: City of Palm Springs
Prepared by: David J. Barakian, Director of Public Works/City Engineer
(by Marcus L. Fuller, Assistant Director of Public Works/Assistant City Engineer)
Date: May 8, 2012
Fiscal Year 2013-2017, 5-Year Measure "A" Local Street & Roads Program
Fiscal Year 2014/2015
ITEM I TOTAL MEASURE "A"
PROJECT NAME/LIMITS PROJECT TYPE COST FUNDS
1. Ramon Road Widening (Sunrise Way to El Cielo Road) Road Widening $4,000,000 $250,000
2. Annual Slurry Seal Street Maintenance $900,000 $900,000
3. S. Palm Canyon Dr. Low Water Crossing Bridge New Bridge $3,100,000 $400,000
Replacement (HBP Grant)
4. Indian Canyon Drive UPRR Bridge Widening Bridge Widening *Included $300,000
previous sheet et
5. Alejo Road at Avenida Caballeros Traffic Signal Traffic Improvements `Included on $250,000
previous sheet
Traffic Safety Projects Traffic Signal Modifications $40,000 $40,000
7. Mid-Valley Parkway Reimbursement- CVAG Street Improvements $10,422 $10,422
TOTAL Fiscal Year 2014/2015 $8,050,422 $2,150,422
0
C" Page 1 of 1
RIVERSIDE COUNTY TRANSPORTATION COMMISSION
MEASURE "A" LOCAL FUNDS PROGRAM
Agency: City of Palm Springs
Prepared by: David J. Barakian, Director of Public Works/City Engineer
(by Marcus L. Fuller, Assistant Director of Public Works/Assistant City Engineer)
Date: May 8, 2012
Fiscal Year 2013-2017, 5-Year Measure "A" Local Street & Roads Program
Fiscal Year 2015/2016
ITEM TOTAL MEASURE "A"
N0 PROJECT NAME/LIMITS PROJECT TYPE COST FUNDS
Ramon Road Widening Roadway Widening "Included on $750,000
(Sunrise Way to El Cielo Rd) previous sheet
2. Indian Canyon Drive Widening Road/Bridge Widening 'Included on $500,000
(UPRR to Garnet Ave including UPRR Bridge Widening) previous sheet
3. Annual Slurry Seal Street Maintenance $900,000 $900,000
a. Bridge Repairs Bridge Maintenance $100,000 $100,000
$. Traffic Safety Projects Traffic Signal Modifications $40,000 $40,000
6. SB 821 Sidewalk Project (FY 15116) Sidewalk Construction $90,000 $30,000
7. Mid-Valley Parkway Reimbursement - CVAG Street Improvements $10,422 $10,422
TOTAL Fiscal Year 2015/2016 $1,140,422 $2,258,422
Page 1 of 1
RIVERSIDE COUNTY TRANSPORTATION COMMISSION
MEASURE "A" LOCAL FUNDS PROGRAM
Agency: City of Palm Springs
Prepared by: David J. Barakian, Director of Public Works/City Engineer
(by Marcus L. Fuller, Assistant Director of Public Works/Assistant City Engineer)
Date: May 8, 2012
Fiscal Year 2013-2017, 5-Year Measure "A" Local Street & Roads Program
Fiscal Year 2016/2017
ITEM TOTAL MEASURE "A"
Nlp, F- PROJECT NAME/LIMITS PROJECT TYPE COST FUNDS
1. Annual Slurry Seal Street Maintenance $900,000 $900,000
Araby Drive at Palm Canyon Wash *Included on
2. Low Water Crossing Bridge Replacement New Bridge Construction previous sheet $115,000
(Right of Way Phase)
3. Traffic Calming Program Traffic Improvements $50,000 $50,000
3. Traffic Safety Projects Traffic Signal Modifications $40,000 $40,000
4. SB 821 Sidewalk Project (FY 15/16) Sidewalk Construction $90,000 $30,000
5. Mid-Valley Parkway Reimbursement- CVAG Street Improvements $10,422 $10,422
TOTAL Fiscal Year 2016/2017 $1,090,422 $1,145,422
0
Co Page 1 of 1
FY 2012113 MAINTENANCE OF EFFORT
CERTIFICATION STATEMENT
The undersigned agrees and certifies for the city of Palm Springs (the "Agency")that sales
tax transportation funds received pursuant to Ordinance No. 02-001 of the Riverside
County Transportation Commission ("Measure A") shall be used in compliance with the
Commission's Maintenance of Effort Guidelines and a base year amount of$1,498,732,
approved by the Commission at its September 2011 meeting, and that the Agency shall not
use such funds to replace discretionary local funds previously expended by the Agency for
local transportation purposes. The Agency hereby acknowledges that the failure of the
Agency to continue such local expenditure shall result in a reduction or loss of Measure A
funds. Additionally,the Agency commits to expending Measure A Local Streets and Roads
funds for projects listed in the Five Year Capital Improvement Plan as approved by
Riverside County Transportation Commission.
Dated: �� 2012
CITY MANAGER
ATTEST:
rry
09
FEW
8. We obtained the maintenance of effort(MOE) base year requirement from RCTC.
a. We obtained a copy of schedule 3 from the annual Street Report.
Finding:No exceptions were noted as a result of this procedure.
b. We compared the amount of discretionary funds spent per the street report to the MOE base
requirement.
Finding: No exceptions were noted as a result of this procedure.
C. Using the prior year's report, we added any current year MOE excess or deducted any current
year MOE deficiency to the prior year carryover.
Finding: MOE activity is summarized as follows:
MOE excess at July 1,2010 $ 38,876,520
Current year local discretionary expenditures 4,274,880
Less: MOE base year requirement 1,892,584
Deficiency MOE for fiscal year ended June 30,2011 2,382,296
MOE excess at June 30,2011 $ 41,258,816
We were not engaged to, and did not, conduct an audit, the objective of which would be the expression of
an opinion on the accounting records. Accordingly, we do not express such an opinion. Had we
performed additional procedures, other matters might have come to our attention that would have been
reported to you.
This report is intended solely for the information and use of the Board of Commissioners of the RCTC
and the City is not intended to be and should not be used by anyone other than this specified party.
Newport Beach,California
December 15,2011
10
5