Date: July 11, 2012 CONSENT! CALENDAR
Subject: APPROVAL OF AMENDMENT NO. 4 TO CONTRACT SERVICES
AGREEMENT NO. 5235 WITH DOKKEN ENGINEERING FOR THE
INDIAN CANYON DRIVE WIDENING, CITY PROJECT NO. 01-25
From: David H. Ready, City Manager
Initiated by: Public Works and Engineering Department
SUMMARY
An amendment to the contract services agreement with Dokken Engineering is required
to extend the period of time for construction phase services (contract administration,
materials testing, and inspection) for the Indian Canyon Drive Widening, City Project
No. 01-25.
RECOMMENDATION:
1) Approve Amendment No. 4 to Agreement No. 5235 with Dolkken Engineering, in
the amount of $19,283 for a total revised contract amount' of $970,323 for the
Indian Canyon Drive Widening, City Project 01-25; and
2) Authorize the City Manager to execute all necessary documents.
STAFF ANALYSIS:
On February 15, 2006, the City Council approved Agreement No. 5235 with Dokken
Engineering to provide environmental and civil engineering design services for the
Indian Canyon Drive Widening, City Project 01-25. This project will widen Indian
Canyon Drive from two to four lanes between Tramview Road and the Union Pacific
Railroad, extending through the Whitewater River.
On May 4, 2011, the City Council approved Amendment No. 2 with: Dokken Engineering
in the amount of $190,980 to provide the City with turnkey construction phase services
for this project. The original budget for construction phase services was based on a 90
working day construction period. An additional 39 days were required to complete this
project, and a corresponding budget increase for construction Iphase services was
required.
ITEM NO. aW\,
City Council Staff Report
March 21, 2012- Page 2
Amendment No. 3 to Agreement No. 5235
On March 21, 2012, the City Council approved Amendment No. 3 with Dokken
Engineering in the amount of $38,310 for a total revised contract amount of $970,323 to
provide the City with construction phase services for this project. The budget for
construction phase services was based on a 129 working day construction period.
This request for Amendment No. 4 with Dokken Engineering in the amount of $19,283
for a total revised contract amount of $970,323 is based on a 140 working day
construction period. Additional materials testing and additional 11 working days for
construction inspection were required to complete this project.
Staff recommends Council approve the contract amendment which will provide sufficient
budget to close-out this federally funded project.
FISCAL IMPACT:
Sufficient funds for construction phase services are available in account 134-4497-
50216. No City funds are required for this project as CVAG has agreed to cover the
City's local match towards the federal grant paying for construction.
SUBMITTED:
Prepared by: Recommended by:
George F. Farago David J. Barakian
Associate Civil Engineer Director of Public Works/City Engineer
Approved by:
Thomas J. Wil Asst. City Manager David H. Ready, Ci4ombMiger
Attachments:
1. Amendment No. 4 to Agreement No. 5235
02
AMENDMENT NO. 4 TO CONTRACT SERVICES AGREEMENT NO. 5235
WITH DOKKEN ENGINEERING
INDIAN CANYON DRIVE WIDENING
TRAMVIEW ROAD TO THE UNION PACIFIC RAILROAD BRIDGE
(THROUGH THE WHITEWATER RIVER)
CITY PROJECT NO. 01-25
FEDERAL PROJECT NO. STPLN-5282(023)
The following articles of Agreement No. 5235 are hereby amended to read as follows:
SECTION 2.1 Maximum contract amount is amended to Nine Hundred Seventy Thousand
Three Hundred Twenty Three Dollars ($970,323.00).
SCHEDULE OF COMPENSATION (Exhibit"C)— Exhibit"C" is amended as follows:
"Phase 3 — Construction Services" is replaced with the attached "Phase 3 — Construction
Services".
Purchase Order Number(s): 616346
Agreement Number: 5235
Original City Council Approval: February 15, 2006
Original Contract Amount: $745,855
Amount of Prior Changes: $205,185
Amount of This Change: $ 19,283
Amended Total: $970,323
Account Number: 134-4497-50216; $19,283
SIGNATURES ON NEXT PAGE
03
Except as specifically amended by this Amendment No. 4, all terms and provisions of
Agreement No. 5235 remain in full force and effect.
ATTEST: CITY OF PALM SPRINGS,
a California charter city
By:
City Clerk By:
City Manager
APPROVED AS TO FORM:
By:
City Attorney
CONSULTANT: DOKKEN ENGINEERING
Check one:_Individual_Partnership X Corporation
Corporations require two notarized signatures: One signature must be from the Chairman of Board,President,or any Vice
President.The second signature must be from the Secretary,Assistant Secre easurer,Assista t T easurer,or Chief
Financial Officer). O '
By: /L 'L e� By:
Notarized Signature of Chairman of Board, Notarded Signat S cretary,Asst Secretary,
President or any Vice President Treasurer,Asst tre ur or Chief Financial Officer
Name: f����—+ /i— �1p' dc� Name:
Title: /�f � `�-�^ ® Title:
State of Ctxl i4U rn Z a _ Stateof
Countyof Sacf`4rv>K'i4b-se County of t4+ -as
on6IS IZ beforeme, C_am('011 On 6 IS Y2 before me, CO''V rA V, SAAeSs
personally appeared P rc-Va rJ T. L i r-44_ personally appeared C OL+U") C L`Ck."`
who proved to me on the basis of satisfactory evidence)to be who proved to me on the basis of satisfactory evidence)to be
the persor�0 whose name(s) is/aw subscribed to the within the person(s)whose name(&) isMm subscribed to the within
instrument and acknowledged to me that he/ahefthep instrument and acknowledged to me that he/she/they-
executed the same in his/MeNtheir authorized capacity(iea), executed the same in his/her/their authorized cepacity(les}
and that by his/herkhair signature(*on the instrument the and that by hwher/their signatpre(o on the instrument the
person(s), or the entity upon behalf of which the persons) person(*,, or the entity upon behalf of which the person(*
acted,executed the instrument. acted,executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the I certify under PENALTY OF PERJURY under the laws of the
State of California that the foregoing paragraph is true and State of California that the foregoing paragraph is true and
correct. correct.
WITNESS my hand and official seal. WITNESS my hand and official seal.
Notary Signature: t Notary Signature:
Notary Seal: Notary Seal:
CA AN SADEGHI CAM AN SADEGHI
comm. #1945433 = COMM. #1945483 =
Notary Public•California c °� Notary Rublic-CaFfornia o
a Sacramento County z Sacramento County
IMWNComm.Ex ire&Jul 25,2015 Comm, JW 25,is Yw
04
EXHIBIT"C"
SCHEDULE OF COMPENSATION
PHASE 3-CONSTRUCTION SERVICES
The following budgeted hours are based on a project schedule of 140 working days.
Previous This Change
Project Manager: (34 + 2) hours @ $200/hour= $ 6,800 + $ 400 $7,200
Resident Engineer: (345+24) hours @ $150/ hour= $51,750 + $ 3,600 = $55,350
Biologist: 92 hours @ $120/hour= $11,040 = $11,040
Inspector: (572+60) hours (d-) $100 /hour= $57,200 + $ 6,000 $63,000
Subtotal -Construction Inspection: $136,790 + $10,000 = $136,790
Materials Testing: $ 30,000 + $ 9,283 = $39,283
Quality Assurance Testing: $10,000 $10,000
Labor Compliance: $18,000
Milk Veche Seed Collection & Dispersal: $ 2,500 $ 2,500
Design Support: $30,000 $30,000
Equipment/ Per Diem: $12,000 $12,000
Phase 3 Subtotal: $229,290 + $19,283 = $248,573
Grand Total of Contract $951,040 + $19,283 = $970,323
END OF EXHIBIT"C"