F OR��P s City Council Staff Report
C4<t
DATE: October 17, 2012 NEW BUSINESS
SUBJECT: SKATE PARK IMPROVEMENTS AND MANAGEMENT FACILITY,
APPROVE THE ARCHITECTURAL CONCEPT DESIGN, RATIFY
NEGOTIATED COSTS FOR ENGINEERING DESIGN SERVICES
PROVIDED BY ENGINEERING RESOURCES OF SOUTHERN
CALIFORNIA, APPROVE PLANS, SPECIFICATIONS AND ENGINEER'S
ESTIMATE AND AUTHORIZATION TO BID THE GRADING PLAN AND
SITE WORK FOR THE FIRST PHASE OF THE SKATE PARK PROJECT.
FROM: David H. Ready, Esq., Ph.D., City Manager
BY: Parks & Recreation Department
Public Works and Engineering Department
SUMMARY
The City Council will consider three items consistent with the previously approved
comprehensive operating program of the Palm Springs Skate Park including: a) ratifying
$42,600 to Engineering Resources of Southern California for "on-call" Skate Park
engineering site plan design services; b) approving the plans, specifications and
Engineer's estimate and authorizing staff to bid the grading plan and site work
necessary for Phase One of the Skate Park Project; and c) approving the design
concepts.
RECOMMENDATION:
1. Ratify the negotiated cost of $42,660 in accordance with Agreement No. 6109
with Engineering Resources of Southern California for "on-call" Skate Park
engineering services.
2. Approve plans, specifications and the Engineer's Estimate, and authorize Staff to
bid the grading plan and site work necessary for the first phase of the Skate Park
project.
3. Approve the design concept for the exterior modular finishes and landscaping,
and the interior improvements as prepared by Reuel Young, Interactive Design.
ITEM NO. 690
Skate Park Project
October 17, 2012
Page 2
STAFF ANALYSIS:
On October 19, 2011, the City Council approved a five-year agreement with Action Park
Alliance, Inc., to operate and manage the Palm Springs Skate Park (the previous staff
report outlining the terms of the agreement is attached for background and reference).
Contracting with Action Park Alliance, Inc. provides for a comprehensive operating
program for the Skate Park, along with experienced daily management to address a
number of operating and program issues which have significantly hindered the
community's use and enjoyment of the facility.
With the execution of the contract with Action Park Alliance, Inc., the City committed to
provide an operations and management facility at the Skate Park. Staff secured a
modular structure to serve as the new facility. Additionally, City Staff exercised the "on-
call" provisions pursuant to City Council approved Agreement No. A6109, with
Engineering Resources of Southern California, to provide preparation of necessary
surveys, site and drainage design, utility research and location, and an engineering
grading plan and specification for site work necessary for the first phase of the Skate
Park project.
The Parks and Recreation Department and the Public Works and Engineering
Department have teamed to provide the design concept for the new modular facility and
to engineer the site work necessary for its placement at the Skate Park. The attached
materials present the design concept by Reuel Young of Interactive Design, along with
the necessary site improvements engineered through the Public Works and Engineering
Department, by Engineering Resources.
The new operations and management facility for the Skate Park will also serve as the
new entrance to the Skate Park. The facility will consist of a modular building finished
with appropriate exterior design finishes and interior improvements. To prepare for the
installation of the modular on site, the first phase of the project requires the engineering
of the foundation for the modular building, the appropriate provision for utilities and the
necessary grading and site work to accommodate street circulation and the entrance
and exiting from the Skate Park through the new facility. These engineering services
were provided pursuant to the "on-call" agreement with Engineering Resources of
Southern California at a total cost of$42,660.
The Public Works Department has reviewed and approved detailed plans and
specifications and a cost estimate. Section 7.03.040 of the Procurement and
Contracting Code requires that for public projects in excess of $100,000, Council
approve and adopt the plans, specifications and authorize Staff to advertise for
construction bids. The Engineer's Estimate for this project is $148,852.
Reuel Young, Interactive Design, has prepared the design concept for the interior
improvements in coordination with Action Park Alliance, Inc., the new Skate Park
operator, along with the exterior design, finishes and landscaping. Staff requests
Council's review and approval of the design concept, after which Interactive Design will
002
Skate Park Project
October 17, 2012
Page 3
provide detailed construction drawings and specifications which will be returned for
Council approval as Phase 11 of the construction of the project.
Staff recommends approval of the engineering design services by Engineering
Resources of Southern California, approval of the design concept by Reuel Young, and
approval of the site plan specifications and engineering for the grading plan and site
work to be bid as the first phase of the project.
FISCAL IMPACT:
Funding for the Skate Park project is available through Quimby Funds for the present
costs of 1) the engineering design of site improvements and grading plans, by
Engineering Resources of Southern California, $42,660, 2) construction of the
foundation for the modular building, provision for utilities, grading and site work,
Engineer's Estimate $148,852.
Estimates of future costs to complete the Skate Park project include: 1) Modular
acquisition, $75,000, 2) Relocation and installation of the modular at the Skate Park
site, $15,000 to $20,000, 3) Exterior modular finishes, interior improvements, site flat
work and landscaping, $300,000 to $350,000.
-i � — — j/xz—
Vicki Oltean, Director David Barakian, Director
Parks and Recreation Dept. Public Works and Engineering Dept.
David H. Ready, D., City Manager Thomas J. WOdn, Asst. City Manager
Attachments:
Staff Report Action Park Alliance
Construction Cost Estimates
Plans and Specifications
Design Concepts
003
PpLMsp
W
V N
• �oben�`o4 �
CITY COUNCIL STAFF REPORT
DATE: October 19, 2011 Consent Calendar
SUBJECT: APPROVAL OF AGREEMENT WITH ACTION PARK ALLIANCE FOR
OPERATION AND MANAGEMENT OF THE PALM SPRINGS SKATE
PARK
FROM: David H. Ready, City Manager
BY: Parks and Recreation
SUMMARY
At the direction of the City Council, staff has been working with Action Park Alliance
(APA) on an agreement to operate and manage the Palm Springs Skate Park. This
new management and operating program will take the skate park to an entirely new
level of operation offering programs such as camps, clinics, skate contests and special
events for local residents and tourists. Staff has secured a modular structure to be
placed at the site for APA to effectively operate and manage the facility. Staff is
recommending that City Council approve a five (5) year agreement with Action Park
Alliances (APA) to operate and manage the Palm Springs Skate Park. The City shall
pay APA a management fee in the not to exceed amount of $160,000 per year in four
equal quarterly payments of $40,000. Anticipated date agreement would begin is
January, 2012.
RECOMMENDATION:
1. That the City Council approve a five (5) year agreement.
2. Authorize the City Manager to execute all necessary documents.
STAFF ANALYSIS:
When the Skate Park opened in 2003 city staff collected entrance fees and monitored
skate boarders entrance and exits. In addition, they performed minor maintenance
in the park i.e. trash, graffiti, etc; however, active programming of lessons, clinics, and
special skate events were never initiated.
In 2004, private security was hired to assist city staff with issues at the park such as
behavior problems, vandalism, etc. The summer of 2009 the entrance fees were
eliminated and the park remained open for free skating without any programming.
At the May 4, 2011 City Council meeting there was a presentation and discussion of a
proposal from Action Park Alliance (APA) to operate and manage the Palm Springs Q }tj
City Council Staff Report
October 19, 2011 --Page 2
Agreement with APA
Skate Park. The City Council voted 5 — 0 directing staff to work with APA on an
agreement and potential structure for the Skate Park.
Staff has been working with APA on an agreement to operate and manage the park.
APA's management team has over ten (10) years experience in skate park
management and they currently operate and manage skate parks in Fontana, CA (2),
Grand Prairie, TX, and Orlando, FL and they have been very successful at these sites.
Their expertise will take the Palm Springs Skate Park to a new level of programming,
offering camps, clinics, skate contests such as Skate or Rock and Concrete Showdown,
and special events such as National Go Skate Day and Skate Jams. These types of
activities have never been possible with city staff.
Staff has secured a modular structure to be located at the site adjacent to the skate
park for APA to operate and manage the skate park. This will allow for better control of
users entering/exiting the facility. In addition, APA will have an area for the rental and
sale of skate equipment such as boards, pads, helmets, etc.
Anticipated date that operation and management of the Skate Park begins by APA is as
soon as the modular can be installed, potentially in January 2012.
FISCAL IMPACT:
Pursuant to the agreement the annual operation and management fee will be $160,000.
During the 2008-09 and 2009-10 fiscal years the City spent more than $130,000 for
operations and maintenance of the Skate Park;
Three Staff Members $ 92,019
Maintenance $ 15,000
Security 33,230
TOTAL $140,249
Funds are available in 001-2512-43200 (Skate Park, Contractual Services). Fiscal year
2011/2012 costs would be approximately $80,000 due to only six (6) months of
operation by APA.
VICKI OLTEAN Thomas J.Wi n, Asst. ity Manager
Director, Parks & Recreation
DAVID H. READY, CWanager
Attachments:
1. Agreement for Operation of Palm Springs Skate Park 005
Palm Springs Skate Park Project - Construction Probable Cost Estimates
Construct 3"AC Paving Over 6" Miscellaneous Base SF 4,658 $ 6.70 $ 31,279
Remove and Disposal of Existing AC Pavement SF 5,610 $ 1.50 $ 8,415
Grind Existing AC Pavement and Construct 2"of AC SF 8,7os $ a.5o $ 3s,186
Pavement Overly
Remove Existing Concrete Sidewalk SF 2,271 $ 1.50 $ 3,407
Relocate Area Light EA 2 $ 400.00 $ 800
Parking Stall per Plan LS 1 $ 1,000.00 $ 1,000
Construct Handicap Pavement Symbol/Marking per Plan LS 1 $ 1,500.00 $ 1,500
Remove Existing Tree EA 2 $ 400.00 $ 800
Remove and Dispose of Existing Curb and Gutter LF 119 $ 2.00 $ 238
Remove and Dispose Existing Curb LF 85 $ 1.50 $ 128
Relocate"No Parking Sign"to New Location EA 2 $ 700.00 $ 1,400
Remove and Salvage Irrigation System LS 1 $ 2,000.00 $ 2,000
Relocate Concrete Bench to New Location Per 1 $ spp pp $ 600
Direction of City Engineer EA
Remove and Construct Handicap Ramp Per Plan EA 1 $ 2,500.00 $ 2,500
Construct 6"Curb Per CPS STD 200 Type Al LF 242 $ 18.00 $ 4,356
Construct 6"Curb and Gutter Per CPS STD 200 Type A3 LF 122 $ 26.00 $ 3,172
Administration Building-Foundation Excavation CY 300 $ 14.00 $ 4,200
Administration Building-Concrete Footing (including CY 4s $ 220.00 $ 10,780
Formwork
Administration Building-Footing Steel Reinforcement TON 2.18 $ 1,soo.o0 $ 4,142
(including Retaining Wall Steel Reinforcement
Mason Wall-8"Thick SF 353 $ 60.00 $ 21,180
Masonry Wall-8"Thick SF za $ 60.00 $ 1,440
Masonry Wall-1 6"Thick ISF 80 $ 80.00 $ 6,400
TOTAL $ 148,852
006
Palm Springs Skate Park Project - Construction Probable Cost Estimates
Construct 3"AC Paving Over 6" Miscellaneous Base SF 4,658 $ 6.70 $ 31,209
Remove and Disposal of Existing AC Pavement SF 5,610 $ 1.50 $ 8,415
Grind Existing AC Pavement and Construct 2"of AC SF a,7oa $ a.5o $ 39,186
Pavement Overlay
Remove Existing Concrete Sidewalk SF 2,271 $ 1.50 $ 3,467
Relocate Area Light EA 2 $ 400.00 $ 800
Parking Stall per Plan LS 1 $ 1,000.00 $ 1,000
Construct Handicap Pavement Symbol/Marking per Plan LS 1 $ 1,500.00 $ 1,500
Remove Existing Tree EA 2 $ 400.00 $ 800
Remove and Dispose of Existing Curb and Gutter LF 119 $ 2.00 $ 238
Remove and Dispose Existing Curb LF 85 $ 1.50 $ 128
Relocate"No Parkin Sign"to New Location EA 2 $ 700.00 $ 1.400
Remove and Salvage Irrigation System LS 1 $ 2,000.00 $ 2,000
Relocate Concrete Bench to New Location Per EA 1 $ s0o.0o $ s0o
Direction of City Engineer
Remove and Construct Handicap Ramp Per Plan EA 1 $ 2,500.00 $ 2,500
Construct 6"Curb Per CPS STD 200 Type Al LF 242 $ 18.00 $ a,356
Construct 6"Curb and Gutter Per CPS STD 200 Type A3 LF 122 $ 26.00 $ 3,172
Administration Building-Foundation Excavation CY 300 S 14.00 $ 4,200
Administration Building-Concrete Footing (including CY 4s $ zzo.00 $ 1o,7ao
Formwork
Administration Building-Footing Steel Reinforcement TON 2.1s $ 1,s00.00 $ a,142
(including RetainingWall Steel Reinforcement
Mason Wall-8"Thick SF 353 $ 60.00 $ 21,180
Mason Wall-8"Thick SF 24 $ 60.00 $ 1,440
Masonry Wall-16"Thick IsF 80 $ 80.00 $ 6,400
TOTAL $ 148,852
007
Palm Springs Skate Park Project - Construction Probable Cost Estimates
Construct 3"AC Paving Over 6"Miscellaneous Base SF 4,658 $ 6.70 $ 31,209
Remove and Disposal of Existing AC Pavement SF 5,610 $ 1.50 $ 8,415
Grind Existing AC Pavement and Construct 2"of AC SF a,7o8 $ a.5o $ 39,1as
Pavement Overlay
Remove Existing Concrete Sidewalk SF 2,271 $ 1.50 $ 3,407
Relocate Area Light EA 2 $ 400.00 $ 800
Parking Stall per Plan LS 1 $ 1,000.00 $ 1,000
Construct Handicap Pavement Symbol/Marking per Plan LS 1 $ 1,500.00 $ 1,500
Remove Existing Tree EA 2 $ 400.00 $ 800
Remove and Dispose of Existing Curb and Gutter LF 119 $ 2.00 $ 238
Remove and Dispose Existing Curb LF 85 $ 1.50 $ 128
Relocate"No Parking Sign to New Location EA 2 $ 700.00 $ 1,400
Remove and Salvage Ini ation System LS 1 $ 2,000.00 $ 2,000
Relocate Concrete Bench to New Location Per EA 1 $ 600.00 $ 600
Direction of City Engineer
Remove and Construct Handicap Ramp Per Plan EA 1 $ 2,500.00 $ 2,500
Construct 6"Curb Per CPS STD 200 Type Al LF 242 $ 18.00 $ 4,356
Construct 6"Curb and Gutter Per CPS STD 200 Type
A3 LF 122 $ 26.00 $ 3,172
Administration Building-Foundation Excavation CY 300 $ 14.00 $ 4,200
Administration Building-Concrete Footing (including CY 49 $ 220.00 $ 10,780
Formwork
Administration Building-Footing Steel Reinforcement TON 2.18 $ 1,900.00 $ 4,142
(including RetainingWall Steel Reinforcement
Masonry Wall-8"Thick SF 353 $ 60.00 $ 21,180
Mason Wall-8"Thick SF 24 $ 60.00 $ 1,440
Masonry Wall-1 6"Thick SF 80 $ 80.00 $ 6,400
TOTAL $ 148.852
008
Palm Springs Skate Park Project - Construction Probable Cost Estimates
Construct 3"AC Paving Over 6" Miscellaneous Base SF 4,658 $ 6.70 $ 31,279
Remove and Disposal of Existing AC Pavement SF 5,610 $ 1.50 $ 8,415
Grind Existing AC Pavement and Construct 2"of AC SF a,7o8 $ 4.50 $ 3s,196
Pavement Overlay
Remove Existing Concrete Sidewalk SF 2,271 $ 1.50 $ 3,407
Relocate Area Light EA 2 $ 400.00 $ 800
Parking Stall per Plan LS 1 $ 1,000.00 $ 1,000
Construct Handicap Pavement Symbol/Marking per Plan LS 1 $ 1,500.00 $ 1,500
Remove Existing Tree EA 2 $ 400.00 $ 800
Remove and Dispose of Existing Curb and Gutter LF 119 $ 2.00 $ 238
Remove and Dispose Existing Curb LF 85 $ 1.50 $ 12e
Relocate"No Parking Sign"to New Location EA 2 $ 700.00 $ 1,400
Remove and Salvage Irrigation System LS 1 $ 2,000.00 $ 2,000
Relocate Concrete Bench to New Location Per EA 1 $ 600.00 $ so0
Direction of City Engineer
Remove and Construct Handicap Ramp Per Plan EA 1 $ 2,500.00 $ 2,500
Construct 6"Curb Per CPS STD 200 Type Al LF 242 $ 18.00 $ 4,356
Construct 6"Curb and Gutter Per CPS STD 200 Type A3 LF 122 $ 26.00 $ 3,172
Administration Building-Foundation Excavation CY 300 $ 14.00 $ 4,200
Administration Building-Concrete Footing(including CY as $ 220.00 $ 1o,7so
Formwork
Administration Building-Footing Steel Reinforcement TON z.1e $ 1,soo.00 $ 4,1az
(including Retaining Wall Steel Reinforcement
Mason Wall-8"Thick SF 353 $ 60.00 $ 21,180
Mason Wall-8"Thick SF 24 $ 60.00 $ 1,440
Masonry Wall-1 6"Thick ISF 180 1 $ 80.00
TOTAL $ 148,852
009
Palm Springs Skate Park Project - Construction Probable Cost Estimates
Construct 3"AC Paving Over 6" Miscellaneous Base SF 4,658 $ 6.70 $ 31,209
Remove and Disposal of Existing AC Pavement SF 5,610 $ 1.50 $ 8,415
Grind Existing AC Pavement and Construct 2"of AC SF 6,708 $ 4.50 $ 3s,186
Pavement Overlay
Remove Existing Concrete Sidewalk SF 2,271 $ 1.50 $ 3,407
Relocate Area Light EA 2 $ 400.00 $ 800
Parking Stall per Plan LS 1 $ 1,000.00 $ 1,000
Construct Handicap Pavement Symbol/Marking per Plan LS 1 $ 1,500.00 $ 1,500
Remove Existing Tree EA 2 $ 400.00 $ 800
Remove and Dispose of Existing Curb and Gutter LF 119 $ 2.00 $ 238
Remove and Dispose Existing Curb LF 85 $ 1.50 $ 128
Relocate"No Parkin Sign"to New Location EA 2 $ 700.00 $ 1,400
Remove and Salvage Irrigation System LS 1 $ 2,000.00 $ 2,000
Relocate Concrete Bench to New Location Per 1 $ soo $ soo
Direction of City Engineer EA
Remove and Construct Handicap Ramp Per Plan EA 1 $ 2,500.00 $ 2,5W
Construct 6"Curb Per CPS STD 200 Type Al LF 242 $ 18.00 $ 4,356
Construct 6"Curb and Gutter Per CPS STD 200 Type A3 LF 122 $ 26.00 $ 3,172
Administration Building-Foundation Excavation CY 300 $ 14.00 $ 4,200
Administration Building-Concrete Footing(including CY 4s $ 220.00 $ 1o,7so
Formwork
Administration Building-Footing Steel Reinforcement TON 2.18 $ 1,900.00 $ 4,142
(includingRetaining Wall Steel Reinforcement
Mason Wall-8"Thick SF 353 $ 60.00 $ 21,18o
Mason Wall-8"Thick SF 24 $ 60.00 $ 1,440
Masonry Wall-16"Thick SF 80 $ 80.00 $ 6,400
TOTAL $ 148,852
O10
Palm Springs Skate Park Project - Construction Probable Cost Estimates
Construct Y AC Paving Over 6"Miscellaneous Base SF 4,658 $ 6.70 $ 31,209
Remove and Disposal of Existing AC Pavement SF 5,610 $ 1.50 $ 8,a15
Grind Existing AC Pavement and Construct 2"of AC SF a,7oe $ a.so $ 39,1as
Pavement Overlay
Remove Existing Concrete Sidewalk SF 2,271 $ 1.50 $ 3,407
Relocate Area Light EA 2 $ 400.00 $ 80o
Parking Stall per Plan LS 1 $ 1.000.00 $ 1,000
Construct Handicap Pavement Symbol/Marking per Plan LS 1 $ 1,500.00 $ 1,500
Remove Existing Tree EA z $ 400.00 $ 800
Remove and Dispose of Existing Curb and Gutter LF 119 $ 2.00 $ 238
Remove and Dispose Existing Curb LF 85 $ 1.50 $ 128
Relocate"No Parkin Si n"to New Location EA 2 $ 700.00 $ 1.400
Remove and Salvage Ini ation System LS 1 $ 2,000.00 $ 2,000
Relocate Concrete Bench to New Location Per EA 1 $ soo.00 $ soo
Direction of City Engineer
Remove and Construct Handicap Ramp Per Plan EA 1 $ 2,500.00 $ 2,500
Construct 6"Curb Per CPS STD 200 Type Al LF 242 $ 18.00 $ 4,356
Construct 6"Curb and Gutter Per CPS STD 200 Type A3 LF 122 $ 26.00 $ 3,172
Administration Building-Foundation Excavation CY 300 $ 14.00 $ 4,200
Administration Building-Concrete Footing(including CY a9 $ 220.00 $ 1o,7a0
Formwork
Administration Building-Footing Steel Reinforcement TON z.1a $ 1,soo.00 $ a,1a2
(including RetainingWall Steel Reinforcement)
Mason Wall-8"Thick SF 353 $ 60.00 $ 21,180
Mason Wall8"Thick SF 24 $ 60.00 $ 1,440
Masonry Wall-16"Thick ISF 80 $ 80.00 $ 6,400
TOTAL I $ 148,852
Oil
Palm Springs Skate Park Project - Construction Probable Cost Estimates
Construct 3"AC Paving Over 6" Miscellaneous Base SF 4,658 $ 6.70 $ 31,279
Remove and Disposal of Existing AC Pavement SF 5,610 $ 1.50 $ 8,415
Grind Existing AC Pavement and Construct 2"of AC SF 8,708 $ 4.50 $ 3s,186
Pavement Overlay
Remove Existing Concrete Sidewalk SF 2,271 $ 1.50 $ 3,407
Relocate Area Light EA 2 $ 400.00 $ 800
Parking Stall per Plan LS 1 $ 1,000.00 $ 1.000
Construct Handicap Pavement Symbol/Marking per
Plan LS 1 $ 1,500.00 $ 1,500
Remove Existing Tree EA 2 $ 400.00 $ 800
Remove and Dispose of Existing Curb and Gutter LF 119 $ 2.00 $ 238
Remove and Dispose Existing Curb LF 85 $ 1.50 $ 128
Relocate"No Parkin Sign"to New Location EA 2 $ 700.00 $ 1,400
Remove and Salvage Irrigation System LS 1 $ 2,000.00 $ 2,000
Relocate Concrete Bench to New Location Per EA 1 $ soo.00 $ 600
Direction of City Engineer
Remove and Construct Handicap Ramp Per Plan EA 1 $ 2,500.00 $ 2,500
Construct 6"Curb Per CPS STD 200 Type Al LF 242 $ 18.00 $ 4,356
Construct 6"Curb and Gutter Per CPS STD 200 Type A3 LF 122 $ 26.00 $ 3,172
Administration Building-Foundation Excavation CY 300 $ 14.00 $ 4,200
Administration Building-Concrete Footing (including CY as $ 220.00 $ 10,780
Formwork
Administration Building-Footing Steel Reinforcement TON 2.18 $ 1,900.00 $ 4,142
(including Retaining Wall Steel Reinforcement)
Mason Wall-8"Thick SF 353 $ 60.00 $ 21,180
Masonry WaIF8"Thick SF 24 $ 60.00 $ 1,440
Masonry Wall-1 6"Thick ISF 80 $ 80.001 $ 6,400
TOTAL 1 1 $ 148,852
012
Palm Springs Skate Park Project - Construction Probable Cost Estimates
Construct 3"AC Paving Over 6" Miscellaneous Base SF 4,658 $ 6.70 $ 31,209
Remove and Disposal of Existing AC Pavement SF 5,610 $ 1.50 $ s,a15
Grind Existing AC Pavement and Construct 2"of AC SF s,7o3 $ a.so $ 3s,16s
Pavement Overlay
Remove Existing Concrete Sidewalk SF 2.271 $ 1.50 $ 3,407
Relocate Area Light EA 2 $ 400.00 $ 800
Parking Stall per Plan LS 1 $ 1,000.00 $ 1,000
Construct Handicap Pavement Symbol/Marking per
Plan LS 1 $ 1,500.00 $ 1,500
Remove Existing Tree EA 2 $ 400.00 $ 800
Remove and Dispose of Existing Curb and Gutter LF 119 $ 2.00 $ 238
Remove and Dispose Existing Curb LF 85 $ 1.50 $ 128
Relocate"No Parking Sign"to New Location EA 2 $ 700.00 $ 1,400
Remove and Salvage Irrigation System LS 1 $ 2,000.00 $ 2,000
Relocate Concrete Bench to New Location Per 1 $ 600 $ s00
Direction of City Engineer EA
Remove and Construct Handicap Ramp Per Plan EA 1 $ 2,500.00 $ 2,500
Construct 6"Curb Per CPS STD 200 Type Al LF 242 $ 18.00 $ 4,356
Construct 6"Curb and Gutter Per CPS STD 200 Type A3 LF 122 $ 26.00 $ 3,172
Administration Building-Foundation Excavation CY 300 $ 14.00 $ 4,200
Administration Building-Concrete Footing(including CY as $ 220.00 $ 10,760
Formwork
Administration Building-Footing Steel Reinforcement TON 2.18 $ 1,900.00 $ a,1a2
(including Retaining Wall Steel Reinforcement)
Masonry Wall-8"Thick SF 353 $ 60.00 $ 21,180
Mason Wall-8"Thick SF 24 $ 60.00 $ 1,440
Masonry Wall-1 6"Thick ISF 80 $ 80.00 $ 6,400
TOTAL $ 148,892
013
Palm Springs Skate Park Project - Construction Probable Cost Estimates
Construct 3"AC Paving Over 6" Miscellaneous Base SF 4,658 $ 6.70 $ 31,209
Remove and Disposal of Existing AC Pavement SF 5,610 $ 1.50 $ E,415
Grind Existing AC Pavement and Construct 2"of AC SF b,7oa $ a.so $ 3s,186
Pavement Overlay
Remove Existing Concrete Sidewalk SF 2,271 $ 1.50 $ 3,407
Relocate Area Light EA 2 $ 400.00 $ 800
Parking Stall per Plan LS 1 $ 1,000.00 $ 1,000
Construct Handicap Pavement Symbol/Marking per Plan LS 1 $ 1s00.00 $ 1,500
Remove Existing Tree EA 2 $ 400.00 $ 800
Remove and Dispose of Existing Curb and Gutter LF 119 Is 2.00 $ 238
Remove and Dispose Existing Curb LF 85 $ 1.50 $ 128
Relocate "No Parkin Sign"to New Location EA 2 $ 700.00 $ 1,400
Remove and Salvage Irrigation System LS 1 $ 2,000.00 $ 2,000
Relocate Concrete Bench to New Location Per EA 1 $ soo.00 $ soo
Direction of City Engineer
Remove and Construct Handicap Ramp Per Plan EA 1 $ 2,500.00 $ 2,560
Construct 6"Curb Per CPS STD 200 Type Al LF 242 $ 18.00 $ 4,356
Construct 6"Curb and Gutter Per CPS STD 200 Type A3 LF 122 $ 26.00 $ 3,172
Administration Building-Foundation Excavation CY 300 $ 14.00 $ 4,26o
Administration Building-Concrete Footing(including CY as $ 220.00 $ 1o,7so
Formwork
Administration Building-Footing Steel Reinforcement TON 2.1a $ 1,soo.00 $ a,142
(including Retaining Wall Steel Reinforcement)
Mason Wall-8"Thick SF 353 $ 60.00 $ 21,180
Mason Wall-8"Thick SF 24 $ 60.00 $ 1,440
Masonry Wall-16"Thick ISF 80 $ 80.001 $ 6,400
TOTAL $ 148,852,
014
Palm Springs Skate Park Project - Construction Probable Cost Estimates
Construct 3"AC Paving Over 6" Miscellaneous Base SF 4,658 $ 6.70 $ 31,207
Remove and Disposal of Existing AC Pavement SF 5,610 $ 1.50 $ 8,415
Grind Existing AC Pavement and Construct 2"of AC SF 8,706 $ a.so $ 3s,186
Pavement Overlay
Remove Existing Concrete Sidewalk SF 2,271 $ 1.50 $ 3,407
Relocate Area Light EA 2 $ 400.00 $ 800
Parking Stall per Plan LS 1 $ 1,000.00 $ 1,000
Construct Handicap Pavement Symbol/Marking per Plan LS 1 $ 1,500.00 $ 1,500
Remove Existing Tree EA 2 $ 400.00 $ 800
Remove and Dispose of Existing Curb and Gutter LF 119 $ 2.00 $ 238
Remove and Dispose Existing Curb LF 85 $ 1.50 $ 128
Relocate"No Parkin Si n"to New Location EA 2 $ 700.00 $ 1,400
Remove and Salvage Irrigation System LS 1 $ 2,000.00 $ 2,000
Relocate Concrete Bench to New Location Per EA 1 $ soo.00 $ soo
Direction of City Engineer
Remove and Construct Handicap Ramp Per Plan EA 1 $ 2,500.00 $ 2,500
Construct 6"Curb Per CPS STD 200 Type Al LF 242 $ 18.00 $ 4,356
Construct 6"Curb and Gutter Per CPS STD 200 Type A3 LF 122 $ 26.00 $ 3,172
Administration Building-Foundation Excavation CY 300 $ 14.00 $ 4,200
Administration Building-Concrete Footing(including CY as $ 220.00 $ 1o,780
Formwork
Administration Building-Footing Steel Reinforcement TON 2.1a $ t,soo.00 $ a,1a2
including RetainingWall Steel Reinforcement
Mason Wall-8"Thick SF 353 $ 60.00 $ 21,180
Mason Wall-6"Thick SF 24 $ 60.00 $ 1,440
Masonry Wall-1 6"Thick ISF 180 $ 80.00 $ 6.400
TOTAL $ 148,852