Loading...
HomeMy WebLinkAbout2006-05-24 STAFF REPORTS 1D 1sr?ALA; 5 s c F ' City o m f Pal S nn s p g Department of Finance and Treasury There are three different sections of the Capital Improvement Plan (CIP) budget. These sections are the General Capital Improvements Section (Fund 261), the Special Revenues Section and the Enterprise Funds section. For each section there are summary pages. The shaded areas of the summary pages are those items that staff is recommending be funded. Behind the summary pages are more detailed descriptions for most of the projects listed on each section's summary page. The projects on the detail pages are grouped together by department in the Fund 261 section and by funding source in the Special Revenues and Enterprise Fund section. The number on the left side of the summary page is cross referenced with the same number in the detailed sections. Item No. FY 06-07 CAPITAL IMPROVEMENT PLAN - 2601 FUND Current General Misc. Tech Fiscal Year Measure Fund Rev. & Enhance. NAME OF PROJECTS Requests Y Transfer Grants Fees Fund 261 -Revenue Source- Grants & Others Parks & Rec: 1 Desert Landscape Conversion (on-going) 147,000 (1) 147,000 2 Stadium Renovation (on-going) 20,000 (1) 20,000 Library: 3 Computer Replacement and Upgrade 66,040 (2) 66,040 4 Unscheduled Library Capital 66,960 (2) 66,960 Engineering: 5 Asphalt Rubber Hot Mix(ARHM) Overlay 400,000 (3) 400,000 6 Indian Ave. Roadway& Bridge Widening 165,000 (3) 165,000 over UPRR 7 Sidewalk Construction (SB821) 60,000 (5) 60,000 City Hall: 8 Security Improvements for Police& 100,000 (4) 100,000 City Hall ($130,000**) Multiple Depts: 9 Technological Enhancements: ($270,300 avail) Info Tech: 9a Microsoft Exchange Mail Server Upgrade 17,500 17,500 (Total Cost.$35,000-Costs Split**) 9b City Hall Server Backup Solution 10,621 10,621 (Total Cast$21,241 --Costs Split**) 9c Microsoft Office 2003 Licenses 16,172 16,172 (Total Cost$32,344--Costs Split**) 9d Technology Master Plan 25,000 25,000 (Total Cost$55,000--Casts Split**) 9e Sophos Anti-Virus User License Upgrade 1,500 1,500 (Total Cost$3,000--Costs Split **) 9f Upgrade, Modify, or Replace Telephone Syst. 15,000 15,000 (Current Yr Req. $30,000--Casts Split**) Planning/Dev.Services: 9g Computer Software 5,000 5,000 Unidentified: 9h Technology Enhancements-Unsch. Balance 179,507 179,507 10 Subtotal-Fund 261 Grants/Other Revenue 1,295,300 300,000 0 725,000 270,300 1 FY 06-07 CAPITAL IMPROVEMENT PLAN - 261 FUND (page 2) Current General Misc. Tech Fiscal Year Measure Fund Rev. & Enhance. NAME OF PROJECTS Requests Y Transfer Grants Fees Fund 261 -Revenue Source- General Fund Transfer City Hall. 11 Remodel Lobby/City Clerk's Area 15,000 15,000 '12 City Hall Furniture & Equipment 60,000 25,000 13 Directional Signage for City Hall 8,500 8,500 14 Security Improv. for Police/City Hall (Balance**) 30,000 30,000 Engineering: 15 Re-Lighting Downtown (Full cost$2,100,000, 600,000 booking current year costs only.) 16 Indian Canyon Drive-Street Lights Rewire 35,000 '17 Museum Way Lighted Crosswalk 60,000 18 Traffic Speed Study 30,000 30,000 19 Traffic Volume Counts 15,000 15,000 20 City Hall Resurface& Repair South Parking Lot 500,000 20,000 Facilities: 21 City Hall Roof Drains 25,000 22 City Hall Energy Management System 80,000 (Lights&HVAC on/off) 23 James Jessie Desert Highland Unity Center Reroof 45,000 24 JJDHUC Repair/Replace Missing Light Poles 20,000 Fire Dept: 25 Fire Training Portable Classrooms(Full Cost-- 145,301 $290,000 have$144,699) 26 Mobile Data Terminals for Fire Engines 40,000 40,000 27 Replace Worn Carpet ($45,000 over 3 years) 15,000 28 Install Tomar"Opticom"($75,000 over 3 yrs) 25,000 25,000 29 Paint Fire Stations Interior/Ext($24,000 over 3 yrs) 8,000 30 Slurry Seal Parking Lot Station 442 10,000 Info Teich: 31 Microsoft Exchange Mail Server Upgrade (Balance*') 17,500 17,500 32 City Hall Server Backup Solution (Balance**) 10,620 10,620 33 Microsoft Office 2003 Licenses (Balance"') 16,172 16,172 34 Technology Master Plan (Balance**) 30,000 35 Sophos Anti-Virus User License Upgrade(Balance**) 1,500 1,500 36 Upgrade, Modify, or Replace Telephone System 15,000 15,000 (Full cost$300,000; -shared w/tech enhanc**) PSCTV: 37 Replace:Master Control Computer Resources 30,000 38 Replace Bulletin Board Computer 10,000 10,000 2 FY 06-07 CAPITAL IMPROVEMENT PLAN - 261 FUND (page 3) Current General Misc. Tech Fiscal Year Measure Fund Rev. & Enhance. NAME?OF PROJECTS Requests Y Transfer Grants Fees Fund 261 -Revenue Source- General Fund Transfer Parks&Rec: 39 Replaster Pool, Replace Tile, & 180,000 180,000 Add New Lanes&Targets 40 Tennis Court Lighting 35,000 35,000 41 Pave DeMuth Parking Lots(7 &8) 550,000 42 Repave: DeMuth Parking Lots(5&6) 60,000 43 DeMuth Security Lighting 50,000 44 Parks Concrete Replacement 150,000 45 Tennis Court Resurfacing 50,000 46 Fence (Fabric Replacement 40,000 47 Downtown Banners 52,000 48 Oleander Replacement(on-going) 200,000 Police Dept.: 49 Plasma Smart Board 10,000 50 Reconfigure HVAC System 35,000 35,000 51 Install Air Filtration System in Jail HVAC 10,000 10,000 52 Install Pepper Spray Decontamination in Jail 9,000 53 Refurbish Plumbing in Animal Control Bldg 14,000 Unidentified: 54 Unscheduled Capital Balance 708 708 55 Subtotal-Fund 261 General Fund Transfer 3,343,301 540,000 56 Grand Total 4,638,601 261 Funds -General Fund Transfer&Grants/Other 57 General Fund Transfer-All Other 540,000 58 Total Grants, Tech Fees&Other Rev. _ 1,295,300 59 TOTAL 261 FUNDS AVAILABLE 1,836,300 Highlighted projects recommended for funding: Proj.with funding from General Fund Transfer = 540,000 Proj. with funding from grants &other sources = 1,295,300 References&Notes: (1) Revenue for Park& Recreation from Measure Y= $167,000 (2) Rev. for Library from Measure Y= $133,000 (3)STP Federal Grant (4) Homeland Security Grant (5) SB 821 Bike Trail &Sidewalk Grant Costs in () represent full costs of project; project may be full or partially funded in this fiscal year. 'Project casts funded/split between a granttspecific revenue source and the general fund transfer. 3 CITY OF PALM SPRINGS CAPITAL. IMPROVEMENT BUDGET FY 06-07 CITY HALL Fund 261 Total Current Project Project F /Y Cost Amount 11 Remodel Lobby/City Clerk's Area 15,000 15,000 In light of security concerns staff proposed that the reception counter in the lobby of City Hall be relocated and that a new reception/public information counter be created in the City Clerk's Office. 12 City Hall Furniture and Equipment 60,000 25,000 (Remaining portion funded under Fund 811 -RDA) Existing tables, chairs, couches are worn and broken in need of replacement. 13 Directional Signage for City Hall 8,500 8,500 Installation of directional signs at City Hall and two portable directory units to show map of City Hall and telephone directory. Security Improvements for Police/City Hall 130,000 14 Fund 261 Revenue 30,000 8 Homeland security grant funding 100,000 Total City Hall Capital Projects 213,500 178,500 4 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06-07' ENGINEERING - FUND 261 otal urren Project Project F 1 Y Cost Amount 5 ARHM Overlay 900,000 400,000 (STP Grant Revenue) (Remaining portion funded under Measure A) Pavement failure-Slurry Seal has no effect- Pavement needs reconstruction to remain functional. 13 Indian Ave UPRR Bridge& 5,827,000 165,000 Indian Canyon Drive Widening (Current year project cost$674,000) (STP Grant Revenue) (Remaining portion funded under Measure A) Bridge is functionally obsolete and needs widening to handle traffic- Roadway segment between bridge and freeway will need to be widened to avoid creating bottleneck. 7 SB821 Sidewalk Construction 90,000 60,000 (SB281 Grant Revenue) (Remaining portion funded under Measure A) Repair sidewalks to provide pedestrian safety. 15 Re-Lighting Downtown 2,100,000 600,000 Electrical system for decorative and palm tree light are old, failing and cannot take anymore lights. '16 Indian Canyon Drive-Streetlights Re-wire 35,000 35,000 Streetlights are failing and the City is also suffering from knockdowns. It is proposed to replace the existing overhead wires with a single line SCAR wire. '17 Museum Way Lighted Crosswalk 60,000 60,000 Fashion Plaza remodel will be most likely conditioned to do this. 18 Traffic Speed Study 30,000 30,000 Last study five years ago new study must be done in order to set enforceable speed limits. 19 Traffic Volume Counts 15,000 16,000 Traffic Counts have not been updated for 4 years. 5 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06-07 ENGINEERING -FUND 261 (page 2) otal Current Project Project F / Y Cost Amount 20 City Hall Resurface and Repair South 500,000 500,000 Parking Lot Resurface City Hall South parking lot with concrete white topping. Parking lot is is in extremely poor condition. Large transverse cracks are resulting in trip and fall claims. Also include repairs as required. Total Engineering Capital Projects T557,000 1,865,000 6 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06-07 FACILITIES Total Current Project Project F /Y Cost Amount 21 City Hall Roof Drains 25,000 25,000 Drains are plugged on the awnings around Engineering Building. This floods the roofs and water gets above the roof flashings and then the roof leaks. This will eventually cause damage to the stucco underneath. 22 City Hall Energy Mgmt. System(Lights&HVAC off/on) Replace energy management system at City Hall. 80,000 80,000 The system handles the programming that turns the lights and HVAC equipment on and off. System is original and parts have been by- passed to keep it running. Could package this City Hall product with the system that Park's has at DeMuth Park and save costs by not having to buy two systems. 23 Desert Highland Center Reroof 45,000 45,000 Roof is original roof and is leaking with rain. Ceiling is damaged. 24 Desert Highland Ctr Repair/Replace Light Poles 20,000 20,000 Two to the poles have fallen from the winds and three of the poles have been pushed over at an angle. They need to be removed and new bases poured that will withstand the high winds. Total Facilities Department Capital Projects 170,000 170,000 7 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06-07 FIRE Total Current Project Project F /Y Cost Amount 25 Fire Training Portable Classroom 290,000 145,301 Replace portable training classroom for the fire department. $183,000 of the total project costs of$233,404 will be covered by reprogramming existing funds. 26 Mobile Data Terminals for Fire Engines 40,000 40,000 Digital mapping and preplan information. Field reporting not currently available. 27 Replace Worn Carpet 45,000 15,000 Replace worn carpet. To be allocated over a three year period. 28 Install Tomar"Opticom" 75,000 25,000 Provide safe response for Fire, Police, and ambulance units responding to emergencies. Increases response time in a safe manner. 29 Paint Fire Stations Interior/Exterior 24,000 8,000 Paint interior and exterior of fire station same time the carpet is replaced. To be allocated over a 3 year period. 30 Slurry Seal Parking Lot Station 442 10,000 10,000 North parking lot is deteriorating. Total Fire Dept Capital Projects 484,000 243,301 8 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06-07 INFORMATION TECHNOLOGY Total Current Project Project F /Y Cost Amount Microsoft Exchange Mail Server Upgrade 35,000 9a Technology Enhancement Revenue 17,500 31 Fund 261 Revenue 17,500 Current mail server is at the end of it's life cycle. In order to avoid Data loss (E-mail)the system must be upgraded. City Hall Server Backup Solution 21,241 9b Technology Enhancement Revenue 10,620 32 Fund 261 Revenue 10,620 The current Backup solution has reached its maximum capacity. At the City's current rate of data growth, this solution will give enough capacity for the next 7-10 years. Microsoft Office 2003 Licenses 32,344 9c Technology Enhancement Revenue 16,172 33 Fund 261 Revenue 16,172 The City has used up all available Microsoft Office licenses. New licenses must be purchased to support new computers and to upgrade existing computers. Technology Master Plan 55,000 9d Technology Enhancement Revenue 25,000 34 Fund 261 Revenue 30,000 Short-range technical and financial plan for specified IT projects designed to achieve the City's long-range strategic information goals. Similar in nature to the City's CIP program. Sophos Anti-Virus User License Upgrade 2,994 9e Technology Enhancement Revenue 1,500 35 Fund 261 Revenue 1,500 The City has exceeded the number of licenses for the Sophos Anti-Virus Software. Licenses need to be upgraded to continue the use of the Anti-Virus Software. 9 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06-07 INFORMATION TECHNOLOGY(page 2) Total Current Project Project F /Y Cost Amount Upgrade City Hall and PD Telephone Systems 300,000 9f Technology Enhancement Revenue 15,000 36 Fund 261 Revenue 15,000 The two AT&T and PBX phone systems installed at City Hall and the Police Dept were installed in April 1994. It would be prudent to prepare for future system upgrades. Staff proposes to set aside a modest sum annually to lessen the fiscal impact, once the upgrade or replacement becomes an urgent necessity. Total Information Tech.Dept Capital Projects 446,579 176,584 10 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06-07 PSCTV otal Current Project Project F /Y cost Amount 37 Master Control Computer Resources 30,000 30,000 Replace aging computers for: live switcher sound system controls, non-linear editing &office PC extending Hard Drive Space for digital assets. 38 Bulletin Board Computer 10,000 10,000 Replace aging GX110 (1999) computer and software that displays digital signage and other information on Ch 17 &the live web stream. Total PSCTV Capital Projects 40,000 40,000 11 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET PARKS &RECREATION FY 06-07 Total Current Project Project F /Y Cost Amount 1 Desert Landscape Conversion (on-going) 324,000 147,000 Measure Y Revenue Tahquitz Canyon Way islands need to convert to desert landscape. 2 Stadium Renovation (on-going) 30,000 20,000 Measure Y Revenue Generalized repairs to Palm Springs Stadium in restrooms, offices, dugouts, and concessions. 39 Repl,aster Pool/Replace Tile/Add New Lanes&Targets 180,000 180,000 Pool bottom is"peeling". Per county health department, the next time the pool is drained, it will need to be replastered. 40 Tennis Court Lighting 35,000 35,000 The old system has not worked for years and needs to upgraded for use by the citizens of Palm Springs. 41 Pave DeMuth Parking Lots(7&8 ) 550,000 550,000 Current parking lot is gravel. The City would not allow a local business to have a parking lot of this nature. The City should set the standard. 42 Repave DeMuth Parking Lots(5&6 ) 732,000 60,000 Parking lot is old and deteriorating-potholes and broken asphalt throughout. It creates a serious hazard for both vehicles and park patrons. 43 DeMuth Security Lighting 50,000 50,000 Current system has not been operative in over 15 years. It would be beneficial to the patrons of the park and the surrounding neighborhoods to provide some sort of lighting. 44 Park Concrete Replacement 150,000 150,000 Sidewalks throughout both, Sunrise and DeMuth parks, are cracking and becoming hazards to park patrons. 45 Tennis Court and Basketball Court Resurfacing) 50,000 50,000 Tennis courts at DeMuth have not been resurfaced in years and are due. The basketball courts at Sunrise Plaza, Baristo Park and Ruth Hardy Park are due for resurfacing as well. 12 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET PARKS&RECREATION (page 2) FY 06-07 Total Current Project Project F / Y Cost Amount 46 Fence Fabric Replacement 40,000 40,000 Eighty percent of the fence fabrication at DeMuth Park is over twenty years old. It is very worn and stretched in need of replacement. 47 Downtown Banners 52,000 52,000 Existing banners are worn out and need replacement. Banners cost$100 each for 260 poles, or 26,000 per set. 48 Oleander Replacement(on going) 200,000 200,000 Oleander hedgerows are dying from disease and old age and need to be replaced. Total Parks and Recreation Capital Projects 2,393,000 1,534,000 13 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06-07 POLICE DEPARTMENT Total Current Project Project F /Y Cost Amount 49 Plasma Smart Board 10,000 10,000 50 Reconfigure the HVAC System The current HVAC system allows pepper spray 35,000 35,000 deployed in the jail to contaminate other areas of the building rendering them unusable. 51 Install Air Filtration System in Jail HVAC Due to lack of good filtration in the jail the rear 10,000 10,000 door is left open to evacuate odors. This can cause a security or inmate escape risk. 52 Install Pepper Spray Decontamination in Jail 9,000 9,000 When pepper spray is used on suspects they must be decontaminated as soon as possible. Currently there is no secure area to perform this task. 53 Refurbish Plumbing System in Animal Control Bldg. The plumbing in the Animal Control building is 14,000 14,000 rotting and needs to be replaced soon. The system is over 40 years old. Total Police Dept Capital Projects 78,000 78,000 14 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06-07 LIBRARY Total Current Project Project F /Y Cost Amount 3 Computer Replacement and Upgrade 66,040 66,040 (Measure Y) Includes 13 Dell workstations, a Dell server 5 Dell Opt Plex, Fiber optic cable, and a self checkout machine. 4 Capital Projects-Unscheduled 66,960 66,960 (Measure Y) Total Library Capital Projects 133,000 133,000 15 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06-07 PLANNING Total Current Project Project F /Y Cost Amount 9g Technological Enhancements 5,000 5,000 Computer Software Total Planning Dept Capital Projects 5,000 5,000 16 FY 06-07 CAPITAL IMPROVEMENT PLAN- SPECIAL REVENUES NAME OF PROJECTS Fund 133 Fund 134 (CVAG) Fund 135 Fund 811 Fund 152 Gas Measure Measure RDA Quimby Tax A Fund A Fund Drainage Merged 1 Act Fees Fund Local Regional Fund Capital Capital 1 Auditing (Required) 2,300 2 Traffic Signal Flow Improvement 50,000 3 Drainage Repairs-Araby Circle& 100,000 Patencio Lane 4 Curb&Gutter Repair-City Wide 100,000 5 ADA Ramp Repair (Full Request$50,000) 2,700 5a ADA Ramp Repair (Deferred Balance) 47,300 6 Drainage Improvements(Sonora Road) 100,000 7 Residential Traffic Speed 100,000 Reduction (Traffic Calming) 8 Bridge Repairs-Citywide 100,000 9 SB821 Sidewalk FY 06-07** 30,000 10 Mid-Valley Parkway Reimb.-CVAG 10,422 11 Annual Citywide Slurry Seal 500,000 12 ARHM Overlay(Full Request$900,000)** 500,000 13 Traffic:Signal- Indian Canyon Dr/Tamarisk 200,000 14 Traffic:Safety Projects 40,000 15 Ramon Road Widening Concept Study *** 50,000 16 Indian Ave UPRR Bridge& ** 127,250 127,250 17 Indian Canyon Drive Widening * 127,250 127,250 18 Block Floodwall- Palm Cyn Wash 654,000 at Tahquitz Creek 19 Storm Drain Line 6A-Vista Chino 150,000 to Via IEscuela 20 Storm Drain Line 8-Baristo Channel 1,025,000 to Tahquitz 21 Storm Drain Line 20C &20CA 200,000 22 Unscheduled Downtown Capital Improv. 100,000 23 City Hall Furniture&Equipment 35,000 24 General Plan Update-RDA Contribution 60,000 25 Unallocated Capital Projects 353,078 26 Gene Autry Trail/Vista Chino **** 825,000 Landscape Median&Gateway 27 SUB TOTAL_ 502,300 2,038,000 254,500 2,029,000 195,000 825,000 28 TOTAL CAPITAL PROJECTS Transfers Out: 29 To General Fund for Street Maintenance 600,000 TOTAL CAPITAL PROJECTS REQUESTS& 30 PROJ. COVERED BY TRANSFERS OUT 1,102,300 2,038,000 254,500 2,029,000 195,000 825,000 31 TOTAL AVAILABLE FUNDING 865,000 2,038,000 264,500 160,000 195,000 826,000 Details on individual projects can be provided by City Engineer. Highlighted projects recommended for funding. (Recommendations for Drainage will be determined at a later date). *These projects also receive funding from grants, such as STP, HBRR&SB 821, as shown under the Fund 261 schedule. * Matching Fund 134 Measure A Regional share budgeted in previous year. * Quimby funding recieved in prior year. 1 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06-07 Gas Tax Fund 133 otal Current Project Project F / Y Cost Amount 1 Auditing 2,300 2,300 2 Traffic Signal Flow Improvement 50,000 50,000 Existing protective left turn signals are being changed to protective-permissive to reduce delays. This continues program started in 2004. 3 Drainage Repairs-Araby Circle& 100,000 100,000 Patencio Lane These two locations have drainage problems created by city street construction 20 years ago. Residents have requested these problems be rectified. 4 Curb and Gutter Repair-Citywide 350,000 100,000 Many curbs have been damaged and need repair to avoid holding water. With the threat of West Nile Virus, it would be prudent to make repairs. 5 ADA Ramp Repairs 50,000 50,000 Per ADA Coordinator, many of the old ramps in the City are in need of updating to current ADA Standards. 6 Drainage Improvements-Sonora Road 100,000 100,000 The system was constructed over 30 years ago and does not drain well. The result is stagnant water and an odor problem. Neighbors have requested the situation be rectified. 7 Residential Traffic Speed Reduction 100,000 100,009 (Traffic Calming) Responses to neighborhood requests to reduce speeds on local streets. Total Gas Tax Fund Capital Projects 752,300 502,300 2 CITY OF PALIVI SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06-07 Measure A Fund Local (134-4498) total urren Project Project F / Y Cost Amount 8 Bridge Repairs-Citywide 100,000 100,000 Response to Caltrans' bridge reports indicating bridges in need of repair. 9 SB821 Sidewalk Construction 90,000 30,000 (Remaining portion funded under Fund 261 - SB821 Grant) Repair sidewalks to provide pedestrian safety. 10 Mid-Valley Parkway Reimbursement 364,744 10,422 -CVAG Per Council Agreement with CVAG. Payments over 34 years. 11 Annual Citywide Slurry Seal 500,000 500,000 Maintain and prolong life of City streets. 12 ARHM Overlay 900,000 500,000 (Remaining portion funded under Fund 261 - STP Grant) Pavement failure-Slurry Seal has no effect- Pavement needs reconstruction to remain functional. 13 Traffic Signal-Indian Canyon Dr/Tamarisk 200,000 200,000 Signal warrants met 14 Traffic Safety Projects 40,000 40,000 Projects to help correct vehicle or pedestrian safety issues. 15 Ramon Road Widening Concept Study 100,000 50,000 (Remaining portions funded under Meas. A. - Regional) Widening to ultimately 6 lanes. Concept study will identify details and costs of project-this is in the CVAG list of Regional projects. 3 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET Measure A Fund Local (134-4498) (page 2) Total Current Project Project F /Y Cost Amount '16 Indian Ave UPRR Bridge& 5,827,000 127,260 17 Indian Canyon Drive Widening (included above) 127,250 (Current year project cost$674,000) (Remaining portions funded under Fund 261 - STP arrant& Meas A-Regional) Bridge is functionally obsolete and needs widening to handle traffic- Roadway segment between bridge and freeway will need to be widened to avoid creating bottleneck. 25 Unallocated Capital Projects 353,078 363,078 To account for the unallocated capital projects balance. And to allow for coverage of unexpected price increases. Total Measure A Local Capital Projects 8,474,822 2,038,000 4 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06-07 Measure A Fund Regional (134-4497) o a urren Project Project F / Y Cost Amount 15 Ramon Road Widening Concept Study 100,000 0 (Remaining portions funded under Measure A-Local; $50,000 Regional portion budgeted in prior year) Widening to ultimately 6 lanes. Concept study will identify details and costs of project-this is in the CVAG list of Regional projects. 16 Indian Ave UPRR Bridge& 5,827,000 127,250 17 Indian Canyon Drive Widening (included above) 127,250 (Current year project cost$674,000) (Remaining portions funded under Fund 261 - STP Grant& Measure A-Local) Bridge is functionally obsolete and needs widening to handle traffic-Roadway segment between bridge and freeway will need to be widened to avoid creating bottleneck. Total Measure A Regional Capital Projects 5,927,000 254,500 5 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06--07 Drainage Fund 135 otal Current Project Project F /Y Cost Amount '18 Block Floodwall-Palm Canyon Wash 2,000,000 664,000 at Tahquitz Creek Part of Golf Course LOMR to remove areas from Flood Zone, 19 Storm Drain Line 6A-Vista Chino Via 400,000 160,000 Escuela Surface water creating problems at shopping center entrances. 20 Storm Drain Line 8-Baristo Channel to 1,800,000 1,025,000 Tahquitz New development along Sunrise has resulted in need for storm drain which will reduce Tahquitz and Ramon flooding at Sunrise. 21 Storm Drain Line 20C &20CA 1,000,000 200,000 Extension of previously constructed storm drain to serve proposed new development. Total Drainage Fund Capital Projects 5,200, 000 2,029,000 6 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06-07 Redevelopment Agency Fund 811 Merged Area#1 -Capital Total Current Project Project F I Y Cost Amount 22 Unscheduled Downtown Capital Improvements, 100,000 100,000 Yet to be determined capital projects to enhance downtown area. 23 City Hall Furniture and Equipment 60,000 36,000 (Remaining portion funded under Fund 261) Existing tables, chairs, couches are worn and broken and needs to be replaced. 24 General Plan Update 1,010,000 60,000 ($950,000 funded by General Fund Transfers in previous years) Additional Funds required to complete on going project. This is RDA's contribution. Total Downtown Redev. Capital Projects 1,170,000 195,000 7 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06--07 Quimby Act Fees Fund 152 otal Current Project Project F / Y Cost Amount 26 Gene Autry Trail/Vista Chino 2,200,000 825,000 Landscape Median&Gateway Landscape Median &Gateway on Gene Autry Trail between Vista Chino and Via Esuela and the Parcel Identified as APN#677-220-016 Total Quimby Act Fees Fund Capital Projects 2,200,000 825,000 8 FY"06-07 CAPITAL IMPROVEMENT PLAN- ENTERPRISE NAME OF PROJECTS Fund 420 Fund 415 Wastewater Airport Treatment 1 AIP 38-(includes matching revenue)` 3,850,000 2 AIP 40-(includes matching revenue) 7,900,000 3 Annual Crack Filling 30,000 4 Furniture, Fixtures&Equip. New Holdroom Phase I 150,000 5 Parking Gate Equipment 30,000 6 Road Signage Enhancements 15,000 7 Furniture Replacement-Terminal 12,500 8 Sewer Line 250,000 9 Unscheduled Capital 75,000 250,000 10 SUB TOTAL 12,062,500 500,000 11 TOTAL CAPITAL PROJECTS 12,062,500 500,000 Transfers Out: 12 To General Fund 13 AMOUNT PROVIDED BY FEDERAL GRANT 11,150,000 14 AMOUNT PROV.BY FUND REVENUES OR RESERVES 912,500 500,000 Highlighted projects recommended for funding: Terminal Holdrooms Expansion '* Airfield Safety Improvements 1 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06-07 Airport Fund 415 Total Current Project Project F /Y Cost Amount 1 AIP 38 -(includes matching revenue) 3,850,000 3,850,000 Terminal Holdrooms Expansion 2 AIP 40 -(includes matching revenue) 7,900,000 7,900,000 Airfield Safety Improvements 3 Annual Crack Filling Program 30,000 30,000 Pavement crack sealing, airside and landside according to pavement condition. Non-FAA reimbursable 4 Furniture, Fixtures and Equipment New 300,000 160,000 Holdroom-Phase 1 Furniture, Fixtures and Equipment needed for new terminal holdroom, 50%of total requirement. 5 Parking Gate Equipment 30,000 30,000 Create a short term lot to increase revenue and provide better use of all parking areas in public lot. 6 Road Signage Enhancements 15,000 16,000 Amend overhead signage to create a more efficient traffic flow and reduce passenger confusion when entering and exiting the airport. 7 Furniture Replacement-Terminal 12,500 12,500 Replace seating over 10 years old with new units of the same design (old units cannot be repaired). 9 Unscheduled Capital 75,000 75,000 Unidentified capital expenditures for airport. Total Airport Capital Projects 12,212,500 121062,500 2 CITY OF PALM SPRINGS CAPITAL IMPROVEMENT BUDGET FY 06-07 Waste Water Treatment Plant Fund 420 Total Current Project Project F /Y Cost Amount 8 Sewer Line 250,000 250,000 Sewer line improvements. 9 Unscheduled Capital 250,000 250,000 Unidentified capital improvements to sewer line. Might include Influent/Effluent modifications. Total Waste Water Treatment Capital Projects 500,000 500,000 3