DATE: February 6, 2013 CONSENT CALENDAR
SUBJECT: APPROVE AMENDMENT NO. 2 TO ARCHITECTURAL SERVICES
AGREEMENT NO. A6262 WITH URRUTIA A.I.A. AND ASSOCIATES
FOR AIRPORT PROJECTS.
FROM: David H. Ready, City Manager
BY: Airport
SUMMARY
The City Council will consider an amendment to Urrutia Architects agreement for
professional architectural services at Palm Springs International Airport.
RECOMMENDATION:
1. Approve Amendment No. 2 to Urrutia A.I.A. and Associates Agreement
No. A6262 for design, bid, permitting, and construction phase services in the
amount not-to-exceed $31,935.00, to complete the remodeling and expansion of
an existing vacant building to accommodate the USO.
2. Authorize the City Manager to execute Amendment No. 2, and approve change
orders not-to-exceed ten percent (10%) of the total contract amount.
STAFF ANALYSIS
Due to the continued growth of the USO and the constrained space it occupied in the
airport baggage claim area, arrangements were made over a year ago to relocate the
entire operation into a facility just a short distance from the terminal's North end next to
the US Customs.
Since that time the USO organization has changed management and operational
structure and now prefers a smaller, modern, single level facility on the South end of the
terminal that does not share with other tenants. The location is more secluded,
provides improved security requirements for the United States Marines and the facility
can be easily customized to address their specific functional requirements.
ITEM NO.
City Council Staff Report
February 6, 2013—Page 2
Urrutia Associates for Architectural Services
The Airport Commission voted unanimously to recommend the City Council fund a
newly remodeled facility and hiring the City's professional architect to complete the
design, bid and construction of the project. Staff estimated the project could be
completed by the end of this calendar year.
The City Council previously approved an agreement with Urrutia Architects for on-call
architectural services at the Airport. Amendment No. 2 will incorporate the design and
engineering services for the remodel of the USO Building.
FISCAL IMPACT
The amount of Amendment No. 2 to the Agreement is not-to-exceed $31,935, for the
design, bid and construction documents. Funds are available in Account
No. 416-6501-56121.
Staff estimates the construction cost for the remodel will be approximately $135,000.00.
Construction bids will return to the City Council for award of a construction contract.
The Fiscal Year 2013-14 Airport Budget will include sufficient funding for the
construction costs.
The USO will be responsible for all furnishings of the building.
Thomas N61an,
Executive Director, Airport
David H. Ready, City Manager
Attachments:
1. Urrutia Amendment No. 2
2. Urrutia Scope of Work
02
AMENDMENT NO. 2
TO AGREEMENT NO. A6262 On-Call Architectural Services
PALM SPRINGS INTERNATIONAL AIRPORT
THIS SECOND AMENDMENT is made and entered into as of the 6th day of Feb-
ruary, 2013 (the "effective date") by and between the CITY OF PALM SPRINGS, a Cali-
fornia charter city and municipal corporation ("City'), and Urrutia A.I.A. and Associates,
Inc., dba Urrutia Architects (herein "Consultant') as follows:
RECITALS
WHEREAS, the City owns and operates Palm Springs International Airport ("Air-
port") located in Palm Springs, California for the convenience of the general public.
WHEREAS, City and Consultant entered into that certain Consulting Services
Agreement No. A6262 for Aviation Consulting ("Agreement') for On-Call Architectural
Services, as duly amended from time to time; and
WHEREAS, the parties wish to amend the Agreement to increase work assign-
ments.
NOW, THEREFORE, for good and sufficient consideration, the parties agree as
follows:
1. Exhibit "A", Scope of Services, is hereby amended to add the following on-call
Architectural Services for additional resident professional services for the Re-
model and Addition to the existing Modular Building for the USO as described in
the proposal from the Consultant dated December 13, 2012.
Task 4 — Design and Engineering Services - Remodel/Addition for USO Modular
Building.
2. The agreement shall allow a total project sum up to $31,935.00 for professional
services relating to the design, construction management and planning of Task 4.
Except as previously modified herein, all other provisions of the Agreement shall remain
unmodified in full force and effect.
[SIGNATURE PAGE FOLLOWS] 03
Urrutia Architects Inc. A6262
February 6, 2013—Page 2
Palm Springs International Airport
IN WITNESS WHEREOF, the parties have executed and entered into this Agreement as of the date first
written above.
ATTEST: CITY OF PALM SPRINGS
a municipal corporation
By: By:
City Clerk City Manager r
APPROVED AS TO FORM:
By:
City Attorney
CONTRACTOR: Check one: _ Individual_Partnership_Corporation
Corporations require two notarized signatures: One from each of the following: A. Chairman of Board,
President, or any Vice President: AND B. Secretary, Assistant Secretary, Treasurer, Assistant Treasurer,
or Chief Financial Officer.
By: By:
Signature (notarized) Signature(notarized)
Title: Title:
State of State of
County of County of
On before me, On before me,
personally appeared personally appeared who
proved to me on the basis of satisfactory who proved to me on basis of satisfactory evi-
dence to be the person(s)whose name(s) evidence to be the person(s)whose names(s)
name(s)is/are subscribed to the within instrument is/are subscribed to the within instrument and
acknowledged to me that he/she/they and acknowledged to me that he/she/they ex-
ecuted the same in he/her/their authorized executed the same in his/her/their authorized
capacity(is), and that by his/her/their sigma- capacity(is), and that by his/her/their signa-
ture(s) on the instrument the person(s), or the tares(s)on the instrument the person(s) or the
entity upon behalf of which the person(s) the entity upon behalf of which the person(s)
acted, executed the instrument. acted, executed the instrument.
I certify under PENALTY OF PERJURY I certify under PENALTY OF PERJURY under
the laws of the State of California that the under the laws of the State of California that the
foregoing paragraph is true and correct. foregoing paragraph is true and correct.
WITNESS my hand and official seal. WITNESS my hand and official seal.
Notary Signature: Notary Signature:
Notary Seal: Notary Seal: 04
165 Luring Drive
Palm Springs,CA 92262
76O7,6800
urrum M
760.327.6813 fax
Ti a
December 13, 2012
Mr. Thomas Nolan
Executive Director
Palm Springs international Airport
3400 E. Tahquitz Canyon Way
Suite OFC
Palm Springs, CA. 92262-6966
RE: Proposal for Professional Design and Engineering Services Remodel/Addition to
Existing Modular Building for USO.
Palm Springs, CA.
Dear Mr. Nolan:
Urrutia Architects is pleased to provide the City of Palm Springs International Airport with
our proposal for professional architectural and engineering services for the remodel and
addition to the existing modular building for the new USO facility located in Palm
Springs, CA.
Scope of War
The following points summarize our understanding of the scope of work. The airport and
City of Palm Springs are proposing to add additional space of about 1066 SF to the
existing modular building (865 SF) located to the east of the existing Vehicle Inspection
Plaza. The total combined area will be about 1931 SF. In addition to the additional
space the existing building will be remodeled to include upgrading the existing finishes
and the following:
• New retaining wall on the west and north sides.
• New patio area with shade cloth or trellis on the west side.
• New Baggage area that will be secured to hold about 50 sea bogs.
• Tl Internet connectivity and computer stations within the Lounge area.
• New Kitchen area with clothes washer and dryer, refrigerator/freezer,
dishwasher, and full size sink with garbage disposer. Provide storage cabinets
for snacks, plastic/paper goods.
• Lounge area with tile or polished concrete floors, with space for both fables
and chairs and sofas or recliners.
• Reception counter and desk.
05
Remodel and Addition to Existing Modular Building for USO
Palm Springs International Airport
Palm Springs,CA
December 13,2012
Office for the USO manager.
• Two existing bathrooms shall be upgraded with new finishes, fixtures as
necessary. Possible shower.
• Hot water heater.
• Security features, two phone lines, one fax line.
• 7-10 dedicated parking spaces, including handicapped spaces.
• New HVAC system for addition. Check existing HVAC systems to ensure they
are in good condition.
We are assuming that the project will be subject to review by only the following
agencies/departments:
o City of Palm Springs Airport
o City of Palm Springs Planning Department and Architectural Review
Commission
o City of Pafm Springs Building Department
Scope of Services
Based on the above Scope of Work, Urrutia Architects will provide Architectural and
Engineering Services including Design and Construction Documents for the proposed
Parking Lot Space Expansion to include the following services:
• Architectural
• Electrical Engineering
• Mechanical Engineering
• Structural Engineering
A. Pre-Design/Site Analysis Phase:
a; Urrutia Architects and their consultants shall provide the following services:
• Architectural design shall include review of existing construction
documents and record drawings furnished by the City or airport. A
site visit shall be conducted.
• Electrical and mechanical engineering shall consist of a site visit to
document the existing plumbing, power sources, electrical panels,
and HVAC loads.
• Structural engineering shall consist of review of existing structural
drawings and details to determine structural components of the
existing modular building.
B. Design Development Phase:
a, Urrutia Architects shall prepare design development drawings which will
consist of the following:
- 2 - 06
Remodel and Addition to Existing Modular Building for USC
Palm Sorings International Airport
Palm Springs,CA
December 13,2012
• Architectural design shall include a proposed floor plan layout,
reflected ceiling plan, exterior elevations, roof plan, site plan,
sections, and finish material selections. The Architect shall be
responsible for the coordination of all consultants work; provide the
airport with delineated layouts for review and comment; attend all
meetings, including City review meetings; and scheduling of all
consultant's work.
C. Construction Document Phase:
a. Urrutia Architects and their consultants shall prepare detailed
cons*ruction documents based on the final design development
drawings approved by the City of Palm Springs and the airport, which
will, in general, consist of the fcliowing:
• Title sheet with code analysis and ADA requirements.
• Site Plan to identify location of work.
• Site hardscape plan.
• Demolition Plan and details.
• Remodel floor plan and finish schedule.
• Reflected ceiling plan and details.
• Exterior elevations.
• Sections.
• Structural drawings and details.
• Electrical demolition plan and remodel plan.
• Mechanical load calculations to determine added
heating/cooling load effect on existing mechanical system and for
determining new HVAC equipment.
• Specifications book prepared in CSI format.
• Attend meetings as required.
D. Bidding Phase:
a. Urrutia Architects shall assist the airport in soliciting and obtaining bids from
general contractors for this project through the public noticing process
which will include prevailing wage requirements. During the course of the
- 3 - 07
Remodel and Addition to Existing Modular Building for 11SO
Palm Springs International Airport
Palm Springs,CA
December 13,2012
bidding process, the architect shall prepare and issue addenda as
necessary to the bidders, respond to bidders' RFI's, review bids, and make
final recommendations to airport executive director approval,
E. Construction Administration Phase:
a. Urrutia Architects shall provide professional services during the course of
construction that shall include the following:
• Provide clarification and interpretive drawings to the
contractor.
• Review and respond to RFI's from contractors.
• Review submitted changes in construction and costs proposed by
the contractor. Process any Change Orders during the
construction phase.
• Review Applications for Payment from the Contractor and make
recommendations for payments.
• Visit the job site once a week to review the progress of work and
answer any questions the contractor may have. Document the site
visits with photographs and written memos which will be
distributed.
• Review and process shop drawings and submittals.
• Prepare punch lists during substantial completion and final punch
lists to close out the project.
• Documentation of all warranties, guarantees, and operation
manuals.
• Provide Geotechnical Services to include soil compaction tests for
new foundation and retaining wall; concrete cylinder compression
tests; test reports.
- 4 - 08
Remodel and Addition to Existing Modular Building for USO
Palm Springs International Airport
Palm springs, CA
December 13, 2012
F. Proposed Compensation
To provide the services described in this proposal, the following compensation is
proposed:
A total fixed cost of$30,435.00, plus reimbursable expenses.
A. Pre-Design/Site Analysis Phase:
A fixed sum of $2,000.00, plus reimbursable expenses.
B. Design Development Phase:
A fixed sum of$2,000.00, plus reimbursable expenses.
C. Construction Document Phase:
A fixed sum of $18,165.00, plus reimbursable expenses.
D. Bidding Phase:
A fixed sum of $ 800.00, plus reimbursable expenses.
E. Construction Administration Phase:
A fixed sum of$7,470.00, plus reimbursable expenses.
Reimbursable Expenses:
Reimbursable Expenses are in addition to the Architect's compensation, and include
actual expenditures made by the Architect and the Architect's employees and
Consultants in the interest of the Project for the expenses listed in the following
Subparagraphs:
• Long distance communications;
• Fees paid in securing approvals of authorities having jurisdiction over the Project;
• Reproductions of drawings, specifications and other documents;
• Postage and special handling of documents;
• Finish/ detailed models requested by the Client,
We are proposing an estimated budget of$1,500.00 for reimbursable expenses.
- s - 09
USO
Proposed KIRK DOUGLAS PARKWAY
i
Location
E
r ry
i
A
o-EP:
E �
L �
S
Parking
0
Loti
.-.. _ "
RENTAL CAR L
LONG
d . . TERM
® ENTRANCE
Short Term Short Term smTin
Parking Parking Long Term Long Term
SHORT Parking Parking
TERM SHORT O
+, ENTR NCE TERM TAXI BUS
ENTRANCE STAGING AREA
OQ
EL CIELO ROAD 9
veVi 'p.C t
R\ p;
TAHQUITZ CANYON WAY
�-+ AIRPORT ENTRANCE Ln
1 �\
USO
\C
Proposed Building Layout
�g
—77
E'
4�_ 4$i
E'
o
11