DATE: March 6, 2013 UNFINISHED BUSINESS
SUBJECT: 5.1290 PD 361 / Planned Development Permit;
Review of Hotel Redesign per Condition of Approval
FROM: David H. Ready, City Manager
BY: Department of Planning Services
SUMMARY
The City Council will review the revised hotel elevations for the Downtown project, as
conditioned by Planned Development (PD 361), approved December 19, 2012.
RECOMMENDATION
Approve the revised elevations and determine that Condition No. 1 of Resolution 23270
is satisfied.
DISCUSSION
At its public hearing of December 19, 2012, the City Council reviewed and approved the
Downtown Palm Springs project consisting of a tentative tract map (TTM36446), three
Major Architectural applications, and a Planned Development District application for a
hotel in excess of sixty (60) feet. The hotel component of the project is located within
Block c-1 of the Museum Market Plaza Specific Area. As part of the hotel approval, the
Council added a condition requiring the applicant to submit a redesign to the Planning
Commission for comments prior to City Council final review. Condition No. 1 of City
Council Resolution No. 23270 states:
1. Review by the Planning Commission of the revised elevations and all colors
and materials, to be submitted no later than noon February 13, 2013 and
reviewed at the next regular Planning Commission meeting, prior to Council
review.
Revised Elevations: The applicant has made significant changes to the hotel elevations
on all sides. The revised architecture is now modern with a pronounced mid-century
motif; the buildings now incorporate projecting balconies, vertical fins, insulated glass,
poured-in-place architectural concrete and other screen walls to break up the long walls
of the hotel. As originally proposed, the hotel will still consist of approximately 185
rooms and is to be located on the westerly (back) half of Block C (referred to as Block
ITEM NO. LVK
CC Memo—Case No. 5.1290/ Planned Development District PD 361 March 6, 2013
Review of Revised Hotel Elevations Page 2 of 2
C-1), with the entry fronting on W. Tahquitz Canyon Way. The main portion of the hotel
runs along the east side of Belardo Road and approximately 89 feet high.
In accordance with the Council's condition of approval, the Planning Commission
reviewed the revised elevations on February 13, 2013. The Commission concluded that
the new design is a major improvement over the previous drawings, and that the new
design is consistent with the Council's desire for a landmark building. The
Commission's draft comments are attached to this report. At the conclusion of its
review, the Commission adopted a motion in support of the redesign, subject to the
following additional recommendations:
- A stronger emphasis be given to the landscape design;
- A more integrated attitude about the public art component
- The design team to propose the colors for the building.
The Council may determine one of the following regarding the revised elevations:
1. That they are acceptable, as submitted, and the condition of approval is satisfied;
2. That they are acceptable subject to additional conditions; or
3. That they are not acceptable and additional work is required.
ENVIRONMENTAL DETERMINATION:
An Addendum to a Final Environmental Impact Report was approved by the City
Council on October 17, 2012. The City Council certified that the certified Specific Plan
EIR and the Addendum together are adequate to support approval of each component
of the proposed project as approved in the Amendment and any future discretionary
approvals needed to implement the project. The entitlements currently under
consideration by the City Council simply implement the project approved in the
Amendment for CEQA purposes on October 17, 2012 No further environmental review
is required. (Public Resources Code § 21166; California Code of Regulations, Title 14, §
15162.)
NOTIFICATION:
No notice is required for this action.
r ' wi IC
Thomas Wilso ssistant City Manager
Di or of an ing Services
David H. Ready, Ci ger
Attachments:
1. Revised Hotel Elevations
2. Draft comment of the Planning Commission, Feb. 13, 2013
02
Planning Commission Minutes
February 13, 2013
3. OTHER BUSINESS:
3A. Case 5.1290/PD-361 / Block C-1 - A preliminary Planned Development
District (PDD) project by Wessman Development within Block C of the
Museum Market Plaza Specific Plan area for a hotel of approximately 185
rooms and various accessory and ancillary uses, including building height
in excess of sixty (60) feet, located at the northwest corner of West Tahquitz
Way and North Palm Canyon Drive. (Project Planner: Edward Robertson,
Principal Planner)
-John Wessman, applicant, provided an overview of` the 'revisions made to the
elevations and building architecture of the proposed hotel, Mr. Wessman described the
redesign to the architecture and incorporation of several articulations on all side
elevations such as projecting balconies and vertical fins to break the long walls of the
hotel.
Vice Chair Hudson expressed appreciation to the Wessman design team for the
revisions made to the proposed hotel. He indicated that this is textbook process on
what can be done during a public review process to`'make a project better. It's
an example of what an architectural DNA can do to a project where the massing of this
building is not that much different but just using;application of materials and techniques
enriches the project and makes it what Palm Springs so famous for. He encouraged the
applicant to apply this architectural DNA to the rest of the project. He commented that
the landscape architecture is very important such as the benches, street furniture and
fountains. He encouraged the,'ity to utilize';Public Arts funding for specific artwork of
this size such as a mural, mosaic artwork or;a fountain to tie this project with the
architecture.
Commissioner Caterdine commended the design team and requested clarification on
the proposed colors for the hotel... He suggested keeping the Marilyn statue on
the Tahquitz Canyon Way corner.
Commissioner tMunger thanked Mr. Wessman for going the extra mile and spoke in
favor of the architectural irpiesign and particularly liked the turquoise and gold/yellow
colors on the building.
Commissioner Roberts said that because of its location this site deserved the best
architecture and the Wessman team has brought design excellence. It is a very
beautiful piece of architecture. He commented that the proposed colors are perfect
and fit the architecture beautifully. The designs and finishes are great and especially
likes the water fountain. Mr. Roberts encouraged a public art component to be special
and unusual and will fit the architecture. He suggested that the design team be
included as a part of the landscaping group because of the sensitivity they
exhibited towards the design of the building.
03
Planning Commission Minutes
February 13, 2013
Commissioner Weremuik spoke in favor of the revisions to the proposed hotel
and commented that the landscaping and public art are a very important part of the
project. She noted that since the design team did such a great job she would prefer that
they present the colors of the building.
Chair Donenfeld spoke in favor of the architectural revisions to the proposed hotel and
noted that it catches the legacy of the mid-century architectural of our city but it is a very
progressive looking building, as well. It will attract all ages and; demographics to the
City.
Commissioner Roberts disclosed that he had communication with the applicant
regarding a rendering of the project.
Vice-Chair Hudson disclosed he had communication with the applicants regarding
comments on the design.
Chair Donenfeld disclosed that he brief conversation with the applicant regarding the
layout of the new design.
Commissioner Calerdine disclosed that he had a brief exposure to the initial drawings a
few weeks ago.
Vice-Chair Hudson, strongly; support the redesign of the facade and materials of the
downtown with emphasis is gyeo to the landscape (wait for the design team).
ACTION: To accept-'the redesign of facade and materials for the hotel of the Palm
Springs Downtown project with the following recommendations:
-A stronger empli`asis be given to the landscape design.
-A more integrated attitude about the public art component.
-The desijn team to propose the colors for the building.
Motion Vick,",'Chair Hudson, seconded by Chair Donenfeld and unanimously
carried on a rollacall vote.."
AYES: Leslield`nger, Philip Klatchko, J.R. Roberts, Chair Donenfeld, Vice Chair
Hudso Lyn Calerdine, Kathy Weremiuk
04