DATE: July 26, 2006 CONSENT CALENDAR
SUBJECT: EXPAND TERMINAL/HOLDROOMS-ADD CHECKPOINT PHASE 3,
PART 2 SCHEDULE I (CITY PROJECT #2005-10), CHANGE ORDER
NO. 1 — DEDUCTIVE, TO AGREEMENT NO. A5257
FROM: David H. Ready, City Manager
BY: Department of Aviation
SUMMARY
Change Order No. 1 - Deductive reflects the changes, deletions, and modification of
materials related to reduce the cost of the project resulting in a net decrease of
$823,365 to the construction contract amount.
RECOMMENDATION:
1. Approve Minute Order No. , approving Change Order No. 1 to Agreement
No. A5257 for Harbor Construction Co., Inc. for revisions and modifications
related to the construction of the new regional holdroom in the amount of
$823,365, reducing the total contract price from $9,278,000 to $8,454,635
pending FAA approval.
2. Authorize the City Manager to execute all necessary documents.
STAFF ANALYSIS:
In response to possible reduction of federal monies related to the construction of the
new regional holdroom, the airport staff and consultants reviewed the construction plans
and specifications for potential areas for reducing the cost of materials and/or methods.
In February of 2006, the City Council awarded a construction contract for the new
regional holdroom and restroom to Harbor Construction Co. Inc. Prior to construction
commencing, it was determined that FAA funds may not be available for the full contract
price of $9,278,000. As a contingency for potential funding shortfall, staff and
consultants reviewed the plans specifications to identify materials, and design changes
that could be implemented without compromising the holdroom's intended use.
ITEM NO.
I
City Council Staff Report
(July 26, 2006) -- Page 2
(Holdroom CO No.1
The approved multi-year FAA grant for the Palm Springs International Airport totals
$10,791,854. The airport assumes the city will receive the $10.8M thereby providing
sufficient funds for the $9.2M tasks as well as some of the development tasks allotted to
the future. However, discussions in Washington occurred, after acceptance of the low
bid, concerning the overall FAA budget. The effect of the action as a result of these
discussions may reduce the $10.8M to $9M. However, of the $10.8M dollars only $9.9
is available for the terminal expansion as $900K of the $10.8M was allocated for
completion of the security checkpoint project. Thus, if the $9.9M is reduced by the
$1.8M as mentioned, the new total dollars available for new holdroom project would be
approx $8.1 M. Airport staff decided to value engineer the project to determine if this
shortfall could be accommodated without compromising the primary purpose of building
the Holdroom, to accommodate an increase in passenger throughput.
The plans for this potential shortfall include a value engineering assessment of the
approved plans and specifications and identify those items/materials that will provide
potential savings without compromising the intent of the Holdroom. Current value
engineering estimates are approximate $1.2 million. Of this $1.2 million, the Attached
provides a breakdown of the value engineering that can be accomplished to reduce the
project costs by $823,365, Subsequent deductive change orders will be brought to City
Council that will account for the balance of the cost savings needed.
As has been done on the recent projects for the Airport and in accordance with Council
direction, design changes have been presented to the Airport Commission and the
Architectural Review Committee as advisory to City Staff.
The Architectural Review Committee did not take action on the value engineering
recommendations made by staff. City Planning Staff has reviewed these changes and
has elected to proceed with City Council approval. Those changes the ARC did not
action are identified on the attached Exhibit A to Change Order No. 1, identified as
items 03450-A, 04220-S, and 09220-A.
Approval of Change Order No. 1 to Agreement No. A5257 will allow Harbor
Construction to proceed with implementing the necessary project design and
construction documentation to allow the project to continue, without compromising the
primary goal of the Project.
FISCAL IMPACT:
No impact as this is a deductive Change Order in the amount of$823,365 and reduces
the cost of the project in keeping with the City/Airport's program of cost containment.
City Council Staff Report
(July 26, 2006) -- Page 3
(Holdroom CO No.1
Richard S. Walsh, A.A.E., Director of Aviation David H. ReadyI/anager
Attachments:
Change Order No. 1
Value Engineering Construction Estimates
Minute Order
i
MINUTE ORDER NO.
APPROVE MINUTE ORDER NO. APPROVING
CHANGE ORDER NO. 1 TO AGREEMENT NO. A5257 FOR
HARBOR CONSTRUCTION CO., INC. FOR REVISIONS AND
MODIFICATIONS RELATED TO THE CONSTRUCTION OF THE
NEW REGIONAL HOLDROOM IN THE AMOUNT OF $823,365,
REDUCING THE TOTAL CONTRACT PRICE FROM $9,278,000
TO $8,454,635 PENDING FAA APPROVAL.
I HEREBY CERTIFY that this Minute Order, approving Change Order No.
1 to Agreement No. A5257 for Harbor Construction Co., Inc. for revisions
and modifications related to the construction of the new regional holdroom
in the amount of $823,365, reducing the total contract price from
$9,278,000 to $8,454,635, was adopted by the City Council of the City of
Palm Springs, California, in a meeting thereof held on the 26th day of July,
2006,
James Thompson, City Clerk
CITY OF PALM SPRINGS
SECURITY CHECKPOINT PHASE III
CONSTRUCTION CHANGE ORDER
To: Harbor Construction Co.., Inc. Date- July 26,2006
15550 Rockfield Blvd, Suite B-100 Project No. CP05-010
Irvine, CA 92618 Project Name: Expand Terminal Holdroom (Part 2)
Change Order No. 01
Contract Purchase No.616120
Attn: Steven R. Padula, President Account No.A5257
Description of Change: This change order confirms the value engineering costs for reducing the original contract price and
scope of work needed.
(See attached 'Exhibit A'for specific additional value engineering description and unit cost breakout):
AUTHORIZATION FOR CHANGE:
Summary of Cost/Time
Original Contract Price $ 9,278,000.00
Total of all Previous Change Orders S 0
Total of this Change Order -$ 823,365,00
Total Contract Price $ 8,454,635.00
This Change Order(' Greases)(decreases) (unchanged) the contract time by 0 working days.
I have received a copy of this Change Order Construction Manager:
and the above AGREED PRICES are acceptable Approval: Date,-
to the contractor. Parsons
Aviation Department Approval:
By: Reviewed By: Date:
Assistant Director of Aviation
Title:
Approved by: Date:
Date: Director of Aviation
City Approval.
Date:
City Clerk
Date:
City Manager
Distribution:
Original Conformed Copies Conformed - File Coov
City Clerk (1) Aviation Director (1)
Contractor (1) Procurement& Contracting (1)
FAA (1) Finance (1)
Airport File (1) Parsons (1)
Page 1
CONSTRUCTION ESTIMATES
(HOLDROOM)
SPEC REM SPECIFICATION TITLE ARC ARC Dale Deductive CONKey Description
01001) GENERAL CONDITIONS
Bonds $ 7,380 Fedueiion in bonds and insurance at due to value
engineering based on$797,905 In savings(1.85%)of
total accepted value engineering).Value to be adjusted
based upon the value of the accepted Items-Sarngs
$14 780
Liabilih,insurance $ 7 3130 Same as Bonds.
01500-A Office trailers $ 4 500 1 Utilizing existing office trader.
01732-A Demolition-Se.ecLwo(A-B Holdroams) $ 45,000 1 Delete the demohbon of existing Hold Rooms AB B.
Note:removal of the canopies must occur prior to the
demolition of the Hord Room which was part of alternate
adddive bid-La ndsca In .
02000 SITE CONSTRUCTION
03450 A Plant Precast Architectural Concrete Y 77101200"0 $ 258,000 2,3 Eliminate a0 precasl.Provide metal stud and plaster
[PRESENTED TO ARC-PENDING Flnish at building exterior In place of precast Provide
PLANNING STAFF REVIEM metal stud and drywall(high impact drywall al areas'f-
or less from finish floor)at butlding interior n place of
04000 MASONRY news[ Use`F 'fabrications for reveals.
04220-5 Concrete Unit Masonry
Stone Veneer Assemblies Y 7ilmo06 $ 44,400 2 Prov de,"Si;ver Sesame Slate ashler pattern"at feature
1.Feature @480sq, 2 wall and at the front corners of the toilet room,courtyard
Holdroom @600sq• 3 site,in lieu of"Yosemite Slate ashler pattern'-no
Restrocm @383sq• change in price.Eliminate alone veneer at exterior
TOTAL @1,4845q entrance walls(outside walls of e:ectncal and storage
(PRESENTED TO ARC-PENDING rooms)and provide plaster 0mshh In its place.Eliminate
PLANNING STAFF REVIEW) all other alone and provide colored scared split-face
CMU in!Is place
05000 METALS
�. 06402 A Interior Architectural Woodwork $ 10,500 1 El,minale all perforated panels and stainless steel at the
caserrork.Casework to he standard plastic laminate
07000 THERMAL&MOISTURE PROTECECTiON
07412 A Metal Wall Panels $ 22,360 1 Provide a kynar coated Flush panel system
manulacLured by Melal Sales Manufacturing-coSor to ba
weathered zinc In Irau of Umlcore for metal wall panels.
OBBOO-A Glazing $ 40,475 1 Provide O[dcasHe glass in lieu of Viracon glass where
indicated on the clans.
_ 09000 FINISHES
09111-A WannLoad-bearin Steel Framin
ATTACHMENT'A'
CONSTRUCTION ESTIMATES
(HOLDROOM)
SPEC ITEM SPECIFICATION TITLE ARC ARC Elate Deduct!a CO" Key Descriptlon
09220-A Penland Cement Piaster Y 7/10/2006 § 30,100 2 Delete plaster finish over CMU walls Provide colored
(PRESENTED TG ARC-PENDING scored split-race CMU Change 12"thlck concrete stem
PLANNING STAFF RENEW) walls at the mechanical enclosures to 12"CMU.Change
W thick concrete walls at ramp to S"CMU.Change B"
thick concrete wall at column Lne VViD to e"Cm U.
Change B"Ih:ck concrete stem walls at restroom buildine
10 5"CMIJ Use colored scored spk4face CMU at
exposed areas.Re engineering should not be
necessary.However,engineering it any IS to he by
others and not included.
09250A Gypsum board $ 3,700 1 Delete drywall cetlings in the storage,electrical,and
jamlor's rooms Eliminate column wraps In the storage
and electircal rooms.
09310-A Ceramic Tile $ 81300 1 Reduce height of ceramic ti:e at walls from full heightto
5'high tile wainscot and fins had drywall Delete the at
janitor's room and provide FRP wall panels at the mop
slnk-
09402-A Epozy7errazzo 5 53,250 3 Dalete terrazzo flooring provide S301s-y allows nice
carpat In tls place
095F1-A Acauslical Panel Gail ngs(wood)(CT-2) $ 19,550 1 Provide calling typo(CT-1)2a2 acoustical lay in tailing
system in lieu ofArmstrong wocdnvrk csll:ng(CT-2)at
the clerestory
9512-A Acoustical Panel Ceilings(metal)(CT-3) $ 11780 1 Change metal celFng al entry(360sf)to ceiling type(CT
III
Acoustcal gnd{CT-1) $ 2,800 Change suspended acoustic ceiling(CT-1)from
Armstrong Uhima 01912 to Armstrong Fissured,R1758.
09514 A Acoustical Metal Pan Ceilings
09653-A Resilient Wall Base&Accessories $ 55,200 3 Delete"Trespa'wainscot provide high impact drywall in
its place. Change stainless steel base to rubber
3 resilient base In its place.
086S1-A Carpet-rile $ 18,000 Delete specified carpel,use an allowance amount of
$30 Per so Yard for furnishing and mstallaton
09771-A Fabric-wrapped Panels
09772-A Slrelched Fabric Panel System $ 13,700 1 Delete fabric panel system at walls provide finished
d •.vat[In its lane.
10000 SPECIALTIES
10i55-A Tollet Cam partments $ 4,300 1 Change slamless steel toilet partitions to phenolic
standard color).
10520-A Fire protection5 eaaldies 1
10705-A htelaI Sun Shades
10801.A Tollet&Bath Accessories $ 1,250 1 Delete slainless sle el knee guards at restreom counler
A412.04
15000 MECHANICAL
General Provisions
ATTACHMENT A'
CONSTRUCTION ESTIMATES
(HOLDROOM)
SPEC ITEM SPECIFICATION TITLE ARC ARC Dale Deductive CONKey Description
15042 A Au&Water Test&Balance 5 1,200 Provide lesl and balance of HVAC system by NEBB
A en in lieu of AABC agency t5042-1.5 A.1
15060-'dE Underground Pre-insulated Piping System 5 39,450 4 Provide alternate underground hydronlc piping for
HVACX system.Use Perm@ Pipe Tema Gurard In I au
Ric Wil secfon 15080.
15800-ME HVAC 5 20,600 4 Provide a handling units and indirect evaporative
coolers by Dynamic Air Techno:ogy,Inc.in lieu of Energy
Lab Referdrwin MMD101
]GOOD ELECTRICAL 5 6,600 2 'Ebmiaate roof maunfed light fixtures except for north
elelvahon(entry elevations
16510-ME Lrghling Fodures $ 21,20D 1 Provide an alternate lighting package{Refer to the
attached list of oloposed Falures
16B04-ME Fire Ala rm System $ 06,600 Provide conduits only for Fire alarm system Delete
s eddied fire alarm s slem Sim ax).
NfA Secun Wa11 2
DEDUCTIVE CO'S SU BTOTAL'S: 5 823,366
f KEY 1
PROJECT IMPACT ASSESSMENTS CONSIDERED:
1.Acceptable design Impact
2.Impacts Design approved bythe ARC(May require archltectual review board concurrence.)
9.Life Cycle 7 Maintenance Issues
4.Items requl ring re-deslgn andfor modill cations to the Construction Documents(Addltlonal Services)