Date: July 3, 2013 CONSENT CALENDAR
Subject: AWARD OF CONTRACT FOR TAHQUITZ CANYON WAY SECTION 14
MEDIANS, CITY PROJECT NO. 08-20
From: David H. Ready, City Manager
Initiated by: Public Works and Engineering Department
SUMMARY
The Agua Caliente Tribe of Cahuilla Indians has allocated $2,000,000 to the City, from
its federal Tribal Transportation Program (TTP), to replace the existing median
landscaping within Tahquitz Canyon Way in Section 14 from Indian Canyon Drive to
Sunrise Way.
The project includes landscape, irrigation, lighting and paving improvements to the
existing medians along Tahquitz Canyon Way, from Indian Canyon Drive to Sunrise Way.
Award of this contract will allow staff to proceed with the construction of the "Tahquitz
Canyon Way Section 14 Medians" project, City Project No. 08-20.
RECOMMENDATION:
1) Approve Agreement No. in the amount of $1,688,150.00 with Marina
Landscape, Inc., for the construction of the Tahquitz Canyon Way Section 14
Medians project, City Project No. 08-20;
2) Authorize the City Manager to execute all necessary documents.
STAFF ANALYSIS:
At the May 15, 2013 meeting, City Council approved the Plans, Specifications, and
Estimates (PS&E) and Authorized Staff to Bid the Tahquitz Canyon Way Section 14
Medians, City Project No. 08-20.
The project design was prepared by RGA Landscape Architects, Inc.
ITEM NO.�_
City Council Staff Report
July 3, 2013-Page 2
Award of Contract for Tahquitz Canyon Way Section 14 Medians (City Project 08-20)
On May 25, 2013 and June 1, 2013, the project was advertised for bids, and on June
25, 2013, the Procurement and Contracting Division received construction bids from the
following contractors:
1. Marina Landscape, Inc., Anaheim, CA $1,688,150.00
2. Golden Valley Construction, Indio, CA $1,791,356.50
3. Diversified Landscape Management, Inc., Corona, CA $1,838,700.55
4. Earth Sculptures, Inc., Indio, CA $1,873,145.00
5. Land Forms Construction, Laguna Nigel, CA $1,892,367.10
6. Kasa Construction, Inc., Ontario, CA $2,207,140.00
The lowest, responsive bidder is Marina Landscape, Inc., from Anaheim, California,
whose principal officer is Robert B. Cowan, President.
The Engineer's estimate was $1.9 Million.
FISCAL IMPACT:
Funding for this project is from the Tribal Transportation Program in account number
261-4491-50303.
SUBMITTED:
Prepared by: Recommended by:
avat Khamphou David J. Barakian
Assistant Director of Public Works Director of Public Works/City Engineer
Approved by:
David H. Ready, City Mana
Attachment: Agreement
02
AGREEMENT
THIS AGREEMENT made this day of in the
year 20 , by and between the City of Palm Springs, a charter city, organized and
existing in the County of Riverside, under and by virtue of the laws of the State of
California, hereinafter designated as the City, and Marina Landscape, Inc., hereinafter
designated as the Contractor.
The City and the Contractor, in Consideration of the mutual covenants hereinafter set
forth, agree as follows:
ARTICLE 1 -- THE WORK
The Contractor shall complete the Work as specified or indicated under the Bid
Schedule(s) of the City's Contract Documents entitled:
TAHQUITZ CANYON WAY, SECTION 14 MEDIANS
CITY PROJECT NO. CP 08-20
The Work is generally described as follows:
Landscape, irrigation, lighting and paving improvements to the existing medians in
Tahquitz Canyon Way, from Indian Avenue to Sunrise Way, in the City of Palm
Springs, CA.
ARTICLE 2 -- COMMENCEMENT AND COMPLETION
The Work to be performed under this Contract shall commence on the date specified in
the Notice to Proceed by the City, and the Work shall be fully completed within the time
specified in the Notice to Proceed.
The City and the Contractor recognize that time is of the essence of this Agreement, and
that the City will suffer financial loss if the Work is not completed within the time specified
in Article 2, herein, plus any extensions thereof allowed in accordance with applicable
provisions of the Standard Specifications, as modified herein. They also recognize the
delays, expense, and difficulties involved in proving in a legal proceeding the actual loss
suffered by the City if the Work is not completed on time. Accordingly, instead of
requiring any such proof, the City and the Contractor agree that as liquidated damages or
delay (but not as a penalty), the Contractor shall pay the City the sum of 700 for each
calendar day that expires after the time specified in Article 2, herein.
ARTICLE 3 -- CONTRACT PRICE
TAHQUITZ CANYON WAY,SECTION 14 MEDIANS AGREEMENT FORM O ,y
CITY PROJECT NO.CP08-20 AGREEMENT AND BONDS-PAGE 1 J
6/27/13
The City shall pay the Contractor for the completion of the Work, in accordance with the
Contract Documents, in current funds the Contract Price(s) named in the Contractor's Bid
and Bid Schedule(s).
ARTICLE 4 -- THE CONTRACT DOCUMENTS
The Contract Documents consist of the Notice Inviting Bids, Instructions to Bidders, the
prevailing rate of per diem wages as determined by the Director of the California
Department of Industrial Relations, Federal Labor Standards Provisions, Federal Rates of
Prevailing Wages, the accepted Bid and Bid Schedule(s), List of Subcontractors, Non-
collusion Affidavit, Bidder's General Information, Bid Security or Bid Bond, this
Agreement, Worker's Compensation Certificate, Performance Bond, Payment Bond,
Standard Specifications, Special Provisions, the Drawings, Addenda numbers
to , inclusive, and all Change Orders and Work Change Directives which may
be delivered or issued after the Effective Date of the Agreement and are not attached
hereto.
ARTICLE 5 -- PAYMENT PROCEDURES
The Contractor shall submit Applications for Payment in accordance with the Standard
Specifications as amended by the Special Provisions. Applications for Payment will be
processed by the Engineer or the City as provided in the Contract Documents.
ARTICLE 6 -- NOTICES
Whenever any provision of the Contract Documents requires the giving of a written
Notice, it shall be deemed to have been validly given if delivered in person to the
individual or to a member of the firm or to an officer of the corporation for whom it is
intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the
last business address known to the giver of the Notice.
ARTICLE 7 -- MISCELLANEOUS
Terms used in this Agreement which are defined in the Caltrans Standard Specifications
and the Special Provisions will have the meanings indicated in said Standard
Specifications and Special Provisions. No assignment by a party hereto of any rights
under or interests in the Contract Documents will be binding on another party hereto
without the written consent of the party sought to be bound; and specifically, but without
limitation, monies that may become due and monies that are due may not be assigned
without such consent (except to the extent that the effect of this restriction may be limited
by law), and unless specifically stated to the contrary in any written consent to an
assignment, no assignment will release or discharge the assignor from any duty or
responsibility under the Contract Documents.
TAHOUITZ CANYON WAY,SECTION 14 MEDIANS AGREEMENT FORM 04
CITY PROJECT NO.CP08-20 AGREEMENT AND BONDS-PAGE 2
6/27/13
The City and the Contractor each binds itself, its partners, successors, assigns, and legal
representatives, to the other party hereto, its partners, successors, assigns, and legal
representatives, in respect of all covenants, agreements, and obligations contained in the
Contract Documents.
IN WITNESS WHEREOF, the City and the Contractor have caused this Agreement to be
executed the day and year first above written.
APPROVED BY THE CITY COUNCIL:
ATTEST: CITY OF PALM SPRINGS,
CALIFORNIA
Date
By
City Clerk
Agreement No.
APPROVED AS TO FORM:
By
City Attorney
Date
CONTENTS APPROVED:
By
City Engineer
Date
By
City Manager
Date
TAHQUITZ CANYON WAY,SECTION 14 MEDIANS AGREEMENT FORM O 5
CITY PROJECT NO. CP08-20 AGREEMENT AND BONDS-PAGE 3
6127/13
Corporations require two notarized signatures: One signature must be from Chairman of Board, President,
or any Vice President. The second signature must be from the Secretary, Assistant Secretary, Treasurer,
Assistant Treasurer, or Chief Financial Officer.
CONTRACTOR: Name: Check one:_Individual_Partnership
_Corporation
Address:
By: By.
Signature (notarized) Signature (notarized)
Name: Name:
Title: Title:
(This Agreement must be signed in the above This Agreement must be signed in the above
space by one of the following: Chairman of the space by one of the following: Secretary, Chief
Board, President or any Vice President) Financial Officer or any Assistant Treasurer)
State of State of
County of I ss County of ss
On On
before me, before me,
personally appeared personally appeared
who proved to me on the basis of satisfactory who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) evidence to be the person(s)whose name(s) is/are
is/are subscribed to the within instrument and subscribed to the within instrument and
acknowledged to me that he/she/they executed acknowledged to me that he/she/they executed
the same in his/her/their authorized capacity(ies), the same in his/her/their authorized capacity(ies),
and that by his/her/their signatures(s) on the and that by his/her/their signatures(s) on the
instrument the person(s), or the entity upon instrument the person(s), or the entity upon behalf
behalf of which the person(s) acted, executed the of which the person(s) acted, executed the
instrument. instrument.
I certify under PENALTY OF PERJURY under the I certify under PENALTY OF PERJURY under the
laws of the State of California that the foregoing laws of the State of California that the foregoing
paragraph is true and correct. paragraph is true and correct.
WITNESS my hand and official seal. WITNESS my hand and official seal.
Notary Signature: Notary Signature:
Notary Seal: Notary Seal:
TAHQUITZ CANYON WAY, SECTION 14 MEDIANS AGREEMENT FORM Q 6
CITY PROJECT NO.CP08-20 AGREEMENT AND BONDS-PAGE 4
6/27113