Loading...
HomeMy WebLinkAbout05328 - CVAG, CVCC AND CITY MOU RE FUNDING OF GENE AUTRY TRAIL BRIDGE MEMORANDUM OF UNDERSTANDING BETWEEN THE COACHELLA VALLEY ASSOCIATION OF GOVERNMENTS, THE COACHELLA VALLEY CONSERVATION COMMISSION AND THE CITY OF PALM SPRINGS REGARDING FUNDING OF THE GENE AUTRY TRAIL BRIDGE This Memorandum of Understanding is entered into between Coachella Valley Association of Governments, a California JPA ("CVAG"), the Coachella Valley Conservation Commission, a California JPA("CVCC"), and the City of palm Springs, California,a Charter City("Palm Springs"), RECITALS WHEREAS, Gene Autry Trail is an important transportation corridor for the City of Palm Springs and the Coachella Valley. CVAG and Palm Springs anticipate that in the future a bridge will be built where Gene Autry Trail crosses the Whitewater Wash. CVAG estimates that, in order to accommodate flood flows,the bridge would need to be approximately 3000 feet long,or shorter, depending on flood control design.. WHEREAS,CVAG and Palm Springs have both now adopted the Coachella Valley Multiple Species Habitat Conservation Plan (CVMSHCP), contingent upon successful completion of this MOU. The CVMSHCP will protect the relgion's biological resources, vegetation communities, and natural areas. The CVMSHCP provides that the Whitewater Wash in the vicinity of Gene Autry Trail be preserved as a wildlife corridor. There is concern that if a bridge is built on Gene Autry Trail over the Whitewater Wash, preservation of the wildlife corridor may require a bridge in excess of 3000 feet. WHEREAS, under CVAG's transportation funding regulations, and being that the Gene Autry Trail bridge at the Whitewater River is a "Named Measure A" project, Palm Springs would ordinarily be required to pay the local share (25%) of the bridge when it is constructed. Palm Springs is concerned that its approval of the CVMSHCP would increase the cost of its share of the bridge as the bridge will need to be longer to accommodate the wildlife corridor required by the CVMSHCP, CVAG and Palm Springs believe that any additional cost for the Gene Autry Trail bridge, in order to accommodate the wildlife corridor, should not be borne by Palm Springs. WHEREAS, CVAG, CVCC and Palm Springs are entering into this Memorandum of Understanding to memorialize their agreement that if Palm Springs approves the CVMSHCP, CVCC commits to develop funding alternatives for the Gene Autry Trail bridge such that Palm Springs'required share shall not be greaterthan necessary to fund a bridge longer than 3000 feet. AGREEMENT THEREFORE, CVAG, CVCC and Palm Springs agree as follows: If a bridge longer than 3000 feet is required in order to accommodate the wildlife corridor, CVCC commits to develop funding alternatives that will not require Palm Springs to fund a portion greaterthan what otherwise would be required to fund a 3000 foot bridge on GeneAutry Trail over the Whitewater Wash. Dated- 102.1 Z t° I xdQ� CITY OF PALM SPRINGS Dated CHAIRMAN, CVAG EXECUTIVE COMMITTEE By klm Dated- �( G CHAIRMAN, CVCC Ba o Di ectors -Attest Clerk APPROVED-By CITY COUNCIL V AS3Z,5