Loading...
HomeMy WebLinkAbout9/4/2013 - STAFF REPORTS - 2.Q. p ALM g a4�y 0 U N k k1 C41109Mf0 G'fe c4`'F°aa�P City Council Staff Report Date: September 4, 2013 CONSENT CALENDAR Subject: APPROVAL OF A NOTICE TO PROCEED FOR VEOLIA WEST OPERATING SERVICES, INC., FOR THE 2013 SEWER COLLECTION SYSTEM REPAIRS, CITY PROJECT 12-03 From: David H. Ready, City Manager Initiated by: Public Works and Engineering Department SUMMARY Approval of this item will authorize Veolia West Operating Services, Inc., ("Veolia") to proceed with the 2013 Sewer Collection System Repairs. RECOMMENDATION: 1. Authorize the Director of Public Works/City Engineer to issue a Notice to Proceed for Veolia West Operating Services, Inc., in the amount of $419,647 for the 2013 Sewer Collection System Repairs, City Project No. 12-03. STAFF ANALYSIS: The City has approximately 230 miles of sewer mainline in the collection system that transports sewerage to the Wastewater Treatment Plant. The City's contract with Veolia includes monitoring the collection system network. Veolia routinely video tapes, records, and rates the sewer mainlines. Ratings of 4 and over are in need of repair. The project proposed includes only sewer mainline rated at 4 and above. Per agreement with the City, Veolia is allocated is allocated $2,500 per month to pay for minor individual repairs to the sewer collection system. When the needed repair exceeds these costs, a capital improvement project is initiated. Veolia proposes to perform these major repairs to keep the system safe and operable. This proposal includes Removal and Replacement of damaged pipe, Cured-in-place Pipe (CIPP) Point Repair, CIPP Lining, Slurry and Plug, Traffic Control, Record Drawings, Construction Management Services, and General Liability Insurance. ITEM NO. _ City Council Staff Report September 4, 2013- Page 2 2013 Sewer System Repairs (CP 12-03) Due to ongoing slurry seal and overlay projects throughout the City, Veolia did not include certain locations in the bid that were in conflict with the City's roadway projects. This work will be included in a future project. Two preselected contractors in the Coachella Valley responded to their request for invitation to bid with the following bids: 1. G & M Construction, Palm Springs, CA; Bid Amount: $290,550 2. Tri-Star Contracting ll, Inc., Desert Hot Springs, CA; Bid Amount $324,205 The estimated construction cost per Veolia was $280,000. The winning bid of $290,550 by G & M Construction is being used for this proposal. Veolia has submitted a proposal to the City for the construction phase of this project which includes the following items. 1. Professional Construction Services $326,869 (Includes 12.5% mark-up) 2. Record Drawings (Mylars) $ 19,406 (Includes 12.5% mark-up) 3. Veolia Construction Management Services $ 70,570 4. General Liability Insurance 2,801 Total: $419,647 (rounding) *Note: With any capital project undertaken at the WWTP, Veolia operates as the general contractor under its own contractors license. As the general contractor, Veolia is responsible for ensuring all construction is performed in accordance with State and federal rules and regulations, and is liable for all risks and damages that may occur. Accordingly, Veolia obtains general liability insurance for each project, which is passed as a direct cost to the City at a rate of 0.66% of the overall cost of the project. In accordance with Section 5.3 (f) of the Amended and Restated Wastewater Services Agreement between the City and Veolia, Veolia is entitled to make a first proposal to do any Capital Project related to the wastewater treatment plant. The Agreement provides for a mark-up and profit margin varying between 12.5% and 16%. For this project, Veolia has proposed a 12.5% mark-up (the lowest mark-up available by contract) which is not applied to Veolia's own labor rates and general liability insurance cost. FISCAL IMPACT: Sufficient funds are available in account No. 420-6800-57030 (Sewer System Repairs) and account number 420-6800-50000 (Unscheduled Capital Projects). 02 City Council Staff Report September 4, 2013 - Page 3 2013 Sewer System Repairs (CP 12-03) SUBMITTED: Prepared b Recommended by: A Sa - - W, ,at Khampho David J. Barakian Assistant Director of Public Works Director of Public Works/City Engineer Approved by: David H. Ready, City er Attachment: Veolia's 2013 Collection System Repairs Proposal 03 Project Cost WATER Summary Sheet City of Palm Springs l Cow SBrmr CoWdionss aum P -ecr Pa9ns ri sWWTF a 0112011 1 11.ps Praad name: sewer conemoms mPr m Sob rvumear: 1005580 Master ,oaeon: Patin YAYfF Jola Coat Estimate MoOel PmPnssol Mentor MidMxe MxL Vanion 1.9 City of Palm Springs goer FeANahba PpawaTC 1111 Cale ]RSQ013 1 1 Re',ron 9 CONTINGENCY MARKUP ConMrtobon SoeYnmrxmR: 0." 135% Efnmaie Tnlal 1$ 419,f4] E',PP gConwlbn6: O.Pb 125% Mark UP f 30A]3 ImxwmPBnr So. O.a% 12.5% MBterelBEeuiwnerc IIA% 125% Y tabor 00% 00% awleM LMp 0.o oO% TvaBads Ober 00% 0.0% vecan Dan Bmk TOTK: S E 9815 Defcn vlp coat Gooffippncy Mod Iva Total y.f3 100 Ce.morr suCwntraclors E - $ - $ - E 00% 101 Site Reme6'aOan suRontredme S S - $ - s - 00% t02 EaMwork sahonaaclon $ - $ - $ - E - 0.0% 103 CMIFBncraM SUMonlraMm $ $ - $ - S 001' 101 Subwnbactan $ 280.550 E - E 3e.319 S Mult'0 ]]B% 105 MiMan[al ln.11arao suEconaBctan S - q - S - S - 00% 100 Elad ial lmMlkEBn 3ubcirradon S S - f - $ - 00% 107 Fieo EmdeO Tenff SubcmMadorr $ - $ - $ - S - 00% 100 M11cmIMmPw lreblbWn 3ubmnhadps IS - f - E S - 00% 180 PrololonM84Mna $ 17.2w S - f 21% $ 19.400 4.8% IN SeMae $ $ f 00% SOBTOTK'. S' -WAN $ - $ 38A]8 I ioaCT75 025% Chaotcoot Cenrngoocr fl§*Pp Total 200 Momon.1 E a ar9 $ - S - $ 00% 210 ElednalE S - S - 5 - f - 00% 220 InUr 6 - S - $ 2W ONerE uin eM f S $ IS 00% cB m n MaM yp Total %o_15_B. 3W 'xi em $ 12119 S - $ - f 12,i19 29% 305 SeNBr n Mm S - 5 $ S 00% 310 Pan' i $ 9,621 i - S - $ 9.41 23% 320 MmrcaaOPn $ f - $ - S 00% OW Combudmr Gorr.. f 4$.BSO $ - i - i 48.8W 118% 340 Aoaift,t Pmoo,1 Moral $ - i - $ - $ - 00% IN Sr.Ccnfa !Aa f - f E - $ - 00% 380 P dE f f - E - $ - 00% 370 $ - f - $ - $ - 0.0% $80 te0w-CPrmliaaune $ - $ - $ - $ - 00% 390 oarmoovErm, $ OD% 51RTOTK: 6 10,Srp S - f - S ro >0 168% CuNmdr" 14Aw Trial 100 Trevel6 Llo S - $ - i - $ - 001I 400 Tmelfl ro Olbar S $ i .aµ SUBTOT L If - IS L S 0.0% N coat Coral Mort uP Tobl 4m TreeBle $ - $ - $ .10 TrBv4Ia abler $ f 0a% SUI S ' - - $ - $ - 00% 12i�ffi. coato en<r Mod UP Tom No FM If - $ - $ - S - am 500 Bur Bones $ - f - 0.0% No w BwMs i - $ E - $ - 0.0% No BJMenR 1... $ $ - f - $ 00% General W bwrvnq $ 2.801A2 $ - $ - f 2.801 G.M No Sebe a Ua Tu s - i - $ - $ - am No tic omM Few $ - $ - $ - s - am 500 6outl�em GlilaNa Edwn9NBAa9ori E $ 0.0% SGBTOTPL i 2A01 $ - S - 2801 s - am C [ IPbau i3nnre$$ rNmI ll Mork., Ty1a1 000 General SBe Cmh f - f $ - $ - 0.0% 800 CM Imm i - i - S f - 0.0% 010 FIMVeMGe $ - $ - $ - $ 00% a20 ab11-u Crab $ $ $ __00% SUBTOTN $ - 6 - - 00% 419846.95 iro.Dx 04 Summary SMel P"1 a"