Cg11FOaN�P. City Council. Staff Report
DATE: January 15, 2014 CONSENT CALENDAR
SUBJECT: APPROVAL OF PROPOSAL FOR DESIGN SERVICES BY MSA
CONSULTING, INC. FOR THE POLICE DEPARTMENT AND CITY HALL
PARKING LOTS
FROM: David H. Ready, City Manager
BY: Public Works & Engineering Department
SUMMARY:
Approval of this item will approve the proposal and authorize MSA Consulting, Inc. to
design plans, specifications and estimate for reconstruction of the two Police
Department parking lots and the two City Hall parking lots (City Project No.'s 13-35 and
01-17 respectively) in accordance with their on-call agreement with the City (Agreement
#6445).
RECOMMENDATION:
1. Approve the proposal from MSA Consulting, Inc. for a) design of the two Police
Department parking lots (Hourly not to exceed $50,790) and b) design of the two
City Hall parking lots (hourly not to exceed $49,930) and;
2. Authorize the City Manager to execute all necessary documents.
STAFF ANALYSIS:
In November 2013, City Council approved Agreement No. 6445 with MSA Consulting,
Inc. for On-Call Civil Engineering Design Services on an as needed basis. When design
services are needed, the agreement authorizes staff to seek a proposal from one of the
on-call firms. Council may then approve the proposal, thereby authorizing staff to
prepare a purchase order for the design services. Staff sought proposals for design
(Plan, Specifications and estimate) for the two parking lots at the Police Department and
the two parking lots at City Hall.
The Proposed cost for the Police Department lots is not to exceed $50,790, while the
ITEM NO.
City Council Staff Report
January 15, 2014 -- Page 2
Approval of Proposal for Design Services by MSA Consulting, Inc. for the Police Department and City Hall
Parking Lots
proposed cost for the City Hall lots is $49,930. The Police Department lots are proposed
for removal of all existing asphalt and complete reconstruction of new asphalt concrete
lots. The City Hall lots are proposed for Portland cement concrete "white topping" similar
to the process done at the Library and Pavilion.
FISCAL IMPACT:
Sufficient finds are available in Measure J account No.'s 260-4500-59448 (Police
Department Lots) - $50,790 and 260-4500-59460 (City Hall Lots) - $49,930.
Recommended by: Approved by:
David J. Barakian David H. Ready, Cit ger
Director of Public Works/City Engineer
Attachments:
1. Proposal
02
Q � MSA COW- L.-FING, INC.
VI
PLANNING-CIVM ENWNffielFla-LAND Straysrnta
December 12, 2013
Mr. Dave Barakian
CITY OF PALM SPRINGS
3200 E. Tahquitz Canyon Way
Palm Springs, CA 92262
Subject: Proposal for On-Call Civil Engineering Services (RFP 5443)
Plans, Specifications and Estimates (PS&E)for City Hall and
Police Station Parking Lots
Dear Mr. Barakian:
MSA Consulting, Inc. (MSA) is pleased to provide you with this proposal for Civil
Engineering Services related to the parking lots for City Hall and the Police Station.
Our proposal is based upon the information provided to us and the City of Palm Springs
standards and requirements.
The proposal, both Scope and Fee, contained herein, shall be valid until June 30, 2014.
Scheduling for the Work will commence upon receipt of a signed copy of a Purchase
Order. All terms and conditions of our On-Call Civil Engineering Agreement dated
November 18, 2013 shall apply.
We hope the attached scope and fee are consistent with your requirements. We
appreciate the opportunity to offer our services and would be pleased to answer any
questions you might have.
Very truly yours,
Julian A. De La Torre, P.E.
Vice President/ Principal Engineer
MSA Consulting, Inc
JAD:rp
Enclosures
Exhibit A— Scope of Services
Exhibit B — Compensation
RUieanocun vs++3PaftV waVea_oem�n_��m�Pa Vi M_iz,z.,3e
Via Electronic Mail
34200 Bon HOPE DR1vE ■ RANCHO MIRAGE ■ CALIFORNIA N 92270 03
760.320-9811 0 760.323-7893 fax 0 www.MSACoNSULTINGINC.COM
City of Palm Springs On-Call Civil Engineering Services
Page 2
December 12, 2013
EXHIBIT "A"
SCOPE OF WORK
MSA(Consultant) proposes to perform the following tasks:
ParkingPS&E for City Hall Lots
Base Survey and Topography
North Parking Lot
1. Provide field survey of the north city parking lot existing improvements (curb,
gutters, v-gutters, sidewalk, islands, and utilities, including pavement spot
elevations on the existing pavement. Prepare existing survey topo base plan for
final design purposes.
South Parking Lot
2. Perform spot checks of existing improvements to confirm existing data shown on
city-provided plans is still accurate.
Utility Research
North Parking Lot
3. Perform utility research from available city-provided improvement plans for onsite
areas and from utility agencies for adjacent public right of ways.
4. Create Existing Utility Base from available plan information.
5. Field verify existing surface utilities.
6. Update Utility Base.
Precise Grading Plan
North Parking Lot
7. Based on compiled existing utility and field survey information, prepare a Precise
Grading Plan at a scale of 1"=20'; process plan through the City for approval. It
is anticipated that `white-topping' will be placed over the existing pavement.
Existing pavement elevations will be reviewed in an attempt to address ponding
areas or drainage concerns.
South Parking Lot
8. Review City-provided Precise Grading, Demo, Landscape and Irrigation Plan for
the South Parking Lot. Incorporate the revised curb island in the south west
corner.
Specification
North and South Parking Lots
9. Complete Bid documents, special provisions and technical specifications based
on City template and Greenbook.
34200 BOB HOPE DRIVE ■ RANCHO MIRAGE ■ CALIFORNIA ■ 92270 04
760.320-9811 ■ 760.323-7893 fax 8 www.MSACoNSULTINriINC.COM
City of Palm Springs On-Call Civil Engineering Services
Page 3
December 12, 2013
Cost Estimate
North and South Parking Lots
10. Prepare an Opinion of Probable cost at 95% complete.
Storm Water Pollution Prevention Plan and Fugitive Dust Control Plan
North and South Parking Lots
11.Prepare Storm Water Pollution Prevention Plan (SWPPP); process through the
State for approval.
12.Prepare Fugitive Dust Control Plan (PM-10); process through the City for
approval.
Landscape and Irrigation Review
North Parking Lot
13.Review existing landscape and irrigation with City Engineer and Staff. Determine
if trees require removal or irrigation modifications. Reflect removals or
modifications on plan.
South Parking Lot
14.Review existing landscape and irrigation with City Engineer and Staff. Determine
if trees require removal or irrigation modifications. Reflect removals or
modifications on city-provided plan.
Water Quality Management Plan (Optional)
15. Prepare Water Quality Management Plan (WQMP); process through the City for
approval.
ParkingPS&E for Police Station Lots
Base Survey and Topography
Front Parking Lot
1. Provide field survey of the front of station parking lot existing improvements
(curb, gutters, v-gutters, sidewalk, islands, and utilities, including pavement spot
elevations on the existing pavement. Prepare existing survey topo base plan for
final design purposes.
Back Parking Lot
2. Provide field survey of the back of station parking lot existing improvements
(curb, gutters, v-gutters, sidewalk, islands, and utilities, including pavement spot
elevations on the existing pavement. Prepare existing survey topo base plan for
final design purposes.
34200 BOB HOPE DRIVE ■ RANCHO MIRAGE ■ CALIFORNIA ■ 92270 05
760.320-9811 4 760.323-7893 fax 0 www.MSA CONSULTING INC."M
City of Palm Springs On-Call Civil Engineering Services
Page 4
December 12, 2013
Utility Research
Front and Back Parking Lots
3. Perform utility research from available city-provided improvement plans for onsite
areas and from utility agencies for adjacent public right of ways.
4. Create Existing Utility Base from available plan information.
5. Field verify existing surface utilities.
6. Update Utility Base.
Precise Grading Plan
Front and Back Parking Lots
7. Based on compiled existing utility and field survey information, prepare a Precise
Grading Plan at a scale of 1"=20'; process plan through the City for approval. It is
anticipated the existing pavement will be cold-planed and overlaid. Existing
pavement elevations will be reviewed in an attempt to address ponding areas or
drainage concerns.
Specification
Front and Back Parking Lots
8. Complete Bid documents, special provisions and technical specifications based
on City template and Greenbook.
Cost Estimate
Front and Back Parking Lots
9. Prepare an Opinion of Probable costs at 95% complete.
Storm Water Pollution Prevention Plan and Fugitive Dust Control Plan
Front and Back Parking Lots
10.Prepare Storm Water Pollution Prevention Plan (SWPPP); process through the
State for approval.
11.Prepare Fugitive Dust Control Plan (PM-10); process through the City for
approval.
Landscape and Irrigation Review
Front and Back Parking Lots
12.Review existing landscape and irrigation with City Engineer and Staff. Determine
if trees require removal or irrigation modifications. Reflect removals or
modifications on plan.
Water Quality Management Plan (Optional)
13. Prepare Water Quality Management Plan (WQMP); process through the City for
approval.
34200 BOB HOPE DRIVE ■ RANcuo MIRAGE ■ CALIFORNIA ■ 92270 06
760.320-9811 ■ 760.323-7893 fax 0 www.MSACONSULTINGINC.COM
City of Palm Springs On-Call Civil Engineering Services
Page 5
December 12, 2013
CLIENT RESPONSIBILITIES and ASSUMPTIONS
The following has been taken into consideration in the preparation of this proposal:
1. Client to provide access to sites.
2. Client to provide City Improvement and Utility Plans.
3. South City Hall parking lot will not require revisions to plans except as noted
above.
4. City to provide baseline specifications.
EXCLUSIONS
Consulting services relating to any of the following tasks are presently specifically
excluded from the agreement. Some items, if required, may be provided by Consultant
by separate written proposal with additional fees approved by the Client:
1. Agency fees/research costs.
2. Potholing/Pothole coordination.
3. Utility relocation coordination.
4. Boundary survey.
5. Plotting of easements.
6. Construction staking.
34200 Boo ELOPE DRIVE ■ RANCHO MIRAGE ■ CALIFORNIA■ 92270 07
760.320-981I 0 760.323-7893 fax 0 www.MSACONSLILTINGINC.COM
CRY OF PALM SPRINGS
MSA Consulting,Inc.Fee Proposal
Plans,Specifications and Estimates(PSBE)for City Hall and Police Station Parking Lots
C�D
Nan FN Han Fp Noun Fp 11o11i • Fw Noun Fw Hers Fw Noun Fw Nara Fw Man Fw 11an Fw Han FN Neu+ Fp
aCOPE-nEM ITaeH OTK
P ra Hr1 Pr Lob
1 P B S YqT 0 m 1 f2W < 9600 13 $1,00 20 U'i a m 0 m. 0 m 0 w0 w 0 f0 0.6 m5 566)5
23aNP as OSu aqT 0 W 1 W 2 $300 3 m a ma 0 m 0 m 0 m 0 W 0 W 0 W OS wi1155
16 NaNP Utl' Rwaaca 0 W 0 W 0 m 0 m 0 $0 0 m 0 W 0 m 0 W 0 m 22 $3,190 0.6 usmm5
T Nar P Rplp G,pA Pip a S1m0 0 m 0 m 0 W 0 W 20.5 m925 82 $12300 0 W a m 0 m 0 W W 10 on $15935
a S M Pr G Pip Rea 2 Soda 0 $D 0 W 0 W 0 W 5 a a" 18 i2 m0 0 m 0 m 0 W 0 W 1 WO $1,+W
95 to mW 0 W 0 m 0 $0 0 W 0 m 0 m 0 $0 a 1 W 0 m m UAW 0 m $0.510
la CaM EHYneto 1.5 $530 0 m 0 1 W 0 W 0 W 0 W 0 W 0 $0 0 m 0 W tT Hem 0.5 $d5 lo'm
11-12 SWPPP I 10 a W 0 W a W 0 m 0 m 0 m 0 m 1a 12600 12.5 i1525 15 $17e0 0 W 0 m m.025
13 N P L v R-N 5.5 $1210 0 m 0 W 0 W 0 W 0 W 0 W a m 0 m 0 $0 a W a m $1,210
to Sw P land "I R0N0F 5.6 $1210 0 W a W 0 W 0 1 W 0 W 1 0 m 0 1 W 0 W I 0 W 0 W 0 m $1210
15 WCa0' 0 m 0 W 0 W 0 W 0 m 0 m 0 In 6 m90 15 $1,9m 325 M575 0 W 0 SO F(/�
&MOW PSSE br HJP Lab U0 1 35210 1 $IOC 6.0 1400 1" H"m0 20A $500 W75 INA H6 i" 3 000 f2A 91,025 104 $1,700 "a saw 13.0 $1110 W
IM
PB$E larPgw 8b6onP Lob
1 FradP $uw uAT 0 m 1 $200 a m]0 6 $550 a $1TW 0 m 0 m 0 W 0 W 0 m 0 W 1 w m.310
2 BxkP a 6u+a MT 0 m 1 $M0 a sl.m 1e +Sb 15 $3620 0 $0 0 $0 0 m o $0 0 $0 0 m 1 $m m5m
"U R066r00 0 W 0 W 0 m 0 m a W 0 m 0 m 0 W 0 m 0 m 32 m520 0 W 0620
T Pr0oaa Plan 0 $1,m0 0 W 0 m 0 W 0 W 24 m.0aa m $+1]00 0 m 0 W 0 m 0 m 10 W00 $13.BW
as v
itm o W o m a m o m 9 W o o W o m o W 35 mBW o W N6T6
9Cea E0an010 f220 0 W 0 W a W 0 $0 0 m 0 m 0 W 0 W 0 m 17 $tem 0.5 $06 135
1P11 WPPPfP 10 W 0 m a m 0 W 0 W 0 W a W 12 s19W 12 $1500 13 il.a 0 m 0 m H,9m
12I " Wtlov: $1,T00 a $0 0 W 0 W 0 m 0 m a W 0 m 0 W o Sa o m o W 11 i00
19 WCYN W 0 $0 0 m 0 W 0 m 0 m 0 m a m 15 31.050 325 $Awe 0 $0 0 m x5f5
SRNab1 P35fft, b 6OnP fi 20 $40e 12A $1AW "A $2,2m SSA s5,210 UA stw mA $11Tm 120 sl W 120 HAW 13.0 al. it M.0 W,em 125 $1.126 iM,125
TOTHa 62A WmeA0 6.0 Slesso 10.0 $2TWA0 mA mAWAO WA 710Am.00 MS isAls" 1TS 20T00A0 A fA $s.02000 2l6 f3,105A0 30,0 mIWA0 1MA f11AW.W m.b iWA•a6.00
0
� F
e
F ont f oli -e x
E7ack 1'olice
rrt i
su
i
A r
i
s
P
r .
.R�o n #A s ss t a
ip� � I P•
-
3 i .k
x
7 ri
pp
x
1 {
n• 1
I
{ rN_orth CityRbrk{ng , !
�" PRiJ4" � t
�L eve
} {
.- 9
pf
}
I +
a
South
t
L Tahqutlz=CanyomWayT—+—>--
mm
+, 33°49'