HomeMy WebLinkAbout05475 - STATE OF CA PROGRAM SUPPL AGR INDIAN CYN DR AT WHITEWATER RIVER ROADWAY REPLACEMENT Cindy Berardi
From: Vonda Teed
Sent: Tuesday, May 29, 2018 7:39 AM
To: Cindy Berardi
Cc: Tabitha Richards
Subject: RE: A5475 State of CA Program Suppl 02
Okay to close.
Vonda L.Teed 4 J
Engineering Secretary /
City of Palm Springs r
Engineering Services Department
760-323-8253 X8737
From: Cindy Berardi
Sent: Thursday, May 24, 2018 10:13 AM
To: Vonda Teed
Cc: Tabitha Richards
Subject: A5475 State of CA Program Suppl 02
Is it OK to close this one?
t
PROGRAM SUPPLEMENT NO. N020 rah �;-')tin Date:February 26, 2007
to Wit r EFlU"chi S°C�]V41!uu Locat ion:08-R1V-0-PSP
ADMINISTERING AGENCY-STATE AGREEMENT CI ;(2a`S Project Nvinber;ER-4211(012)
FOR FEDERAL-AID PROJECTS NO. 08-5282R "-''"1 � `G`� '�
E"A- Nuznbar:08-924960
This Program Supplement hereby incorporates the Adminssterinb Agency-State Agreement for Federal Aid which was entered into
between the Administering Agency and the State on 02/07/07 and is subject to all the terms and conditions thereof.This Program
Supplement is executed in accordance with Article I of the aforementioned Master Agreement under authority of Resolution No.
�a I Fly I ,approved by the Administering Agency on ez�loz l,9-7 (See copy attached).
The Administering Agency further stipulates that as a condition to the payment by State of any funds derived from sources noted
below Obligated to this project, the Administering Agency accepts and will comply with the Special covenants or Remarks setforth
on the following pages-
PROJECT LOCATION:
Indian Canyon Drive at the Whitewater River, in Palm Springs. DAF ft WWL-PSP•001-0
TYPE OF WORK:Roadway Replacement LENGTH- O(MILES)
Estimated Cost Federal Funds Matching Funds
L"R60 $166,980.00 LOCAL OTIIF,R
$166,980.00 $0.00 $0.00 50.00
CITY OF PALM SPRINGS STATE OF CALIFORNIA
Depa.rtme of Transportation
t � By
X
- •� Chief, Office of Project Ymp,lemantation
Bata d Division of Local Assistance
Attes
Data ,S'Jy; c�-7
Tit. II Ir'9 ,G'I_h V;165
I hereby certify upon nW personal ]mowledge that budgeted fund are available Evr this encumbrance:
Accounting Offic f Date ' $166,980.00
chapter Statutes Item Yoar Program 8c Cat gory Pund Source .lNoi1NT
38 2005 2660-102-890 2005-2000 20,30.010.650 C 225000 S92-F 166,980-00
APPROVED By CITY COUNCIL
Program Supplement 08-5282R-N020- TSTEA Page 1 of 5
0S-RIV•0-PSP 02/26/2007
ER4211(012)
SPECIAL COVENANTS OR REMARKS
1. All project repair, replacement and maintenance involving the
physical condition and the operation of project improvements
referred to in Article III MAINTENANCE, of the aforementioned
Master Agreement will be the responsibility of the ADMINISTERING
AGENCY and shall be performed at regular intervals and as
required for efficient operation of the completed project
improvements.
2. The ADMINISTERING AGENCY is required to have an audit in
accordance with the Single Audit Act and OMB A-133 if it receives
a total of $500,000 or more in federal funds in a single fiscal
year. The federal funds received under this project are a part
of the Catalogue of Federal. Domestic Assistance (CFDA) 20.205,
Highway Planning & Research. OMB A-133 superceded OMB A-128 in
1996. A reference to OMB A-128 in a Master Agreement (if any) is
superceded by this covenant to conform to OMB A-133.
3. The ADMINISTERING AGENCY agrees that payment of Federal funds
will be limited to the amounts approved by the Federal Highway
Administration (FHKA) in the Federal-Aid Project
Authorization/Agreement or Amendment/Modification (E-76) and
accepts any resultant increases in ADMINISTERING AGENCY funds as
shown on the Finance Letter, any modification thereof as approved
by the Division of Local. Assistance, Office of Project
Implementation.
4. Award information shall be submitted by the ADMINISTERING AGENCY
to the District Local Assistance Engineer within 60 days after
the project contract award. A copy of the award package shall
also be included with the submittal of the ADMINISTERING AGENCY' s
first invoice for the construction contract to:
Department of Transportation
Division of Accounting
Local Programs Accounting Branch, MS #33
P. 0. Sox 942874
Sacramento, CA 94274-0001.
Failure to do so will cause a delay in the State processing
invoices for the construction phase. Please refer to Section
15.7 "Award Package" of the Local Assistance Procedures Manual.
Program Supp]-event OB-5282R-N020- ISTEA Page 2 0£ 5
09-R1v-0-Y5Y 02/26/2007
FR-4211(012)
SPECIAL COVENANTS OR REMARKS
5. STATE and ADMINISTERING AGENCY agree that any additional funds
which might be made available for new phase(s) of work by future
Federal obligations will be encumbered on this PROJECT by use of
a STATE approved "Authorization to Proceed" and Finance Letter.
ADMINISTERING AGENCY agrees that Federal funds available for
reimbursement will be limited to the amounts obligated by the
Federal Highway Administration.
6_ ADMINISTERING AGENCY agrees that it will only proceed with work
authorized for specific phase (s) with an "Authorization to
Proceed" and will not proceed with future phase(s) of this
project prior to receiving an "Authorization to Proceed" from the
STATE for that phase(s) unless no further State or Federal funds
are needed for those future phase(s) _
7 . The ADMINISTERING AGENCY agrees that payment of Federal funds
will be limited to the amounts approved by the Federal Highway
Administration (FHWA) in the Federal=Aid Project
Authorization/Agreement or Amendment/Modification (E-76) and
accepts any resultant increases in ADMINISTERING AGENCY funds as
shown on the Finance Letter, any modification thereof as approved
by the Division of Local Assistance, office of Project
implementation.
8 . Any State and Federal funds that may have been encumbered for
this project are only available for disbursement for a period of
five (5) years and seven (7) years, respectively, from the start
of the fiscal year(s) that those funds were appropriated within
the State Budget Act. All project funds not liquidated within
these periods will revert unless an executed Cooperative Work
Agreement extending these dates is requested and is approved by
the California Department of Finance per Government Code Section
16304 . The exact date of each fund reversion will be reflected
in the approved finance letter(s) issued for this project.
Notwithstanding the unliquidated sums of project specific State
and Federal funding remaining and available to fund project work,
any invoice for reimbursement that is not submitted to the
Department on or before 60 days after that applicable fixed fund
reversion date will not be paid from that fiscal year' s
encumbered funds because all of these unexpended funds will be
irrevocably reverted by the Department ' s Division of Accounting
Program Suppleme= 08-5282Tt-N020- xST£A Page 3 0£ 5
08-RIV-0 PSP 02/26/2007
ER-4211(012)
SPECIAL COVENANTS OR REMARKS
on that date.
Pursuant to a directive from the State Controller' s Office and
the Department of Finance, the last date to submit invoices for
reimbursed work in each fiscal year is May 15th in order for
payment to be made out of those then current appropriations.
Project work performed and invoiced after May 15th will be
reimbursed only out of available funding that might be encumbered
in the subsequent fiscal year, and then only when those funds are
actually allocated and encumbered as authorized by the California
Transportation Commission and the Department ' s Accounting Office.
9. "ADMINISTERING AGENCY certifies that neither the ADMINISTERING
AGENCY nor its principals are suspended or debarred at the .time
of the execution of this agreement. ADMINISTERING AGENCY agrees.
that it will notify the STATE immediately, in the event a
-• suspension or a debarment happened after the execution of this
agreement. "
M. The Administering Agency shall not discriminate on the basis -of .
race, color, national origin, or sex in the award and performance
of any DOT -assisted contract or in the administration of its DBE
Program or the requirements of 49 CFR Part 26. The Administering
.Agency shall take all necessary and reasonable steps under 49 CFR
Part 26 to ensure nondiscrimination in the award and
administration of DOT -assisted contracts. The administrating
Agency's DBE Race-Neutral Implementation ,Agreement is
incorporated by reference in this agreement. Implementation of
this program is a legal obligation and failure to carry out its
terms shall he treated as a violation of this agreement. Upon
notification to the recepient of its failure to carry out its
approved DBE Race-Neutral Implementation Agreement, Caltrans may
impose sanctions as provided for under Part 26 and may, in
appropriate cases, refer the matter for enforcement under 18
U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986
(31 U.S.C. 3801 et seq. ) .
ll. ADMINISTERING AGENCY agrees, as a minimum, to submit invoices at
least once every six months commencing after the funds are
encumbered for each phase by the execution of this Project
Program Supplement Agreement, or by STATE' s approval of an
applicable Finance Letter. STATE reserves the right to suspend
Program Supplement08-5282R-N020- ISTEA Page 4 pf 5
08-RIV-0-P'SP 02/26/2007
ER-4211(012)
SPECIAL COVENANTS OR REMARKS
future authorizations/obligations, and invoice payments for any
on-going or future federal-aid project by ADMINISTERING AGENCY if
PROJECT costs have not been invoiced by ADMINISTERING AGENCY for
a six--month period.
If no costs have been invoiced for a six-month period,
ADMINISTERING AGENCY agrees to submit for each phase a written
explanation of the absence of PROJECT activity along with target
billing date and target billing amount.
ADMINISTERING AGENCY agrees to submit the final report documents
that collectively constitute a "Report of Expenditures" within
one hundred eighty (180) days of PROTECT completion. Failure of
ADMINISTERING AGENCY to submit a "Final Report of Expenditures"
within 180 days of PROJECT completion will result in STATE
imposing sanctions upon ADMINISTERING AGENCY in accordance with
the current Local Assistance Procedures Manual.
12.. Disaster No. CA-05-1- Emergency opening work will be reimbursed
at 100% if completed within 180 days from the initial day of
storm occurence_ The initial day of storm occurence is December
28, 2004 . ADMINISTERING AGENCY records must clearly identify
those costs incurred on or after December 28, 2004 . Incurred
costs are defined as disbursements made or in process for goods
and services delivered. Emergency opening work completed after
June 26, 2005 will be funded at the federal-aid reimbursement
ratio of 88. 53%. Restoration work, including preliminary
engineering, will be reimbursed at an 88.53% ratio. The
ADMINISTERING AGENCY will be responsible for the matching
requirement.
13. The work eligible for Federal Reimbursement shall be performed by
the ADMINISTERING AGENCY either by using their own forces or by
contract. The ADMINISTERING AGENCY must be able to identify the
costs incurred at each site and be subject to an audit for
verification.
Program Snpplement08-5282R-N020- ISTEA Page 5 of 5