Subject: APPROVAL OF PLANS, SPECIFICATIONS AND ESTIMATE (PS&E)
AND AUTHORIZATION TO BID FOR THE 2014 ANNUAL ASPHALT
OVERLAY AND RECONSTRUCTION, CITY PROJECT 14-04
From: David H. Ready, City Manager
Initiated by: Public Works and Engineering Department
SUMMARY
The Public Works and Engineering Department schedules, annually, asphalt overlay
and reconstruction of various City streets. Each year the City budgets funding to
overlay and reconstruct streets that are too deteriorated to receive slurry seal treatment.
The construction documents (Plans, Specifications and Estimate) are completed and, in
accordance with Section 7.03.040 of the Procurement and Contracting Code the City
Council is required to approve and adopt plans, specifications and working details, and
authorize the bid request for all public projects in excess of $100,000. Approval of this
project will allow staff to proceed with this public project, with an estimated cost of
approximately $2,945,000
RECOMMENDATION:
1. Approve the Plans, Specifications, and working details for the 2014 Annual
Overlay and Reconstruction, City Project 14-04, and authorize staff to advertise
and solicit bids.
2. Approve additional Measure J funds in the amount of $300,000 of street
improvements at Via Las Palmas (from Vista Vespero to Via Monte Vista),
Sonora Drive (from S. Palm Canyon Drive to Calle Palo Fierro), and San Rafael
Drive (from Virginia Street to North Indian Canyon Drive) as recommended by
the Palm Springs Neighborhood Involvement Committee (PSNIC).
ITEM NO. ��
�pALM$A9
iy
c
u m
k k
�fOfiTfOT
O4<IFOR��P City Council Staff Report
Date: April 16, 2014 NEW BUSINESS
Subject: APPROVAL OF PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E)
AND AUTHORIZATION TO BID FOR THE 2014 ANNUAL ASPHALT
OVERLAY AND RECONSTRUCTION, CITY PROJECT 14-04
From: David H. Ready, City Manager
Initiated by: Public Works and Engineering Department
SUMMARY
The Public Works and Engineering Department schedules, annually, asphalt overlay
and reconstruction of various City streets. Each year the City budgets funding to
overlay and reconstruct streets that are too deteriorated to receive slurry seal treatment.
The construction documents (Plans, Specifications and Estimate) are completed and, in
accordance with Section 7.03.040 of the Procurement and Contracting Code the City
Council is required to approve and adopt plans, specifications and working details, and
authorize the bid request for all public projects in excess of $100,000. Approval of this
project will allow staff to proceed with this public project, with an estimated cost of
approximately $2,945,000
RECOMMENDATION:
1. Approve the Plans, Specifications, and working details for the 2014
Annual Overlay and Reconstruction, City Project 14-04, and authorize
staff to advertise and solicit bids.
2. Approve additional Measure J funds in the amount of $300,000 of street
improvements at Via Las Palmas (from Vista Vespero to Via Monte Vista),
Sonora Drive (from S. Palm Canyon Drive to Calle Palo Fierro), and San
Rafael Drive (from Virginia Street to North Indian Canyon Drive) as
recommended by the Palm Springs Neighborhood Involvement Committee
(PSNIC).
ITEM NO. �L—
City Council Staff Report
April 16, 2014- Page 2
2013/2014 Annual Overlay& Reconstruction (CP 14-04)
STAFF ANALYSIS:
The Public Works and Engineering Department oversees the maintenance of the City's
street system. Each year, the Department assembles a capital project to continue its
asphalt overlay and reconstruction program on various City streets as needed. The
Federal Highway Administration (FHWA) in a joint effort with the United States
Department of Justice (USDOJ) has recently implemented a program providing
Technical Assistance on the Americans with Disabilities Act Requirements to Provide
Curb Ramps through Resurfacing. For any pavement treatments that are "Alterations",
the project will require installing or upgrading curb ramps that connect to an existing
traveled path, regardless of the funding source. FHWA has defined Overlay and
Reconstruction to be an Alteration. Therefore, costs for this project include upgrades or
installation of curb ramps where necessary.
A complete listing of streets and maps of this year's asphalt overlay and reconstruction
program is attached. The Palm Springs Airport is also including their loop road for
reconstruction as part of this project.
The plans and specifications have been prepared by Department staff, are ready for
Council approval and the subsequent advertisement for construction bids. Section
7.03.040 of the Procurement and Contracting Code requires that for public projects in
excess of $100,000 Council approve and adopt the plans, specifications and working
details, and authorize staff to advertise for construction bids. The Engineer's Estimate
for this project is $2,945,000. Approval of the recommended action will allow staff to
proceed with bidding of this project.
FISCAL IMPACT:
Funding for this project is made available through local Measure A funds in account
134-4498-50225; Measure J funds in account 260-4493-50808; Airport funds in account
416-6501-56145 (for the airport loop road); and funding match for work in Section 14
from the Tribal Transportation Program (TTP) granted by the Agua Caliente Band of
Cahuilla Indians (ACBCI) for Tahquitz Canyon Way (from Indian Canyon to Sunrise), in
the amount not to exceed $1.8 Million through a Memorandum of Understanding (MOU)
that was approved by Tribal Council on April 1, 2014 and to be, subsequently, approved
by City Council
CONSTRUCTION FUNDING SUMMARY $2,945,000
Measure A Tribal Match Measure J Airport Funds Measure J Addt'I
134-4498-50225 TTP Funds 260-4493-50808 416-6501-56145 Funding Request
$720,000 $510,700 $898,000 1 $516,300 $300,000
02
City Council Staff Report
April 16, 2014 - Page 3
2013/2014 Annual Overlay& Reconstruction (CP 14-04)
SUBMITTED:
Prepared Recommended by:
Savat Khamphou David J. Barakian
Assistant Director of Public Works Director of Public Works/City Engineer
Approved by:
David H. Ready, City er
Attachment:
1. Street Listing and Maps
03
MEASURE A PAVEMENT REHAB CITY STREETS - 2014 $HOOK BUDGET (CP 14-04) with Tribal Matching Funds
PCI Range Rehan l", 58001K RUDGFT Pavement SF Cust Per Mea sun.A Funds Tribot Total Costs
Unit Funds
Reconstruction $280K 320,000 $ 300 5 480,000 $480,000 $ 960,000
- Overlay $520K 154,073 $ 1.26 $ 194,132 $ - $ 194,132
`Matching Funds for Tahquite Cyn Way ONLY ADA Ramp Repairs: $ 45,868 $ 30,650 $ 76,518
$BOOK 474,073 :Total SF Total Construction Cost: $ 720,000 $510,650 $1,230,650
Contingency,Administration,&Inspection Costs 10% 5 80,000 $ - $ 80,000
Total: $ 800,000 $510,650 $ 1,310,650
ROAD RECONSTRUCTION - PCI RANGE 51-59
Name I Section ID I Neighborhood Ong. iFrom To ILength lWidth ITrue Area lArea Units PCI I SeotO -
TAHQUIT2 CANYON WAY 1444015 AVENIDA CABALLEROS SiJNRISF WAY 2,580 tit 160,000 SgFt 62 $ 480,000
TAHQUITZ CANYON WAY 1444010 NDIAN CANYON DRIVE AVENIDA CABALLEROS 2580 62 160,000 SgFt W 5 480,000
320,000 Sq Ft 60 $ 960,000
Avg PCI
ROAD OVERLAY- PCI RANGE 60-79
Name I Section ID I I From To juength lWidth True Area jAreaI 'PCI I Section Cost
CALLE PAPAGAYO 1244090 N/A CERRITOS ROAD E END 543 32 19,935 SgFt 63 $ 25,118
CALLE CONEIERA 1244095 N/A CERRITOS ROAD E END 545 32 19,998 SgFt 63 $ 25,197
CERRITOS DRIVE 1244175 Sunrise Vista Chino TACHEVAH DRIVE SANDLEWOOD DRIVE 2,000 19 38,000 SgFt 61 $ 47,880
ORCHID TREE LANE 1244105 N/A ALEJO ROAD IN END 515 32 19,035 SgFt 63 5 23,984
BURTON WAY 1244110 N/A ALEJO ROAD N END 515 32 19,035 SgFt 66 $ 23,984
SUNSET WAY 1244115 N/A ALEJO ROAD N END 515 32 19,035 SgFt 63 $ 23,984
CANTERA CIRCLE 1244120 N/A ALEJO ROAD - N END 515 32 19,035 SgFt 63 $ 23,984
IS4,073 Sglat 53 $ 194,132
-ROADS WITH MATCHING TRIBAL FUNDS(SECTION 14) Avg PCI
Printed:4/9/2014 1/1
MEASURE J PAVEMENT REHAB CITY STREETS - 2014 $1M BUDGET (CP 14-04)
PCI Range Rehab Type $1M BUDGET Pavement SF Cost PerUnt Sub-Total
51-59 Reconstruction $500K 76,062 $ 3.00 $ 228,186
60-79 Overlay $500K 495,888.00 $ 1.26 $ 624,819
Total SI: 571,950 Total Cost: $ 853,005
ADA Ramp Repairs: $ 45,000
Contingency,Administration,&Inspection Costs 10% S 100,000
Grand Total: $ 998,005
ROAD RECONSTRUCTION - PCI RANGE 51-59
Name Section ID From ITo ILength ]Wf&h ITrue Area lArea Units I PCI I Section Cost
VIRGINIA ROAD 344025 SANTA CATALINA ROAD 270'NORTH OF SAN CARLOS ROAD 508 20 10,160 Sq Ft 52 $ 30,480
CAPISTRANO COURT 1044225 LOS ROBLES DRIVE E END 255 36 11,988 SgFt 57 $ 35,964
FRIAR COURT 1044230 LOS ROBLES DRIVE EEND 165 36 8,748 SgFt 62 $ 26,244
MISSION ROAD 1044355 CAMINO SUR VIA LOLA 278 32 8,896 SgFt 55 $ 26,698
MISSION ROAD 2044430 HERMOSA PLACE MERITO PLACE 956 27 25,812 SgFt 59 $ 77,436
BILTMORE PLACE 2344170 CAMINO REAL E END 313 25 10,458 SgFt 51 $ 31,374
76,062 SgFt 56 $ 228,186
Avg PCI
me Section ID From 10 ILength Width ITrue Area lArea Units IPCI I Section Cost
CRESCENT DRIVE 1044145 VIA MONTE VISTA W END 1174 33 38,742 SgFt 63 $ 48,815
PATENCIO ROAD 1044366 VIA LOLA CANYON PLACE 1065 26 27,690 SgFt 64 $ 34,889
HERMOSA PLACE 1044410 PATENCIO ROAD MISSION ROAD 733 34 24,922 SgFt 62 5 31,402
DOLORES COURT 1044460 LOS ROBLES ROAD W END 200 32 6,400 SgFt 62 $ 8,064
SOUTH RIVERSIDE DRIVE 2344125 SUNRISE WAY RANDOM ROAD 4345 27 118,890 SgFt 64 $ 149,801
MESQUITE AVENUE 2344180 S PALM CANYON DRIVE RANDOM ROAD 717 37 26,529 SgFt 63 $ 33,427
MESQUITE AVENUE 2344185 RANDOM ROAD CALLE PALO FIERRO 2020 37 74,740 SgFt 64 $ 94,172
FERN CANYON DRIVE 2244015 RAMON ROAD CAMINO PAROCELA 626 37 23,162 SgFt 63 $ 29,184
CAMINO PAROCELA 2244020 145'E OF FERN CANYON 180'W OF FERN CANYON DRIVE 325 19 6,175 SgFt 63 $ 7,781
LA MIRADA DRIVE 2244025 RAMON ROAD SUNNY DUNES 1102 37 40,774 SgFt 64 $ 51,375
RAMON ROAD 2244070 BELARDO ROAD W END 2449 26 63,674 SgFt 66 $ 80,229
CAMINO REAL 2344160 MESQUITE AVENUE CALLE PALO FIERRO 720 57 44,190 SgFt 73 $ 55,679
495,888 SgIPt 64 $ 624,819
Avg PCI
O
CJt
Printed:3/26/2014 1/1
AIRPORT ROAD REHABILITATION - 2014
Rehabilitation Type Pavement SF Cost Per Unit Total Costs
Reconstruction 172,100 3.00 $ 516,300
WORK AREAS
True Area jArea Units I Section Cost
AREA 1-ENTRANCE/LOOP ROAD 136,500 SpFt $ 409,500
AREA 2-TAXI/SHUTTLE AREA i0,000 SgFt $ 90,000
AREA 3-EXIT ROAD 5,600 SgFt $ 16,800
272,100 SpFt $ 516,300
iCCWISTR MIM LIMITS EMIEIT
Iameuieu�
1 � xllr,xl�� x�xnxwnn•
i-
� e , � cHi��xin�Vu� cxx�xnmu�ueixwixxx�[� I �! cnornl�nl;�
FIN 7
o
I''111 II1I - N�
I1111I1I111,1I1
I�IT�111I1
E VIM �
0
Printed:4/8/2014 1/1
MEASURE J PAVEMENT REHAB CITY STREETS - 2014
(Requested by Palm Springs Neighborhoods Involvement Committee)
Pavement Cost Per Total Costs
Rehab Type SF Unit
Reconstruction 98,000 $ 3.00 $ 294,000
ADA Ramp Repairs on Sonora Road: $ 7,000
Signal Loops on San Rafael Road: $ 2,000
Total Costs $ 303,000
Name ja Section ID IFrom ITo ILengih JWidthTrue Area jArea Units
SAN RAFAEL DRIVE 344005 INDIAN CANYON ROAD VIRGINIA ROAD 1,678 30 50,330 SgFt 63
VIA LAS PALMAS 1044175 VISTA VESPERO VIA MONTE VISTA 300 33 9,900 SgFt 58
SONORA ROAD 2344565 CALLE PALO FIERRO VIA SOLEDAD 850 25 21,250 SgFt 63
SONORA ROAD 2344570 VIA SOLEDAD 5 PALM CANYON DRIVE 450 35 15,750 SgFt 57
97,230 SgFt 60
Avg PC]
O
Printed:4/9/2014 1/1
CITY OF PALM SPRINGS
CP 14-04 OVERLAY/RECONST
MAP
SECTION 3-T4S-R4E
--- - -- - - - - - - - - - - - - - -
SAN FAEL
- -
c _
SP�ZP CATALINA RD?9 SANTA CATALINA RD
�aRgP ROAQ
pICO ¢ ROAD SAN �CARLOS RD
W Z INTA CLARA WY
w SAN MARCO 'e, SEPULVEDA ROAD SAN MARCOS WY
c �G DOMINGUEZ ROAD Z
Pyya c 09�01�0 o �ALVARADO ROAD Z
F
i
9GF v CABRILLO y ROAD ZCABRILLO ROAD z
GIRASOL q CORTEZ ROAD z
CT 9GF m
cD
0
`-RACQUET S ROAD-- CQUET-7UB o
o - � ¢ C dG
CDN o = �'
co
_ z
Of
Q o VIA OLIVERA c VIA OLIVER
l
G
SANBORN WAY o 90 9 9GF 9F r
0
VIA ESCUELA W FGF VIA ESCUELA
W MARISCAL RD Z
111 if
� CHINO z -
CAZ�CANYpN o ROAD o W SANTA ELENA RD
C/FCO W CHINO CYN RD
D PANORAMA ROAD �
W VISTA CHINO _
=2014 RECONST STREET
(HWY 111 NOT APART OF THIS PROJECT) 08
CITY OF PALM SPRINGS
CP 14-04 OVERLAY/RECONST
MAP
SECTION 10-T4S-R4E
PANORAMA KUAD
W VISTA CHINO
CORONADO o
w
¢ AVE o W z VIA = SOL o 0
� w Q
W STEVENS Y ROAD
w
� zc~n z oST
W CAMINO NORTE o
NS CAMINO ¢
s \ DEL NORTE 11501 �CAMINO MC
DOOR�CAPISIRANO �FP9 VIA DE c,`�P��`� W VERADA Z NORTE z
1'� o o N VIA LAS PALMAS
s 1 o :5 PALMAS Q Q
¢ '� z 5 VIA o LAS PALMAS z
W VIA VADERA ¢
s CD
oo " W VERADA c¢) SUR
m
L
00¢ Nn SUR W CAMINO SUR Qo TA H H
W VIA LOLA DR
ICJ XU 6U 0 �o
REGAL DRIVE" cli W ' HERMOSA PLACE o of
CERES ~HE�M�I e o
RD �, Q� " ¢ o o EL ALAMEDA
fi > a-_ of Lo t,
o� ¢ >MTNo r-- K z z
VIEC W MTN VIEW o
LEISURE WAY PLC Z (n Q Q
v . o 52 PRESCOTT TAMISK
= Qo �9V CANYON P N DRIVE S Rp
¢ z
�� z W o MERITO PL Q
IRTSMzT W MERITO L � Q Z
CRESDCRNTz ¢ VALMONTE
LAS PALMAS ESTATES DR ¢ NORTE
a m
W CHINO ROAD
z z
W ALEJO RD
=2014 RECONST STREET
III 1 1 1 1 1 1 1 1 =2014 OVERLAY STREET
09
SUNRISE WAY SUNRISE m WAY
FSATURMINO
'CIR
BUTTON
WILL CIR W m = o
a o CARI
N TERCERO
CIRLA
a
a N CCIQUITA n CI CIR
o
m o m n
o
CERRITOS DINE CERRITOS DRIVE CERRITOS DRIVE
_ n
IT�� N CALLE A
o a: m CAMINO LORD m zo [
n' �• "' CONDOR c
FARRELL DRIVE PAF n
o
0
Jill
JVEE Z m
MONTERY ROAD -0D�
0CDn
FARRELL
DRIVE o c
m
m a N JUANITA ROAD \0 N n Z
m 3AIN0 n fTl O G7
oCOMMERCIAL z C/)
ROAD
x
� o
m n
T
o � D � D
� v
T4S= R4E
CITY OF PALM SPRINGS
CP 14-04 OVERLAY/RECONST
MAP
SECTION 14-T4S-R4E
W ALE ROAD
o
cr
W
F C
� J
W
J
AMADO W �F7 ROAD
TMk
o EII
_—ARENAS RD CEf�RY
ARENAS < RD ARENAS _
J W _
Z _ N
O w
c BARISTD
W �
z " J SATURNINO DR =
o SATURNINO DR
z o _
� -
z Q
z
RAMON I R6 M RAMON _ RD
L
D
-, .
=2014 RECONST STREET
11
CITY OF PALM SPRINGS
CP 14-04 RECONST/OVERLAY
MAP
SECTION 22-T4S-R4E
71,
< -
¢- Q Q
-
�. C7
J
. Cfl
In.
1
S�I'TIES
E SUNNY DUNES
z TAHQU / r
z cn
TAHQUITZ
U INTERPRETIVE
U CENTER
J
W-� MESQUITE— AVENUE
n
Elf
U�
> O o
MORONG0 z
ROAD z
p U
O a
p
V)
w
m
-=2014 RECONST STREET
1 1 III 1 1 1 1 1 1=2014 OVERLAY STREET 12
CITY OF PALM SPRINGS
CP 14-04 OVERLAY/RECONST
MAP
SECTION 23-T4S-R4E
RAMON RD RAMON RD
0
r
��n J o E CAMINOV'
PAROCELA=E C`A INV a z PAROCELA- E PA LA w
PLACE = Q
�5CALLE ROCA N U o ¢
2 L � CD " N
c ,
0
IES z E SUNNY DUNES 3 E SUNNY DUNES
0
Q.Z INDUSTRIAL PL �_ SAN -LUCAS� ROAD
A�
---`" _RI<rERSIDE �s o
-T N
. . . RSIDE, DRIVE
TA QUIZEEKI _
Lmi
� O%R;I¢E .R � . . . . . .
0
o SAN LORENZO ROAD SAN o LORENZO J
� . . ESQUITE AV NUT . . QUITE AVENUE
PALO VERDE AVE �_ �U E CACTUS AVE Q
Of
FF��p o Of
o OCOTILLO AVENUE o Q�p ¢ OCOTILLO AVE N
p = J Z
o MORONGO ROAD ` EE � Lo
Q N J W W (n u)
N SONDRA ROAD � � � �' a o SONORA
Q o PALMERA o z ROAD N N o
E AVID o o �_ o ��
cn
o
N " HOKONA z U a DEEPWELL ROAD
E AVID z &OLANCHA AVID OLANCHA
N SUNTAN LN PALM TREES J
W10 ORTEGA DRIVE
N
E PALM CANYON DR E PALM CANYON DR
-=2014 RECONST STREET
III 1111111=2014 OVERLAY STREET
13