Loading...
HomeMy WebLinkAbout6/4/2014 - STAFF REPORTS - 2.G. ?ALM SA4 iy V 1/i • 40 � C ••ouco` ?"* 44 ,FOIL CITY COUNCIL STAFF REPORT DATE: June 4, 2014 CONSENT AGENDA SUBJECT: PALM SPRINGS SWIM CENTER POOL DECK REPLACEMENT — APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORITY TO GO TO BID, CP#14-08, AUTHORITY FOR THE CITY MANAGER TO APPROVE THE CONTRACT AND SPECIAL AUTHORITY FOR CHANGE ORDERS FROM: David H. Ready, City Manager BY: Special Projects Coordinator SUMMARY The proposed action would be to approve the Plans and Specifications for the Palm Springs Swim Center Pool Deck Replacement and authorize staff to proceed to bid and authorize the City Manager to award contract and suspend normal working hours during the construction period, and provide special change order authority. RECOMMENDATION: 1. Approve the Plans and Specifications for the Palm Springs Swim Center Pool Deck Replacement Project, CP# 14-08, as prepared by MSA Consulting, and authorize staff to proceed to bid on the project. 2. Authorize the City Manager to, award the contract to the lowest responsive, responsible bidder so long as the bid comes within the Measure "J" budget, suspend the normal work hours during the construction period and execute all necessary documents. 3. Provide Special Change Order Authority up to 10% of the contract amount for the City Manager, subject to reporting back to the City Council. STAFF ANALYSIS: The Palm Springs Swim Center pool deck is suffering from serious deterioration and concrete failure and engineering analysis has revealed that the decking needs to be removed and replaced. Attached is a copy of the plans for the replacement of the ITEM NO. 9c7 City Council Staff Report June 4, 2014 - Page 2 Swim Center Pool Deck Replacement- Approval of Plans decking. The job is further complicated by the fact that asbestos containing drainage pipe exists that needs to be removed and properly disposed of; this work will be included as part of the project. The work necessary should be able to be accomplished in a three week window of time. Staff has worked with Parks and Recreation to identify the best window to shut the pool down for the work and that is the month of August. To ensure this timeline can be met staff seeks authority for the City Manager to award contract to the lowest responsive, responsible bidder so long as the cost is within the Measure "J" budget as well as special change order authority up to 10% of the total contract cost. The contractor will be given a fixed period of time to carry out the work and it will be up to them if they need to budget for double shifts or other special provisions to ensure the work is completed. During the construction period the normal work hours will need to be suspended so this project can be completed in a timely fashion. FISCAL IMPACT: Funds for this project come from Measure "J" account 260-4500-59425. The project engineer has estimated the work at $300,000. k�ip� Alen F. Smoot, Special Projects Coordinator David H. Ready, Hager Attachments: 1. Project Plans 02 f � A ttlL- -ULG(90UNUARY 'ROPE LINE ® r I I my ' —[x. POOL EDCE w u CONC vw uo tim• GE "` [0 PE COPING NPII PCOI EDGE C£ NO MODIFICATION TO rn EXISTING POOL C%. CONC, COPING TO BE pROIECIECiEO IN FIACE 8-GONG. EDGE T I 3AAG i0 BE REMOVED CON E GE 8WD ryEHWE Er. 6''((/[/per) ' /.dE5i0SCCEYENi IX P.C.C. WNEL TO BE REMWED ANC RCP m >ar Nrs I ® war m. POOL EOGE �s s ® ED ® n s ENISTNG CONC.COPING n � a V ® [ -n.::Y'i k..4..+.>.: [ r. '...•._ /\ ®... S C.ER D.N Z ED T2NCN oR.Ux EKE B'CON4 eav6 e ;F PRfIV E TAG ANti�L fS� 9 PROP A'PEC PANEL ® i PO POST AREA ORMN oNSOSOm N [F5 ( 1[xr twmc FRGiEc'IN PVLE(SEE DETAL) a1.IF a s 'y NI- 1� ®REWOl E AND REPLI.CE (SEE DETAIL) OR ;elm wxwx eW0/H >> � IO .p w¢ ♦ ` 2>f s o c¢l R(v CwCYC ®CRIND COGI DECK AI PIP,�e PROPD o T - BECK o rt DUA PALM SPRINGS POOL EXHIBIT FOR BIDDING PURPOSES ONLY mgpe. m .uor�•n me D.N>I»I.fr p1.IDtr 03