Loading...
HomeMy WebLinkAbout6/4/2014 - STAFF REPORTS �OF V A LM sp4 iy u � .Cq`+FOIL K% CITY COUNCIL STAFF REPORT DATE: June 4, 2014 CONSENT AGENDA SUBJECT: CONVENTION CENTER TEMPORARY PARKING LOT—APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORITY TO GO TO BID, CP#14-09. FROM: David H. Ready, City Manager BY: Special Projects Coordinator SUMMARY The proposed action would be to approve the Plans and Specifications for the Palm Springs Convention Center Temporary Parking Lot and authorize staff to proceed to bid. RECOMMENDATION: 1. Approve the Plans and Specifications for the Palm Springs Convention Center Temporary Parking Lot, CP# 14-09, as prepared by MSA Consulting, and authorize staff to proceed to bid on the project. 2. Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS: With the potential for development of a hotel on the current Convention Center parking lot on the north side of Amado Rd. replacement parking is needed. The City Council previously approved an agreement with MSA Consulting to design a 650 space temporary parking lot on the SE corner of Amado Rd. and Avenida Caballeros. Staff and the consultant worked closely with the Convention Center staff to be certain the parking lot would meet their needs and work well for future events scheduled for that property. The temporary parking lot was to incorporate the existing concrete pad, allow for relocation of the outside electrical service currently on the north lot, relocate the four electric vehicle charging stations. The project plans were submitted to Planning under a Land Use Permit Process and the review has been completed and the Land Use Permit has been approved; LUP # 14- 020B. ITEM NO. -W City Council Staff Report June 4, 2014- Page 2 Convention Center Temporary Parking Lot-Approval of Plans Attached is the parking lot site plan, its landscape plan and a lighting plan. The plans provide for a 650 space parking lot, with perimeter landscaping that reutilizes the palms from the existing parking lot and with a lighting program that utilizes fixtures with shaded lenses to prevent spillage onto adjacent property. The design also accommodates the needs of the Convention Center to bring taxing aircraft onto the site in the future should the need occur. With City Council approval staff will be prepared to move to bid as soon as the City Manager provides that direction based on the activities of the proposed hotel. To be completed by September 1, 2014 the project needs to bid in July. FISCAL IMPACT: Funds for this project will be budgeted as a General Fund Capital Project. The engineer has provided a preliminary cost estimate to complete this work as follows: Landscaping $155,000 Lighting/electrical $390,000 Lot Improvements $740,000 Total Estimate $1,285,000 i *+ Allen F. Smoot, Special Projects Coordinator David H. Ready, City er Attachments: 1. Project Plans 02