Cg41FORN`P City Council Staff Report
Date: July 16, 2014 CONSENT CALENDAR
Subject: APPROVAL OF A NOTICE TO PROCEED FOR VEOLIA WATER WEST
OPERATING SERVICES, INC., FOR THE LIFT STATIONS
COMMUNICATIONS UPGRADE, CITY PROJECT 14-11
From: David H. Ready, City Manager
Initiated by: Public Works and Engineering Department
SUMMARY
Approval of this item will authorize Veolia Water West Operating Services, Inc., ("Veolia") to
proceed to upgrade the communication and alarming capabilities to the five (5) lift stations they
maintain for the Palm Springs Waste Water Treatment Plant.
RECOMMENDATION:
Authorize the Director of Public Works/City Engineer to issue a Notice to Proceed for Veolia
Water West Operating Services, Inc., in the amount of $35,000 for the Lift Stations
Communications Upgrade Project, City Project No. 14-11.
STAFF ANALYSIS:
The current communication system is based on telephone lines and modems. While it works in
its current state, it is problematic and not 100% reliable. Veolia staff uses pagers to receive
alarms; however they have problems with the phone lines quite often.
The loss of communications to the Lift Stations lead to gaps in monitoring that increases the
potential for a Sanitary Sewer Overflow. Veolia has had communication failures at least once a
month for the last 6 months. The failure periods last from 1 day up to 5 days. During the outage
periods Veolia staff is only able to do spot checks once or twice a day. The phone lines are all
City lines and as such the repairs have to go through to the City.
The existing modem system as connected to the PLC (Programmable Logic Controller —
industrial strength computers to monitor and control the plant) is problematic as well. There is
feedback from the modem that corrupts the data files in the PLC causing the modem polling to
fail, resulting in loss of communications to the Lift Stations. This problem is very intermittent.
Veolia staff have been unable to resolve this problem after extensive research and
troubleshooting with the equipment manufacturers and vendors. Attached are two reports from
Veolia's computerized maintenance systems for your reference.
ITEM NO. ZZ
City Council Staff Report
July 16, 2014- Page 2
Veolia Notice To Proceed for Lift Station Communications Upgrade(CP 14-11)
The new Mission system that is proposed is based on cellular carrier signals; the vendor claims
99.9% reliability. This will be a web based system, which we would log in to a website to see
the status of pumps, wet well levels, etc. This new system also calls a telephone number and
notifies the user of what the alarm is and requires a response before it is cleared. The price is
for an installed system at each of the five (5) lift stations. Also included is the software to allow
us to bring the Lift Station data from the vendor's servers to the Supervisory Control and Data
Acquisition (SCADA) system. The M800 Service Package is initially included in this proposal,
but will have an annual fee of $2,817 to maintain the service package per year moving forward.
This annual service fee will be included in Veolia's new 15 year contract as part of the
Operations and Maintenance costs.
Per agreement with Veolia, "the City agrees not to solicit or retain any Person other than Veolia
to design, construct, manage or supervise any Capital Project without inviting Veolia to make a
first proposal to do so . . ." Their proposal follows this staff report.
FISCAL IMPACT:
Sufficient funds are available in account No. 420-6800-TBA (Lift Stations Communications
Upgrade) and account No. 420-6800-50000 (Unscheduled Capital Projects).
SUBMITTED:
Prepared by: Recommended by:
Savat Khamphou David J. Barakian
Assistant Director of Public Works Director of Public Works/City Engineer
Approved by:
David H. Ready, City M
Attachments:
1. Veolia's Proposal: Palm Springs 2014 Lift Stations Communications Upgrade
2. Veolia's Job + Monthly Maintenance Report
3. Veolia's Loss of Communications Report
02
OVEOLIA
WATER
April 22, 2014
City of Palm Springs
2014 Lift Station Communications Upgrade - Project Proposal
Veolia Water West Operating Services, Inc. is pleased to submit the following proposal to
upgrade the communication and alarming capabilities to the (5) lift stations that we maintain.
Our current system is based on telephone lines and modems. While it works in its current
state, it is problematic and not 100% reliable. Veolia staff uses pagers to receive alarms;
however we have problems with the phone lines quite often. They are the Cities phone lines
so we have to contact the City for repairs, causing additional delay to get the repairs made.
The new Mission system is based on cellular carrier signals; the vendor claims 99.9%
reliability. This is a web based system, which we would log in to a website to see the status
of pumps, wet well levels, etc. This new system also calls a telephone number and notifies
the user of what the alarm is and requires a response before it is cleared. The price is for an
installed system at each of the (5) lift stations. Also included is the software to allow us to
bring the Lift Station data from the vendor's servers to our SCADA system. The M800
Service Package is initially included in this proposal, but will have an annual fee of$2,817 to
maintain the service package per year moving forward. Our proposal includes:
Communications Unit
Mission Communications M800 RFU in Flatpak enclosure w/Digital Expansion Board (5)
Mission Service Package for one year
Dual Band Low Profile Antenna (5)
Mission Communications SCADA integration software
Construction Mananement Services
Coordinate installation/integration activities.
Monitor daily progress.
Monitor schedule.
Provide monthly reports.
Monitor construction safety.
General Liability Insurance
Veolia general liability insurance
We have negotiated a firm price with Southland Water Technologies (proposal included for
reference) who will also complete the installation and integration at the (5) lift stations over a
7 day period.
Veolia Water West Operating Services,Inc. it 9
4375 E.Mesquite Ave it J
Palm Springs,CA 92264
w veoliawaterna.com
Palm Springs 2014 Lift Station Communication Upgrade 2
Our base not to exceed fee for the project is $36,000.
Thank you for the opportunity to present this proposal for the 2014 Lift Station
Communications Upgrade Project. We look forward to working with you on this project.
Please do not hesitate to contact me should you have any questions or need additional
information on this proposal.
Sincerely,
I
I
Michelle McLey
Project Manager
Veolia Water West Operating Services, Inc.
562-397-5706-cell
Veolia Water West Operating Services,Inc.
4375 E Mesquite Ave.
Palm Springs,CA 92264
w .veoliawati,ma.com 04
Southland Water Technologi( QUOTATION
2588 El Camino Real SW} { ANDWATM Quote Number. 091013-13MC
Suite F-5'10 f C M N O L O G I E S L L C
Carlsbad,CA 92008 Quote Date: Jan 30, 2014
United Statesoop Page: 1
Voice: 760-230-5231
Fax: 760-431-7397
Drop Shipment
UPS Ground
Veolia Water North America eolia Water- City of Palm Springs
375 Mesquite Avenue
115 W.Washington Street Palm Springs,CA 92264
Suite 1450S United States
Indianapolis, IN 46204
Veolia Water NA 3/1/14 Net 30 Days Kg
QUOTED TO DOUG LOAR-CITY OF
PALM SPRINGS WASTEWATER
OPERATIONS
5.00 M803C Mission Communications M800 RTU in 1,996.00 9,975.00
FlatPak Enclosure, induces battery,charger,
antenna with bracket, Dallas Keys
5.00 580 M800 Service Package 1 yr 563.40 2,817.00
5.001650 Digital Expansion Board 495.00 2,476.00
5.00 581 Single Expansion Board Service Adder 60.00 300.00
47.00 !AB-700-HK36AI General purpose Slim Line Relay, 16 Amp 18.00' 846.00
contact, SPOT, 120V 50160Hz
47.00 AB-700-HN121 Mini 5-Blade Base Socket, Screw Terminals, 17.00 799.00
Guarded Touch Safe Terminal Construction
5.00 415C Mission Communications ultra low loss 104.00 520.00
antenna cable-25 feet
5.00 411 3db Gain Low Profile Antenna Without 87.00 435.00
Cable. Dual band tamper resistant without
cable.Comes with N to TNC female
connector
1.00 550 New Account Setup Fee 250.00 i 250.00
5.00 651 Mission Communication wet well module- 165.00 825.00
includes two current sensors
1.00 586 Mission Communications SCADA OPC 1,790.00 1,790-00
integration software
SubtotalI Continued
Sales Tax Continued
Freight Continued
05
Southland Water Technologi( Aftk, QUOTATION
2588 El Camino Real Suite F- SOUTHLANDWATM Quote Number: 091013.13MC
TECHNOLOGIES i E C
Carlsbadd,,CA 92008 Quote Date: Jan 30, 2014
United States Vw Page: 2
Voice: 760-230-5231
Fax: 760-431-7397
Drop Shipment
UPS Ground
eolia Water-City of Palm Springs
Veolia Water North America 375 Mesquite Avenue
115 W.Washington Street Palm Springs, CA 92264
Suite 1450S United States
Indianapolis, IN 46204
L
Veolia Water NA 3/1/14 Net 30 Days KB
40.00 Labor Labor Estimated 8 Hours Per Station, 95.00 3,800.00
Inclusive of Travel
;7
i
Subtotal 24,832.00
Sales Tax y 1,589.85
Fe htt .00 06
0
s �000000
Lid � - �" . . . �- „ ............
» »NNNNN. N»»»» N »
u
ww»N w"N "M N w M N
w w
fill
»
F @ s
m
z
E
Q VEOIIA JOB COST ESTIMATE
WATER
Sub_ Adjusted
AccouM Code Coet Code UdW Deeerip0on OrISM1 C Ofust Change Order CumM
Budget B ud9
Coat Budget
A B C
A-B
10,. 11C710N -
i
603010 1001 6657 $
603010 1002 6657 - E E $
S030f0 1003 6657 - S _ g _ q _
603010 10" 6557 - E S $
807010 1006 6657 - $ $ $
»: 1 +. 1 - -
603010 1011 6657 - g affivAM $ E '.
803010 1012 6657 - E $ E
603010 10131 U57 E E $
603010 10141 6667 - S _ $ $
603010 1015 6657 - $ It $
603010 1021 6657
603010 1022 5857 -
603010 f023 6657 - g g _ $ _
6030f0 1024 6657 - $ $ $
603010 1025 6657 - $ - $ _ $ _
W3010 1031 6657 $$E _
603010 1032 6657 - E S $
It
603010 1033 6657 - $ $ $
603010 IOU 6657 - $ $ $
603010 1036 6657 - $
803010 1047 6657 S $ $
603010 1042 6657 p $ $ _ $ _
603010 IM 6657 0 $ $ $
603010 10" 6687 0 $ E $
ql�
1045 6657
.y 'last 6657 $0ulhlerq Waler TedmO lea E 26546.55 $ f 25546.85
1052 6657 1063 6957 1054 6657S
tOs6 6657 - g Ir " " to 1051 6657 p $ S $
1062 6657 0 $ $ $
1083 6657 p $ $1054 6657 0 $ $ $1065 6657 0 $
803010 A 1071 6657 - $ S E
603010 1072 6657 - $ _ $g $
603010 1073 6657 $ q
603010 1074 886] E - $ - E -
603010 1075 6657
SNIOanta 1081 6657 p S
603010 108 6657 0 $ S $
603010 1083
6657
603010 105464 6657 $ _
603010 10 6657 $ _
603010 1096 8E 6657
603010 1087 6657 $
603010 1055 6667 $
Santa 109 6657
603010 1090 6657 $ _
6030f0 1091 6657 q _ $ _ $ _
603010 1092 6667 - $ $ _ $ _
603010 1093 6657 - $ g _ $ _
603010 1094 6657 q _ $ _ S _
603010 1096 6657 - $ $ S
603125 1 1501 WA $ 5 _ $
W3125 1502 WA 0 $ S $
803125 1 15031 WA
603135 1504 WA 0 E $ $
603125 1505 NIA 1 0 $ $ $
Job Cost Estimate Page 1 of 4
® VEOIIA JOB COST ESTIMATE
WATER
iBD
se> Adjuebd
Account Code Coat Code Lachar Daecdpd0a Odginel Change Order Comets
gA Coat Budges r�
Cost Budget
W3125 15M N/A 0 $ $ $
603126 1507 N/A 0 $ $ $
603125 1508 N/A 0 3 3 - $ -
603125 1509 N/A 0 $ $ $
603125 1510 N/A 0 $ 3 $
603125 15I1 N/A 0 $ $ $
603125 1512 N/A 0 $ $ $
603125 1513 N/A 0 $ $ _ $ _
603125 1514 N/A 0 $ $ $
603126 Isis NIA 0 $ $ $
fill r• !
603020 1601 N/A `0 $ $ §
6030M 1602 N/A - $ $ $
603020 1603 WA - $ $ $
603020 1604 WA - It $ $ _
M020 low WA - j $ $ _
603020 law WA $ $ E
603020 1607 WA - $ E E
603020 1606 WA - $ - E $
603020 is" WA $ $ - $ -_
6=20 Isla WA $ $ $
20 MATENAL Is IPMENT
606410 �2001 N/A 0 $ $ $
606410 20021 NIA $ g $ _
606410 2003 NIA - $ $ It _
606410 2004 NIA - $ $ $ _
606410 2005 WA - $ E $ _
606110 2006 WA - E $ $
easels 2007 N/A - $ g §
606410 2008 NIA
606410 2009 N/A - $ It § _
606410 201a N/A - $ $ $ _
606410 2011 NIA $ $ $
606410 2012 N/A $ $ $
605410 2013 NIA - $ E S
806410 2014 N/A - $ $ $ _
606410 2016 N/A - $ $ $ _
606410 2016 WA - $ $ $ _
606410 2017 N/A - $ g g
608410 2018 WA - $ g $ _
606410 2019 WA - $ g $
606410 2020 WA $ $ $
806410 2101 WA 0 S $ $
606410 2102 WA - $ $ $ _
606410 2103 WA - $ g $ _
S06410 2104 WA - $ $ § _
606410 2105 WA $ § $
606410F 2201 WA - g -�$ § _
606410 2202 WA g $ $ _
608410 2303 WA - $ $ $ _
608410 2204 WA - $ $ _ $
E06410 2205 WA - It $ $
608410 2301 N/A 0 f $ S
606410 2302 NIA - $ $ g
606410 M03 NIA It g $ _
609410 2304 NIA - $ $ f
606417 2305 NIA - $ $ $
30 LABOR. -
300 7 -
601026 3000 NIA PM No,1-Michelle McLey E 4,903.79 $ $ 4,903.79
601382 $ $ _ $ _
$ 3 $
Total s 4X3.79 _ $ -
601025 3001 N/A PM No,2 $ $ $
M382 $ $ g -_
$ $ S
Total . C 9
306 r.. .
601025 3050 WA SR.PM No.1 $ $ g
Job Cost Estimate Page 2 of 4
Q VEOLIA JOB COST ESTIMATE
WATER
TSD LiR$tatlpq ,.
Mill, .
Bob, Adjusted
Account Cade Cost Code LedW Budget
Description Original at ChangeOrder Current
Cost Budget
N/A
40 TRAVEL s.LM
8019 4000 WA Meals B Entarta rtmenl/Business Meals $ } g $
_
601B16 4000 WA Aidansiod ' Car Rembd/Mi vel-0ef raIh § $ $
6025115 4000 WA Offica Su ies-Olhar $ § g -
80284 4000 WA Postage $ _ $
604640 40001 6620 iMobile/CelluwT one g g _ $ _
B10 bloa WA MeelsB EntarteirmanVBuskress Meals $ $ _ g _
191 4100 WA AirtamlLotl Ca RentaVBej revel4)Uw $ $ $ _
26 41oa N/A Office Su lies-Other $ $ _ $
BO2610' 4100 WA Poe § S _ g
604610 41M 6620 Mobilef Cellular Tel one $ g $
50 TAXE94NO1201
602810 6000 WA Freight $ $ $
B M70 MID WA Surety Bonds $ _ $ g -
604570 6000 WA Bid Bonds $ $ §
604920 60oa WA Builders Rlak Insurance g $ _ $
607070 5000 WA General Liabil' Insurance $ 231.00 $ g 231.00
607315 Soa0 N/A Sales Bllse Tax $ g _ $
607615 Soa0 WA License/Permit Fees $ $ $ _
B07876 5000 N/A Soultrem California Edison estimate-direct pay $ $iii g _
69 SITE.00BT8 $ $
1411110010
602510 6000 WA Once Equipment Rental/Leese
603010 SM 6224 Cleani fJanitomal q _ $ $ -
604610 6000 8610 Lo 4)bm nce Telephone $ _ $ $ _
608flo 6000 WA Water $ $ _ $ _
W6116 6000 WA Electricity $
605125 Me WA se,sage, $ _ $ $
606135 MID WA Utilities-Other § $ $
606420 Goal) WA Equip/Trailer Rental $ s _ $
607635 MID WA Miscellaneous g $ $
See
Account am N/A CM Livi $ $ $
t .�•:. - ea _
$02210 elm N/A Vehicle Lease as $ $ $ _
BOMB Bloc WA Vehicle MeirftM elFueVOlher d $ E
1 _605210 62oa Other Chemicals $ _ $
60.1010 6201 6690 Other Outside Services $ g $
S $ g
70 CONTINGENCY
hcm. .. r ..
606989 70oa N/A '..Corm $ $ :£ $
$ 31,681.64 $ - $ 31,681.64
10
Job Cost Estimate Page 4 of 4
Palm Springs Monthly Maintenance Report
06126/2013 To 07/10/2014
Date
Complete WO# Equipment Task Description Assigned To Hours
7/10/2013 31550 PLC-MCB-PLC, 'CMU- Doug Loar 0.5
Admin CORRECTIVE
MAINTENANCE-
UNPLANNED
WO Notes: Problem: Phone bill for Lift Station Dialer was higher than normal again. Check dialer settings
in PLC.
Corrective Action: Found extra character in dialer string. Removed extra character.
Downloaded to PLC. Back in service.
7/15/2013 27249 PLC-MCB-PLC, PM-Bi-Annual PLC Dave Sopko 1
Admin Battery
Replacement
WO Notes: (x) Replace battery on processor board.
2/17/2014 33483 PLC-MCB-PLC, 'CMU- Maintenance 3
Admin CORRECTIVE Crew
MAINTENANCE-
UNPLANNED
WO Notes: Problem:Alarm failure, No comminucations at All Lift Stations..
Corrective Action: Reset CPU at Administration Office, Doug programed and cleared system
with the Laptop, Put back system on line...All lift Stations are comminucating.. System Good.
3/17/2014 33686 PLC-MCB-PLC, "CMU- Dave Sopko 3
Admin CORRECTIVE
MAINTENANCE-
UNPLANNED
WO Notes: Problem: Lift stations loss of comunication, Scada data wire framed
Corrective Action: check lift stations for proper operation, reboot plc, (still wire framed )
download known good program to replace corrupted program on scada. test run ok at this time.
4/1/2014 34201 PLC-MCB-PLC, 'CMU- Dave Sopko 4
Admin CORRECTIVE
MAINTENANCE-
UNPLANNED
WO Notes: Problem: intermittent loss of communication for lift stations
Corrective Action: replace back plane on plc. nessesary to upload program and reprogram
when done
4/11/2014 34277 PLC-MCB-PLC, 'CMU- 1.5
Admin CORRECTIVE
MAINTENANCE-
UNPLANNED
WO Notes: Problem: loss of communication to all lift stations
Corrective Action: Verify problem install known good program into PLC, Test OK
4/18/2014 34307 PLC-MCB-PLC, "CMU- Domingo Felix 7
Admin CORRECTIVE
MAINTENANCE-
UNPLANNED
WO Types C-Corrective P-Preventative S-Skipped Pagel of 2
IL
Date
Complete WO# Equipment Task Description Assigned To Hours
WO Notes: Problem: PLC loss of communications to lift stations.
Corrective Action: Reset PLC power. Hard fault. Reset power Soft fault. PLC lost program,
reprogram PLC with known good saved program. Run OK.
4/24/2014 34357 PLC-MCB-PLC, "CMU- Dave Sopko 3
Admin CORRECTIVE
MAINTENANCE-
UNPLANNED
WO Notes: Problem: Loss of communication to all lift stations
Corrective Action: Cycle power to plc. reprogram plc test ok at this time
5/16/2014 34951 PLC-MCB-PLC, 'CMU- 10
Admin CORRECTIVE
MAINTENANCE-
UNPLANNED
WO Notes: Problem: Loss of communicatins from LS-04, 05.
Corrective Action: Switched modems. Reset PLC. Reloaded program into PLC. Switched
phone lines at the plant. Nothing seems to work. Intermittent communications failures. Left
message for Randy Cobb at the City to contact Verizon. Phone lines were fixed the following
Wednesday.All back to normal.
Summary
Total#of WO's 9
Total Hours 33.00
WO Types C-Corrective P-Preventative S-Skipped Page 2 of 2
12
Lift Station Loss Communication Report
ludo Malntenancetvee 7lggflal9l [cruse of fallum Date/nmeoftorm p3ttQf0CN6g4 Ternieader Dateoomoleled L9ID41eted AstaA ft ve Ni
ls(CO) COMP COM FAIL 6/2/201414:00 6/2/201418:05 LOPEZ 6/2/201618:35 1 L6
LS MO is(CO) COMP COM FAIL 6/2/201414:00 6/21W1417:30 LOPEZ 6/21201418:02 1L5
LS N3 Ls(Cc) COMP COM FAIL 6/2/201414:00 6/21M1417:02 LOPEZ 6/2/20141730 1LS
U42 LS(CO) Camp COM FAIL 6/2/201416:00 6/2/201416:30 LOPEZ 6/2/201417:01 1L5 Check the LS and make sure the pumps are working.
Ls l LS(CO) COMP COM FAIL 6/21201414:00 612/201416:00 LOPEZ 6/2/201416:30 ILS Check the LS and make sure the pumps are working.
IS N4 LS(Cc) COMP COM FAIL 5/5/201417:56 5/5/201412:00 KNOLES 5/5/201418'.O0 ILS Reset the lS
IS" LS(CO) COMP COM FAIL S/3/201415:00 5/3/201415:00 KNOLES 5/3/201418:00 1 L5 RAW the IS
LSNO LS(CO) COMP COM FAIL 4/22/201415:30 4127/201415:30 KNOLES 4/27/201417:00 1LS Reset the IS
LS NS Is(CO( camp COM FAIL 4/24/20149:05 4/24/20149:05 HUNTZNGER 4/24/2133414:42 1L5 All LS went down,let Dave know so he could fix them.
LS NL IS(Call Camp COM FAIL 4/24/2014904 4/24/20149:04 HUNTZINGER 4/24/201414:40 1IS All LS want down,let Dave know so he could fix them.
LS N3 LS(COI COMP COM FAIL 4/24/20149'.03 4/24/201A 9:03 HUNTZINGER 4/24/201414:38 1LS All IS wentdown,let Dave know so he could fix them.
LS N2 LS(CO) Camp COM FAIL 4/24/20249:02 4/24/20149:02 HUNTZINGER 4/24/201414:26 1L5 All IS went down,let Dave know so he could fix them.
LSNS LS(CO) COMP COM FAIL 4124/20149:01 4/24/2014%01 HUNTZINGER 4124/20141443 1B All LS went down,let pave know so he could fix them.
IS Nl a(CO) COMP COM FAIL 4114/20140:00 41W20140:0 HUNRINGER 4/14/2014000 1LS All LS went down Davecame In and fix them.
LS 02 LS(CO) Camp COM FAIL 4/14/20147:OO 4114/20140:o0 HUN121NGER 4/14/20140:00 10 All LS went down Dave came In and fix than.
LS 03 Ls(CO) COMP COM FAIL 4/14/20147'.00 4114/20140:o0 HUNTZINGER 4/14120140:00 1L5 All LS went down Dave came in And fix them.
ISW LS(CO) COMP COM FAIL 4114/20247:00 4/14/20140:00 HUNTZINGER 4/14120140:00 1L5 All IS went down Dave came In and fix them.
1545 Ls(CO) COMP COM FAIL 4/14/20147:00 4114120140:00 HUNTZINGER 4114/20140,00 1IS All IS went dawn Dave came in and fix them.
LS NS LS(CO) COMP COM FAIL 41101201419:22 4/101201410:22 HUNTZINGER 4110/201411:04 1L5 All LS wentdown,let Dave know so he could fix them. 'I
6N4 LS Ica) COMP COM FAIL 4/10/201410:10 4/10/201410A2 HUNTZINGER 4/101201411.03 11S All LS wentdown,let Dave knew so he could fix them.
IS N3 IS Ica) COMP COM FAIL 4/10/2014 LOAD 4/10/201410:10 HUNTZINGER 4/10/201411:01 1L5 Ali LS wentdown,let Dave know so he could fiathem. �
LS N2 0lcol Camp COM FAIL 4/10/20149:59 4/10/20149:59 HUNTZINGER 4/30/2111410:59 1L5 All IS wentdown,let Dave know so he could fix them.
Bill IS(CO) Camp COM FAIL 4/10/20149:58 4/10/20149:S8 HUNTZINGER 4/10/201410:55 1L5 All LS went down,let Dave knows.he mould R.M.M.
LS 93 LS(COI COMP COM FAIL 3/30IM14942 3/30/2014 SAO KNOLLS 3130/2014 SAO 1LS All Lift Stations had Communic ra Failed,Dave could not fix so Buddy check all LS to make sure everything else is in working condition.
LSN2 LS(CO) COMP COM FAIL 3130120148:39 3/30/20148:38 KNOIES 3/30/20149:38 1US All Lift Stations had CommunicationsFaBed,Dave could not fix so Buddy check all LS to make sure everything else is in working condition.
IS NS LS(CO) COMP COM FAIL 4127/2014832 3/30/20148:27 KNOLES 3/30/20149.27 1LS All Lift Stations had Communications Failed,Dave could not fix so Buddy Check all LS to makesure everything elseisin working schitim.
LS N4 LS(Cc) Camp COM FAIL 8/30/2014800 3/30/20148:36 KNOLES 3/30/20148:36 115 All Lift Stations had Communications Failed,Dave could not fix so Buddy check all LSt0 make sure everything else is In working condition.
LS Nl L9(CO) COMP COM FAIL 3/30/2014&OD 3/30/20148:34 KNOLLS 3/30/2014934 1B All Lift Stations had Communications Fallei Dave could not fix so Buddy check all LS to make sure everything else is in working Fond pion. it
UPS IS(Cc) Camp COM FAIL 3/29/201420:26 3/29/201420:24 KNOLES 3/291201421:24 11S All LIR Stations had Communications Failed. Buddy call David t0 come out fix them.
LS N4 Ls(CO) COMP COM FAIL 3/29/201420:23 31291201420:23 KNOLES 3/29/2014 21 23 1IS All Lift Stations had Communications Failed. Buddy call David to mine out and 9x them.
LS N3 LS Ica) COMP COM FAIL 3/29/201A 20:00 3/291201420:20 KNOLES 3/291201421:20 1IS All Lift Stations had Communications Failed. Buddy.11 David to come ouund fiefiem,
LS N2 LS Ica) COMP COM FAIL 3129/201420:19 9/29/201420:17 KNOLES 3/29/20142117 1LS All Lift Stations had Communications Failed SuddycAIDASidtocome0utandfixthem.
L5N1 LS Ica) COMP COM FAIL 3/29/20142000 3/29/201420:14 KNOLES 3129/201421.14 113 All Lift Stations had Communications Failed.Buddy Fall David to come out and fix them.
LS N4 LS CO) Camp COM FAIL 1/19/201419:0 1/19/201418:30 KNOLES 1/19/201420:03 1L5
IS N4 6(COI camp COM FAIL 1/19/20148:00 1/19/2D349:30 KNOLES 1/19/201411:01 1LS
ISM LS(COI Camp COM FAIL 1/18/20343S:OO 11181201415:30 KNOLLS 1/18/201417:00 16
LS N4 LS(CO) COMP COM FAIL 1/17/201411,30 1/18/201411:33 KNOLLS 1/18/201413:00 1 LS
LS N4 LS(CO) COMP COMFAIL 22127120131945 12/27/201321:45 KNOLES 12/22/201322:45 1LS
IS N4 LS(CO) COMP COM FAIL 12/21/201310A0 12/21/2013945 RYMER 12121/201311:00 1 LS
LSNS Is(CO) COMP COM FAIL 11/14/201311an 11114/201311:D0 RYMER 11/14/20131195 1LS Reset the 15
LS Nl LS(CO) COMP COM FAIL 11/131201311:01 11113/20131101 RYMER 11/13/201311:05 11S
IS 03 Ls(CO) Camp COM FAIL 111141201311,03 11113/20131103 RYMER 11/13/201311:OS 1 LS
L5N4 ts(CO) COMP COM FAIL 11/13/201311:04 11/13/201311:04 RYMER 11/13/201311:05 1LS
LS" Ls(CO) COMP COM FAIL 11/9/201312:00 11/9/201316:35 KNOLES 11/9/201318:00 1L5
LS" Ls(CO) COMP COM FAIL 11/8/2013 10 36 11/712013 10 36 KNOLES 11/71201311:36 1IS Reset the lS.
IS N2 Ls(CO) COMP COM FAIL 11/13/20131102 11/131201311:02 RYMER 11/612 013 11:05 ILS
LSM LS Ica) COMP COM FAIL 10/17/20136:00 10/17/2013 TOO RYMER 10117/20138:00 1IS Check level in the wet well and make sure the pumps are working.
IS" IS(00i COMP COM FAIL 10/14/201329:00 lOY14120130:00 RYMER 10/14/2013 DO0 1LS Reset the station
13N4 IS(COI Camp COM FAIL 10/13/201315:34 10/19/20131633 RYMER 10/131201319:33 1L5 Check level in the wet well and make sure the pumps are working.
LS N4 LS(COI Camp COM FAIL 10/13/2013600 10/13/20136:31 RYMER 10/13/20137:31 1LS Check level in the wet well AM make sure the pumps are working.
LSIfA LS(CO) COMP COM FAIL 10/17/2013 I5O0 10/12/201318:30 RYMER 10/12/201319:30 1L5 Check level in the wet well and make sure the pumps are working.
LSN4 L5(CO) COMP COM FAIL 10/1212013 8 00 30/1Z/2013 B:DD RYMER 10/12/20139:00 1L5 Check level in the wet well and make sure the pumps are working.
LSNL LS(Cc) COMP COM FAIL 101111201314:00 10/11/201313:24 RYMER 10/11/201314:24 1L5 Reset the LS.
LS NL Ls(Cc) Camp COM FAIL 10/11/20139:D0 10/11/20139:20 RYMER 10/11/201310:20 ILS Reset the LS.
15 93 ts(CO) COMP COM FAIL 10/3/2013 SIA3 1013/20134:43 KNOLES 1013/2013543 1 L5 Reset the LS
IS K4 LS(CO) COMP COM FAIL 9/221201320:OO 9/22/201319Z1 RYMER 9/22/201320',21 1 LS Reset the LS.
L5 N4 Is(Cc) COMP COM FAIL 9/22/20130:00 9/22/20138:18 RYMER 9/22120239:18 115 Reset the 15.
LS NL Ls(Cc) COMP COM FAIL 9/21/201320:00 5/211201320:00 RYMER 9/21/201A 21:00 1IS Resetthe LS.
IS N4 Ls[Cc) COMP COM FAIL 9/21/201320:00 9/21/201320:00 RYMER 9121/20132100 1L5 Reset the LS.
LS N4 LSICO) COMP COM FAIL 9/20/201318:00 9/20/201318 DO RYMER 9/20/201319:00 1L5 Reset the LS.
IS N1,12,N3 0 ICO) Camp COM FAIL 9/31201319:56 9/31201319:52 KNOLES 9/3/201322,11 1L5 Communications Failed at all LS.Buddy&Hu..check all LS to make sure everihing is mooing. All Goad)
IS NO IS(CO) Camp COM FAIL 9/2/201317A5 9/2/201317:45 KNOLES 9/212 013 18:45 1 LS Reset the IS.
LS NS LS(COl COMP Cl FAIL 9/1)201312:15 9/1/201312:15 KNOLES 9/1/201313:15 1 LS Reset the LS.
LS$4 LS(COI COMP COM FAIL 9/1/20139:00 9/1/20139:00 KNOLLS 9/1/201310:00 1LS Reset the LS.
LSS4 LS(CO) COMP COM FAIL 9111:13 9/1/20135:00 KNOLES 9/1/20136:00 1L5 Reset the LS.
G� Prepared by Ken Hu ntaineer 7/7/2014 Page I
Lift Station Loss Communication Report
L.Cith 1 MalMenan4lrvpe THaAnus ra0reofhllure DM ITlmeplanned DateRlmestghad Teamleader Eft e 1 Led C,thal,,d basal y�
B#5 LS(CO) COMP COM FAIL 9/1/2D331:44 9/1/20131:44 KNOIES 91112013300 115 Reset the B.
LS#4 B(CO) COMP COM FAIL 8/29/201316:30 8/2912013 16 30 KNOLES 8/29/20131705 1L5 Reset the LS.
B#1 LS(CO) Camp COM FAIL 8/12/201314:00 8/121201314:24 HUNTZINGER 8/121201315:00 1B Reset and eveMhing is working.
Bb5 LS(CO) COMP COM FAIL 7/31/201312:35 7131120131445 HUNRINGER 7/31/2013 ISAS lB ResettheB
IS#5 B(CO) COMP COM FAIL 7/31/20131000 7131/201310:00 HUNTINGER 7/31IW1310:31 1L5 Resetthe15
15#5 RICO) COMP COM FAIL 2/30/20134:00 7/90/2013400 KNOLES 7130/2013&00 1US Reset the LS
B#5 LS(CO) COMP COM FAIL 7/2612013349 7/26/20133.49 KNOLES 7/26120134:49 1B Reset the LS
B#5 B(CO) COMP COM FAIL 7/16/20131400 7/151201315:15 RYMER 7/15/201315:30 1 LS Reset the LS
B#5 B(CO) COMP COM FAIL 7/15/20138:45 7/15/20138:45 HUNRINGER 7/15/20139:00 1LS Resetthe LS
LS#5 15(CO) Camp COM FAIL 7/13/201330:00 7/13/201310:08 RYMER 7/13/201311:08 1LS Resetthe LS
LS#3 LS(CO) Camp COM FAIL 61161201316:02 6/16/2013 LEW KNOLES 6116/201319:58 1L5 Reset and everything b good.
LS#5 LS(CO) Camp COM FAIL 618/20139A0 6/8/20139:00 RYMER 6/8/201312:DD 1 B Resetthestation
B02 IS;(CO) COMP COM FAIL 5131120132:00 5/31/2033100 KNOLES 5131/20137:30 1IS
lS#1 LS(CO) COMP COM FAIL 5131/20236:45 5/31/20136:42 KINDLES 5131/20137:15 1LK RESET THE IS
B#1 B(CO) COMP COM FAIL 5/19/201312:15 5119/201312,14 KNOLES 5/19/201314.14 1 B
LS#3 B(CO) COMP COM FAIL 5/1/201314:00 5/3/201314:00 RYMER 5/1/201314:00 1LS
IS#2 B(CO) COMP COM FAIL 5/1/201313:54 5/1/20131354 RYMER 5/11201313:50 Its
Bps l5(CO) Camp COM FAIL 5/1/201312:32 5/1/201312:32 RYMER 511/201312:32 1IS
Best RICO) COMP COM FAIL 4/39/201322:00 4/30/201222:00 RYMER 4/3D/20132350 1L5 Lest communications. Eric reset the B and let Dave know of the lost communications.
All UN Statio IS ICO) COMP COM FAIL 12/13/201218:55 1Z/13/201218:15 RYMER 12/13/201219,30 1LS Loss Communication.Reset everything
All Uft Statics LS(COI COMP COM FAIL 12/12/20121'.30 12/12/20121:30 KNOLES 13/12/20133:00 1B Less C.amemicatlon.Reset everyMing
All Lift Statio LS(CO) COMP COM FAIL 12/2/201210:45 12/2/201210:45 LOPEZ 12/2/201212:31 1L1 Loss Communication.Reset everything
All Lift Static LS(CO) COMP COM FAIL 12/112012930 12/1/20129:30 LOPEZ IUV201211:30 1L1 Los.Communlcltion.Reset everything
All Lift Static B(CO) Camp COM FAZE 11IN12012 17 29 11/29/201219:27 LOPEZ 11/29/201221:27 1B Loss Communication.Reset everything
All Un Statio IS(CC) COMP COM FAIL 11/28/201220:CO 11/28/201220:00 LOPEZ 11/28/201222:00 1L5 Lass Communication.Reset everything
L5#1&3 LS(CO) COMP COM FAIL 11/25/20129:00 1112512012900 KNOLES 11/25/201210:30 1L3 Loss Communication.Reset everything
LS#I LS(CO) COMP COM FAIL 11/23/201218:49 11/231201218:49 KNOLES 11123/201220:15 1B L-11 Communication.Reset everything
LS#1 B(CO) COMP COM FAIL 11/26/20128:23 11/23/20129:23 KNOLES 11/231M121000 115 Loss Communication.Reset everything
B12 LS(CO) COMP COM FAIL 11/23/20122A9 11/23120122:49 KNOLES 11/231M123A5 1LS Loss Communbtion.Reset everything
B#2 B(CO) COMP COM FAIL 11/2Z/20126:00 11/22120126:47 KNOLES 11/22IM129:15 1LS Loss Communication.Reset everything.
B#1 Us(CO) COMP COM FAIL 11/21120122:00 11/21/20122:42 KNOLES 11/21/20124:00 1IS Loss Comnmr,"ation Resetiry"hing
IS#2 LS[CO) Camp COM FAIL 11120Y20129:21 11/20/201222'.28 KNOLES 11/20/2012 23 OJ 1L5 Loss Communication Reset everything
LS#2 LS ICO) Camp COM FAIL 11/20120129:17 11/20/201219:28 KNOLES 11/20/201221:W ILS Loss Communication.Reset everything
LS#4 is hCOj Camp COM FAIL 13/2012012301 11/20/20123:06 KNOLES 11/20/20124:02 1 L5 Loss Communication.Reset everything
LS#4 B(Cal Camp MM FAIL 11/19/201219:51 11/191201219:51 KNOLES 11/19/201220:59 1 LS Loss Communication.Reset everything
IS#4 IS(CO) Camp COM FAIL 11/19/20123:19 11/19/20123.19 KNOLES 11/19/20124:50 1B Loss Communhatlon Reset everything
LS" is(Cal COMP COM FAIL 11/18/201216:19 11/18/201217:19 KNOLES 11/18/201220:00 1LS loss Cpmrsimcatipn.ReeUtevery1hirg
6#2 LS(CO) COMP COM FAIL 111141201210:11 11114/201218:10 KNOLLS 11/14/201219:10 1L5 Loss Communication.Reset everything
LS 95 LS(CO) COMP COM FAIL 11/12/201210:IS 11/12/30132:30 RYMER 11/12/20123:45 1B Loss Communication.Reset everything
All Lift Slat LS(CO) COMP COM FAIL 11/111201210.02 11111/201211O0 RYMER 11/11/20121800 1L5 Loss Communication.Reset everything
All Lift Statio B(CO) COMP COM FAIL 11110/20126'D0 11110/20126:3D RYMER 11/10/20127:30 1L5 Loss Communication.Reset everything
All Lift Statio IS(CO) COMP COM FAIL 11/9/201212:00 II/9/201212:00 RYMER 1119/201213:30 1IS Loss Communication.Reset everything
IS is LS(CO) COMP COM FAIL 11/712012IBM 11/7/3012 IS 06 RYMER 11/7/201218:30 1B Loss Communication
15#2 B(CO) COMP COM FAIL 11/7/201216:00 11nC01216A4 GUEVARA 11/7/201216.15 1IS Loss Communication
Ups LS(CO) COMP COM FAIL 11/2/201215:00 1117/20121SAS KNOLES IU`7/201216,02 11S Loss Communication
B#1,2.3,4,515(CO) COMP COM FAIL 8/12/201216:00 8/12/201216.00 KNOLLS 8112/201219,00 1L5 Made sure all Dk stations are back on line.
B#1,2,3A,5 B ICO) COMP COM FAIL 8/12/20128:10 8/12/20121100 KNOLES 0p21201214:00 1LS Lost communications at all lift stations
LS#2 Is(CO) COMP COM FAIL 8/51201211:21 8/5/201213:30 KNOLES 0/5/201215.30 1 IS Lestoomen.m.ions
LS#2 Ls(CO) COMP COM FAIL 8141201211:19 8/4/201219:DO KNOLES e/4/201221 O0 1LS Lestcemmunlcati.e,
LS#2 B(CO) COMP COM FAIL 8/4/201211:12 8/4/201214:00 KNOLES 8/4/201236:00 1LS Lost communications
LS#2 LS(CO) Camp COM FAIL 7/29/201223:00 7/29/201223:00 LOPEZ 7/29/201223',55 1US Lost communications
LS 42 LS(Col COMP COM FAIL 7/29/MI220,30 7/29/201220:30 LOPEZ 7/29/201221'.30 1L5 Lost communications
LS#4 LS(CO) Camp COM FAIL 6/4/201214'00 6/41201214:00 HUNRINGER 6/5/201214:30 ILS
LS 04 L5(CO) COMP COM FAIL 5/25/20121640 5/26/2D1211:00 INCHES V26/201213,00 1LS
BALL LS(CO) Camp COM FAIL 5/19/20121442 5/19/201215:00 RYMER 5/19/201216:00 1 LS
B#5 is(CO) COMP COM FAIL 5/16/201210:00 5116/201210:00 BRAVO 5/16/201210:30 11S Loss Communication.Reset the is.
LS#2 B(CO) COMP COM FAIL 2/20/201214:12 2/20/20122:30 HUNRINGER 2/20/201210:00 1LS
.tom
Prepared by Ken Huntainger 7/7/2014 Page 2