c'`ivolk CITY COUNCIL STAFF REPORT
DATE: July 16, 2014 CONSENT AGENDA
SUBJECT: AMENDMENT NO. 3 TO URRUTIA ARCHITECTS CONTRACT FOR
AIRPORT ESCALATOR AND AIR HANDLING EQUIPMENT
REPLACEMENT PROJECTS
FROM: David H. Ready, City Manager
BY: AIRPORT
SUMMARY
A professional services contract amendment with Urrutia Architects for the Palm
Springs International Airport escalator replacement and air handling equipment
rehabilitation projects.
RECOMMENDATION:
1. Approve Amendment No. 3 to Urrutia A.I.A. and Associates Agreement No.
6262 for design, bid, permitting, and construction phase services in the
amount not to exceed $ 35,200 to complete facility equipment replacements.
2. Authorize the City Manager to execute all necessary documents, and change
order authority up to a ten (10) percent increase over the total project amount.
STAFF ANALYSIS:
There are two outdoor escalators in the Palm Springs International Airport terminal
complex that facilitate the safe and efficient movement of passengers. These
escalators were part of the 1999 Bono Concourse project, a two-level facility housing
eight loading bridge boarding gates for the growing airport. Based on the cost of
maintenance and increasing downtime for repairs, the two escalator units are
approaching the end of their useful life.
This contract amendment will initiate the professional services required in to design the
escalator with modern, more reliable and more energy efficient units. Additionally, a
passenger data analysis will be conducted and integrated into the specification so that
the durability of the escalators sufficiently matches current and forecast passenger
ITEM NO..=_
City Council Staff Report
July 16, 2014 -- Page 2
AMENDMENT NO.3 TO URRUTIA ARCHITECTS CONTRACT
FOR AIRPORT ESCALATOR AND
AIR HANDLING REPLACEMENT PROJECTS
demand loads without experiencing above normal breakdowns or excessive wear and
tear.
A second facet of work relates to the airport terminal's mechanical air handling
equipment. The older main terminal building has eight large capacity air handling units
for heating, ventilating and cooling (HVAC) and all are several decades old. Many of the
units, if not all, require either some level of overhaul or full replacement in order to
reliably and efficiently continue supplying cooled and heated forced air throughout the
complex. Urrutia Architects, will render the necessary professional services to
appropriately evaluate and then design the bid specifications and provide construction
oversight.
FISCAL IMPACT:
The Fiscal Year 14/15 Airport Budget planned for these projects and funds are available
in accounts 416-6501-56173 and 416-6501-56177.
Thomas Nolan
Executive Director, Airport
David H. Ready, City ger
Attachments: Urrutia Amendment No. 3
Scope of Service
02
AMENDMENT NO. 3
TO AGREEMENT NO. A6262 On-Call Architectural Services
PALM SPRINGS INTERNATIONAL AIRPORT
THIS THIRD AMENDMENT is made and entered into as of the 16`h day of July,
2014 (the "effective date') by and between the CITY OF PALM SPRINGS, a California
charter city and municipal corporation ("City"), and Urrutia A.I.A. and Associates, Inc.,
dba Urrutia Architects (herein "Consultant') as follows:
RECITALS
WHEREAS, the City owns and operates Palm Springs International Airport ("Air-
port") located in Palm Springs, California for the convenience of the general public.
WHEREAS, City and Consultant entered into that certain Consulting Services
Agreement No. A6262 for Aviation Consulting ("Agreement') for On-Call Architectural
Services, as duly amended from time to time; and
WHEREAS, the parties wish to amend the Agreement to increase work assign-
ments.
NOW, THEREFORE, for good and sufficient consideration, the parties agree as
follows:
1. Exhibit "A", Scope of Services, is hereby amended to add the following on-call
Architectural Services for additional resident professional services for the Design
and Engineering Services to the Airport Terminal heating and ventilation system
and the Bono Concourse escalator replacement as described in the proposal
from the Consultant dated July 7, 2014.
Task 5 — Design and Engineering Services— HVAC Air Handler replacement study.
Task 6— Design and Engineering Services— Escalator Replacement.
2. The agreement shall allow a total project sum up to $35,200.00 for professional
services relating to the design, construction management and planning of Task 5
and Task 6.
Except as previously modified herein, all other provisions of the Agreement shall remain
unmodified in full force and effect.
03
[SIGNATURE PAGE FOLLOWS]
Urrutia Architects Inc. A6262
July 16, 2014— Page 2
Palm Springs International Airport
IN WITNESS WHEREOF, the parties have executed and entered into this Lease as of the date first written above.
CITY OF PALM SPRINGS
ATTEST: a municipal corporation
By: By:
City Clerk City Manager
APPROVED AS TO FORM:
By:
City Attorney
CONTRACTOR: Check one:_Individual_Partnership_Corporation
Corporations require two notarized signatures: One from each of the following:
A.Chairman of Board, President,or any Vice President:AND
B. Secretary,Assistant Secretary,Treasurer,Assistant Treasurer, or Chief Financial Officer.
By: By:
Signature (notarized) Signature(notarized)
Name: Name:
Title: Title:
ffllfifff#t####,YYi#Y#'YY####YY##f!!llNllflHNflf IRN}f1Ri IfIRRf}}111R}f#itYYi###!##i}11f1R!}flflRifHllHHlliNflf
State of State of
County of County of
On before me, On before me,
Personally appeared proved to Personally appeared proved to
me on the basis of satisfactory evidence to be the person(s) me on the basis of satisfactory evidence to be the person(s)
whose name(s)istare subscribed to the within instrument and whose name(s)is/are subscribed to the within instrument and
acknowledged to me that he/she/hey executed the same in acknowledged to me that he/she/they executed the same in
his/herllheir authorized his/her/their authorized
capacity(ies),and that by his/herttheir signature(s)on the in- capacity(ies),and that by his/her/their signature(s)on the in-
strument the person(s),or the entity upon behalf of which the strument the person(s),or the entity upon behalf of which the
person(s)acted,executed the instrument. peson(s)acted,executed the instrument.
WITNESS my hand and official seal. WITNESS my hand and official seal.
Notary Signature: Notary Signature:
Notary Seal: Notary Seal:
04
165 Luring Drive
Palm Springs, CA 92262
urru1n 760.327.6800
760.327.8813 fax
des ign@urrutiaarc hitects.com
July 7, 2014
Mr. Thomas Nolan
Executive Director
Palm Springs International Airport
3400 E. Tahquitz Canyon Way
Suite OFC
Palm Springs, CA. 92262-6966
RE: Proposal for Professional Design and Engineering Services - HVAC Air Handler
Replacement Study.
Dear Mr. Nolan:
Urrutia Architects is pleased to provide the City of Palm Springs International Airport with
our proposal for professional architectural and engineering services to include the
evaluation and study of the existing HVAC Air Handlers located within the main the
main airport terminal.
Scope of Work
The following summarizes our understanding of the scope of work. The main airport
terminal contains eight air handers of various sizes in locations throughout the terminal.
These units are suffering from old age and inefficiency and may need to be replaced or
refurbished. A detailed evaluation will be made of each of the units.
We are assuming that the project will be subject to review by only the following
agencies/departments:
o City of Palm Springs Airport
Scope of Services
Based on the above Scope of Work, Urrutia Architects will provide Architectural and
Engineering Services to include the following:
• Architectural
• Mechanical Engineering
05
HVAC Air Handler Replacement Study
Palm Springs International Airport -
Palm Springs.CA
July 7,2014
A. Pre-Design/Site Analysis Phase:
a. Urrutia Architects and their consultant shall provide the following services:
• Initial preparation shall include review of existing construction
r t it or airport. A documents and record drawings furnished by he City p I
subsequent site visit shall be conducted to document all air handler
equipment, including serial numbers, make, and size, components,
and maintenance record. The documentation shall include listing
of faulty components and the status of each unit or component
with regard to expected life. Af�er compiling all the data for each
unit, a recommendation shall be made for each unit covering
replacement or refurbishment of components, or the entire unit.
• The study will include recommendations for replacement or
refurbishment of the units. Implementation of the
recommendations are not a part of this study but can be provided
if requested by the Airport as an additional service.
B. Proposed Compensation
To provide the services described in this proposal, the following compensation is
proposed:
A total fixed cost of$7,800.00, plus reimbursable expenses.
A. Pre•Deslgn/Site Analysis Phase:
A fixed sum of$ 7,800.00, plus reimbursable expenses.
Reimbursable Expenses:
Reimbursable Expenses are in addition to the Architect's compensation, and include
actual expenditures made by the Architect and the Architect's employees and'
Consultants in the interest of t'ne Project for the expenses listed in the following
Subparagraphs:
• Long distance communications;
• Fees paid in securing approvals of authorities having jurisdiction over the Project;
• Reproductions of drawings, specifications and other documents;
• Postage and special handling of documents;
• Finish/ detailed models requested by the Client,
- 2 - 06
i
HVAC Air Handler Replacement Study
Palm Springs Irternational Airport
Palm Springs,CA i
July 7,2014
We are proposing an estimated budget of $500.00 for reimbursable expenses.
Assumptions include the following:
The City or Airport shall provide the Architect with copies of "as built" drawings,
Including structural, architectural, mechanical, and electrical data or any other
drawings of scope related information relevant to this project that may assist the
Architect in the preparation of their drawings,
i
l
If our proposal is acceptable, please have the City prepare an agreement for our
services. Should you have any questions, please call me. I look -orward to hearing from
you.
Sincerely,
co A A
Presid t
rnia License # C7467
IIf I
- 3 - 07
III
165 Luring Drive
Palm Springs, CA 92262
urrunn 760.327.6800
760.327.6813 fax
10- des ign@a rrutiaarc h itects.com
July 7, 2014
Mr.Thomas Nolan
Executive Director
Palm Springs International Airport
3400 E. Tahquitz Canyon Way
Suite OFC
Palm Springs, CA. 92262-6966
RE: Proposal for Professional Design and Engineering Services- Escalator Replacement.
Dear Mr. Nolan:
Urrutia Architects is pleased to provide the City of Palm Springs International Airport with
our proposal for professional architectural and engineering services to include the
replacement of the two existing escalators located at the Bono Terminal.
Scope of Work
The following summarizes our understanding of the scope of work. The Bono Terminal
has two existing escalators that connect the terminal with the main terminal. Due to
continued maintenance reasons, the airport would like to upgrade and modernize the
existing KONE escalators. The intent will be to leave the existing metal truss in place
and to replace the balance of the units with a new "modernization" package that will
address better efficiency, current code requirements, upgraded safety features, and
long term low maintenance.
We are assuming that the project will be subject to review by only the following
agencies/departments:
o City of Palm Springs Airport
o City of Palms Spring Building Department
Scope of Services
Based on the above Scope of Work, Urrutia Architects will provide Architectural and
Engineering Services to include the following:
08
Escalator Replacemenl
Palm Springs Intemofional Airport
Palm Springs,CA
July 7,2014
• Architectural
• Electrical Engineering
A. Pre-Design/Site Analysis Phase:
a. Urrutia Architects and their consultant shall provide the following services:
• Initial preparation shall include review of existing construction
documents and record drawings furnished by the City or airport. A
site visit shall be conducted to verify record drawings and to obtain
equipment data and specifications on the existing escalators.
B. Construction Document Phase:
a. for the purpose of this proposal, all construction documents created for
this project shali be a part of a single set of construction drawings for this
project. Urrutia Architects will prepare documents that will reflect the
"modernization" package requirements for the escalators, Modernization
specifications will follow recommended specificaticns/guidelines that can
be met by any of the four major escalator companies:
• OTIS
• Schindler
• ThyssenKrupp
• Kone
b. Urrutia Architects and their consultant shall prepare construction
documents, which will, in general, consist of the following:
• Title sheet with code analysis and ADA requirements.
• Partial Site Plan to identify location of work in the overall building.
• Demolition Plan, including temporary construction phasing,
• Remodel escalator plan.
• Electrical demolition plan and remodel plan.
• Specifications book prepared in CSI format.
• Attend meetings as required.
C. Bidding Phase:
a. Urrutia Architects shall assist the airport in soliciting and obtaining bids from
the major escalator companies for this project as an overall single project
through the public noticing process. During the course of the bidding
process, the architect shall prepare and issue addenda as necessary to
2 0 9
i
Escalator Replacement
Palm springs International Airport
Palm springs,CA
July 7, 2014
the bidders, respond to bidders' RFI's, review bids, and make final
recommendations to airport executive director approval.
D. Construction Administration Phase:
a. Urrutia Architects shall provide professional services during the course of
construction that shall include the following:
• Provide clarification and interpretive drawings to the
contractor,
• Review and respond to IRA's From contractors.
• Review submitted changes in construction and costs proposed by
the contractor. Process any Change Orders during the
construction phase.
• Review Applications for Payment from the Contractor and make
recommerdations for payments.
• Visit the job site once a week to review the progress of work and
answer any questions the contractor may have. Document the site
visits with photographs and written memos which will be
distributed.
• Review and process shop drawings and submittals.
• Prepare punch lists during substantial completion and final punch
lists to close out the project.
• Documentation of all warranties, guarantees, and operation
manuals.
• All tests and state inspections will be furnished and provided by the
escalator compacy as a part of the modernization package
i
I
i
i
i
- 3 -
2
Escalator Replacement
Palm Spdngs Intematlonal Alrport -
Palm Spdngs.CA
July 7,2014
E. Proposed Compensation
To provide the services described in this proposal, the following compensation is
proposed:
A total fixed cost of $25,800.00, plus reimbursable expenses.
A. Pre-Design/Site Analysis Phase:
A fixed sum of$ 1,800.00, plus reimbursable expenses,
B. Construction Document Phase:
A fixed sum of$17,000.00, plus reimbursable expenses.
C. Bidding Phase:
A fixed sum of$ 1,000.00, plus reimbursable expenses.
i
D. Construction Administration Phase:
A fixed sum of$5,200.00, plus reimbursable expenses,
Reimbursable Expenses:
Reimbursable Expenses are in addition to the Architect's compensation, and include
actual expenditures. made by the Architect and the Architect's employees and
Consultants in the interest of the Project for the expenses listed in the following
Subparagraphs:
• Long distance communications;
• Fees paid in securing approvals of authorities having jurisdiction over the Project;
• Reproductions of drawings, specifications ona other documents;
• Postage and special handling of documents;
•
Finish/ detailed models requested oy the Client,
We are proposing an estimated budget of$1100.00 for reimbursable expenses.
I
I
4
t �
I
Escalator Replacement
Palm Springs Internatlonal Airpor
Palm Springs,CA
July 7,2014
Assumptions include the following:
The City or Airport shall provide the Architect with copies of "as built" drawings,
including structurcl, architectural, mechanical, and electrical data or any other
drawings of scope related information relevant to this project that may assist the
Architect in the preparation of their drawings.
If our proposal is acceptable, please have the. City prepare an agreement for our
services. Should you have any questions, please call me. I look forward to hearing from
you..
Sincerely,