Date: September 3, 2014 NEW BUSINESS
Subject: APPROVAL OF PLANS, SPECIFICATIONS AND ESTIMATE (PS&E)
AND AUTHORIZATION TO BID FOR THE TRAFFIC MANAGEMENT
CENTER AND CITYWIDE TRAFFIC SIGNAL INTERCONNECT
PROJECT, CITY PROJECT NO. 08-04, FEDERAL AID PROJECT NO.
CML 5282 (031)
From: David H. Ready, City Manager
Initiated by: Public Works and Engineering Department
SUMMARY
The Public Works and Engineering Department has received from Caltrans the
Authorization to Proceed (E-76) with Construction for this project, with a total cost of
$1,644,000 (with 100% reimbursement) for construction. The construction documents
(Plans, Specifications and Estimate) are completed and, in accordance with Section
7.03.040 of the Procurement and Contracting Code the City Council is required to
approve and adopt plans, specifications and working details, and authorize the bid
request for all public projects in excess of $100,000. Approval of this project will allow
staff to proceed with this public project, with an estimated cost of approximately
$1,480,000.
RECOMMENDATION:
1. Approve the Plans, Specifications, and Estimates for the Traffic Management
Center (TMC) and Citywide Traffic Signal Interconnect Project, City Project No.
08-04, Federal Aid Project No. CML 5282 (031); and authorize staff to advertise
and solicit bids.
STAFF ANALYSIS:
The City of Palm Springs has undertaken this project in order to migrate from a legacy
system to an Ethernet system and expand their Intelligent Transportation System (ITS)
in order to improve video and data communications from the signalized intersections to
the City of Palm Springs Traffic Management Center (TMC), to provide new closed
circuit television (CCTV) camera systems that will be communicating via the new fiber
optic, new wireless, and existing hardwired (copper/twisted-pair) communication system,
ITEM NO.
City Council Staff Report
September 3, 2014 - Page 2
Traffic Management Center/Traffic Signal Synchronization, CP 08-04
removing/salvaging/modifying traffic signal controllers, video detection equipment,
wireless communication equipment, and cabinets; and installing new traffic signal
controllers and cabinets.
The project will also provide for a new TMC at City Hall within the City's Public Works
Department complete with two desktop work stations and a 60" LED HDTV Monitor that
will be able to display real time video of intersections and be able to monitor blow sand
and/or flood conditions at the Whitewater River crossings at Indian Canyon Drive, Gene
Autry Trail and Vista Chino. This will be accomplished by furnishing and installing a
total of three (3) Thermal/Daylight Color Cameras to monitor flood, blow sand, and
traffic conditions at the following locations:
1. Palm Springs Amtrak Station
2. Gene Autry Trail at Via Escuela
3. Vista Chino at Clubhouse View Drive
Although the main objective of the project is to provide traffic signal synchronization and
interconnect along the following major corridors:
1. North Palm Canyon Drive —from Tachevah Drive to Andreas Road
2. South Palm Canyon Drive —from Tahquitz Canyon Way to Camino Real
3. East Palm Canyon Drive —from Sunrise Way to Cherokee Way
4. Indian Canyon Drive —from San Rafael to Ramon Road
5. Sunrise Way—from San Rafael Drive to Mesquite Avenue
6. Tahquitz Canyon Way—from Calle Encilia to El Cielo
7. Ramon Road —from Calle Encilia to Crossley Road
The City received $199,000 in federal funds for the Preliminary Engineering phase,
including environmental clearance and design for this project. The City's consultant,
RBF Consulting, has completed the environmental studies, construction plans,
specifications and estimates.
On April 4, 2014, Caltrans authorized the City to proceed with the construction phase of
this project with the total cost of $1,644,000 ($100% federally reimbursable using
federal toll credits) for construction. The plans, specifications, and estimates are
available for viewing in Public Works and Engineering Department and are ready for
Council approval. The Engineer's Estimate for this project is $1,480,000. Approval of
the recommended action will allow staff to proceed with advertisement for construction
bids.
02
City Council Staff Report
September 3, 2014- Page 3
Traffic Management Center/Traffic Signal Synchronization, CP 08-04
FISCAL IMPACT:
Funding project for this is made available in account number 261-4491-50266.
SUBMITTED:
Prepared Recommended by:
Savat Kha phou David J. Barakian
Assistant Director of Public Works/ Director of Public Works/City Engineer
Assistant City Engineer
Approved by:
David H. Ready, City Manager
03
LIAILQ1-CAI.I( ON AND KOUSTNG AGENCY COMUN BROWN h.Gowwr
DEPARTMENT OF TRANSPORTATION
DIVISION OF PLANNING AND LOCAL ASSISTANCE
464 W.4T"STREET,6°Floor.MS-760
SAN BERNARDINO.CA 92401-1400
PHONE (909)383.4030 Flezyourpower.!
FAX (909)383-5936 8e energy efficientl
TTY 711
www.dot.ca.gov/ding
April 8,2014
Dave Barakian 08-RIV-0-PSp
Director of Public Works/City Engineer CML-5282(031)
City of Palm Springs Traffic Management Center
3200 E. Tahquitz Canyon Way Advance Interconnected Signal
Palm Springs, CA 92263 Citywide
Dear Mr. Barakiam
We have reviewed and processed your obligation submittal for the above-referenced project
through Caltrans Headquarters and the Federal Highway Administration(FHWA). You are
hereby authorized to begin the Construction phase of your project. Enclosed is a copy of the
authorizing document (E-76)for your records.
Please consult your Local Assistance Procedures Manual(LAPM), Chapter 15, for proper
Advertising and Award procedures. The City shall follow its normal procedure in awarding the
contract to the lowest responsible bidder and assuring us that all federal requirements have been
met, including an approved Quality Assurance Program.
Please notify this office in writing of the date of the bid opening. After the bid opening and
award,please send us the following items:
• A complete award package as outlined in Chapter 15, section 15.7.
• One copy of plans and specifications, as advertised.
Prospective bidders should be reminded of the Disadvantage Business Enterprise(DBE)
requirements contained in Chapter 9 of the Local Assistance Procedures Manual.
Please be reminded of the invoice processing requirements and reimbursement process in
Chapter 5 of the LAPM. Invoices for reimbursement cannot be submitted until after funds are
encumbered via an executed Program Supplemental Agreement(PSA) and/or an executed
Finance Letter.
Page 1 of 2
04
Dave Barakian
CML-5282(017)
April 8, 2014
Page 2 of 2
If you have any questions, please call me or my staff, Alberto Vergel de Dios at(909) 806-3944.
Sincerely,
Sean Yeung, P.E.
District Local Assistance Engineer(Acting)
Attachment
E-76
c; Grace Alvarez,RCTC
Savat Khamphou, City of Palm Springs
George Farago. City of Palm Springs
Anna Alonso, Caltrans Oversight Engineer
"Callraw improves mobility across Cal Jornw
05
AMENDMENT MODIFICATION SUMMARY-(E-76)
FEDERAL AID PROGRAM CALIFORNIA DEPARTMENT OF TRANSPORTATION
DLA LOCATOR: 08-RIV-0-PSP PROJECT LOCATION:
PREFIX: CML THROUGHOUT PALM SPRINGS
PROJECT NO 5282(031) TYPE OF WORK:
SEQ NO: 2 INTERCONNECT SIGNALS AND NEW TMC ITC) PREV AUTH I AGREE DATES:
STATE PROJ NO 08925113L FED RR NO'S PE- 06/30/2009
AGENCY: PALM SPRINGS PUC CODES: R/W:
ROUTE: PROJ OVERSIGHT:DELEGATED/LOCAL ADMIN CON.
TIP DATA ENV STATUS 1 DT: DELEG TO STATE SEC 6004 0712612012 SPR'
MPO: SCAG RW STATUS/OT: 1 07/18/2013 MCS.
FSTIP YR. 13/14 INV RTE'. 000000000000 OTH'
STIP REF: 209-4000-3653 BEG MP' 0
DISASTER NO END MP: 0
BRIDGE NO'S'
FROG CODE LINE NO IMPV TYPE FUNC SYS URBAN AREA URB/RURAL DEMO ID
L400 10 15 P INDIO-COACHELLA URBAN
L400 30 24 P INDIO-COACHELLA URBAN
L400 31 17 P INDIO-COACHELLA URBAN
FUNDING SUMMARY
PHASE PROJECT COST FEDERAL COST AC COST
PREY.OBLIGATION $225,000 00 $199,000.00 90.00
PE THIS REQUEST $0.00 $0,00 50.00
SUBTOTAL $225,000.00 $199,000.00 $0.00
PREY.OBLIGATION $0.00 $0.00 $Ozo
RAW THIS REQUEST $0.00 $0.00 $0.00
SUBTOTAL $0,00 $0.00 $0.00
PREV.OBLIGATION $0.00 $0.00 $0.00
CON THIS REQUEST $1,644,00000 $1,644,000,00 $0.00
SUBTOTAL $1,644,000.00 $1,644,000,00 $000
TOTAL'. $1,869,000.00 $1,843.000.00 $0.00
STATE REMARKS
HISTORICAL COMMENTS
This is a request for preliminary engineering funding to interconnect traffic
signals throughout the City of Palm Springs and to construct a Traffic
Management Center(TMC)in City Hall using Congestion Mitigation and Air
Quality(CMAQ)funds programmed in SCAG's 2008 FTIP on 11/17108. This project
has been determined to be a minor ITS project. Federaf funding is capped at
$199,000 for preliminary engineering with a maximum reimbursement ratio of
88.53%. THIS AUTHORIZATION TO PROCEED FOR PRELIMINARY ENGINEERING IS
CONTINGENT ON SATISFYING THE FOLLOWING CONDITIONS:(1)PRIOR TO ADVERTISING,
THENADMINISTERING AGENCY'S CONTRACT SOLICITATION DOCUMENTS MUST INCORPORATE
THE RACE-CONSCIOUS DBE PROVISIONS:AND 2)PRIOR TO CONTRACT AWARD,THE
ADMINISTERING AGENCY MUST ADOPT AND RECEIVE CALTRANS'S APPROVAL OF A NEW RC
DBE IMPLEMENTATION AGREEMENT. Reimburse with L400 CMAO funds at approximately
88.4%up to the federal amount shown for preliminary engineering. PL_____
TOTAL COSTS PARTIC.COSTS FED.FUNDS(L400) LOCAL FUNDS
Prel.Engr. $225,000 $225,000 $199.000 $ 26,000
07222013 SEQ 2.This request is for$1,644,000 for CON and CE.CMAO funds programmed in 2013 FTIP.amendment no.6 approved on 04/181I3.Toll credit use as 11 47%match.
09/02/2013 Sequence 02 is a request for construction and construction engineering funding to interconnect traffic signals throughout the City of Palm Springs and to construct a Traffic Management Center(TMC)in City Hall
using Congestion Mitigation and Air Quality(CMAO)funds programmed for FY 14-15 in Amendment 96 approved on 4/18/13 to SCAGs 2013 FTIP and EPSP'd to FY 12-13. Funding for preliminary engineering
was previously obligated. The original NEPA decision approved on 7126112 was revalidated on 3121113. Federal funding is capped at$1,644,000 for construction with a maximum reimbursement ratio of 100%
using toll credits in lieu of matching funds. Reimburse with M400 CMAQ funds at 100%on a pro rate reimbursement basis up to the federal amounts shown for construction and construction engineering.
0 110 812 01 4 SEQ 2.Provide Public Interest Findings for use of proprietary items and EPSP approval.
03/2412014 Submit Emission Benefit clarification.
0 3/2 812 014 Sequence#2 is a request for construction and construction engineering funding to interconnect traffic signals throughout the City of Palm Springs and to construct a Traffic Management Center(TMC)within City
Hall using Congestion Mitigation and Air Quality(CMAQ)funds programmed for FY 14-15 in Amendment#6 approved on 4/18113 to SCAGs 2013 FTIP and EPSP'd to FY 13-14. Funding for preliminary
engineering was previously obligated. The original NEPA decision approved on 7125112 was revalidated on 3121113. The City issued a Public Interest Finding on 12/12/13 for the proprietary items of work. Federal
funding is capped at$1,644,000 for construction with a maximum reimbursement ratio of 100%using toll credits in lieu of non-federal matching funds. Reimburse with L400 CMAQ funds at 100%on a pro rate
reimbursement basis up to the federal amounts shown for construction and construction engineering.
FFDERk REMARKS
AUTHORIZATION
AUTHORIZATION TO PROCEED WITH REQUEST:CON PREPARED IN FADS BY: VERGEL DE 0105,ALBERTO ON 03/2412014 383.6414
FOR:CONSTRUCTION&CENG. REVIEWED IN FADS BY: GARCIA.JAVIER ON 03128/2014 653-864G
DOCUMENT TYPE:AMOD SUBMITTED IN FADS BY: LOUIE.PATRICK ON 0 312 812 01 4 FOR CALTRANS
PROCESSED IN FADS BY: FOGLE,JERILYNN ON 0312812014 FOR FHWA
APPROVED IN FMIS BY: MARY CUNNINGHAM ON 04104/2014
SIGNATURE HISTORY FOR PROJECT NUMBER 5282(031)AS OF 0 410 8/2 01 4
FHWA FMIS 4.0 SIGNATURE HISTORY
MOD# SIGNED BY SIGNED ON
1 JERILYNN FOGLE 03/31/2014
CHRISTOPHER M.NEWMAN 03/31/2014
MARY CUNNINGHAM 04/04/2014
0 JERtLYNN FOGLE 06/29/2009
JACOB R.WACLAW 06/30/2009
DUSTIN BAILEY 06/30/2009
FHWA FMIS 3.0 SIGNATURE HISTORY
CALTRANS SIGNATURE HISTORY
DOCUMENT TYPE SIGNED BY SIGNED ON
AMENDIMOD LOUIE,PATRICK 03/28f2014
O
v
[�2
13,500'
!9AN RAFAE
y
LEGEND
CITY LIMITS
.., 1711ET CLILS
• l - �, y -- "� CITY HALL
'] ® PtLICE CEPART+EUT
! YAE llt *�55 CO�YF24 ® PALM 9PR7WS ALGEL'S STADIUM
d
W ED
HYATT REC£R;Y HOTEL
L.... y.. T .•� CO CONVENTION CENTER
N 'VISTA. . . _ ..,,.
[� Ex:STING TOWER
i PROPOSED RIRF16S POINT TO POINT BALI'%U_ _OCZATI0
yq
;y • E%ESTINC TRAFFIC SICAlAL WITH PI�OSD NIRElE55 S..IscRzGM WIT
jY '^ ' T' ■ Ex!Sf TFAFFI_ SICRS wlI PRtPfI D ETFfRt Ef OVEN COPPER
29 AH s a PROPOSED WEATHER =TV CAMERA LOCATION
S
PROPOSED INTERSECTION CCTV �1ERA LOCATION
1 ThMAR431[R�
i3
rslxan ri I L '�
1 0011-14 AM I RR
1 Fs
X �
f:17M-L7 �' d
fi —'a Coble to rrlu I W zm
t_ml
w
WARE 0RD -CDM-2D To AND
2
. . .,.... W RD+
GAMINO PAiWGC1A
..........�.iA 1
H � 'may SE
da
{W{ etc 1 d.
' T.. ESiDZJITE A4E� 1� ..hI..SC7UITE VE 0R IS61E0R1 Ua�
iJ
�. r ESGieB.A.OR � ]6T)f AVE
1 7WINPA
APPR O AS SHOMN
TRAFFIC SIGNAL SYNCHRONIZATION AND TRAFFIC MANAGEMENT CENTER, CP 08-04
o�