CITY COUNCIL STAFF REPORT
September 17, 2014 CONSENT CALENDAR
Subject: ACQUISITION OF RIGHT-OF-WAY FOR THE SOUTH PALM CANYON
DRAINAGE IMPROVEMENT PROJECT, FEDERAL-AID PROJECT NO.
BR-NBIL (502), CITY PROJECT NO. 06-18
From: David H. Ready, City Manager
Initiated by: Public Works and Engineering Department
SUMMARY
The City is ready to proceed in acquiring all necessary right-of-way for the South Palm
Canyon Drainage Improvement Project, Federal Aid Project No. BR-NBIL (502), City
Project No. 06-18. The recommended action will allow the City Manager to approve the
acquisition of individual segments of right-of-way as negotiations are settled with
different property owners.
RECOMMENDATION:
1) Adopt Resolution No. "A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF PALM SPRINGS, CALIFORNIA, AUTHORIZING THE CITY MANAGER
TO APPROVE THE ACQUISITION OF RIGHT-OF-WAY FOR THE SOUTH
PALM CANYON DRAINAGE IMPROVEMENT PROJECT, FPN BR-NBIL (502),
CITY PROJECT NO. 06-18.
STAFF ANALYSIS:
The City has completed the environmental phase of the project, and obtained formal
California Environmental Quality Act (CEQA) and National Environmental Policy Act
(NEPA) approvals, the acquisition process is now underway.
On May 23, 2012 Caltrans issued an E-76, authorizing federal funding for the right-of-
way phase of the project. For the last two years, the City has worked on the right of
way phase and has determined the necessary right of way for the project and is now
ready to present offer letters to the various property owners.
This project involves acquiring right-of-way and/or temporary construction easement
from 3 different parcels owned by EC Land Holdings and US Department of
ITEM NO.
City Council Staff Report
September 17,2014—Page 2
Acquisition of Right of Way for South Palm Canyon Drainage Improvement Project, CP 06-18
Interior/Bureau of Indian Affairs (BIA). Appraisals have been completed and offers to
acquire right-of-way will be presented to all of the owners. A fourth parcel, APN 513-
460-032 for a temporary construction easement, will be handled through the BIA at no
cost to the City.
Therefore, it is staff's recommendation that the City Council authorize the City Manager
to acquire the various parcels of right-of-way and/or temporary construction easements
for the South Palm Canyon Drainage Improvement Project (City Project No. 06-18), in
conformance with the City Charter and Title 7 "Procurement and Contracting".
FISCAL IMPACT:
The total appraised value is $126,336, but the final negotiated price of the various
easements and rights-of-way will vary. Funds are available in account numbers 261-
4491-50221 (88.53%) and 133-4298-50221 (11.47%)
SUBMITTED:
Prepared by: Recommended by:
/ %ZI _
Savat Khamphou David J. Barakian
Assistant Director of Public Works/ Director of Public Works/City Engineer
Assistant City Engineer
Approved by:
David H. Ready, City
Attachments:
1. Resolution
2. Vicinity Map
3. Project Location Map
4. Right of Way Impact Exhibit
02
ATTACHMENT
RESOLUTION
03
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
PALM SPRINGS, CALIFORNIA, AUTHORIZING THE CITY
MANAGER TO APPROVE THE ACQUISITION OF RIGHT-
OF-WAY FOR THE SOUTH PALM CANYON DRAINAGE
IMPROVEMENT PROJECT, FEDERAL AID PROJECT NO.
BR-NBIL (502), CITY PROJECT NO. 06-18
WHEREAS, the City of Palm Springs ("City"), has proposed to construct a 4-lane bridge
to replace a low water crossing on South Palm Canyon Drive over the Arenas Canyon
South Drain Canal in Palm Springs, Federal Aid Project No. BR-NBIL (502), City Project
No. 06-18, a local public agency project, ("Project"); and
WHEREAS, the Project requires the acquisition of various parcels of permanent right-of-
way and temporary easements, from a variety of different property owners; and
WHEREAS, pursuant to the terms of a Master Agreement No. 08-5282R, the City shall
acquire and furnish all right of way, if any, and to perform all right of way activities,
including all eminent domain activities, if necessary, in accordance with procedures
acceptable to Caltrans, in compliance with all applicable State and Federal laws and
regulations; and
WHEREAS, Caltrans is performing complete oversight of the City's right-of-way
activities for the Project, in accordance with its own procedures and all applicable State
and Federal laws and regulations; and
WHEREAS, Title 7 "Procurement and Contracting" of the Palm Springs Municipal Code,
("Code'), established procedures for the procurement of supplies, services, and
construction of public projects, and defined the authority for the procurement function
including signatory authority for purchase orders and written contracts which bind the
City for the acquisition of equipment, supplies, labor or services within the budget
approved by the City Council and within the monetary limits established by the City
Council; as provided in Section 318 the City Charter; and
WHEREAS, Section 318 of the City Charter allows the City Council by Resolution to
authorize the City Manager to bind the City, with or without a written contract, including
by purchase order, for the acquisition of equipment, materials, supplies, labor, services
or other items included within the budget approved by the City Council, and may impose
a monetary limit upon such authority; and
WHERAS, the public's interest is best served by implementing a streamlined process
for the acquisition of right-of-way and easements for the Project, whereby the City
Council authorizes the City Manager to acquire any and all right-of-way and easements
for the Project pursuant to the terms of the Agreement.
04
Resolution No.
Page 2
THE CITY COUNCIL OF THE CITY OF PALM SPRINGS DOES HEREBY RESOLVE
AS FOLLOWS:
Section 1. The City Council hereby authorizes the City Manager to approve any and
all agreements for the acquisition of permanent right-of-way or temporary easements,
as the case may be, for the South Palm Canyon Drainage Improvement Project,
Federal Aid Project No. BR-NBIL (502) City Project No. 06-18.
Section 2. The City Manager may designate the Director of Public Works/City
Engineer, or his designee, to execute and process any and all escrow documents or
other forms on behalf of the City Manager, as may be necessary to facilitate the transfer
of property, subject to the approval of the City Attorney.
ADOPTED THIS 17th day of September, 2014.
David H. Ready, City Manager
ATTEST:
James Thompson, City Clerk
05
Resolution No.
Page 3
CERTIFICATION
STATE OF CALIFORNIA ) ss.
CITY OF PALM SPRINGS )
I, JAMES THOMPSON, City Clerk of the City of Palm Springs, hereby certify that
Resolution No. is a full, true and correct copy, and was duly adopted at a regular
meeting of the City Council of the City of Palm Springs on September 17, 2014, by the
following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
James Thompson, City Clerk
City of Palm Springs, California
106
De art Hot Springs
F reSnO Joshua Tree National Parii
Las VJe`gas
Patin Springs
' m
1 r
sill, San Di' 'go
0 ,W .,; _
Mks
111
Palm Igs
Cathedral City Tho nd Palms
Mt San Jacinto State Park "
Project Vicinity
Ra •ho Mirage
Idyllwild-Pine Cove
E
6
m
San Bernardino National Forest
Palm Des rl
U
m
E
R yq
N
�9
Source ESRI2008,Dokken Engineering 04/2sW10,Orealed Sy.K.Smith
FIGURE 1
PROJECT VICINITY
e 08-RIV-S.Palm Canyon Drive-PM 10.6
Federal Project No.NBIL(502)
South Palm Canyon Drive Bridge Project
0 1 2 3 4 5 Miles Palm Springs,Riverside County,California
11a0
OCCURS
CIO
35
Project Location r �;
COMRATS
I' N D I A l n 1
J
' r � r
E 'R,-IV A T I
i
uatlrenglea; n Eiginaenna 010;Ueaten By:K.SrniN
FIGURE 2
PROJECT LOCATION
08-RIV-S.Palm Canyon Drive-PM 10.6
19 Federal Project No.NBIL(502)
D 0.25 0.5 0.75 1 South Palm Canyon Drive Bridge Project
Miles Palm Springs,Riverside County,California
08
NV \\\
IM
\a w\oo IN
��
OWNS
.r• . r
i