Loading...
HomeMy WebLinkAbout10/1/2014 - STAFF REPORTS - 2.O. EQALM SA AO Fi Z fA u u+ CQ�IFOR�`P City Council Staff Report DATE: October 1, 2014 CONSENT CALENDAR SUBJECT: APPROVAL OF PROPOSAL FOR TRAFFIC ENGINEERING DESIGN SERVICES BY ALBERT A. WEBB ASSOCIATES FOR THE DESIGN OF PRIORITY BIKE LANE CORRIDORS FUNDED BY MEASURE J, CITY PROJECT NO. 13-32 FROM: David H. Ready, City Manager BY: Public Works & Engineering Department SUMMARY: Approval of this item will authorize Albert A. Webb Associates to design plans, specifications and estimates for construction of Priority Bike Lane Corridors funded by Measure J (City Project No. 13-32) in accordance with their on-call agreement with the City (Agreement #6443). RECOMMENDATION: 1. Approve the proposal (attached) from Albert A. Webb Associates for design of Bicycle Corridors as prioritized by the Non-Motorized Transportation Committee and approved by City Council, in the amount not to exceed $38,630.00 and; 2. Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS: On November 6, 2013, City Council approved Agreement No. 6443 with Albert A. Webb Associates for On-Call Traffic Engineering Design Services on an as needed basis. When design services are needed, the agreement authorizes staff to seek a proposal from one of the on-call firms. Council may then approve the proposal, thereby authorizing staff to prepare a purchase order for the design services. Staff sought proposals for design (Plans, Specifications and Estimate) for the design of priority bicycle lane corridors as approved by City Council on September 3, 2014 and funded by Measure J. ITEM NO. City Council Staff Report October 1, 2014-- Page 2 Approval of Proposal for Traffic Engineering Design Services by Albert A. Webb Associates for the Design of Bicycle Lane Corridors funded by Measure J The proposed cost for the project is not to exceed $38,630.00. The project consists of the design of six bicycle lane corridors, four of which have been approved by City Council on September 3, 2014. Before making a decision on the final configuration of Farrell Drive, Staff is currently seeking input from the affected neighborhood organizations. Engineering has also included a proposal for a sixth corridor that was also included in the neighborhood survey. The bike lane corridors included in the design proposal are listed below and shown on the attached map. 1. El Cielo Road Corridor- From East Palm Canyon to Alejo 2. Alejo Road Corridor— From Belardo to Civic 3. Belardo Road Corridor— From Sunny Dunes to Alejo 4. Farrell Drive Corridor— from East Palm Canyon to Racquet Club 5. Calle Encilia Corridor— from Ramon to Alejo 6. Racquet Club Road Corridor— from North Palm Canyon to Farrell FISCAL IMPACT: Sufficient finds are available in Measure J account No. 260-4500-59445. SUBMITTED: Recommended by: Approved by: David J. Barakian David H. Ready, City Director of Public Works / City Engineer Attachments: 1. Map 2. Proposal 3. Memorandum (Material to follow) 02 �R CARNE!ACE U.P. RMLF" aF ?ALA4 S A OESM — C1 U ul mAWNEw OIEMi Q cq� 1 F&R PARK VEM 00 t� RAaw m ���p � sAx RAPAFL oR. !r r4 FAAMQS DIL PMY 31KY .i vw yYpl MIPIMV da NOT M SCME IfotiA� RAC 41A ROAD N7x1HA RD. � 1� ®11p1 C Y ar V 111 � ESaIEtA O gp< NsrA'< awo Row 111 TM < wa 5 i = AL" RMn O O 111 i i ice\ osnanox 'uu°° Ron° ff i i F"� d mimi SE P SPFANM 5 A AR T A cou GU1 WAY Wry xMA I I \`-1 5 mnu BAR=RMD L1___r�� PAYI eIRY � e�"w sawn DM i 10 =D RAYOx ROAD RAxv' Row � WAFJ1sAxos 1 �r Duxes Row ■ 01 � o Ro O Gi AM d �A OAv'�Wmr Neva. S O oav oKw: P mn soxaRA eAsr PALM CAKWN DR ESNBA AAA ov auxaus xmRWK RMANCIL a a�De VICINITY MAP 2013-2014 BICYCLE LANES CITY OF PALM SPRINGS, CALIFORNIA 111 LEGEND: BIKEWAY LOCATIONS 03 A L a E R T A. IIIIII, A s s o c 'Na T rS W.O.#010618 Corporate Headquarters September 22, 2014 3788 McCray Street Riverside, Mc Savat Khamphou 951,686.1070 Assistant Director of Public Works/Assistant City Engineer Palm Desert Office City of Palm Springs 36.951 Cook Street#103 3200 E.Tahquitz Canyon Way Palm Desert,CA 92211 Palm Springs, CA, 92262-2743 760.568.5005 RE: Proposal to Prepare Plans, Specifications and Estimates for City Project 13-32 Mufrieta office 41391 Kalmia Street#320 Dear: Savat: Murneta,CA92562 951A86A070 Thank you for the opportunity to submit this proposal to provide Traffic Engineering Services in the preparation of signing and striping plans related to implementation of the City's Bicycle Route Plan. Our proposal covers services related to preparing typical sections and striping plans for critical areas, specifications and estimates for six corridors within the City. Five of the corridors are described in the City project 13-32 which was approved by Council on September 3,2014.The sixth is the racquet club corridor which extends from Farrell to Palm Canyon Drive.We understand a final bid package needs to be ready for Council action on December 3, 2014. To that end Webb intends to work with City staff to deliver final plans, specifications and estimates no later than November 19, 2014. Exhibit A contains our proposed scope of work. Exhibit B contains a summary of our fee proposal for services described in Exhibit A. We appreciate the opportunity to assist the City and look forward to working with you on this project. In the meantime, if you have any questions or require additional information, please call. Sincerely, Albert A.Webb Associates Dilesh R. Sheth, P.E./T.E. Zoe Davis, P.E. Vice President Senior Vice President Attachments: Exhibit"A"-Scope of Work Exhibit'B"-Compensation Fee Schedule www.webbassoaiates.Com 04 Exhibit "A" - Scope of Work I. Preliminary Design A. Review City Council Staff report and alternative cross sections. B. Review each corridor using photographic base(photo source is March 2012 from Eagle Aerial)and Google Map to determine critical street width areas. C. Inventory signage along corridors by field review and Google Map Street View. D. Field verify curb to curb dimensions in critical locations and existing signage. Prepare base map for critical areas using photographic base. E. Prepare typical sections for all corridors. Identify issues for critical areas and propose resolutions. Prepare preliminary striping plans for critical areas. F. Prepare preliminary estimate of probable cost. G. Meet City staff to review typical sections, preliminary estimate of probable cost and to discuss issues and potential solutions in order to obtain input. Deliverables:Typical sections/preliminary design, preliminary estimate of probable cost. H. 90 Percent Complete Bid Package A. Prepare typical sections and signing and striping plans for critical areas. B. Prepare specifications in accordance with City requirements. C. Update estimate of probable cost. D. Submit bid package to City for review and comment. E. Meet staff to obtain comments and discuss any remaining issues. Deliverables:Two(2)sets 90 percent plans, specifications and estimate of probable cost. III. Final Bid Package A. Prepare final typical sections and signing and striping plans for each corridor. B. Prepare final specifications in accordance with City requirements. C. Prepare final estimate of probable cost. D. Submit final bid package to City for review and comment. E. Project management and coordination with City throughout project duration. Deliverables: one(1) set signed Mylars,digital files of specifications and final estimate of probable cost. IV. Bid Support A. Assist City as Requested with Responding to Questions from Bidders B. Attend Pre-Bid Meeting C. Draft up to Two Addenda D. Evaluate Bids as Requested by City 05 Exhibit "B" - Compensation Services described in our Scope of Work(Exhibit "A") shall be provided on a time and material basis not to exceed $38,630. Charges for services will be billed monthly in accordance with the attached fee schedule. A breakdown of our fees is provided below: Task Description Total I. Preliminary Design $ 16,250 ll. 90 Percent Complete Bid Package $ 11,350 III. Final Bid Package $ 6,070 IV. Bid Support $ 4, 960 Total $38,630 06 A I. R E R T A. FEE SCHEDULE A s s D C I A T B S CLASSIFICATION Rates /Hour Engineers/Project Managers/Planners/Scientist/ Assessment/Special Tax Specialists/Landscape Architects/Designers Principal11............................................................................................................ 230.00 PrincipalI............................................................................................................. 210.00 SeniorIII.............................................................................................................. 195.00 SeniorII .............................................................................................................. 185.00 SeniorI ............................................................................................................... 175.00 AssociateIII......................................................................................................... 165.00 AssociateII ......................................................................................................... 150.00 AssociateI .......................................................................................................... 140.00 AssistantV .......................................................................................................... 125.00 AssistantIV ......................................................................................................... 115.00 AssistantIII.......................................................................................................... 100.00 AssistantII .......................................................................................................... 85.00 AssistantI ........................................................................................................... 70.00 Survey Services 2-Person Survey Party ........................................................................................ 220.00 1-Person Survey Party ........................................................................................ 160.00 Inspection Services Inspector(Non-Prevailing Wage)........................................................................ 110.00 *Inspector(Prevailing Wage).............................................................................. 120.00 Administrative Services ProjectCoordinator............................................................................................ 90.00 Administrative Assistant III................................................................................. 80.00 Administrative Assistant II.................................................................................. 70.00 Administrative Assistant I .................................................................................. 55.00 Other Direct Expenses IncidentalCharges............................................................................................... Cost Postageand Telephone ...................................................................................... Cost In-House Prints,Copies and Delivery.................................................................. Cost Travel&Subsistence .......................................................................................... Cast SpecialConsultant............................................................................................... 310.00 Subcontracted Services....................................................................................... Cost+ 15% Inspection/Survey Per Diem .............................................................................. 100.00 Survey/Inspector Vehicle ................................................................................... .81 per mile Mileage ............................................................................................................... .72 per mile *Prevailing wage inspection rate is subject to increase based on State prevailing wage. NOTE:All rates are subject to change based on annual inflation and cost of living adjustments. A FINANCE CHARGE of one and one halfp..t(1-12%)per month(18%per year)will be added to any unpaid amowt commencing thirty(30)days from date of invoice. A mechanics'lien my be filed for any imvmoe remaining unpaid after thirty(30)days from dam of invoice. SCH 37(07/01/2013) 07 Good evening Mr. Mayor, Council and staff. My name is Vic Yepello and I'm here representing the PS Sustainability Commission and specifically the NMT Sub Committee. I am here to speak about the addition of bike lanes to a specific segment of Farrell Dr. The NMT Sub-Committee heard input from a few of the neighborhood groups in the area of Farrell Dr from Tamarisk to Tahquitz Cyn Wy. They were asked by the city to weigh in on plans to add bike lanes in that segment. Some reached out to us with their questions which we answered and then we listened to their concerns. We heard them loud and clear and we understand that building a successful cycling network requires buy-in from the community on all levels. What they told us in short, is they are against losing parking or traffic lanes on that segment of Farrell Dr. And we agree that it would be a big hardship for homeowners with limited parking to lose what little they have. Farrell Dr is a very important part of our bike network. It will connect the northwest end of the city with the southeast end via Racquet Club Rd. This is an important piece of the bike network that will eventually circle the city and will provide needed connectivity to the area that will become the new COD campus. It provides connections to Tahquitz Cyn Wy which is also an important east/west corridor from downtown to the Airport, to City Hall, and to the DOHC complexes. The NMT Sub-Committee held a meeting on 9/30 regarding a solution for adding biking lanes on the Farrell Drive segment between Tamarisk and Tahquitz. Note that other segments of Farrell have been approved. We discussed the challenges of that section, the needs of the residents to preserve parking, the needs of the city to preserve 4 lanes of traffic and foremost, cyclist safety. We are aware that our choices of solutions are very few and it really gets down to making that segment a Class III bike lane which means the use of Sharrows. So our only choice is to make that segment a Class III bike lane but we must try and step outside the box on this one in order to make it effective and, most of all, SAFE. We checked on how we can best implement GREEN BACK SHARROWS for that segment. That type of Sharrow would make the lanes very visible for drivers to that end, have come up with a plan that is feasible. (At first pass, I did not prefer sharrows and hoped for class II lanes). So in 3 steps: 1. Lay down GREEN BACK SHARROWS. We did some research, and Green Back Sharrows are allowed under a plan that will require us to submit data to Federal Highway Administration or Dept. of Transportation. This idea was not embraced by engineering because of added workloads. In order to lessen the workload on engineering, we are suggesting that the office of 2 c71 O � sustainability take care of that function thus allowing us to move forward with a well marked and very visible shared lane. 2. In order to ensure cyclist safety, and having informed motorists, appropriate signage and flashing yellow lights would be appropriately placed and will warn motorists of cyclists in the lanes ahead. 3. This plan will not affect parking or the number of lanes available for cars in that segment however it would be advisable to reduce the speed on the segment from 45 MPH to 35 MPH. Thank you very much and we are ready to meet with staff to work out the details so we can move towards final approval of this part of our project.