Loading...
HomeMy WebLinkAbout10/15/2014 - STAFF REPORTS - 2.G. 4O�Y A L M Sp4 V N x x �bq C oeneo'41aP �t1FOR�� CITY COUNCIL STAFF REPORT DATE: October 15, 2014 CONSENT AGENDA SUBJECT: CABINETRY AWARD OF CONTRACT FOR THE WELWOOD MURRAY MEMORIAL LIBRARY RPOJECT FROM: David H. Ready, City Manager BY: Special Projects Coordinator SUMMARY The proposed action would award a contract for cabinetry for the Welwood Murray Memorial Library (WMML) project. RECOMMENDATION: 1. Award contract for cabinetry for the WMML project to St. George Construction Contracting Company, Inc., base bid plus the alternates, at a total price of $89,006. 2. Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS: The Palm Springs Library Board provided funding of the Interior Designer (ID) contract and Michael A. Thomas, of the Design Collective Group, was hired for this work. The ID worked closely with the library staff as well as the project sub-committee to design cabinetry that met the needs of the new facility and was in keeping with the historical nature of the building; Historical Site Preservation Board took action to approve the cabinetry design. A copy of the floor plan displaying the cabinetry covered by this bid is attached. The pre-bid estimate was $90,000. On September 30, 2014, after a thirty day bid period, bids for the cabinetry were received as follows: ITEM NO. City Council Staff Report October 15, 2014 - Page 2 WMML Cabinetry Bid Award Base Base Plus Bidder Bid Alternate Arrowwoods Works $127,830 $156,680 St. George Const. Contracting $ 79,956 $ 89,006 The apparent low bidder is St. George Construction Contracting, Inc., a small general contractor that specializes in case work with offices in Fontana, California. The references provided revealed excellent and timely work and a check of the Contractor' State License Board revealed no license issues. FISCAL IMPACT: The project budget has $78,000 set aside for cabinetry for the WMML project. On September 25, 2014 the Library Board voted to allocate an additional $22,000 to the cabinetry line item. i Allen F. Smoot, Special Projects Coordinator David H. Ready, Ci er Attachments: 1. Bid Abstract 2. Cabinetry Floor Plan 02 WELWOOD MURRAYDESIGN MEMORIAL LIBRARY Fu *1719�>6- 1\ -7f- .7 77 <<I Ylennrlal Librap' arFcx}g*t�pSaJ i rr.eplm•.r:� r.'uw;�.„e Pua*/I)'am lwcation Snn6 r,ln Imam, t _____ El El b pr aM�w c__ .� Lmlmal�4 \A\ • yf iT �' � Sek uY.0.eFw \ V J � � µbNH im.. �7 3y A n5• .4mnd ._ I xlvan.,. l� • i Pr '. �xan I .L.w4`f T, ft�l� 1 xq¢acue�ue PnNvIY -s.mna• ra,�,. V j .rixndpnana..r..,.p mL ' •flW IIWCr4 m. fNaeYelbR�Mrt � �8nc IlcebpXT n�ma,m...an .m...e...�o..r,a IRI1.�pf]Al�.t fmp City of Palm Springs, CA Procurement Cwtadng Division Bid Abstract BID ABSTRACT Vendors & Bid Amounts Pv BID # -Z — PROJECT NAME: �Y DUE DATE: DESCRIPTION: �J Total of all Bid Schedule Items 7 dap Witnessed B : Date: O