Loading...
HomeMy WebLinkAbout10/15/2014 - STAFF REPORTS - 2.O. a�,p A LM spy �Z c u w Cq4 FORa�P City Council Staff Report Date: October 15, 2014 CONSENT CALENDAR Subject: APPROVAL OF PLANS, SPECIFICATIONS AND ESTIMATE (PS&E) AND AUTHORIZATION TO BID FOR TAHQUITZ CANYON WAY MEDIAN LANSCAPING FROM SUNRISE TO EL CIELO, CITY PROJECT NO. 13-33. From: David H. Ready, City Manager Initiated by: Public Works and Engineering Department SUMMARY Approval of this item will authorize staff to advertise for construction bids for the Tahquitz Canyon Way Median Landscaping project, Sunrise Way to El Cielo Road and further authorize the City Manager to award the contract to the lowest responsible, responsive bidder provided said bid does not exceed $1,800,000. RECOMMENDATION: 1. Approve the plans, specifications, and working details for Tahquitz Canyon Way Median from Sunrise to El Cielo, City Project 13-33, and authorize staff to advertise for bids. 2. Authorize the City Manager to award the construction contract to the lowest responsible, responsive bidder in an amount not greater than $1,800,000. STAFF ANALYSIS: In accordance with Section 7.03.040 of the Procurement and Contracting Code the City Council is required to approve and adopt plans, specifications and working details, and authorize the bid request for all public projects in excess of $100,000. Approval of this item will allow staff to proceed with the final details of this project and advertise for bids, with an estimated construction cost of$1,800.000 Measure J has funded the median landscaping of Tahquitz Canyon Way from Sunrise to El Cielo. ITEM NO. °2— 1 City Council Staff Report October 15, 2014 - Page 2 Tahquitz Canyon Way Median Landscaping, from Sunrise to El Cielo (CP 13-33) On September 3, 2014 City Council approved an Agreement with RGA Landscape Architects, Inc. for landscape and architectural design services for the Tahquitz Canyon Way Median (Sunrise Way to El Cielo Road) as well as concept revisions to the previously approved segment between Sunrise Way and Civic Drive. Also included were development enhancements to the median landscaping improvements recently completed in section 14. On September 4, 2014 the Council subcommittee (comprised of Councilmen Mills and Hutcheson, and Planning Commissioner Middleton) for the subject project met to discuss the proposed conceptual plan revisions presented by the Landscape Architect Consultant (RGA). The subcommittee provided input and requested revised conceptual plans. The revised plans were presented and approved by the City Council on September 17, 2014. The plans and specifications prepared by RGA Landscape Architects are ready for Council approval and the subsequent advertisement for construction bids. The construction cost estimate for this project is $1,800,000. Approval of the recommended action will allow staff to finalize the PS&E and proceed with bidding of this project. At the Council meeting, full size plans will be posted and/or available for review. Should Council have further comments at this meeting RGA will address them prior to staff advertising for bids. FISCAL IMPACT: Funding is made available through Measure J in account No. 260-4500-59461. SUBMITTED: Prepare y: Recommended by: At Savat Khamphou David J. Barakian Assistant Director of Public Works Director of Public Works/City Engineer Approved by: David H. Ready, Cit er Plans to be presented at Council Meeting 02 TAHQUITZ CANYON WAY, PHASE 2 MEDIAN ISLANDS A. SUNRISE WAY TO EL CIELO ROAD B. INDIAN CANYON DRIVE TO SUNRISE WAY LANDSCAPE ARCHITECTS, INC. CITY OF PALM SPRINGS, CA 92262 73061 EL PASEO, SUITE FF210" CITY PROJECT NO. CP. 13-33 PALM DESERT, CA (760) 568-3624 FAX (760) 773-5615 E-MAIL; rga@rga-pd.com INDEX: WATER CONSERVATION STATEMENT: PREPARED FOR: OVERALL REFERENCE PLAN L-0.00 m..aeroPPPcWPeChecklist CITY OF PALM SPRINGS N.I Panvonwsr.vnss.z 3200 TAHQUITZ CANYON WAY A. SUNRISE WAY TO EL CIELO ROAD PALM SPRINGS, CA 92262 SECTION A REFERENCE PLAN L-0.10 ^°�"gym"^°•^'^�°F' "°^-FN^" .G DEMOLITION PLANS L-1.00 THRU L-1.06 CONSTRUCTION PLANS L-2.00 THRU L-2.07 CONSTRUCTION DETAILS L-2.08 ^=�..al^w.L-^"=•-P�^,^^ IRRIGATION PLAN L-3.00 THRU L-3.07 A I IRRIGATION DETAILS L-4.00 ""r`"S.I.II I M x .nw°.Nw"—G—aa —I PLANTING PLANS L-5.00 THRU L-5.07 PLANTING DETAILS L-6.00 CONSULTANTS: ELECTRICAL NOTES, LEGEND AND DETAILS E-1.00 ELECTRICAL SCHEDULES E-1.01 MRC ENGINEERING INC. ELECTRICAL LIGHTING PLANS E-2.00 THRU E-2.06 ^ TM ��" Po• r 72680 FRED WARING DRIVE SUITE C-11 PALM DESERT,CA 92260 N B. INDIAN CANYON DRIVE TO SUNRISE WAY """"""`°'"""'-""° `"`°"°""' W SECTION B REFERENCE PLAN L•0.20 IRRIGATION PLANS L-3.20 THRU L-3.27 REVISIONS d IRRIGATION DETAILS L-4.20 FIEVISIONI,PESoRIPTION _ INITIA AT PLANTING PLANS L-5.20 THRU L-5.27 a PLANTING DETAILS L-6.20 _°•• -.m� _ 3 VICINITY MAP: 0 3 ; STANDARD SYMBOLS AND PROD. NO.: #R1425 APPROVALS z Q o W o ABBREVIATIONS DATE: 10114/14 v Z'I Q TAHQUITZ j > w W TAHOUITZ U O N CANYON N CANYON ' p w N, U WAY O p Z p WAY U �' CF1gTOt� �ryy1� — — — Llrnr eF unRK uDR uEADEReoArm O U ZQ. U - - HIGH POINT cP nawD<IN INc.IEs z A 4 CENTER LINE oRplra;Lr sREEr❑ eoo.■ ID u -�I Q > w w _ - - STEER AREA O Q Q N J O IGN 1. el J SHEET MATCHLINE TTP. TTPICAL Z Q w O LME a s -.- C MP l LME } Q Wi N LLI Q J R RA DIU9 I• T QU >i 3: ry U NI J O KEYUOTE.SEE MASTER LIST ON SHEET Ea EWA RISERS �NN., Q Z ,L R SURFACE LEVEL l- U -, DETAIL-2ER MIN nwlnun Underground Service Alert W N SHEET NI EI COL OOWMJ HP HIGH PONT ® fnll.lw FFfC EXPAN G'ca. Q 0 Q J J • SII JOINT LP Ni 0 "A DA 'MFuSIANRC E.Cl9JI n u; N t1 SOOFS JOINT DIA 0AHETER 8tt q IISII �p GIY CF PiLM�Hq9 tl1Y EMY✓®t Z CONT HONUN0004 IC =1 pPfAJYED6! Z Z POIN'OF BEGINNING FOR'JIMENSICNIHG 51n 51I'IILAR 0 YS B6rOie Vdl GIC I• I— _ OG ON CENTER SITE ; CIRECTIGN 6 SLOPE.IA MIN LN HAFIOSCAPE PG pEOOMPD=ED GFANITE W W ELEVATION PETAL I'JORTH LANI06C gPE gfK14 CT'OF PALM SPRN69 3TAW/SCJJATIRES a LIMIT OF WORK I r_ _ n SUNRISE WAY � ( LIMIT OF WORK m NDIAN CANYON DR. 1 i m 1AVENIDA C454LLER051 1 1 I (n 1 I � p (n i i M > I I I I I I I I Z i i 5 FARRELL DR I W I I I 1 I I I I I I I 1 I I I I I I 1 I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I SATURMINO DR 1 GALLE ENGELIA i i ul I 1 I I I I I 1 1 I I I D I I I I I I I I 1 I D I p I I D I Z I I I Z D i i i i E i I 1 I Z I I I I I Q I Z 1 I 1 I 1 1 I I D I I I I I I I LOUELLA RID GALLE EL SEGUNDO i 1 1 I i GERRTOS R NW 1 I I I I 1 I I I I I I I I I I I I I I I I I I I I 1 I I I I NERM05Z, DRIVE _ L I I m I I I p I 1 I I 1 I I I I I I I I I I I 1 I I C I I I O 1 I N I 1 D I I N 1 I I 1 Z I 1 I I 1 0 i i i Z I I I Z I I I E I I I 1 I O Z I I I I 1 I I I D I j I I I I I I I 1 1 I I I 1 I I 1 I I I I 1 I I 1 GIVIG DRIVE SUNSET WAY 1 I 1 I GALLE AL VARADO I 1 1 1 I 1 I 1 I I I 1 I I I 1 I I I I I I I I I I I I I 1 I I I I I I I 1 I I I I I I I I I I I I I 1 I 1 I I I I I I I I I I 1 I I I 1 1 I I I I I I I 1 I I I I I I I I I I I I I I I 1 I I I 1 I I I I I I I I I I I I I I I I I I I 1 I I I I I I I 1 I I I I I I I I I I I I I I I 1 I I I I I I I 1 I I I I I 1 I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 1 1 GIELO ROAD I I 1 I I 1 I I I I I 1 I I I 1 ___� 1 I I I I I L_____ LIMIT OF WORK I I I I I I I 1 I I I I 1 I I I ^ I I I /Il 1 I I I I SUNRISE WAY LIMIT OF WORK m D D >,D, o $ m $ $ (p SHEET TTTLE: v r 4 0 € v o OVERALL REFERENCE PLAN -\\ 'O PROJECT: 0 m O D TAHOUITZ CANYON WAY PHASE 2 � oAl '' 'o � ■ PALM SPRINGS, CA y �_ LIMIT O WORK I 5UNR'5E WAY I I I I I I I I I I ; ulwry I Io I , o o I I I I I I I I I � 1 I � I I 5 FARRELL PR I I I I rrr I � I � cnwry 0 0 0 5, 4A A I I I I I I I 1 I I I I SATURI"IINO DR ____J' I I I I I Ir r r l m iw W fV I I I I I N I I I I n I I I Z E I I I I I I I I I I I I I I I I I I I 1 I I I I _LOUELLA RD I I I I CTI COJI Ul Ui Ch W N I I I I N OIV N I I I I I I I U I I I 1 I I I I I I I I I I I 1 I CIVIC *DRIVE -----N 5UN5ET_U)AY______ ; rrr inc;� ry rrr 1 0 0 0 a 0 0 0 w w w ci I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I GELD ROAD I I � I I I I I LIMIT OF WORK J I I I I I I I D > > D > g _ N SHEEP TrrLE I— i o SECTION A REFERENCE PLAN €s s 4 O D D mo-'ECT: �" C o o g TAHOUITZ CANYON WAY PHASE 2 A' w b 's 0 ■ PALM SPRINGS, CA NOTE: AFTER DEMOLITION SMALL FELD SLAKE ALL STATION AFTERCOMPLETE POINTS DEMOLITION C PE PER ASSIST WITH TFE INSTALLATION OF LANDSCAPE PER PLAN O ', � 3 I -- LANDSCAPE AR^kREM INC. -J is is — ]3JBI EL PASEO,SUITE 2D PALM DESERT.CA 9 W QW)W�24 M)M-S FAX 1 EMAL:rps�rysyGcom Q a ; I N STATION POINRS , BEGIN AT 7ME EXEfI1N(' I W O WEST ME04W NOSE r^ E,TANQUITZ CANYON -J AT THE NEF BECTKNN OF co siee ° sama i U 300 SUNRISE AND TAMOUfZ, 1 Q SEE SFNEEf L-106 T Z Z cn 1 O V J cr u 1 EL , I o O E.TAHQUITZ CANYON � 1 m p � 50PA I I Y: 6 n 13 L 21 —13 a <� � • N a II I I SPECIFICATIONS I I BHEET❑ BOOK■ PROJECT MANAGER: TM DRAWN: w rcI e*aawrz cnwraN wnr o CHECKED: BK E.T,414QU N ITZ CANYO oI o I o � PRNOJ.Na RT4zs w e e<m® uI DATE: 10/14/14 I I \ I L-1.00 I 0= _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ J II IZ�l- 14 - mI KEY MAP o= NOTESI - EXISTING UTLf1ES_LOCATED WffVW THE NEW CROSSWALKS EXISTING UTLRES WHCH FALL WffHN THE BOUNDARY OF TFE NEW DECORATIVE PAVERS SHALL RE TREATED AS FOLLOWS SHEET NO A CAREFULLY FBAOVE THE ADJACENT ASPHALT OR CONCRETE BY SAWCUTRq SO AS NOT TO DAMAGE TPE UTLRY COVER OR FOM KXN DAT ,AND EXCAVATE THE ASPHALT OR CONCRETE AS NEEDEDINSTAL-THE TO INSTA PAVERS NORTH B.IFTTE CONCRETE UTILITY FOUNDATO HE N EXTENDS TO SET GRACE,LEAVE TIE FOUNDATION L-1.0O IN PLACE,SANDBLAST THE EXPOSED FOUNDATION WFICH FALLS WTR4!TE CROSSWALK AND NOTE:SEE SHEET L-1.05 FOR DEMOLITION KEYNOTE LEGEND ��E; p_p. THEN STAIN TFE SANDBLAST®FOUD N!ATI TO MATCH TPE CONCRETE PAVERS. GRAPHIC SCALE C.IFED APPROV BY THE CRY ENGINEER REM TS REMOVE AND REPLACE 9AALL UTILITY CA AND CUT PAVERS TO FIT AROUD UTILITY CAN." �� E.TAHQUITZ CANYON 45P9 4 II 4 4629 Ell 0 ' IAIDSC e PALIA DESHiT CA 52280 --_ .CO O D' I -� r.0 W)M-5ft FAX e-aa2a E-m 'g—( -pd GIB YI N w _ CL z � as �j U z Z cl) E.TANQUITZ CANYON O O Q II 41. 4100 41. e Oco — - Q cc 4 e G w Va �I o w v - - - � a I SPECIFICATIONS QQ I SHEET❑ BOOK 0 A.. mm I I of PROJECT MANAGER; TM E.TANQUITZ CANYON I\ DRAWN: SM Q QI E TAM TZ CMTW WAT ICI �C J s Is wI C CI HECKED: PROJ.NO: RM25 I OYY1 0 u V LU DACE: lD/w/14 SCALE: C4 W I I I REVI91ONS ff L- - L-1 - - - - - - - - - - - - - - - � KEY MAP o- I NOTES NOTE:CONTRACTOR SHALL FRD STAKE ALL STATION '�%�ING_VCUIE9 LOCAT®'MIHN ATN I PAVERS S INJCS E%EINO UR111E8 W}ICH FALL Wf118J FONTS AFTER DE IOLMON p COMPLETE TO ASSIST WRH TFE CARER RY OF THE NEW DECORATNT PAVHL SHALL BE TREATED AS FOLLOWS TIE NSTALLATION O=LANDSCAPE PER PLAN A MAOE TW REMOVE TIE ADJACENT ASPHALT A D CONCRETE 8Y 9AWCUITOR SO C NOT AS 7ch, SHEET NOSDNAACE THE URRY COVBi OR FOlDATION,AID EXCAVATE TIE ASPHALT Ofl CONCRETE A3NEEDED TO NSTALL THE PAVERS. NOTE:SEE SHEET L-1.O5 FOR DEMOLRION KEYNOTE LEGENDB F THE CONCRETE UTLRI'FOIkIDATXA EXTENDS TO STRiEET ORADE,LEAVE THE FOIIDATCN N RACE,SANDBLAST THE EXPOSED FCUHDATKIN WHCH FALLS WT1FN THE CROSSVlALK AND L-1.01 THEN STAN THE SANDBLAST®FOINDATKNI TO MATCH RE CONCRETE PAVERS. SCALE: T-tD' C F APPROVED SY THE CRY EN(IEEfT fEMOVE AHD fEPLACE SMALL URRY CANS AND CUf GRAPHIC SCALE PAVERS TO FIT ARORD UTLRY CAN' =rT E.TANQUITZ CANYON ® n ^�� 3100 y 3060 31II 9 LL I Q J\) i - � {� i , � I I � �, 0� Q U J APDSC 14 EL PASEO.S M PALM DESERT,CA 92M (7SO)W-WU A C I T/3-5615 FAX N 5� E?AH(2UITZ CANYON 6IDm O Q ct) 3]ID0 E.TAHQUITZ CNYON O C3 Im 336D A 39p9 ir u�j F 7 I - I ETAHQUI7Z CANYON , / �, — 0 Q e I V w i O , � �`", ✓31 m a E TI.ITZ cn I+ war al SPECIFICA71ONS a SPIFFY❑ BOOK 0 � I Iz I PROJECT MANAGER: TM J DRAWN: SM w BK r PRQI.N0 RW25 I CHECKED. tea( L-1.02 / to - - - - 0/4/14 KEY MAP DATE: SCALE: 1/R•-1'-O' NIT 103 Z I I NOTE:CONTRACTOR SHALL S CO STAKE ALL SSW WT P E AFTER DEMOF LAN B COMPLETE TO ASSIST WRH 0- ITHE NSTALLATION OF LANDSCAPE PER PLAN. _ - NOTE:SEE SHEET L-1.05 FOR DEMOLITION KEYNOTE LEGEND - - - SHEET ND NORTH -- 1 SCALE: r-,a L-1.02 1 ,s O CRAPHC SCALE E.TAHQUITZ CANYON Ism I ,•�`� © 1'O 1 O "0. O m Q I, � O -Q C nHOson�AnanEc�Nc 73M B-PASEO,SXTE W PAL — — _ — — — M DESERT,CA 9Y280 ARo)773.5815 FAX zI I a � N a �� zsmm E.TAHQUITZ CANYON zbmm Z n— �I z 0- co Z - Y o a a �I saw E.TAI-IQUITZ CANYON �3mm 'zf I m o w rn a I �I SPECIFICATIONS �I SHEET❑ BOOK■ Q PROJECT MANAGER: TM DRAWN: SM CHECKED BK NQ Rk125 NOTES DATE: 10/14/14 �mmm 11mm III 'E%HflXl UTILITIES LOCATED WAIN TIE NMCR03SY/ALKS EXISTING URRIE9 N}ICl1 FAIL WfM1N V27$I I THE BOpARY OF THE NEW DECORATN PAVERS SHALL E PAVEALL BE TREATED A9 FIXLOYl3 SCALE: U A CA Y REMOVE THE ADJACENT ASPHALT OR CONCRETE BY SAWCUTTNO SO AS NOT TO REVISONS: NIT CANYON I DAMAGE THE UTLTT COVER OR F NDATKN,AND EXCAVATE THE ASPWLLT OR CONCRETE E.TAHQU TZ AN AB s C NEEDED TO INSTALL THE PAVERS. O 9 B.F T CONCRETE UTILITY FOLI ATKN EXTENDS TO STREET CAADE LEAVE THE FOIRDATION - I IE D N RACE,SANDBLAST THEL4 EXPOS®FA I To WMCfI FALLS WT/N THE ENS, AIX AND _ r z I TEN STAR!THE SANDBLAST®FOMDATKXd TO MATCH THE CONCRETE PAVERS �T I'( �D O O O ., O O' O � O= .O ' : C.F RS TO W R TFE CRY ENGINEER REMOVE AHD FEPIACE SMALL URJTT CANS AHD CUT - � 1 Q I �I �I u 1 a 13 � � �(� 15 v 13 x I I a a I PAVI3R8 TO RT AAOIDD UTLffY CAN' LL-1.03 - - - - - - - - - - - - - - - - - - - - �- KEY MAP UNOFIAHI sEETT,IaNOTECONTRACTOR SHALL FELD STAKE ALL STATION ER POINTS AFT DEMOLITION 0 COMPLETE TO ASSIST WITH THE P6TALLATION OF LANDSCAPE PER PLAX L-1.03 SCALE 1'v10' NOTE:SEE SI-EET L-105 FOR DEMOLRKNN KEYNOTE LEGEND ORAR-eC F,c'4LE J NOTE:CONTRACTOR SHALL RED STAKE ALL SIR TKMI THE S AFTER DEMOLITION LAN S COMPLETE PER LA AS56T WITH THE NSTALLATION OF LANDSCAPE PER PLAN. O C� LAI4DSCAR'E A EO,SATE W. PAL D SENT, A 2q PALM DESERT,CA 92290 O80)568.9624 OW)T13-5945 FA% E-MAL:rS%'rW�com m E.TANQUITZ CANYON 3I N a •\.. , ,1060 19Em 9 Il LU 3iP9 W Q 13 � / O I �"o.LVL � I dIz co © H O� N ' v� — Z e In 1"lp o Z co z o a � - o oEL II I II E.TANQUITZ CANYON 1560 I[.60 11ID9 W w a �© — � SPECIFICATIONS o_I QI SHEET❑ BOOK �IPROJECT MANAGER: TM F DRAWN: SM 1I I CHECKED: BK PROD.N6 R1425 DATE: 10/M/14 n -__..- " ___. — — — — — — — — — — — — T — — --- T scaLE: 1360 IaS9 ;m --I I REVISIONS NIT z ^ I I r\ 3 . 0 4 I V I E TAMQ ITZ CG YCN WAY W Q_ F Z-\ U NOEXLSTTJG UnUTES LOCATED WRHN THE NEW CROSSWALKS EXISTING UTIITES WHICH FALL 07HIN SHEET NO I THE CAREFL L R THE NEW DECORATIVE PAVERS SHALL BE TREATED AS FOLLOWS A AMAOE THE FEMDVE THE A0.IACBTT ASPHALT OR CONCREXCAVATE T BY ASPHALT ON 90 C NOT TO AS DAMAGE THE UTLRYTHE COVER PA E FOLMDATION,AND EKCAVATE THE A3PNULT OR CONCRETE AS RS. s� I L-1.04 F®TIE TO INSTAL�CONC11F E URJIY F DATKJN EXTENDS TO SIt1EEf CRUDE,LEAVE THE F NDATKN LI — — — — — — — — — — — — — — — — " " L-1.04 IN PLACE SANDBLAST THE�FOIRDATION WHICH FALLS W THE CROSSWALK AND SCALE: 1•-10• THEN STAIN THE SMDRLASTfD fVI1NDATKN TO MATCH THE CONCRETE PAVERS KEY MAP GRAPHC SCALE C IFAITRDYI�BY THE CRY ENGNEE.REMOVE AND REPLACE SMALL U CANS AND CUT PAYEE TO FIT AROUND UTLRT'CAN.' NOTE:SEE SHEET L-1.05 FOR DEMOLRICN KEYNOTE LEGEND ��Q o E.TAHQUITZ CANYON "� B I 13F B LANDSCAPE ARCHTECTS,INC. ]30 EL PASEO,811ffE 2P PALM OE)568W CA 60) 82280 0 -382- AX - I E-MAIL:�v9e-Oilcan LLI I u w i cf) I EE® E.TAHQUITZ CANYONCL B� 07 I B - � - - - - 1 - - - 3V - T 0 -- - F- > �I I a oC I rI C U a T — — — —— — — —— ——— — — — — — - i i O z E TAHGJITZ CGN W4" 3 kI CI W W Ir E 0I@IoI a IT JJ I I UI SPECIRCATONS r mW V I I L-1.05 — — — — — — — —— L 3I-IEETo 900K■ PROJECT MANAGER: TM DRAW k SM I � KEY MAP CHECKED BK KEYNOTER IN To PROJ.NO: FU25 O -cc uTFucT.OR ARE OJI 1ISS'Ns. DATEI 10/14/14 FIF U E.IsnN,BETE TTSN TO rc�n�"OT"N RACE uaESS OTUERux SCALE 1/S'-1'-O' C�SF£cGIEDIaTE _.. _ .�ExuTrc cc.IcaEE NEecGR TO zE Faro.EO. REyIypNS: NR EE. PTURE Pm ANO w FITIwE TO e r TTI NOTE:CONTRACTOR SHALL FIELD STAKE ALL STATKIN ©EFx��i A-II�T,To ceOmuowEO xHINO'F TOTER POINTS AFTER DEMOLRKJN D COMPLETE TO ASSIST WITH Q- _ PlIi ,D w�s s `��"',ro �w�w 5LEEI�SOMF AND P TO S,YL THE INSTALLATION OF LANDSCAPE PER PLAN. nw M Q Oi E IETNS JTLITIE9 TO FEMU N PIOTECT IN - eO Ex19TIN5 9TIffEi ION.TO FEI FP0 M RATS. L O E 16TM5"To'p PRV-ECT N RACE. (E) FXBTING OTILITT GOYERS.PROTECT IN PLACE E.ISTIIa:TraE To SE FSTT F.. NOTE E. N5 : 19TI 9ieeE P1nIn Ta SE REnyvEo I.IF GNTTHING EXISTINOi THAT 15 5PE NG CIFIED A5 TO REMAIN I9 DMdSEO DURI �- 0 C ASFN LT pCq CFOIONo,K TO BE CCNSTI TICK CCNTFd 7OR IS TO BRACE MCTEQI4 LIKE FOR LIKE AT Tlacii RaNS TGR WI DTN OF CRAYY4K9.HVCKO SEE CCNTRACTORJ E%PEWEE. 2.PRIDR To CCNSTRucTICN,NCwmaCTDR 15 TD Dav+ENT AND I],F y , , SHEET NOT 13i IETWrt LL 1-1K ANp DECpTq^yD GR/N'TE FFSM SITE NID DI.__ C EIB[F AVTTHRG NOT I THE CONTRACT THAT IS DY SOED AVD IN NEED OF WT 4L FMST'N-i ill LaLLN FE'OF, r —P SOIIL dE FS WUOLSC NeE 'FoO ��GRPDEWNV 3.0 TRAGTC 9HAL_PROM DE A^y PER THE FEGVIEENTS OF THE O TCOrR) WL IaRiCE E.ST11G 0 _ SPECIFICLTICHS.CIAORDMATE THIS IW W UITH TFE CITY EWMEER NORTH NY'£^,v1B�p rE NDKnTED 4 WATER METER LD 71O,S AND SIZE d PRE ED 6 D M.B7 BE vERIFED II.ATE EW.CT E% T OI CJFH FE T THE CTM INSPECTOR WITR CI TT 6VD DESERT WATER K FNCT MFORE DEMO STARTS, —1.O G E l Tpy�CPCR p Ok INEEDDEEE TOO OFEE TE Ate.SIN S CONTRACTOR SHALL 2PLACE EXISTIW'TR/JiIC LOOPS,45 DIf�CTED BT SCALE: 1'-NY J ©BRxa THE CIR E1YaMEER.AT SWRISE.FARREL AND EL CIELO. DTH a.--. - Rm GRAPHIC SCALE ®a Ik TNE .Ol.AND is TO BE DEreR-T ETAFF FDarLOCATwc — av Eo o v o LLI B� « E.TAHQUITZ CANYON Beo _O s I > 7K/) B O I (7 W 5e8-ss24 OeW 773-SSG FAX 3I rl � I W Cn EL Z � E.TAHQUITZCANYON B �� ��, 0 IL co © I ] 13 O.i 13 O O ! 13 3O 13 ]O 19 13 a O O 13 O 13 �D I� 9 �-O A ® O Z co. I o _ 1 1 I I I I I I W a �dl y a WAY E iA STATION POKM SEO� ] ,KTI?2 CA4TGN AT THIS ew1 eTma N�sNo �I SF'ECIFlCATIONS ym ' f N �+ w� SHEET❑ BOCK v PROJECT MANAGER: TM DRAWN: SM L-1.06 I L CHECKED: - 6K 3 — K - - - - -- - - - - - - - - - - 1 , .,.:. i _ i3i �' Q .0 _._. ____ PROD.NO. Rms 1 DATE: 10/14/14 EY MAP SCALE: 1/8'-1'-0' 3 � n REVISIONS Nff 1 F�1 I NOTE:CONIRACTOFi SHALL RELD STAKE ALL STATION Z'\_ 5 I POINB PFf9i OFMOLRION IS COM'LETE TO A556T NT1H _ _ TFE NSTALLATKKi OF LANDSCAPE PFA PLPfI Z�_ 1 NOTE:SEE SHEET L-I0 FOR DEMOLRION KEYNOTE LEGEND - 3 CD 1 SHEET NO NORTH L-1.06 \ SCALE: CRAPHIC SCALE w F I I CONTRACTOR SHALL FIELD STAKE ALL STATION PONE PIiOR TO Im 5 ; Im COAO.ENCELElNf OF ROCK YWJPoG AND LCWATICN WOW 1 1 LANDSCAPE D EL.BASED.SUITE M - - _ _ _ _ _ Ge1 _ _ _ _ _ _ _ _ _ .+ _ PALM DE0)W CA 9R28f1 `l I Oso)558-98aA 1 DSO)773-5615 FA% 1 EMAL:ryarye-plcam 5 I I s Q I F5 A IW POINT. r W TYPO L i C rL'I 51mm AU OIMEN51W5 E.TAHQJITZ CANYON r-6• I vJ S ARE TO INSIDE F4 5709 7. l i - OF CORE(TYPICAL) 11 T W 1 TZ 1 /� 111 LL r _ 1 F 1 FDBRASS DISK _ 1 ` r COB SEC �f �,3 Uv IT 6 43' 3" LO V I GIYIEN5 w-15TATIGN POINT 1 O Z_ L� Z (L Q G C a Z o 1 U ETAHQIJITZ CANYON ' 1 n Fo — I f<D _ Q m \ r _ 1 m1 n' 6•-b• 45 1 w 52-3' I N d I � I I SPECIFICATIONS SHEET❑ EIIN PROJECT MANAGIERI TM �I I DRAWN AC �I E TA ITZ CANYOn=T CHECKED gK E TAHQIJITZ CANYON �I ° R'RQ/ No: R1azs seem �, asmm uI DATE: 10/1- 14 -0 m SCALES 1/S' T-0' I N3 NET �L-2.00- - - - - - - - - KEY MAP Io= 1 6 3 6- 43'-3' 3' 911 - r Q NOTES 3I T SEE SHfff L-20]FOR GENERAL NOTES AND KEYNOTES - Z WISING UTILIZES LOCATED WRVW TFE NEIY CROSSWALKS,EXISTING UTILITIES WHICH FALL QQ WTRf7 THE BOI.I DARY OF THE(ETV DECORATNE PAVERS SHALL RE TREATED AS FOLLOWS 7I A CAREFULLY RENIOVE THE ADJACENT ASPHALT OR CONCRETE BY SAWCURNO$O AS NOT TO V SHEETNO DAMAGE THE UTL HALTRY COVER OR FOUNDATION,AND EXCAVATE TIE ASP OR CONCRETE AS NEEDED TO INSTALL THE PAVERS. B F THE CONCRETE URIL RY FOUNDATION EXTENDS TO STREET GRADE,LEAVE THE FIX.WATgN SCALE. 1'-lD' L-Z.00 IN PLACE,SANDBLAST THE EXPOSED FOUNDATION WHICH FAILS W THE CROSSWALK AND GSCAI-IC SCALE THEN STAR!1HE 9APDRASTED FOUNDATKN TO AIgTCH 1HE CGNCREIE PAVERS. C F APPROVED SY THE CRY ENGINEER,RELDVE AlD REPLACE SMALL VTLUY CANS AND CUT PAVERS TO FIT AROUND.M CAN' av m v s o CONTRACTORCEM NT OF FELD STAKE ALL STATION WO PFICA TO a CW 04 OF ROCK STAKE AK AND ft"TISTAMMk!POINTS FBTATI P"^ E.TA-IQUITZ CANYON LANDSCAPE AWlTECM W. _ BLUE 210 41" I PALAI�DE9HiL CA a2zao B II cFNTER BGLPNIiE l II II I• B (MO)57B-3B24 _ dB0)]TS-3815 FA% ___� _-�`. __•I� ,a - /__ -.v � <( SS 1 �� < ` s�$> t41 t y Vt� ��yi sy` Y;� s� x`�2�z U' ,i S I (�� E-�'ro�'fPv3oom ��� �I ��� I - -_'�� \ ___�� �.�_ B �• 30- �� R6•b tf 7s v z ( < -" Ll l Dm lw Rm1 STATM P Nr '^ QI Q a 3I Z LL 7 `lL < Q Z 3 U O Z U 0 E.TAHQUITZ CANYON /D Z dIDD {3A9 6{60 �✓ "I". I J v Q I — .,ate• O T - - -- - - - - - - - - - - - - - - SPECIFICAllorae SHEET❑ BOOKS II11��1I�{����JJJI I 4m09 4" i i PROJECT MANAGER TM I DRAWN AC E.TAHQUITZ CANYON I JAI CHECKED BK Q 4 E TAH ITZ CAN WAY PROJ.NO RI425 �= U DATE 101"41 LU ' - REVISIONS ab � ab• RATH _ L-2.01 I N -- - - - 3 SCALE- T-1D' As- KEY MAP o- NDT� m m n e 2.S 2W L- FRAL NOTES AND KEYN07E8 Q 2 W k I OCATED E _ - EXISTING UILIIGBV OFALL WIAN THE BOIRDAAT CF THE NEW DECORATIVE PAVERS SHALL BE Y S Al®A9 FDLLOYIS A AMAUE THE RB.10'.E THE AOIACEM ASPHALT OR CCNCIEIE E SPFIA RNO 80 CF NOTES 9HEEf NO DAMAGE THE VRRT COYEP OR F0.lDAllDN AND E%CAVATE ME ASPHALT OR CCNCFE'fE AS NEED TO N FETE nJ PAVHB. I F TIE CC NDSI-A I1II.IfY FOUIDATKM!E(MENDSIDAMM TO CHSTREETFALLS S WffH LEAVE TOE PCUDAND N RACES TFE SANDBLASTED AN TBLA owDe®F«MD M M P>1 FALLS CCNCREM THE CROSSWALK AND L-2.01 IFTHE APPROVED ED Y THE CITY EN FgIDAIE14 TO MATCH M-ILA E SMALL PATERS G F APPROVED BY THE CIfY EN01�L 16.DVE AND FEPLACE&APll IJfLRY CANS AID CUT PAYBi4 TO Rr ANDIMD IffLffY CAN' CONTRACTOR SHALL FELD STAKE ALL STATION POINTS RYOR TO A G aF HOCK WORK AID NifTATKJTlE.TAHQUITZ CANYON `� ILIQ 3lP#r �{� 370 ,f 39 Z 6' 1 6' LAID9CAPER StXF S.W. ]9081ELPAIRED, 2p PALM DESfSEIU,3iT.CA9428D (7W)568-3624 06O)�5&15 FAX 0 Q I3500 E.TAHQUITZ CANYON 36@0 3T� WN 3 I� T I', II N —Al Z 2 TER scuLPT usE — ••r L. PAD M MEDIdN / � _� _ �'•� \ �� _ �_ /x _ CL Q y 5. I E.TAHaUITZ CANYON I O Z w WI 3 60 336Ti 34 1— E.TAHGZUITZ CANYON � �- •�-� i _ � � U � ir H 4 3V .30 of r; Q HENSICNS[� V 0 5 91PTIGN POIM Z) _ 0 F Q 0 O W U � w 5) O — — 0 5 a I T- SPECIFTCATIONS Q I SHEET-El BOOK N I ft J I PROJECT MANAGER: TM 111 Kp n' I ETA ITZ CANYg .AY QI DRAWN: AC a Q wI CHECKED: SK PROD.NO, R1425 DATE: 10/14/14 9 I SCALE: ro 1'i= I REVISIONS IL NR L-2.02 1-6 •-6 I KEY MAP = o= - INOTES 0= - t SEE SHEET L-207 F G RAL NOTES AND KEYNOTES 7cN%C]hh HETISHALBETFETEEAYIR.C THE Y REMT OF THE NEW CENT ASPHA PAVERS SHALL BE'R+FAT®A3OASNA CAREFIAlY FEMGVE THE ADJACBTf ASPHALT OR CONCRETE BT 3AWCU1'TNO SO AS NOT TO SHEET NCDAAAGE THE U COVER OR FOUNDATION.AND EXCAVATE THE ASPHALT CR CONCTETE A9 FTTH F TE TO NSTALL THE PAVERS. .. I F PLACE.SHE ANDBLAST EXPOSATION ED TO FALCfRPDE,LEAVE THE BWALK AND SCALE 1'�IO' N PLACE. THE SANDBLASTED AND THE EXPOS®F011lDATIOII YTCH FALLS CIFEl THE CRDSSY/AJC AND ORAPHpC SCALE n .F STAN 1!E SANJB EN WEER TI IO E MATCH THE CONCfEIE PAVERS ��=1 L-Z.O G C.F ATRO RT l THE CRT ENGINEER y FlEAOVE ATD R�LACE SMALL UTLRY'CANS AND CUT PAVES TO FTf AROl./�D URRY CAN' 10 OOHIMCTM SHALL FELD STAKE ALL STATION FONTS RICH TO OOM.BFCB.BFf OF HOCK WOW(AID Ft10ATKN1 Waif ,/•r��� E.TAHQUITZ CANYON 1'- ii 7__�« - \__"�` - --�� -"�•_� cts �i a ssz<> z"7t{< 4os `o`.,'da c> aQz -tgr�a �> a4 �� aos i,z z LAwaccia e�c. R4 9-XZ� i;� �> _ _ h ..�__ ..,$} - 73M B.PASM SUIEW 1\ 1� _ - .Zt' •• r _ l l l _ — 3 — _ — PALM D®HIT.CA 02200 \ a-- --- -- - - "' _ OeW T)338p FAX B BI N W a I�STATION P M, TTp�AL 24, SM E.TAHQUITZ CANYON < Q T II n II n II \� DII'FH91R14 RXT'I B O z rp iL 9TATICN POMt B V, Ii 0 pTi 7� E.TAHQUITZ CANYON BT smo IM Q n Ij� -i — _ PAD NtEDIPN \ r u'J ST 9PEC 9CATIONB SHEET❑ BOOKS <I PROJECT M,AMOER TM — — — — 7 ORAVM AC CHf EU BK PROJ.KV F"25 DATE 10/14/14 2 VID 21" �I 6 ivavrz cmva m SCALES I/V -Cr i I FVEVKMON& NTT - E.TAHQUITZ CANYON — $ I I NORTr - - - - - - - - - - - - S• '� i � Z z z i-2 Z zt> s� i z ads z z -i tz�a z � � - - — - e - '�t KEY MAPrt �:e• 7•-g - - o= - t SEE SF♦&T L-207 F W OBJEHAL NOTES AID KEYN01Es 2 H- I E73 G NTE BM DOCFA T®E NWERWH NDE TCIOER NATIWVE C PTKAVF3iW9A SLMKASLL J BSS=-JlN URIT FA80 WHCH FALL SHEET NO • I I A CAR3ULY HB.IOVE THE ACUACE14T ASPHALT CH CONCFEM BY SAWCURNG SO AS NOT TO DAMAGE THE TRIM COVER OR R"MTAK AND EXCAVATE THE ASPHALT On CONCFETE AS Mffi TO NSTALL THE PAVHS B.F TIE CONCFETE URTTY FWDATM WE?"TO SJFEET GFIAM LEAVE THE FOMDATKIN L—2.03 N PLACE,SANDBLAST T!E 9(POSH7 FO0IDA7 WHO1 FALLS WIRE!THE pK)S9WALK MO THEN!STAN THE SAIDBASI®FOUNDATION TO MATCH THE CONCRETE PAVERS. C.F APPROVED BY THE CRY BIQffii,FBAJVE AND FEFLACE SMALL U CANS AND CUT PAVERS TO FT AHOUD UR1IY CAN" CONTPAcT FBLD STAKEALL STATION POINTS TO C MMWCBI@NT OF WOW ANID A WORL ,/•/i � I r°pA PO 1•.6' 1'-b' }, }0D0 I L EiW AsAe�feP=-9FQ�AC xg$11INC.INC.73MB PASEO, 20 dI PALPOsENrzinziXI E.TAHQUITZ CANYON E-o T � b6b 4 H0ID W clq 1T 9 s Z D IDNO FRF1 1-b 1-b °TATIWi w (e W F0.1-IP co I =-b _ Z a a Q OU H Z U 0 E.TAHQUITZ CANYON I D Z -- ;�\ �,T--------- --- ---�✓ l '\ ^i..�.\ ;'-�_--_�___�---' . /x�----- / x— Z ' ,.F -- -yam �' 1 i _ �� ---' ab '-- /}`--- ( -- cd L0 r sPEceacnllC'IN9 II°Lp ,.mm T - - - - - - - - - - - - - - - - T sHEET❑ BOOK PRO.lEC7 MANAGER TM — _ — 4 fXTANTk AC _ \ CHECKED BK N c \ �36 %•—"�-"c f 'y-R{'-b" v1-_ I PRO.I.NO R1425 ETAH211TZ GCNTGN W4T I Z DATE: 10/M/M SCALE: -O I I s Evt�n Ns NR ILI o l aII I ; 7I - —�-— — —— KEY MAP NOTM Al - 1 SEE SHEET L-2W FOR GB*RAL NOTES AND KEYNOTES 2'FJOSINO OILRES LOCATED HMIN THE NEW CR08SWALX3 EXISTING UII_TTE9 WHCII FALL SHEET NO WTTIN TIE SCUMMY OF THE NEW DECOMThE PAVBiS SHALL BE TfEATED AS FOLLOWS A CMS=L11Y SEMOVE TIE ADJACENT AIFHALT OR CONCFETE SY BAWCIIRNLT 80 A8 NOT TO DAMAGE TIE VTI.ffY COVBi OR FOUNDATION,AND EXCAVATE TIE ASPHALT OR CONOWTE AS NEEDED TO INSTALL THE PAVEI8 S F TFE OMMTE VMM FOUDATDN EXTENDS TO BREEf GRADE LEAVE TIE FUHMTION L-2.04 N RACE SANDBLAST TIE DWOSE)FOLK9TION WHCH FALLS WHIN THE CR088N'ALK AND TIEN STAIN TIE SAHDNA41®FOIRDATION TO MATCH THE CONCIE PAV C.F APRiOVED BY TIE CRY El"CE L MMOVE AND REPLACE B VMM CANS AND CUT PAVERS TO FIT AR4RD IRTL"CAN- MATCFU E-T� MATCH NE-8 MATCJilER j U 5ATURNINO DRIVE ' J I 1 I ,I I rl I t I 1 �yw < s i i pP $R ti I�;titi:� V 1 Y 1 h 7i I 1 rr -4 1 m k n 4 D / I N X / I ` ash z f l ` 1 O MATCH E-,4_ , I / I _ 9CitIR11N0 DR � I — �f) T� °� I t^1 a y VP Jul ox D m f 1 _ 1 DERRIT09 DR NL _ _ _ ti I I I tl g MATCFLNE-O a MATp�R - GERRITOS IbR NW o BHEET TITLE 9 r x CONSTRUCTION PLAN �� TAHOUITZ CANYON WAY PHASE 2 cqi � V b yy ■ PALM SPRINGS, CA y CONTRACKN SHALL Fan STAKE ALL STATDN PONIS PRI0R TO OO WENCB.BR OF HOCK WORK AID IRWIATIDN WDRL 3T4TICN PO �nPl�xtu E.TAHQUITZ CANYON g I > 9t� II II 4" II ' 4 x 6 x 6 K 0 3' I e —,P �+I' Rat �}� f 1s^Ty 5 r< �z i zc >a>S zs i err;�. LAIDBCAPEAEO,SAT$NC. RiCOL �•�I —rt v / id` _ �`� _ s' rz s > �{' r Srr'� SbivdY [ny S r{_>S; z ]3081 E1 PA8E0,8110E 410 PAD N of •3m^ �_ / •sm^ •s c.ir ti4J �y .:4 �.]> C, �c k...- PALM OE�R.OA� A — —.a I I —w� zv� y�. z (700)SOB4824 - - 2- OW)773-3a15 FAX E-MAU rw+es7d«m x'-b' ten'__' I f— I DRfrNBIQ19 FRLT'1 i srarlw wMT I N N c I z n=a P < >I �� � a 160 x60 „ 360 �{ U I E.TAHQUITZ CANYON = -- O A ) 1 tt> s�:tr ti< $ z{ :i� >. 4 i{t. r �.sziCy z.'•: { it -s <Jt p� T[<'j.. [z4Vi-<s — Q _ __ '_• �` \__�. J` �\ U O /yZ� S1vf) F, { _'v___� .301 1 Z VJ STa' cl HI Z Q I N 1 m 5I O L .r.1 9 F_ 1 1 Q I I SPEC CATIONS I'-T d) I ` /p SKEET❑ BOOK iwl I I E rAHCLItZ cwraJ war FI PROJECT MANAGER TM e A- z, DRAVW* AC I �I crecKEn BK 1 Ix F➢.t•IP PROJ.Na RAW DATE: p/iq/,q I e I L-2.06 I L SCALE= LL �t L _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ L REVSIONg NR KEY MAP I N , 1 NOTES Q_ H Ix "i ;: t SEE 9 L-2 FOR GENERAL NOTES AND KEYNOTES 1 ., 2'E%BINO URIIEB LOCATED wnm THE PEW CH085WALCS EKSTNO VILITE8 WHICH FALL 1 5 WREN THE SdRDARY OF THE NEW DECORATIVE PAVERS SHALL SE TREATED AS FOLLOWS A CAREFULLY PBJDVE THE ADJACENT ASPHALT OR CONCRETE IN SAWCVTTNO 80 AS NOT TO NO DAMAGE THE URTTY COVT3i OR FOLI DATION AND EXCAVATE THE ASPHALT OR CONCETE A8 NORTH b NEEDED TO WALL THE PAVER S F THE CONCRETE UTILITY FOIRDATDN DRBDS TO STREET QNDE,LEAVE THE FOUNDATION SCALE Y-KY I •:„ N RACE SAw9A.4T THE EIR`OSID FUJDATKIN WMCH FALLS WTTHN THE CROSSWALK AHD CAAI'FIC SCALE L-2.06 1 .... I® THEN STAIN THE SPfDSLASTED FOUDATKN TO MATCH THE CONCHEIE PAVER I C.F APRROVED BY THE CITY EN NEBI RBAOVE AND M31-AM SMALL VRM CANS AND CUT �rT PAVER TD RT AROIRD U CAN. m m v s o EYNa a LANDSCAPE 141 73DSlEPABp,SUITE 10 73881 B_PA8E0,SUITE YD O STACKED STONE WALL WITH BOULDER GROUPINGS, SEE DETAIL A/L-2ID8 FOR PALM iDiEsEPm,508 CA BT288 DETAILS AND ELEVATION. OBW SBB-3821 O TOE OF SLOPE. OW)225-W FAX E-AAL rlt -pde 3O NEW CONCRETE SCULPTURE PAD. SEE DETAIL B/L-2D8. O4 4"-10"AY ULAR COBBLE 'APACHE BROWN'MORTARED IN PLACE,SEE DETAIL C/L-2D&STONE AVAILABLE AT SOUTHWEST BOULDER 811-152-1825. ^, wwweoutYw"tbouldwz< . \Y OS 12'WIDE,12-THICK INTEGRALLY COLORED 4000p.1 CONCRETE BAND A"4 W REBAR PER DETAIL.FINISH: LIGHT BROal,COLOR:DAVIS COLORS'ADOBE' © ACKER5TCNE San THICK'HOLLAND STONE'PAVERS,COLOR TO BE CHARCOAL Q BROW BUFF. CONTRACTOR TO INSTALL NEW PAVERS SO EXISTING STREET AND GUTTER FLOW LIDS REMAIN(NO F'CNDING OR FLOW OBBTRLCTIONS). SEE DETAIL D/L-2ID8.PAVERS SHALL BE INSTALLED IN HERRING BCNE PATTERN WITH A /� SOLDIER COARSE BORDER.SEE DETAIL D/L-208. IL lO EXISTING UTILITIES TO REMAIN. PROTECT IN PLACE. OS EXISTING STREET 6IGN Z AGE TO REMAIN. PROTECT IN PLACE 2Q O EXISTING CONCRETE TO REMAIN 7 V Z O ACID WASH EXISTING CONS.WITH A IOx MURIATIG ACID SOLUTION,AI-PLY DAVIS Z COLOR SEALER II,COLOR To BE ADOBE O O Z II MOUNDING,SLOPE NOT TO EXCEED 2-1/2:1 12 EXISTNG UTILITIES TO REMAIN SEE NOTE 2 FOR DIRECTIONS. Z (� O EXIST.CONCRETE TO BE ACID WASHED WITH A IM MURIATIC SOLUTION AND Q STAINED,STAIN TO BE LITHOCFIROME CHEMSTAIN,COLOR TO BE CS-2 PARDRE BROWN U O COMCFEM BAHING SClLFRIE PADS AN PAVER BASE 5 STANDARD: 0 - CONCRETE SHALL BE 4000 PSI (MIND TYPE-2 PORTLAND CEMENT,UNLESS CITY ENGINEER APPROVES OTHERWISE.PLACE FEIHFORCNG STEEL ....11TT...... 3'FROM BOTTOM AND 2'FROM BOTH ENDS(MIN).SEE PLAN FOR STEEL SIZE,QUANTITY AND LOCATION.AM CEMBIAL NOTES L� r - ALL CONCRETE COLORS TO BE CONFIRMED BY LANDSCAPE ARCHITECT IN FIELD PRIOR TO POIURRG WITH 5A1PLE PANELS PER SPECIFICATIONS. - INCLUDE PENETRATING SEALER ON ALL SITE CONCRETE AND PAVERS.(MATTE FINISH UNLESS OTHERWISE SPECIFIED.) - PARKING,ROAD LAYOUT AND DRIVEWAYS BY OTHERS. W - ADA ACCESSIBILITY ANALYSIS,COMPLIANCE AND DESIGN BY OTHERS.(SHOWN HERE FOR REFERENCE ONLY A - LANDSCAPE ARCHITECT MUST FIELD REVIEW FLATUU0W LOCATIONS PRIOR TO CONCRETE BEING POURED. - ALL GRADING AND DRAINAGE DESKdN ON FLATWORK BY CIVIL ENGINEER 0 - SCORE JOINTS -CONTRACTOR SHALL LAYOUT SCORE JOINTS N FIELD IN CONSULTATION WITH LANDSCAPE ARCHITECT.SCORE JOINTS SHALL BE PROVIDED SO THAT NO MORE THAN 400 SF.OF CONCRETE 15 OPEN SPECFFCATIONS - - EXPANSION JOINTS -PROVIDE In'FELT EXPANSION JOINTS WITH JOINT SEALING COMPOUND AND SANDED JOINTS BETWEEN FLATWDRK AND 5TRUCTURE5 OR COLUHINS OR WALLS. SHEET Cl BOOK 0 -__- IRRIGATION SLEEVING - TO ALL POT AND INTERIOR PLANTER LOCATIONS.6LEEVN3 UNDER PARKWAY -SCHEDULE 40 PvC TO BE I VJ TIMES THE DIAMETER OF THE IRRIGATION PIPE-(RECORD FIELD LOCATIONS) PA - PLANTING AREA PROJECT MANAGER TM TW -TOP OF WALL POS - POINT OF BEGINNING DFiAWNk AC - STRUCTURAL DESIGN BY OTHERS. CFECKEQ BK - THIS PLAN IS INTENDED TO PROVIDE AESTHETIC DIRECTION AND FINISH ONLY, - DIMENSIONS INDICATE CENTER POINT OF WALK LAYOUT SHALL HAVE CONTINUOUS UNIFORI CURVE AS 5HOWN ON PLAN LANDSCAPE ARCHITECT PROD.Na R1425 SHALL APPROVE FORt LAYOUTS PRIOR TO CONCRETE POURING. -CONTRACTOR TO COORDINATE IRRIGATION SLEEVING BETWEEN HAROS PE AND IRRIGATION PLANS. DATE 10/14/14 -CIVIL ENGINEERING BY OTHERS SCALE- 1/B' -0' REVI&ONS NIT Q_ SHEET NO L-2.07 a RDIE. 73DM EL PASEO,SUrrE 210 T1E BPLDER LDER MDIL, M iME PLAN N!W pELW IEFTBEENT PALM DE�f.CA9P2BD TE IPE OF7C . NEIWi,TO MAT CLT6'/EBmT ,qt3 IXNLCERH bTACA'm,bR11LAR TO DETAIL]EELW,IIE BTKl2p PER PLAR LSD)Se8-JE9A CGLLDER W4LL BECIIQL I-b HBO)773-5815 FAX EN.H BIDE EyAOj:FP�TVb�B6T 10 WVDIA AVLIYA DOLT Nb Wr TO IILLD b1EEL 0.A,E FLACE AT E4 O R. Vl•AALVAIUSFD STEEL M1A,E N 3/+•fJ16 FER KL B FEfAMIG RIDE _ H4NRY L0.CR+0ALP& W .^ CLNCiETE x00. ..-. CAS TLP GF OTdff •. 9 RESAR-,P OL ElLL •.. u, C6111EF£D M SLAB Q - xscmPACIED NATIVE Boa - J Q vaapERB To s veBEler eeLecr Flaa'I eam6eer BLVLDER,BTLNE TL£LF BTQ•£W4L - .T MIAGE BmE 5 (FADE.6•.6.. GONCRETE SCULPTURE PAD 1/2"=1'_O' v PLAN VIEW 1/4''=P-m" Z rolE.eEE PLAIrB FOR oN[RxL DI'valal cP eaOl wau. LO Z r o OZ VJ �R G bTACKm eTGIE W4LL ALDER�'� bTADQ.D bTLIE uWLL a� BBi pPOxE 6A Mio M[• IAR � � Q EaYDER GRWPSG AyFRY£N [PACRG 4� , FlNIMI GRADE V i0 E#$D b 5 - - a a nail.a,.a�:a♦.E,n'Tiu o' , TZ a e s bales r=ne slm a rIE ANBe♦Ge Z@ ':: � G CQbLE CEW Mt.410. pA V d V � .'V ,/.; I'taRew ro x IMa'u Tttb ro•rrAerala .Q V',� 4:.� Q 11E bTLIEB FLR iVt 6TALKFD DTPE WgLL r0 EE bEP TO SE V-m FR'a'I 9O SO T,pgILDER(BTGTE 36x To eE a"-D",�6..TO SO o•-u'•.,6.To OF a••-,+° I. ELEVATION 1/4"=1'-0" BIe GRwE M^,-0ERB-B¢rtAH FLR?:-IA':-- SPEC II.MTICN3 �`"� G ANGLULAR GOBBLE MORTARED IN PLAGE NTs %'�° �"PAQIECT MANAGER TM DRAW12 AC CFECKER BK PRCJ.NO, FH426 pRlp, PAVMcamPA�RB IwT DE ourALLm ar AN Iw DATE+ 7p/7q/M(1 SCALE Ila'-T-O' "JbTM3 ABPMdLT PA�EHENT.BIWI ;I a REVERON$ R R:f�.t GIf EXIST.PAV ANp I£PA.%R . x Ifp, m rv♦a rvv. IIIIII _ - ow TKMi eArm Ru® M nro +O�pEE �RRMG Q_ IbTE.THIS DETAIL IS DIKaRN'IATIC*B DER SZE F NEI Q "• , DAIM PRAM M Lffb AT LO OT TO BE DETEW'IMED IN THE FIELD.LffIGNi 6 WALL SHALL ELEVATICNB,MLLW PEA Ytl- IbT EXCEED 3 FEET A VE GRAPE W THE NLN-RETAMMG O' SO Mt GRCFEM PAVER tl"WDE CiT1�GNa - SIDE. (`;,' Q• B/+•'BAIa ANVALT BEaM9 eEv O' TAOC COAT X E WIED ASPHALT LN .,_.,. . L.. COIo M E S••WDE PAVER NJID Q nN.i W'THIIX{I[1ro Pd CGN:IETE •µL EDGES(TYP) Q o .4 CL•R.b"OG EILL - Q= Q l"CRPACTm CLA00 II ROAD SAES 'DESERT SELECT' BOULDER 9WB eorw'RETE avE To xo%,x nM ricer �""o"'°dG1Ep d1B` (�I'}�2- SECTION I"=1'-m" pbEAL IDMr CENiER-I E To CURB mGE LF EXIST CCNC. ,.eA&E AND REIIroRCIrG "„vaRr EABm aN amER of BPAVDREL SHEET NO: iwV£Ic.YERmT,4uv cINL ENGIrEER it�{�' U PAVER SECTION PAYING PATTERN ENLARGEMENT L-2 O8 4 STACKED STONE WALL WITH BOULDER GROUPING& TAI PAVER DETAIL I I ,/•,� � I I 1 Y. I } 1. 1 1 ... 1 - ]SOS1 E_PAS B M t _ — PALM DESB ..CA 92M C]BW 58 WN I 1 (]607 773-5615 FA% , E-M4L'r9°'r6°-Pd°°m I I Q I a I N — ° E.TAHQUITZ CANYON s,� -1 53� Q - - - a J I y , — ro_ewss oisu 1 Q E.I — SEC.13 I V W I IO z I , Q Z Zo I I 1 E.TAHQUITZ_CANYON — l a W g D-z I I I SPECIFICATIONS I SHEET BOOK 0 �I I PROJECT MANAGER TM ttl E TAU ITZ CArv1 C WAT p DRAWN: is OI K CHECKED: BIC E.TAHQUITZ CANYON ul PROJ.N6 RI425 — — — — — asmm I I DATE: IO/A/14 IONS WIT EASE 1 N] O KEY MAP II DWA LANDSCAPE APPROVAL �- - - �n ,rere ,ro.a. SHEET N6 miw+.mm �Icn�im�rv�m NO;rH L-3.00 GRAPHK:SCAA LE SEE SHEET L-3.07 FOR IRRIGATION LEGENDS AND WATER CALCULATIONS ��-1 I ESAHQUITZ CANYON — — — — — - — — — — — — — — 1— LU LANDSCAPE A 9,N0 T ]30818_PA9SID,E0�SUITE 2p PALM DESERT.CA W L I4--Y1 L L W)7/3-5 24 beo sW 51s PAz N i w I IRRIGATION CONTRACTOR TO USE EXISTING MAINLINE FROM EXISTING METERVB FOR T. Q Q AND EDIANVERIFY CONTRACTOR TO LOCATETO AND INSTALLATION TNI NEW R LION OF GATION INDI INFORM WM4GE J Q AND PIPE MATERIAL PRIOR TO IDEMLATIONOFNEWIRRIGATIONANOINFORM I^L U LANDSCAPE ARCXITECT OF MAINLINE$RE,M4TERIALANO CCN OITIONCON . SIDE RACTOR TO VERJFY NOUFYLANDSCAPEALL RCHITEflANOBACNFLOWPREVENTERSLOCATIONgNO Z O I III SIZE.NOPFY LANDSCAPE ARCHITECT OF ANY pISCREPANLIES. jIII EXISTING CONTROLLERS TO REMAI N AND BE USED FOR ALL NEW FRIGATION VALVES. Z 0 ir II II C-3 Z _ _ — _ — _ E.TA— — — CANYON_ <smo aaoa `•/ U J - - - - -{ - -�I - Lr— — Lr Q - - �r II — — — — — — - - - d T" - - - - o� w I 1' WI F W F S ro a SPECIFICATIONS T _ - - - - _ — _ _ _ _ T SHEET❑ BOOK■ I PROJECT MANAGER_ TM IL I I DRAM J8 (� E.TANQ11TZ CANYON ' —- �I� CHECKED BK== PRQ1.N0 Rw25 j- ETALI IAMTw wAr _ — _ - - - - - - _ — w r UI DATE: 10/14/14 t - �..Ip O - — I r+( �I SCALE: _ 1'-W_0' ;NOF;rrH REVISIONS NRT W I Z L-3.01 I SCALE: - - - - --- --- - - - - - - - - - 1 CAAPHIC SCALE KEY MAP DWA LANDSCAPE APPROVAL - I :row�Wmruwerean renexm Men wnnwewlgwvti .e.m.a.aia n.mw .m SHEET Na SEE SHEET L-3.07 FOR IRRIGATION LEGENDS AND WATER CALCULATIONS, L-3.01 t.IAHQUITZ CANYON �� L'- - - - - - - - - - L - - - - - - - - o - -3a� - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- LLI a F 3 73]BI A PA .BUIIE W CM)773-5W FAX EMAL:f9AY♦74-pQcan c-1 -C- N 1" o _ - I - - - - - - _ - - -- -- - - �,-- - - -35�_ - - - - - - - - E.TAHQUITZ CANYON co =`ma` - - - - - - - - - - - - - - - - - - - - - - - - �Tmm L Q ti IL (L U E.TAHQUITZ CANYON 3:em — L Q 33mm 0. — - — — — _ _ _ _ _ _ _ _ � O O Z �I E.TAHQUITZ CANYON — Q Z co T Aft fT _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ U � a �I a E TA..ITZ CG IG Y:AT 11 SPECIFICATIONS u g SHEET❑ BOOK■ � I PROJECT MANAGER TM W I I DRAWN: JS CHECKED BK - f I L-3.02 IQ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ PROJ.NO, RI425 DATE: 10/14/14 71 _ - - KEY MAP E SCAL 11-101_01 FDA lM EVISIONS R 10 SEE SHEET L-\3.07 FOR IRRIGATION LEGENDS AND WATER CALCULATIONS. , , R EI I NORTH A,_ ISCALE: 1'-10' _ xa IDWA LANDSCAPE APPROVAL - �a ,MB�` .b ,� °�.,a. ,�.m m..�u�.,m.� s1EE-r No trsl gnv rryyveyl��ly o['an,Y, u N.R --� w A, .A " L-3.02 DEPARTMENT VAN —A MANAREMENT DEVELOANRAT Pv,cE DEPARTMENT — � 1BQ° _.E.I AHQUITZ CANYON :aem ,/•r�\ V� P DEL DESERT C�f0 Et7W)M-51BI!I F c IRRIGATION CONTRACTOR TO USE EXISTING MAINLINE FROM EXISTING METERBACNFLOW TOM NANVERIFY CORPIPE MAERIALP PRIOR TO ANDINSTALLATION INSPECT THIS NEW IRRIGATION OF TION INDINFORWM4GE AND INLIGAFYPIPEMATERNLPRIOINEBIZ MATERAIOFNEWIRRIGATICN AND INFORM II LANDSCAPE ARCXITECiOFM41NLINE 51$E,MATERIALAND CONDITION, •� • r^ CC NI TO VERIFY ALL METER AND DACI(FLOW PREVENTENR LOCATION AND Q SIZE NCTFY LANDSCAPE ARCHITECT OF ANY DISCREPANCIES EXISTING CONTROLLERS TO REMAIN AND BE USED FOR ALL NEW IRRIGATION VALVES. iI III T II y I� III 1" 0 III Z 11 - - B3 e _ -i Q Q E.TAHQUITZ CANYON Alm IRM I r CIO U 1I Y � a R-S W I LL 0 _ - - - - - - - _ — _ — ETAHQUITZ CANYON _ — u p lr �—i I sPECFICAnoNs ZISHEET❑ BOOK PROJECT MANAGER: TM Q DRAWN: `s J3 CHECKED BK PROD.NO, 13M25 �I T - - - - - - - - - - - - - - - - -- DATE: 10/M/14 0 ]1 I I I SCALE: 1'-10'-O" EVI RSION& _-. Nrr I ETAHQUI T Z CANYON �I - - - z� SCALE: T-%1' Z�_ - - — — — — — — — — — — — — DWA LANDSCAPE APPROVAL - KEY MAP M. ,tire DNN. . '"��"°. SHEET NO pwnryA� SEE SHEET L-aO7 FOR IRRIGATION LEGENDS AND WATER CALCULATIONS. �I w...••vN-n .IAra ®e„a.� a:..e TANA mI..DNA �:`�I: : I.Dry" L-3.03 7K� LAlDSCAPE ARCFRIECIs,NC. 73M Ei PAB BIKE 2V PAW�,CA 82280 (]80)She-"2G I ETANQUITZ CANYON I pF)7"86 FAx ~ Comm EZ I.--; -114= 1e60 19ID0 � I N N G p —— � I I o z O O a zV) B2 R-1. . a U a 00 E.TAI-IQUITZ CANYON b 162N � IIIDO _ / 1 V 'iI I a W a t^ ECIFICATIONS SHEET❑ BOOK PROJECT MANAGER TM DRAWN: is CHECKED, BK PROJ.NO R1425 DATE: 10/14/14 I T — — — — — — — — — — — — T 13mm SCALE: 11-10'- 14¢ O'REVI.410N3: NR A Z � 0 Q\' SCALE: 1-10 scA 0- 4 I O I pl E TAH3 1,2 CANY N WAY I w o z� \ DWA LANDSCAPE APPROVAL G- I U d u� SHEET NOS c�1 L-3.04 .a ��ow �:IdM .rom - - - - - - - - - - - -- - - - - I L-3.04 KEY MAP ,b w,.FaN,N.RF.,FNiPFo,kiMiN. SEE SHEET L-3.07 FOR IRRIGATION LEGENDS AND WATER CALCULATI NS. E.7AHQUITZ CANYON PALM— — OtsH fi0 CA 922 oeo)Sea-WU y VW)778-=PA°w^X E-m L,�9ey0e-pd - - - - - - - L - - - - - - - - - - - - - - - - - - �I O W a FA-1 I A 2 I IL Z >— E.TAHQUITZ CANYON I J Q Q T Yr z ZO z ° zcr Q w T — _ - - _ _ - - _ — T > ,= I ; ; W a Q SPECFICA71ONS e TAu UITZ CANYp WAY � plI SHEET❑ BOOK R„— I PROJECT MANAGER TM DRAWN: J3 VI I I uI Na.Zw HECKED: BIC VS PROJ.N RI 5 I I L-3.05 I DATE: ,o/u/,a 3 51 SCALE: t.-lQ.-p. I `I KEY MAP �SKNS NR NORTH Q- SEE SHEET L-3.07 FOR IRRIGATION LEGENDS AND WATER CALCULATIONS. SCALES GRAPHK:SCALE DWA LANDSCAPE APPROVAL ZL - SHEET NO buigrvgnrygprcyl[iNa Cwnh? 4 &i arniwiw�.ireeggn4 t� L-3.05 AJ / I 9ID0 E.TAHQUITZ CANYON s I _ - — - - - - --o— — - - - — — — — — — N' - - - - - - - - - - - �I A5I N ONE ca A-0 ' _ 1^ o I I Q a > I� ,m®_ J Q - l,I E.TAHQ .--UITZ CANYON — ._ — (L � U _ dz Z Z CL F d I I illii — IRRIGATION CONTRACTOR TO ICE USE EXISTING MAINLINE FROM EXISTING METEPIBACNFLOW IIII TONEGAN LOC E AND INSPECT THIS PORTION F MAINLINE FOR AT AND VERIFY PIPE IAL PRIOR T-T-TITATICIN OF NEW IRRIGATIGN AND _ 1. ..•. CONTRACTOR RACTTOR R0.LERYYAL RNETER ON FAGME G FOR IRRIGATION ION NpE INFORM DAMAGE I II I I I 1 IIIII TEOT NY III 01 II11 111 - a � A Bf JtW F ~ w a It Q 1 IL > I I SPECIFICATIONS c() I I s-IEEr❑ 1310 ® I I I PROJECT MANAGER: TM [n I I DRAWN: JS E TANaIITz caurad wer loI CHECKED SK I Fo.l'w -� -_ -.. T PROD-NO RI425 �I DATE: 10/14/14 SCALE: 11-10'-0' 3LL I I REVISION& NR OI I I I UNO� L-3.06 I L L - --- -- - - - - - - - - - - - -L SCALE: ,•-lO' Z�- CRAIKEY MAP — �I SC ALE x^- - - F SEE SHEET L-3.07 OR IRRIGATION LEGENDS AND WATER CALCULATIONS. w s u mil- - 1 - O DWA LANDSCAPE APPROVAL Z�l- - 1 SHEET NO � �v�-••wwazrlcnaca�vt vR ox��oNwK, o,A L-3.06 (1 WA.ERM"AGEME.TUERARIMON: E IRRIGATION_SCHEDULE SYMBOL MANUFACTURER/MODELlDESCRIPTION ARC PSI GPM RADIUS DETAIL LAIOSCAPE ARCMECT^u,W. ]3081 BE PASCO,BLARE 210 RAIN BIRD 1800-1400 FLOOD 360 30 0.50 V 18 N PALM DESERT,CA 91 FIXED FLOW RATE(l)25-2.OGPM),FULL CIRCLE BUBBLER, p60)581 1l2'FIPT. O80)J)3-5815 FA% E-MAIL:ryevpn'Pdgom SYMBOL MANUFACTURERMIGDELIDESCRIPTION DETAIL B RAIN BIROXCZ-LF-100 K LOW FLOW DRIP CONTROL KIT,1'LOW FLOW VALVE WITH 314'PR RBY FILTER,20-5GPM �N//�� RAIN BIRD XCZ-100-PRF K yJ MEDIUM FLOW DRIP CONTROL KIT,1"DV VALVE WITH 1'RBY FILTER,AND 40PSI PRESSURE.3GPM TO 15GPM FOR BELOW GRADE INSTALLATION. + ) /_ VLJ Ll 901Q RAIN BIRD XB-PC-1032 SINGLE OUTLET DRIP EMITTER J 0 O SINGLE OUTLET,PRESSURE COMPENSATING DRIP EMITTERS. FLOW RATES OF o.SGPH=BLUE, 111 Q 1.OGPH=BLACK,AND 2.0GPH=RED. COMES WITH 10.32 •r r THREADED INLET X BARB OUTLET. W J SYMBOL MANUFACTURERIMODEL/DESCRIPTION DETAIL ( � O Z RAIN BIRD FEB C J 2"PLASTICINDUSTRIAL VALVES. LOW FLOW Z O O Z OPERATING CAPABILITY,GLOBE CONFIGURATION. 0 RAIN BIRD 3RC E G WITHCORROSION-RESISTANT STAINLESS STEEL SPRING,THERMOPLASTIC RUBBER COVER,AND 1-PIECE Q a BODY. MV BUCKNER-SUPERIOR 31002" C NORMALLY OPEN BRASS MASTER VALVE THAT PROVIDES LL Q DIRTY WATER PROTECTION.AVAILABLE IN 1^,LL4', 1-V2",2",2-112'AND 3". FS RAINMASTER Hn'FLOW SENSOR I0-1`1_1576 F 0 INSTALLED PER MANUFACTURE SPEC. T ° METER A METER B METER C Q BF FESCO825Y1' A CRITICAL ANALYSIS CRITICAL ANALYSIS CRITICAL ANALYSIS �-- REDUCED PRESSURE BACKFLOW PREVENTER W MO 'MO M3 Generated: 2014-10-0715:99 Generated 2014-10. 8 10 O06 GeGenerated: 2014-10.0]15:39 WATER METER I-1R' F OWA P.O.C.NUMBER:Ot P.O.C.NUMBER91 NUMBER:01 F W Water Source lnformaiion: OWA Water Source lnfonna Water gon: DWA Water Source Information: DWA III � o©©o INMAST O REMAIN EVOLUTION OX2 CONTROLLERS B EX FLOW AVAILABLE FLOW AVAILABLE FLOW AVAILABLE _ EXISTING TO Water Meter Size: 1-1I2" Water Meter Sire 1- W d 1R" Water Meter Size: 7500 Flow Available 75.00 gpm Flow Available: ]5 o«00 gpm FlAvailable: ]5.00 gpm IRRIGATION LATERAL LINE:PVC CLASS 200 SOR 21 O PRESSURE AVAILABLE PRESSURE AVAILABLE PRESSURE AVAILABLE SPECIFICATIONS PVC CLASS 200 IRRIGATION PIPE.ONLY LATERAL Stan Pressure at HOC: am psi Stage Pressure at POC: 0,00 psi Stalk Pressure at POC: 0.00 PSI SHEEP❑ BOOK TRANSITION PIPE SIZES I-AND ABOVE ARE I INDICATED Elevation Change: emft Elevation Change: 5.00ft Ell Change. 500 tit ON THE PLAN,WITH ALL OTHERS BEING 3/4"IN SIZE. Service Line Size: 2' Served Line Size' 2" Service Line Size: 2' Length of Service Line: 20.00 It Length of Service Line' 20.00ft Length of Service Llne: 20.00ft PROJECT MANACBER� TM IRRIGATION MAINLINE:PVC SCHEDULE 40 AND CLASS 315 ° Pressure Available: ODOpsi Pressure Available: 0.00psi Pressure Avmlai 000 psi DRAWN: JS PVC SCHEDULE 40 TO 1-1)2',PVC CLASS 315 SDR 13.5 FOR PIPES 2"AND LARGER. DESIGN ANALYSIS DESIGN ANALYSIS DESIGN ANALYSIS CHECKED: SK Maximum Staten Flow: 2,98 gpm Maximum Station Flow. 900 gpm Maximum Seem Flow' 18,00 lapin Flow Available M POC: 7500 gpm Flow Available at POC' 75.00,pm Flow Available at POC: 7500 qpm PROD Na R1425 ------------ PIPE SLEEVE:PVC SCH 40 Residual Flow Available: 72.02 gpm Residual Flow Available: 66.00gpm Residual Flow Avallade: 5701 ------------ TYPICAL PIPE SLEEVE FOR IRRIGATION PIPE.PIPE SLEEVE DATE: 10/14/14 SIZE SHALL BE 2x dIA OF IRRIGATION PIPE TO ALLOW FOR Crttkal Station: A-6 Critical Satien: 84 Critical Bunch D-1 IRRIGATION PIPING AND THEIR RELATED COUPLINGS TO Design Pressure: 2000 psi Design Pressure: 30.00 psi Design Pressure: 30.00 psi SCALE: 1'-10'-0' EASILY SLIDE THROUGH SLEEVING MATERIAL.EXTEND Elevation Lass: 0.00 psi Elevation Loss: 0.00 psi Elevation LOW: 000 psi Nfi SLEEVE LIT BEYOND EDGE OF PAVING OR CONSTRUCTION. Fnaion Less: 0,14 psi Friction Loss: 1 99 psi Friction Loss: 3.62 psi REVISIONS Fittings Loss: 0,01 psi Fittings Lass: 0.20 psi Fittings Loss' 0.36 psi Valve Celli Loss through Valve: 3.W psi Less through Valve: 1.78 be Loss through Valve: 246 psi - PressureReq.atCnticalStation: 2345 PSI Pressure Req at Cereal Station: 33.98 psi Pressure Rep at Cnfical Station 36.45 psi Q �J Valve Number Loss fortings:Fk 0,01 psi Less for Per, 001 psi Less for Famini O16 psi Loss for Man Line: 0.08 psi Loss for Man Line: 0.13 psi Less for Man Line: 1.61 psi _ #" # Valve Flow Loss for FOG to Valve Elevatlon: OM psi Loss for POC to Valve Oil 0.00 psi Less for POC to Valve Elevation, 0.00 psi 0 - - LessforBaCkflOw: 11.So psi Less for Baekflow: 1228 psi Less for 8 kfi w: 1136 psi Valve Brea Loss for Water Mete, 0.10 psi Less for Water Mete, 0.10 psi Less for Master Valve: 172 psi - Critical Station Pressure at POC: 3544 Psi Cnfical Station Pressure at POC: 4&50 psi Less for Water Metec 0.52 psi - Pressure Available: 0m psi Pressure Avalable' 0.00 psi Cnfical Spear,Pressure at POC: 51.92 psi - ' - Residual Pressure Available: -35.44 psi Residual Pressure Available: 46.50 psi Pressure AvailaNe: 0.00 he Residual Pressure Available: -51,82 psi (DWA LANDSCAPE APPROVAL A�- - - V m rm.,P::ei � wis, e..a ��a&mnn. eHEET NO m�.:are�agmo eW::nf gw4 �a,ep ii­i,,pw" L-3.07 .VT81B42N EOJ4JH�B.ABCfO% AFRBJ HII IM EtlWJIpIO MTL IAIH PNI KR EUWJ RYlDRA9M` BK%NFTXE rtNJ PP®RE PA�rn +oas wl Loxmru.Mrmmnpirx aox+oaeL aammwid es+o>.sLc¢aXroupid d lucLB eL D•�nn a"NmnvRL'.EwrnmwrzH aBYvawo OWES rtAJlxnn ua aIMEUcwacl_ WRVKw pxA® BRroExK.ID BLIg uIB[91 BN FCfl KCIM®WA191 B®IMLAB A PA WANE18[91OlO lff u1HCHIRtl KN KIXII® �,� 41IHIC Ppm TO iIX S]'IY�wRi61AMCATYM wATBIAR11CAra apoTtdrnepana E1JgX allNA YALYLIOX roll Pwn®a �r caauurm LmRm1 DATE. Bus rme mao FAdBar BE,DOOF'T" ppR ® ® BaaRACE VeN]RCAPE AHCHIEOIS,NC. sRURdwEea R®.B BFrtr o o axrEcrwE®seaceraroaETFeR+ Ba1CpA[f ]3081 E1P- 101M)6 WAT(NTIIX.Y WNE A NFlb.® y �� a v�rr.u� lK9pplONlE 9lYEM ::.j!:'.. . . . IAMINEb s WCBAFp i anmE FANH PALM OEBETTT,CA92280 LLMI:ADAPTOR8K'x lanYylul — MAY � (760)568-3624 BWl BBIw AWAAFI rxsHORN E Nd xFffi.Tf L E E-MAL rgWTMn-pdn. uYMNEA` Brtxn HANOB! MITT_ YRTTNO0 AM P.CIIERE lMEnr®xTE IOVLE NOBIIHB RiA _ .�BAHUI S 1 Lit LwDeE ,R@,Bl N BN®9R Rp/ RBI L a �.�' ffA O4Yd BIIffL W el .. IIIII/IIIII Yx cd FrJ PFA B�Ia IEEtMF1C®WIIED ,1 , 1 Plc lKHv MALE W OMPd RJ vn/FAY®IAIE Pf�REXf?LY PR'�TE84TLTlNE iiilx] WRET�H MNF � TCIIE NE MI$N NMro B a41 VKl£ v. Y5ETPL.XRiE /� JNIE O:MLN aXIR1 \` IEMBrtroffPBrul81 grAMYYCFCiTW wMLA LOfI1 FfA wTE .,OL IREFWld EIC aver 2 a MLpeolE msoumarelwRxaaE B6D[Wi rrc Bwmoxur NOTE ••d-:(:i. BOIR'flAL61/JOOEI00.MiBNYPAMA9P8RC10 Wr 4D FWIM� LBINL 2x11A YKY81fYJ16iT MMr //� A x BMB NEA9 ME�0116M$PR11®. ¢J) iL MRNIER MXOLPAMLE9piAQA1DYTMrNi1R J � a ABROJ. lExi roelPW w.M1,ETP l®idp8 ArEroffacvlmL A BACKFLOW PREVENTOR(PER C.V.W.D.) B AUTOMATIC CONTROLLER(EXISTING) C AUTOMATIC VALVE D BALL VALVE E QUICK COUPLER VALVE a Q p ®eurran�rw mnwaoeroznvmwonne w ®w.e ea.sew.eeoxaw sou t sysnawoeavesw.ourx�rxrixarw mnw�ex�a�.xa�awwE pp nwreeseo�wrae wrr.owu:mermn,rrwreruawm• xmo®rv®m..na O ir :a.rn.c ' 1 rxa.xourewa suu�xmeurrwxay.xr (L rm m�g�.R.Rram.wAdw,K.e.,e. 1 "13 .." a veaumartywaewmurKauwxa.arizrvn.® Q _ _ _ __ q axA x�i u.ar xt�am..wur 6 ��,® �u`2 wn@�trM✓m I4� `�J 0- rm.a.�s�va iowuaeaanese'.vaMAcexrtwsuAL MI �� ewaexAmua�rcwxtK. S xsrrtx menaevassuzwao�e ^� eueuxxwfnsu�wwAvuuo.uv�lw 6 uocue Mxlw.Tw.MLL IBTioxGmuiue� 0. xr.y myawgww.mwA wwaxww. � _ __ :�uimnmew RC B^IECUEMR� — meu�urtvAnuos�.suvizomRee ne L ewr. stxiw.twtx rr�� PCSIEMEp811EER ] rai V ✓5 I -.ies Acr xGw nw v:eg Rryv?e la. uu.1n0A3wdvb �$ �Mi vmew w�xw.vonewemae Rm uweaux R>uPH n Par Tm canRDDe n w... ,� r,w�,a wxe C ncYMR 'Am i'.Sn frc YA([ dMe fV<AbY Bib. TC 8]HIII VTH(P BL� as cu"M '. ran d+. z.sw L ew x a n.AS Fro vIc uTBY1 FETI] J n .u..e uee..o�m...uvn uxn P.ewme xw.w�.wrxs.Naw yr III c xwDlm 'Tv . � S fWSanvr railw. °d^Aiaitrr„.v..M�..re..se.M.nV.w�roN.MWwY.hPvad i.rzdd.: B Rwa wmRwrrr"vxaw,.uaa � � PEEERIOMGBIETTY9FD'M111M RWaYMOP(CRCDtl[Ci1'RIN'fIfSFF fp 14N MK/OgN. ra r�rxnw'M�ewwwem�w o•aux. uxwc¢wvtwnsweu�rw•a®r FF BI N d F. ." -_--FLOW SENSOR I TREE BUBBLER _ SPECIFICAn1 SHEET❑ BOOK■ A COVE EM3(OCK TOP VIW MARKEDH* AT)ON SleeurnR TrencAing 4 COVER W1 LOCK TOP IWK®flKTIC BOX PROJECT MANAGER: TM CC JTRC_VALVE CCLOH TO MATCH RffK RDNC K&�QTffi — SCCUSEw ALVEEEYBBCETOBEHET9W % r-mrrx L HAR➢SCAPE (TYP)/FINISH GRADE DRAWN JS ygFgq - r gxg�gR AfRI(:QT2. CLEAN BAC%FIW. - 80% COMPACTION�IB1(ilAce yza Nln. or Per s a B s. sgxo (rn) CHECKED SK d. NON-PRESSURE LATERAL LINE SLEEVE (SME PER PgpJ.Na "425 CHART)/NON DEMURE LITERAL O5PRESSURE MAINLINE SLEEVE(SIZE PER CHART)/PRESSURE MATTILDIR DATE' 10/14/M6. CONTROL MIRE SLEEVE AOIACENT TO MAINLINE.2Cz_I KHSLEEVE. ALL SLEEVES TO BE SCH <0 PVC. EXTEND BCALE' 1'-19-O' N UE)ESEIFO -1 VALVFCM e SLEEVES 12' BEYON➢ EDGE OF HARDSCAPE ONCLIDES HALL VALVE,100PE58 YPLYE PNessuKF XFcuwme NRCONTROL KBOTH ENDS. RECWIMEP WATER SLEEVES TO BEREYISION9. . PfE59/E HEQILATC{U wsxiwc wo cAP —Yu uifJul uN¢ r d a Y MINIMUM S"-dB" OEPP( OR PER WATER ➢6TftICT L vu SF$TON� STANDARDS MHERE APPWCABLE)YA%rMH P Id PR[PIANTW.SP4:ryC DM PUMTIxP Ill6XD _ v 90S COMPACTION REMUTHED- SEE SPECS Q- ��� O TRENCHING/SLEEVING DETAIL Q- - ¢mo EMITTER PIPE SIZING CHART NOTE. 0- K DRIP VALVE TREES, PLANTS, WALLS, SIDEWALKS AND PERMANENT STRUCTURES - L RAN wARBxUT W>1�9�1Aw - 1/2 PIPE D TO ISO GPH mR¢PAul iauxR OF ANY KIND SHALL NOT BE PWATEU INSTALLED OR BUT IN _ veto�•w axcE A� .rNw ��� EGWJ N0L1DRAam 3/a" PIPE IBI TO MO GPH M`WD AND USER EASEMENTS OR RIGHT-OF-WAY WITHOUT FIRST 1 PIPE NU TO 840 GPH BMctl1DN 1'N TYP.� pmi BMy OBTAINING AN ENCROACHMENT PERMIT FROM CYWD. [OIiBIr 1E®UfU Bien NT[ [OR TYwm WRN 1-1/4' PIPE 841 TO 1440 GPH (16FND�POR se[ol P419X CP.N¢ Q_ r 6�Hb�MA9ISAWDQL RExl�i MWMJ_A:B u�Y¢ � � DWA LANDSCAPE APPROVAL - - PRpA91EHE0. 1. INSTALL ONE EMITTER PER PLANT(UNLESS OTHERWISE NOTED) AT➢P Ana�priswreieneyma�wewypreyn 0. W-Ec en IDIL SIDE OF EACH PLANT. " ium "' �'" °m nvw" SHEET Na r>a wEe real aFaE ".II ° -I .rl wiW�7reayicAw ea.,rv>. -i 2. DUE TO THE HIGH SHALL OF EMITTERS, ALL EMITTERS ARE NOT FOR R 5 A recerixo la As.YYwrA PvcuiaL UE -1 - II'- rowmmxan °euown amnx.em.�.nxx.PP,.wm RESPONSIBILITY ON PLAN" IT SNAIL BE THE IRRIGATION CONTRACTORS row BIIBBILB o0 ea Rynnor.w.y nma PA+.a.aM..a 9CERAX Q9� i y III-1;- ME ACTUAL N MB R O."SULT WITH LANDSCAPE TECNTTELT TO OBTAIN RLPI-BVBBJtX UESrJI. ice genunwlnwlmin own �E 0. RW Bc lCld gMrcp RyYHF% 1 s THE ACNAL NUMBER OF PLANTS FOR TNP,PROTECT ..n.a is"ma nu an I —/1•OO RS IDPFlBL IB�BDVALR -I -111.I PUS'D UATDN I6.N P�IACA iBPGAw TMLN a^nwx'.^eMpr^x Rwn DWP W L� T i rvC ilER�llIIaBTrrnTcxeL S. IT SHALL DE THE IRRIGATION CONTRACTOR'S RFSPONSINII.ITY TO AT EDLL OF PUNT HT RL WIIWM Vr 1EAOV.YB ACCURATELY PIPE S1ZE ALL EMITTER PIPE SIZE CHART SHOWN ON PLANS. is wnirP xnxnrcA¢Nr o[warvsx* J DRIP EMITTER L END SELF FLUSHING VALVE " M TYPICAL EMITTER LAYOUT DETAIL N TYPICAL TREE/PALM IRRIGATION DETAIL AAR.,Y oEVELOPMrxi arP�irF.r ocoAa:.E.r '... LAID3CAPE ARCF#IECT9,NC. - — PAUA OE99R.CA 92280 QW)%8 624 1 C/B07 TC,f-SKIS FA% , E-AIAL:rga�rgs-Vdcan co a CV E160 E TAHOUITZ CANYON � s3em TOE 6 SLOPE TYP s: 7�1 I a N Eu f ... OT 1i x i ` L[H LtF ENC u ENG iLOFE TYP-a I]'BW Ey Z 0 z z ziL a � I I UiL E.TANOUITZ CANYON —� 50� TOE GG SLOPE TYP. n > w 1 I Afll. v X fl O ccc xN BTH xupx�wx _ I]'BTF TOE 11'BTH` Ci SLOPE TYP. TGE C4 SLCFE TYP.G�!II 1 W w m 7I w a SPECIFICA71ONS I I I SHEET BOOK I PROJECT MANACEER; TM I I DRAWN_ AC jE TAH ITZ CANYG WAY CHECKED BK o E.TAHOUITZ CANYON ul PROJ.NO R1425 4B/L0 TOE 6 9LGPE T,I,. 4sID UI DATE: 10/14/14 O _Em O �x uXx Mx MX Mp. MX .L� LLi " '� I I REVI9KNJS NIT — — — L EMG „„ E I I ", rG ` NX. �T vd —1— -- - - - - - - - - - - - - - - � — 5 00 BTM LEF ] BTN KEY MAP m o- r I DWA LANDSCAPE APPROVAL 0- - '. ""°vn SHEET NQ uzYlRMwcamryl TREE NOTE NORTH ALL TiEE3 TO BE aw c LEPfIER LOW BRdNCINO WITH SDE BFiN1C1N0 SCALE' T'w TO RBLV4 PEl1 AI¢ONA MIRB(T 3TAIDARJA QRAPFiIL SCALE _ ., X.MxowA L-5.00 - - SEE SHEET L-507 FOR PLANTING LEGENDS AND NOTES. m m v ff 0 =M wkTEFMANA M[Ni PAHivlNT E.TAHQUITZ CANYON smm <-mm LANa9CAPE ARCFRECTS,Nc. j P�DES CA 922W E Is BTM I®BTI' WIE we I urw s a "!- Mu va VV// h L 1 EIML�tGe'9Qean Mrw xx M ss 'rc rn I] BTH I W S PAD r Z Q Q J � U a E.TANQUITZ CANYON Z Fr 4$Epi M3R0 1<C•D L MT It'BTU In, 10'BTM _ r Z O uu 'aP,.O O - ux �- - tiR •Y' `E [ a1V �T[c ,-�_ w'Q rtE� NE3 - -- - J Q N5 c , E/ tE MEP x LL EC B I �I U � a g I I I 9PECIRCATKNJS I II. LL I Q poem alzm I ( I I BHEET❑ BOOK■ — w'eT E.TAH-40UITZ GANYON �I 1 ICI I �a�MANAGER TM \\\ J ` AC Q QI E TA�ITZ Ca Yr WAT w° CHECKED, - SK I11 o c:. u PROD.NO: R1425 DATE: 10/W/M SCALE: 11-10•-O' II I REVISIONS: NR L-5.01 I , n= aI Norm 7 SCALE: T-,0• - KEY MAP �� DWA LANDSCAPE APPROVAL - TREE NOTE SHEET NO: ALL Tflff9T0 BE SNBIE IFs➢Bi LOYl BflNICIM NifH SOE 9WICINO muw�N=xm�a•c�m. TOIBAUi P91 AfYONA M1R9ER(STMONP4. vso-e avnrterwar.* es.oM.a.wr..aw SEE SHEET L-5.07 FOR PLANTING LEGENDS AND NOTES. .rc:e.xm..n.�m:n.n,mw 'r^I w M � : . . L-5.01 WI E.TANQUITZ CANYON Em 3l ly Yp ry - w � t � LPfDSCAPE ARClffEC18,NC. O wR p rtwrtrvwp PALM osw9 (•CA 9E=W R wlPl O M EUG +y .1' w uvx R px � (7W)SB W24 EAIAL+pPT9aY+doom N R'aiM a5z rvp wR wp wp m x � Ewwa�x wx � Ts wG Ew.,T. AG H ..Qa-UIT,Z o E�C AoN�YON 3 6M l aTun 6M ®•BTM - _3_TI ID W 14 m EBoE� o CIE aI J � U P4D (L Cl) �<,BT E.TAHQUITZ CANYON I Z O z 37ypg �13 BTH 336� Im aTM BTM . EXISt ___ _-__ G E.TAHQUITZ CANYON VILITY Z Q �. ee me x. 3 ns b VuG J TEc � J U Q w ww ; w H W _ a w a SPECIRCATKNVS T - - - - - - - - - - - - - - - - - - - - - - - SHEET❑ BOOK PROJECT MANAGER: TM DRAWN: AC LH ty CHECKED BK PROJ.NQ R1425 •" } Yi LL E T6 17Z c<NYD WAY DATE: b/U/m ------------ SCALE: r-u-O REVISIONS Nrr I ► �_ "c I NORTH LE F I SCA r-NY _ - 1-5 -0 2 ORAR11C SCALE- - - - - - - - - - - - - - - - - - - I v a � — KEY MAP I DWA LANDSCAPE APPROVAL - -w,�naa .,.. SHEETNO= TREE NOTE N1lIT0�4NYE EAEERpGN4NCYfOMR1 LEBPANCBq . _. �x,_,..� .�a wM�a.w,�x.�. L-5.02 ,pwpxp.,r�� TO R3MN F81N6CWA MR9Bfl8fAlOMCH ..,,.MMnD<nn. �. SEE SHEET L-5.07 FOR PLANTING LEGENDS AND NOTES. owa cwx vuciTSCRMCEsoev.u.u[ur 11®0 30$0 .TAHQUITZ CANYON 19 I •,1`\ V� a No MR X Q, aM k 9 Zp R E PAUA DE531T.CA 92280 Tec "XN R " u - OBO)588-3824 u uxx yM ,nY' TEc / I 1�607 T/3-56L5 FAX v M ue u es EW'T9a��En I � N W a E.TAHQUITZ CANYON IL 14E0 11 5 }6ID0 b'BTM r �/ C i U � V O W G (I �E � __ G• R Ery _ srs G M \ Ow Y qP LZ _ cc I I I � � wl E.TAHQUITZ CANYON I� d I,'STu i} BTH Q 0'BTH 1l \ ill -- �` MR �i vd _ _ P O i1•� ML NEP wa a fW O �\ uL / NR E� �/ �x P M / �� vF y MFt F y M N � Ni Rry � u O J I -scv�Pnra I SPECIRCA710NS Pao QI 7 &iEET❑ BOOK PROJECT MANAGER TM DRAWN: AC CHECKED, SK PROD.NO R 5 T — — — —— —— — — — — — —— — — — — — — DATE: 70� 3 REVISIONS IT I E.TAHQUITZ CANYON - I �I y� H A_ NORTH _ f� 1 I g BCALE: -GRAPHIC SCALE �- I I L-5A3 L - - - - - - - - - - - - - - - DWA LANDSCAPE APPROVAL �- KEY MAP w•�.e. s:a w•:w w.x,�ae.w••==P. m.� SHEET NO: TREE NOTES ,..P.....E..:N ALL„1B53 TO BE SNf1f LEABHi LOW 9NNClNB WiTN f�E BPANCIfq MM�� r;,,. .. L-5.03 ro rreuN fs AIQaNA worm 8LAN3NOS .�=L,,..P.,.,.:«�m w,. "° SEE SHEET L-5.07 FOR PLANTING LEGENDS AND NOTES. x w,TEa wxwEUExT OEPv.RTufxT Es DEPMTMEN! Li a ]3081 ia-PA ,SUIIE m PALM DE9 ,,CA 92280 (7W)58 MM ENAL:TAflYp9-PdrAEn E.TAHQUITZ CANYON 3 I N mmm w� N I rn EM .% y R. Exl�, Z if <— LTI�ITT z �I z z 3I � z O a- Q � U a E.TAHQUITZ CANYON I Id BTH IS Ir 15 N W60 I,AS rec �I O i'-� -�• Exc -{1 �, -- - �r .P - ew ! xfn xe i ra Iqq LR - �� -O �x. R� xP.v vr., xe a R ll' /.\ ^5 O \� _ {:ua -.� N!{-✓� -MR ZfR I_ uEnry i Eyi 'u •� N d 3PECIFK:ATKNAS eTw SHEET❑ BOOK PROJECT MANAGER TM T -- - - - - - - - - - - - - - - T DRAWN: AC II CHECKED: BK I I I PROD.NO: Rk125 I DATE: 10/14/14 r SCALE: 13eo uem CE x LLI E,aorz ca.a war ,31I fT EXIST. UTILITY _Z VITO, MI SCALE: 1'-%1' n - UI I CAAPHIC SCALE L1- - - �L_5.04 I �- (K Im eTu I —— — — —— — — —— — — — —— DWA LANDSCAPE APPROVAL 0- - I `u KEY I MAPM `; 9 :' .°° SHEET NO TREE NOTE �IIR1" A P�TpBEBNOE EADE LOW9WpNOW H�EBPhV N0 w,. xa�..°m T111, L-5.04 SEE SHEET L-5.Q FOR PLANT)NG LEGENDS AND NOTES. vuTEa xwxacEUEx,oEvnR,uExT DEVEL E.TAHQUITZ CANYON Q00 I 3 n •,1`\ V� LANDSCAM AflCFRECTS.NG ly Y.Y181 P�A PA9E0.3UffE 2p�- QW)W-3CBPC92 EW�`�"P" X rca uEP"E u ua Ev ER B RXN_"wx ed I N 7Bo7 TJ3-5 FAX . � � - � Q EIAAL:r9a�rtAydcan Of 9 E5TH u ', N co I E.TANauITz CANYON Q a EkIST 12'E,1H id'.TH T.T. :9 6TH UTILITY / IL ,.A [NL oEUG EW N R` EW G .�. 45 lEG NG •�T W O V �r R Ea �, O ENL O � � .� � � �� .� W _ ,� � Z � P Rn uRn uRX ��/E]I�� �R x ''.\\ N E — �� NP — r 5.30'E. IL� L \ 4 ���J// EN Xg • uFw vR x nB _ d a wi 5 d fn H T _ _ __ _ __ _ _ _ _ _ _ _ _ _ _T U I W I I I w w N I I I I Z / Ew SPECIRCATIONS RD SHEET El BOOK OR. AP E Td�1i2 CGNTm WAY Z PROJECT MANAGER: TM I �. ENc ENc _ ' Co IzI aI DRAWN: AC 21 CHECKED BK 0 PROJ.Nd R 25 wI UI I I DATE: X7/74/14 L-5.05 I SCALE: 1 - --- - - - - - - - - - - - -- 1' REVkSIONGE Nff I � KEY MAP UNOFTrH o 0 scALE: r-ro - ORdPHIC OWA LANDSCAPE APPROVAL n- - TREE NOTE: :,� ,:o,,,,:,: SHEET NOR nu TrffsTo ee sfoLe tenet�av auw.�-No wTm me auxuafo °�"w.�.�micmwwmi cm.�.m�essz�.:.�,. . To fBANL FBi Pf@IXi>M N 'BrNDAfC4 lm— d—,RUSBRRanxe.m+ay.n"ne zPP ARR wro°e i. L-5.05 SEE SHEET L-5.07 FOR PLANNNQ LEGENDS AND NOTES. WATER MAE�EWERT�EEAETWW owA nrA OElELOPNEMTSERVICESLFRRTNEXT E.TAHCUITZ CANYON 360 IT 6iH '® 67 M u'Gi.i6¢0 12 6Ta 9� - WLBCAPE ARCHIEC ,NC CM)ERf��9Y260 — � �"`xR 9 erw •3 rr. .E � P ¢ ; >�`� — O80)7]3-5fl5 FAX E-M iP'i9o-Pdw xe S LPiNB P,o I N r r II Q I a a mm r J cai E.TAHQUITZ CANYON 4E — _ O d� ' d' a e EAR _� rzc Z R I MR I EW O 0- uRx I IL N a F= - - - - - - - - - - - - - -- - - - C3 I I � ' I I I I Q I 3 E i4uOuiiZ C wn* /OI N R hl �I 11 tt 3 I I SPEC CATIONS NI i mi SHEET BOOK PROJECT MANAGER: TM L-5.06 j LI DRAWN: AC L- - - - - - - - - - - - - - -- - � _I CHECKED: SK PRO.1.N6 RI425 KEY MAP DATE: - — Z/14/14 I � SCALE 1'-10'-O' N [A: r NO _ _ scALE: r-ia TWA LAN)SCAPE APPROVAL 0- n - � TREE NOTE -__.. ..,aW..,.:N,a:a.ee.,; eaaan, .,.�;rc SHEET NO � O11 TilE£9 TO PE snn.E LEA➢Bt LOVl9WltlfiG vmR soE ene>acErio �•R�••,-R aR-•,��na,�...1. TO RJMN PBi ARZIXiA NIR9Bf!SfAN>OfOA P°RrvN of nvax...gq owx a.nm..mvvve.vx aRR,v.aim R Ryaaeuva eagw.Y.a; ercr°amun°e my uam Re mrcn a:avn - mvn L-5.06 / SEE SHEET L-5.07 FOR PLANTING LEGENDS AND NOTES. "`=aN'^•^o.mm EkM—GEWN:ce EN± OW�Ppnn GERE EaPUExi sEF'ncES EE PaN�uExi PLANT SCHEDULE (SUNRISE WAY TO EL CIELO ROAD) TREES BOTANICAL NAME COMMON NAME SIZE WATER USE DTV REMARKS CERCIDIUM X DESERT MUSEUM' - THORNLESS PALO VERDE 38"BOX LOW0.2 11 MULTI-TRUNK - LANDSCAPE ARCHIECTS.NC. ]3061 EL PASEO,SUCTE 210 PALM DESERT,CA 922W XCHITALPATASHKENTENS15 PINK DAWN PINK DAWN CHITALPA 24"BOX LOW02 29 MULTI-TRUNK QW)588-36M OW)T)3 AI5 FAX L:-MALi rgflY(y-pGCOrn PALM TREES BOTANICAL NAME COMMON NAME SIZE WATER USE OTY REMARKS 11 WASHINGTONIA F1UFERA CALIFORNIA FAN PALM 10'-14'BTH MODo.S 41 SKINNED.SEE PLAN • FOR SPECIFIC HEIGHTS. N WASHINGTONIA ROBUSTA MEXICAN FAN PALM EXISTING MOD0.5 21 VJ W WCIO SHRUBSY BOTANICAL NAME COMMON NAME SIZE WATER USE OTY REMARKS 0 AS ASCLEPIAS SUBULATA DESERT MILKWEED iGAL LOW 02 92 J EGC EREMOPHILA GLABRA ESP.CARNOSA WINTER BLAZE EMU BUSH 5 GAL LOW 02 52 L GAG EREMOPHILA GLABRA'MINGENEWGOLD' OUTBACK SUNRISE EMU 5GAL LOW 0.2 121 Q WV EREMOPHILA MACULATA'VALENTINE' SPOTTED EMU BUSH 5 GAL MOD 0.5 112 Z HP HESPERALOEPARVIFLORA PERPA' 6RAKEUGHTS BRAKELIGHTS RED YUCCA 5GAL LOW 02 305 Q LI IAGER5TR0EMIA INDICA'OWARF PINK' DWARF PINK GRAPEMYRTLE 15 GAL MOD QS 5 MULTI-TRUNK U LEF LEUCOPIYLLUM LANGMANIAE'RIO BRAVO'TM BAROMETERBUSH 5GAL LOW 0.2 11 (n MEA MUHLENBERGIAUNDHEIMERI'AUTUMN GLOW TM UNDHEIMER'S MUHLY 5G41 MOD 0.5 188 Q JQ- MER MUHLENBERGIA UNDHEIMERI'REGALMIST RED DEVILSSHOESTRING 5GAL MOD 05 93 Z O Z MRN MUHLENBERGIA RIGENS DEER GRASS 5GAL MOD D5 431 Fr-- NB Ni BLUE NOUNA' BLUE NOUNA L5GAL LOW 02 52 TEC TECOMAX'SIERRAAPRICOT' SIERRA APRICOT YELLOW BELLS 5GAL LOW 0.2 75 '�1�/1 L' J 01) VR VERBENA RIGIDA SANDPAPER VERBENA 1 GAL W LOW 0.2 81 U GROUNDCOVERS BOTANICAL NAME COMMON NAME CONT USE Ci REMARKS /R a ` 3"-5"MEXICAN BEACH(BLACK) SOUTHWEST BOULDERS A STONES - 5,I47 SF Z Z .4"-10"ANGULAR COBBLE'APACHE BROWN' SOUTHWEST BOULDER AND STONE - 1,213 SF D vK i {;4"-10"ANGULAR COBBLE'APACHE GROWN' SOUTHWEST BOULDER 6 STONE - 8,498 SF MORTARED IN PLACE /Q 2 0— Q 318"MINUS DESERT GOLD DECOMPOSED GRANITE WITH 11%FINES,WETTED AND ROLLED TO A P DEPTH. D.G. TO BE PLACED IN ALL PLANTING AREAS EXCEPT GOBBLE AREAS. PLANT NOTES: D w 1.PLANT QUANTITY:List is provided for the convenience of the contractor/client and is not intended for w accurate bidding purposes. w 2.PLANT ALLOWANCE:The contractor shall provide$1,000 to be used for additional plant material not indicated on the legend which may be deemed necessary by the landscape architect and approved by SPEC (CATIONS the owner's representative,such plant material will be specified and field located by the landscape SHEET❑ BOOK■ architect. if this allowance is not used,or is only partially Used,the unused portion shall be credited to the Owner. PROJECT MANAGER TM 3.LANDSCAPE ARCHITECT: Shall field review all plant locations prior to planting. Plants shall be ORAWN= AC placed in their intended locations while still in their containerslbozes. CHECKED 13K 4.UNIT PRICES:Landscape Contractor shall furnish unit prices for all plant material and irrigation PROD.ND Fda25 material when submitting his bid to the owner. OATS: l 74 5.WARNING:Plant material listed may or may not have been approved by the Agricultural Si 11-1O'-0" Commissioners office. Landscape Contractor,please Contact the RF/GIONS ITAgricultural Commissioner for approval. Plant material not Conforming with quarantine laws may be destroyed and civil action taken. All plant material is Subject to inspection at the discretion of the A, - Agricultural Commissioners Office. - 0- - 6.Mounding:All mounding indicated on this planting plan shall be considered decorative,and is not Q_ intended to be a part of the site drainage system.All mounding shall be installed so that the toe of the mound is a minimum of 18 inches from curb.Mounding slopes shall not be sleeper than 31. Q_ _Q- TREE NOTE: DWA LANDSCAPE APPROVAL - AUTRaaroeESNrx.E LFncEn Low lliNiClNO rmnsce lNJL'INaI� Tu<,<w�i.•.e<n„�..<a _ r�.w.�....nn TO IaWt r91 AIRONA H.R513w SfAlDNU9. . SHEET NO Momr.larmabv+Im WoiRr.,n .v<um'm..apo�=•.na user re�om,bP..r.*­. N,aeev;,� L-5.07 I ]'.i081 A PASIIO.WM W PALM DESBTT,CA S 060)5e8-362t 176p)]J3-:3 FAX 9 a °Rn� EMAL:RpaYpe-pdcan o � �6 Cuf aFTaPffC11LW CF Bf.VR:D.LLSC®B!HMIBiRR ff fll« N p CNYIi�Cfl EiAIAL PATNJ 1HIl(ND fIXE �w (R}T By T Bf VV V) � erarm w LCOfHRE Pa.E AIL NRTM1E n.nrns soil Q of asxw.�®wm( j T p INTSC 9Cl CKY i 1 P ax Icc Pan 9.6TPt]fK118 CL uN W1TAE aaL N �wATE16141 Y3 KHlIX6 MPgUMB RBI tlNC£ J Q 1 Q RNIlffAl11LT/dT£ ((�� IRLbRfi®IMThE B.Y Q RI.M flI RT\E9 A8 MLE A91Wf6LLL �9:l MC@f.HT WE! RNlf flf CEPM CF I✓D�T&LLL O Z M1NII flIAB CfB AB RW!&LLL NOTE J r tAU NATM1E TI✓ff9nwan®roes u�P�w,��L ! Z C� awcqu®rnm N..Trvt=sa. arir -�-- nwrvrt zlarawcF rooT aui z aLo-movrx,Pas ENNL ee Z ftlNl®N1111F6�II61 TORklB Ip1E.9fANE CETAL dLY RRYE9 ro sa nuo nwz �x a V a DOUBLE STAKE TREE DETAIL SHRUB PLANTING DETAIL B- za aoCL PLANTING NOTES D e -PEp 0.MIfO.WIIRTMxxx0.[®lV:TE¢TwBBLFWwE )[ "�mmwx.NaQ x "i`®ranr ow.orn T auorN'w`MoxowuoN mnErow+x.rovxa.'mwon�s..e. if 2/3 -Fwsw wiEro EPxrvmw wo°cavEmwwn x �l �wToe ®,am�ire e�°�- .oMmn%w�w�wunaxuE L ceaxxxxxne ue Laf19l xL rtwn®ue.er�roavvcmx � r naro�uAu�rroio�`a'�""� J xN.m®xwor"�'.uc�rNExwx FF �V �� .� 1 � `�,;`o ,(/�`��` rffn ro.xam acnvp�.oemmwro:xce wTmmff nrn® U H<w¢artw vLve T �•��j�•/�V`� ����rar`ivao�.rrnx�w�"ra�nns�nree� /{�"`�"//• 9'JB GAPOE ����4�N.xY®IfR106TE 6ax Nf ��uarow_� (` �_ J�� NOTES �wxorvxxxsaam:mw�rsnroRNma vrxrw cx = ¢ �xM.rixoxo.w�,Axw�Mox:.Yww�,a m a -eLRI eoLLom A MNM.M of 11�rts H3C�1i eaow cnADE. .,+Mx�'x,� -BOLLOHi 5�4 TO BE APPNOX EOUAL N ALL gECTKNB. ° a��.. xru sartwaro SPECFICATIONS -RACE AS NEAfl A8 APRICABLE To PLAN EXACT FINAL uo.omarvxo®umenaxwbro Nxmr LOCATION TO 9E FRO VEH"®9Y LANJ9CAPE ARCHIFCT x:oryµ w�TanE wnxT�x NUFxonei xNN..a..x SHEET❑ BOOK■ BOULDER DETAIL PROJECT MANAGER TA �a„e8^ 9Ag aadA DRAWN AC g CHECKEQ BK /p-g'8 TTAp+wniel-iETn[ �� ° PRQ).NO: R1425 roy ro wNlE etAYrttl - o^y°o�`° dopo� �o °az° I DATE: 10/19/19 SCALE: 1'-MI-W REVISKNJS - arC Y>, - � � Ilp3R1®INThE 5-0'Cfl LEEK S-0'tlI LEBB '., Eff NDfMf P.WI I _ _ HJ.a'T fl.LL '. W _ oPxmT eN.L �: h �� �, ]II-11 I r-111II Ilf ' PA`+gll DWA LANDSCAPE APPROVAL �- L+EAR goer aans(Le sz er mx wA. - - � .^I. . SEEP flbl'Cfl ECVPL NSfAu ,,,,,m° A � SHEET NO: PeIMw.Fnc(vsszsEca-- c.am"°m.w.w�riGaw�a�e No e. t AU XATM1E T(69 A10 s°Ni�roff NDTE ix. e.mrq.nax...n.°Amm wPm..lm aeeuumwlm rwmE aeL arzr. ,m°wp:`�r.T:«..Rw.,,xx z9BTflCR'.411(®9KILff FOOT QIPTR 9WL NJ9TAl18R CN n knm°:muleen Rvr. 1 RANTED YSM F81RIIB1 TA9Ef9 PFa.ECISNPPLM DE9En.fEA CfECRVE OF ...ox:.�nceme nm wu xx� mmv.n:.°wnnn L-6.00 (yg g[(a) CT'CF PALM DES LANDN:APE WN4C81 w..EN N.NA�EnENTOEP.NT.ENT PALM TREE DETAIL ROOT BARRIER DETAIL x. DEVELOPMENT SE CEso PANTNENT f Y N ! Y N N Y N Y N Y N - O • P ' P Y f Y N ARAI yR g t A �� Y N " IN . A 999 �_ � se� �• q€ f �� F e �� "€�� �`s� � �s � d � ' �$1; I ' 8 A b All xi $ f a s ^ y TV a43R€ �€ g 'k $a a q$ A VA _ > Y .6 2 €' £ V q € s § y§ g 9 A$p gg 21 $$ F �sIT a€ o a€ a I € q a m b '�€ _ Cz Y f € 7 € s� is- OR€ R� 4 a" sa€ $ g = $ »� � a� a Rqq> R � $ $ R a ' w € a§ �gm sa ' a 4 $� 0 € gz aqa 4 $I' � H" ga Zia 9 s a , $ nI ! P Ili 'I�9 yya ix, as a € � �a of $fi A € � q € n a :" € aq V c ' f9 � >a r€ a ss x $ 4 " a € � s 9 f �� s s$ sa 3 .� $ F 5 9 € mA q z = a as s q a q F $.€ a D r N } N p a P v P Y t - o '�" !gig e '€q yy€ § s `` $ € 8 s� ; g$g p! Sp a q €$y gah R y @ I� $ 8vA m fad 'S �" 445f : gEp4 RE 4 EE A L = IR 9 F 1 01 Pill Q N n 5y ££ p spp s € i .a g33 6 _ pp ®ag gg a 93g p zyasa % " .1 g FVF4 9$ �> n q P> Iq= F IT ll 111"ANIs HH$ 1 ip = a " Ii € €��� q � � ��� E a gg it p Q � Y7 3 °s $ q f F 8$ " w� P� s ag i" i " 5pr m � � gp �€ a i • 3 d APR € pp _$ €i v 1,11 I g i€ gels Ipm al, qi y �p tl: Tg96� F g G�� €" R E� a �, � 'a R Qe9 S $� 99 a EE gig Nu 4€ 1g q q€Eg `E{ N " Tq 11 �' f 2 $ $Mfjl a `� h� €, > F 9 € Hai l �N8 �e z N � f T No z G y m 1 II H 5 5 O q z /✓ T z Mal > f p N iF m Q$Qi T_ ° aS P /fir l �- k F e3 z z (D z , ggg o s 7Y! W d N I 9 £ gg am c L Fm e4 �> m R @ YN 9l» I~ r h z r Y m L 4 r m f tlf gg 2 Y t O am EA; N m D >1 1 .� SFEET TrrLE, ELECTRICAL NOTES, LEGEND o AND DETAILS p °o TAHOUITZ CANYON WAY PHASE 2 k s ■ PALM SPRINGS, CA y 000 0 � 8 � _ aaaaaa $ com Y , I A- 5 A- m gA O g � � � �€q� � � m c➢i m -E 2 S 11 AA Ya aaaa �;� aaaa Cap A5i Ai 9 € ,� A- a a� A�,l 4 �_ lit 4 1 t RAJ 'a N W F m a�@usa n�$xea S 3 n q ? "d8 � 89n ? A a 8 cP Y y % 9n 8 '1 + .A�z FA�z 3A�z AA�z AAA v F $F ap FF a R €$ F� 90 gg aQ a e3 p - gi 1 wv.n. ___ ac tee: B - — ', P SHIEUr Tom' m ELECTRICAL SCHEDULES � PROJCCT TAHOUITZ CANYON WAY PHASE 2 ■ PALM SPRINGS, CA y 1 PASM ARE 219 PALM CE®91f,G 92M ', 1 Ei.W�19•vpsyiean t" n N ie, co F7 vIL m Ci �5 � 3 z 31 ; I Q Z j ua5 U U � > d co a _�. � I7 1,G„ t � - 1 � 1 pOSi SFECF9CATIONS 9HEEro e 0 PROJECT MANAOEiO TM DRAWN FR PRO).NO R1425 Ins SCALE �> wr ---1 .' _ REvt91oN3 rTr Wx 1-WC -} ---- per-I-wc p,_, lot,) ---- I KEY MAP - I A: _ • �2R,d* • BFffT N0 UOFrrHNILM KEYED NOTES SCALZv T-V E-2.00 �i cxawc ix arix wu aox♦,oa a saecs nr cew ��l3C.�LP � ,....n rmtssru wcr.,wn wro�r ua�rac Lcuvwz aru �=�-� m n.oa Opia ww aa�asrc (�iuwasrE,c mx ua exww -�p��"u"� .�„"I`�� EL PASE-q SURE 210(� PALM DESERT CA -�a Qc - w�:.. ?, ♦' _ 715-SMFM 01 ti+fj {O F.�I�"V"A I /Y {�- t, wXt I/4S wSt 11e. L _ �� J wx +je - AIS31 fTtf "y cq W IL IL Z Q 2 � U Z Z CO 40 fAq- _ XX v n- wx .:r 04 Cc ,-47 -. Awl gj J 0 T T 9FE E] BOOK■ FROJECf MANAOE310 TM DRAV" FIR PROD.NP F44W yRfi3^ DATE %1/74/74 n` --- SCALE: r-w-v WAGIMO - - - - - - - - - - - - - - - - - 1 KEY MAP = .. - F � s-Eer1} Na KEYED NOTES E-2.01 Oi mmo[v w.e[nu eox.,v,o a sacs...ua OAAP3IC SCALE .�,.,n rmcxr.t wunax wn.,rat ms me Icc.,wxx onrrl ��=1 o a zra+n.ao. Ocam.cron ro rwoMoc (17 s•a¢.c ran.0 eo.xc« wean rHw wosaw xoeoxes x=�I�• �,�e�� R B.P J rALu ter.CA aazeo NX fc •, .: NX rc OW)gmFAX EMLL°RG��pwW-pd� N W Z Cn < rF4,°O a0 pCL IL 1 I �O. dOO —;m z-v.�tz�_„•.,.!--. J NY'% '#III il -1—TP�i�$) -- ___--X,�-° AJ9 f L_ Q 'Q• NX Ib NX It __ _• �- NS.fc mj 1"c NX Yc , ^ N�S 1'C I Z I Z ta a "q 1 9i ppi� s loo uv IA/R .u.a 'My " _ 6P _ _ J 1 1, NX 1'° U N's 1-Ipro N'S Pc 1 (T19) I W 4 6 .,Na1M J W. ccl We W T LQy ' � - :� BPECFK.ATIONB '... _ _. __. ._. ._._. .. ...._...�.,. �. SFIEEr0 BOOK FFK J. T MANAGER ThI DRAWN FR �.. XL NCD w { ��J - J- - - - - - - - - - - - - - - - - - - - - - - - � PFiOJ.NO: RM125 �(M) - 1 _- ��� KEY MAP �� p '� LJ REVIeICN3 Y Q- n • 4AW'R QhnIN` SHEET NU ®_. '. KEYED NOTES NORTH o �nn�w—��«RT dR�AFESES �T� acAL9r la E-2.02 MST&LCC W♦T rt LM S OEfuL ABC .w NL n l On � O Z ca+mRc d ro r Ip r smc im/LL alula 1 �—' •: dWYIS YN 0105911c ROI➢WAK m ! O O O Foreem rf _.� _ O] E%SMf WPoCI.nd MM1FW£RS TO H R m"RED . L , - _ MS t IICcPALM DB9EFrr CA i I UIM 7:. -07 - - - El6Jl2lY FAX •. _. .. NA 1-YfnY 7 i -__ I I �¢�___ __ _. _— MS 1-1/41c �+ Min E�UIE 7tP L �I N W I z co a J = {{I IGt ti Ms I-C rr z co a J I w a O O O T �a1 2 9,e d0 L - — I1 �_.. _ - NA fc I NYf I-C NA I'C " ' b NA 1C Mx IT SEC19CA710NB SHEET❑ BC"0 ` PROJECT MANACB# TM MOO!, I CRAWR m CpE VL PROD.N0 R1425 DATE 10n4/14 SCALP f-a-w 1 1 � — — — — — — — — — — — — — — — - - FA 24m1�" arEEr Na KEYED NOTES NORrH�"6 T", E-2.03 Oi raoln¢ix. wE em U TK a aL a c.w1 CIRAPHC SCALE _ i.�,..i vmESK aural un AT ru 1N[11¢Launons oeruL ]69QiELW V O O I Y OMIRKM 10 GAOMCE M Y LEEK! ALL 9R . 9 .o OIdIl51MIFN R344110MWnYS 4WNx W'e�CNM 73M EL PAB>7,8111E M PALM DEBERr CA 92200 am)686�m _ pE0)7]38DI6 FAX E-All�l�rpMa-pQecm cm cn. ucrti u r j .SIO IIIP �xWxam ,x w Vcn JR W,R o az rn w � I i � W O N Q # O0- 3w —`_ 7q�� �ii t� _ _ _ _ /CX 3107 v,t Ar1 MCCr.1>roi RX 3/ff `� - 1- T J ICx]/aY 9 as.]/oc b(m) Ax]/a-c SPEC7RCATK)M _ 9$T❑ BOOK■ PRO IECT AIANAOB', TM ORAYM FR 31 I CHI PRW.NO R1425 DATE K)/14/14 " -T T SCALE: T-KY-V I IFftVISKXM di • iii I I �Y « 4ern a SHEET Na i KEYED NOTES I NTrH Oi rmova ix maa w eor.r vro a XFFES.•r ua 31 y — — — — — — — — — — — a)s. V.0 <i p E-2.04 vm¢raL Lov.na un♦r.ui Tx[nic Launoxs o[rAx ORMfC BCALE KEY MAP zO cnxwrcmx ro rxawe U7 Y sux�c rw ui a+Axa m �rl amxTs w,w aovxc naaowrX ensnra rawnna,mxmaltns ro ee rcvux Axo xc-uxn. '�'��'""� 0 73M APE RUE 210 r® �� i :' .•. I%f{�� �`=1' 'W _.. I _.__. PAW VOW 79-bEIS FAX .l _, -. Js'x tro:.: I E-MAU h 1pAvpAp4mnl S N w �I Z fA ,iqp� Q a- IL z as I�IE�C � A ,I oo O 0- n fl P�H•a � 'i'ti ... PS fc ., � LL L J S - -_ -. PY,-1/IS IYS i•t �i ciwl ArR I•c '— _ -__—__— \ Q J I I w z - T _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ T 1 3 I I SPEancAT1OW SHEET Cl BOOK■ PRCQECT AAAru,DER TU FR FI PR I Vrc L' (rn) I I - ,. Om� VL FFOU R4i25 DATE 7pn4M - -- - - - - - - - - - - - - - - - - - � Fl= r-aw II KEY MAP FI 4 Wix • �4TR1� • SHEET NO, FUNORThm, KEYED NOTES E-2.05 Oi moxx in arnc wu T.•i wo a asks,•3 Imsrll .nw uo/.r ru nIF tISE wunms onK i�rl 2. T.. 9EE El.U1 < i A • 0 i+*e MVO cmu.v.i O3 IXN1R.W'IM 10 PROxOE (1)5 9F£K fOt NL BPNgI ONII14 Mill OIYm16 RY➢M�li %n is xv�ti� '"��_� PAlllOI GYPPaO) {�-'- t --]9 _ 4 �•a.�� N log II CL I I z a z co � a c i ae r Q epa., p eL/� J � _ O W I - - - - - - - - - - - - - - - - I I I _ I Lr I ' a-ffro Boar■ I rr+o.Ec.-r ruwna9Fa TU DRnxmc FR — - - - - - - - - - - - - - - - J crEacr� vL rRDJ.NCA mazy KEY MAP DATE, 10/$4/14 fTM)� I SCALE r-w-w e 1 . 4„M arEErRa ®KEYED NOTES NOFrrH f] �+ Oi vxoxoc m cn.oc vui ear•r vu a sscs,AT ua ❑Rn Tg� E ••"•_ "••".•.: E—L.O V - rt STa,.oc.DM ma AT Ai rl�c rE¢c counas onw 7¢ z a s�¢T zvoo. Oz caxm.cTrn ro vnoxoc (I)r smc ron.0 en.xw ml =`I ww,s wt>,prossxc mvolun ccsEmc imauna�caH,na,ms To m mA"MD ne- . � alw LIMIT OF WORK AVENIDA CABALLEROS ;� / INDIAN CANYON DR. i ---------------------- IL \ r r 1 i O O N N � i CALLE ENCELIA i i N N i ----------J Ch CJl D i r--------- - i p i i r r i z i i i E i ' CALLE EL SEGUNDO I r N£RMO DRIVE------------ ----r N N i i CJ1 C.J i z O i e i it i i D ' GALLE AL VARADO r--------- ------------- --------- r r to to 5LNR15E WAY L----------------------- LIMIT OF WORK D D D D D D 8 ° g I SHEET TITLE: r Q SECTION B REFERENCE PLAN €l y 13 D PROJECT p m TAHOUITZ CANYON WAY PHASE 2 � ' s n ■ PALM SPRINGS, CA 9. y " ExIST FLI.EN � I �LCCATE� VALVE TO BF -. It @ _I �.....® o ,• � i �. _ I PAW OES�,CA9Y260 E=71'S-5815 FAz . r I -MAL'�w.9+�acan . raLocpTEo VxrsT.RrLw I R11911 VALVE pL VE TD CE �L0.'ATEO I N co ml = 3 I a z 0- a a 3 w V . ... . SPECIFICATIONS SHEET❑ BOOK -z PROJECT MANAGER TM AC CHECKER BK PROD.NO= _. M425 ' .. DATE: 10/14/14 SCALE: REVISKNJS NIT SHEETS NaRh•I SHEETS Ld20 THIDDOH CAM NDICATE AOCRIONAL f✓itlO CT TO BE EXCA TO AS E%ISIMO - TO INSTALL BEfW LATERk CANVON ANO 0TH5FI WAT.COt AS F SHALL E%CASATE VA NEED® SCALE:IC C 1'D" 0- TOUBE NEW TOAL3. NIM AND OTHHi EOIAATCH AS ACUACNT ALL E%CAVATEDAREAS GRAPHIC SCALE SHALL BE ERCI1CXf TO A LKE NEW CONCfICN TO MATCH THE ADJACBTT GRADE AFIHi - CCAPLETIDN CF RiCATION WORK u ie e a o Z-\_ _ ° i �.DWA LANDSCAPE APPROVAL SHEET ND: Tn.,.rwm w u TAu1 alrr cA�ura+wpr w .°..�.�.n r.n:.a.rermw.«.w +•=oo..ean.�nr -• _ Q � � w MU Y.+.mMia N�+r 6M.rtonry a i� w w rooms•"r a.",wm"row". ...m.o,..�.,°�.p,o �sEwnI.<cmr .,n...a :. -------------- = L °- L -3.20 KEY MAP °.'"""`"°`�, `"owA. t ` rr"TERMN. E»ENTXPAUwENT �i �� NOTE=SEE SHEET L-3.27 FOR IRWGAT LEGEND. as ## .- ' _ I LANCBCAPE PRCHilECTB,NC. I' A DEG 5RT CA�9S280 v .'r EIAAL rps.ryA fM� r N I w Al a z o � o � ¢ a z � kJ I a I I � SPECIFICATIONS SHEET❑ BOOK 0 PROJECT MANAGER: TM DRAWN: AC CHECKED BK PROD.NO: M425 s _ :. DATE: 10/14/14 SCALE- 1/8'-1'-01 REVISIONS TT . SCALE: 1/8"=1'-O" 2L GRAPHIC SCALE tn' 1fi e < 0 NOTES TWA LANDSCAPE APPROVAL - SHEEf$L-3201FiMJI1Ci1 L-327�DICATE ADORDNAL RPK.A110N TO BE ACO®TO TE EXLSIRr3 l J 1 JqP .> oem r..ee<.,...rFa er�+ 5T81EM BETVIEBI PDWN CANYON ANO 91MOFE WAY.CCNNCTOR 9HWl EXCABATE AS!!ffD® i '� rnucuirz euerw war a .o�n �+.+i�+x b�m�e.:,^v�=aa�i«,wmm. SHEET Na N TO N-L NEW LATERALS,Rl' MD OTHER EWPLENT AS NDICATED.ALL EXCAVATED A�v, wca.mri. WIALL BE BROIX2R TO A LKE NEW CON011pN TO MATCH THE ADIAMIT GRACE AFTER .ei.r,.a..a.mE WAp�mp�d�b�COL OF RRIGATM WORK —.seeny =avr.T.o.e-o<.��.�,-e., am .a vn L____________- own. L-3.21 KEY MAP w<rery a+rvnceMenr cev>nruervr NOTE:SEE SHEET L-3.27 FOR IRAT10N LEGEND. •" RIG I LANJ9C- co I a Z a LL ° I Q Q o z co ijQ Q I I a 2 w H W _ _ I SPECIFK:ATION3 v I... SHEET❑ BOOK PROJECT MANAGER: TM DRAWN AC CHECKED. BK PROJ.NO: R 25 DATE: -... 10/W/14 SCALE! REVISIONS NTT NORTH Q= SCALE:1/8"=1'-O" - - - GRAPHIC SCALE _ t - c Q_ r-------- J °gil & SfE SI-320 iOUGY L-32J ING LATE ADDR ONAL RiOA KN TO SE ACC®TO HE EX 3RJ0 DWA LANDSCAPE APPROVAL LA a -- Tn.ITZ Curs+WAY v TO MT BETWffil TBIA CANYON AN0 E WAY.COMACTOR SHALL EXCASATE VA _ > p TO N3TPLL tEW LAT6NL9,RSHi9 ANJ OTTER EOI1FNBli AS NDICA7H1.ALL EXCAVAT®AREAS SHEET NO u L �I a' °u SHALL BE BRCIK]Hf TO A LKE NEW COPDRKIN TO MATCH TYE A0.1ACBiT CfiAOE AFTER �y o°�„q,e.,.r i�w��. �������°"•"'�"'� �w I w a � COAPLEIION OF fdJ(.A110N WOFK. � wl � I O ron�.iorumxmu,�'::e uxwu pa.nm..:Ni.,.xw..pwa.yw al a I z .mime ,om.grmr.na..wm..,w..:a amnnm.nor,raNe m.v::wx w::Ner� _______ u__J KEYMAP p��p,.••,•ebNfin1oeW.�• L-3.22 NOTE:SEE SHEET L-3.27 FOR IRRIOATKJN LEGEND. :• wAreR MnNAaEUENT DEPu TENT � I W. ]OBI B-PASEO, 2I0 ALM P O I) CAA 924W C6096SMF AK z o . o a_ N I d Q o- H � I YI W .• - SPECIFICAnONS = SHEET❑ BOOK■ PROJECT MANAGER TM DRAWN AC CHECKED BK ' PROD.NO R1425 DATE: 10/14/14 SCALE: 1/e'-1'-0, REVISIONS IT NORTH Q SCALE: 1/8"=1'-O" - -GRAPHIC SCALE _ f lm I 34 I6' B' 0 Q� - ��C DWA LANDSCAPE APPROVAL 0- I TAH ITz CAVTLN WAT Im 3 NOTES 8ffi8 L-3S0 THROIIOH L- 7 NDICATE ADDMONAL RWAT)N TO W ADD®TO TFE EASING arc.' -.min c�e.�s�w�swci�x..e. SHEET NO �u 9TSfEA1 BEIIVEEN HJIAN CANYON AND SJNtlSE WAY.CON ACTOR STALL EXCMATE A9 w r llp TO IWTA PEW LATH a R6ER9 AN)OT EOI.H.BIT AS�ATBJ.ALL EXCAVATED AAEAS TO A TO W eu a Ili BULL 9i01M1R LKE PEW COIONKIN HATCH THE A AC GRADE AFTHi an Rg. f..y.T—.�...r.m �lL J'� COMPLEIK)N OF RFOGATpN WOPoC .,.,,.n,..na..n x.m own .. NM.e.��mmxemown a awi�w.� KEY MAP N L-3.23 NOTE:SEE SHEET L-a2]FOR IRRK:AnN LC�N OED. I wnTEv rnnx.uEMEnr oernx.Mexr - LAILecAPE aRanECTs,Nc. 7P EL PA8E 2p PALM DE CAA )SBB-,38 92280 601 24 ''G •i Oa0)T13-566 FAX i t E-MAIL:Tpetpn-pdmn )4 3� N JI co Z a a- " ooZ r { I '" +z 2 O SPECIFICATIONS _. SHEET❑ BOOK■ f PROJECT MANAGER: TM DRAWP AC Q CHECKEQ BK R Z PROD.NO: FU25 _.. I DATE: W/14/M SCALE: 1/8'-1'-0' REVISIONS NTT ------------------- DWA LANDSCAPE APPROVAL 0' - I �_' L-3N THROUGH L-327 W TE ADOBKINAL f TM TO BE ADDED TO TIE FX61NO awme«n�we�a�„ a.xw�.�e.w.,o� n-w SPIFFY NO: SIEEfS V W TA iTZ CN YCN WAY pmay rcp wceu�iry). I N a 9Y31BA BEIV/FBI IDIAN CANYON A!O 9UJi�E WAY.CCIAACTOP 31W.L EXCAVATE A SEEDED 1 o TO NBTALL NEW LATERALS,F6BI,4 AIU OTHER EQLRXEM AS DUCAT®.ALL EXCAVATE]AfFA3 ron�•�=rraw.. �mvn u.ne....si.wm...pw=mow a SF44LL BE BHOlM31f TO A LIKE NEW 00NDMON TO MATCH TIE A ACENT OAADE AFIEI NORTH COMPLEfid1 OF RRGATION WOFK .,,w,.nnr.�ne.mmvn. mm�u n�.umoeu..rv� SCALE IC C LE L-:j.24 .bryseA...N�m.w�mam. a NOTE:SEE SHEET L-3.27 FOR IRRKiATKJN LEND. GRAPHIC SCALE KEY MAP ,. wnrEnwA.nGE,.ENroEonNr„E„r 1•—r1 DEVELOPMENT�ERV�ES z. rr: a o OFEEPT MENT Ip p . T/S-r FAX 1111 �Q rpAYpa-pdcan I N w a = I _ co _.. _.. _.. I F IFICATIONS SHEET❑ BOOK■ u I O I PROJECT MANAGER. TM DRAWN: AC < CHECKED: BK PROJ.NQ R1425 DATE 10/14/1.3 " SCALE: - I REVISIONS: NIT w Q_ DWA LANDSCAPE APPROVAL �- - - r —T rn.><PM.,n•.En�.•...e er m.w..nwM,nan<v�� Il I I a\ I I&I� SHEEfS L-320 TIROUC�I L-32]140ICATE ADOIIK)NAL RROATKfN TO BE ADDED To hE EX6ING i,.°.i ;gcw Mo �V� e�w, n�� SHEET NQ q I raucuiri c.wrcM war O I BYSIBA BETWEEN WIAN CANYON AHl SUV0.5E WAY.COMACTOB SHALL EXCABATE AS NE'D® a al TO NSTALL NEW LA . VowA y..«'vn"r en....q.pP.w.w.m w I S LATERALS,wBEns AM OTIfffl EOUPABIT AS�UICAIED.ALL EXCAVATED AFEAS NORTH SSX X p (� SHALL BE BNIICIiT TO A LIKE NEW CONIXIKIN TO MATCH TIE ADJAC CBADE AFTER o r.nm✓n'�ne i^pN a.vwn f'� COMRFKXd OF 11MATION W«Y(. L-.J.25 < SCALE LE GRAPHIC SCALE a L------------------------- NOTE:SEE SHEET L-3.27 FOR IFWIGATKNJ LEGEND. 6 ........ m. wnrer.MnxncEMExr rc>naruExr KEY MAP rvi SExVFE3 EE aPXTMEXT LANC6CAPE ARCHIEClB,NC. °� I J306 EL PASEO. 2M PALM OESI I ,,CA 92280 W Oe°I sae-as24 2� m-sels PAx yy y � Q co AE I q � f. I -. . _..L. sPEaP�canoNs SFEEf❑ BOOK■ PROJECT MANAGER TM r DRAV/N: AC CHECKED BK PROJ.ND: M25 DATE: _- IOJ14/14 p p SCALE: REVISIONS NR DWA LANDSCAPE APPROVAL 0- - NOTES L­3.20 THf101Ml1 L-IPJ�IE AtICffIOHAL RPoOATION TO BE PPCFD TO TlfE%BIIJO Uhl SHEET NOSSYSTBA�fWffiI NDIPM CANYONAND'.A111Po9E WAY.C CTO SHA1 EXCABATE A3TO NSTALL IE\1' ATBWAF Al0 OT EOLe'ABfY AS NDICATED.ALL EXCAVATED AREAS-auonTs crwroa uwr SHALL BE BROUGFR TO A LKE NEW COIDITION TO MATCH THE ADJAC@If GAADE AFTER .L6!� o� rc COAPLEfgN OP FEdOATgN WCRC. SCALE:1/8"=1'0" .2s><mm.m P.�„rA�'vvn'"'" XbNANve�w� L-17 GRAPHIC SCALE x NOTE:SEE SHEET L,3.27 FOR IRRQATKNJ LEGEND. 6 enlol m a» WAreR MNA ENeNT DEOA—ENT KEY MAP '° ° , J )5 e N _ I w a 2 . r______ __T Q a Q I ♦auGUrtz CaNrw Wnr 1 —J nl L Z �_ KEY MAP Z Q a � NOTES d SHEETS L. THIOUGH L�27 NDICATE ADDITIONAL IRRIGATION TO BE ADDED TO THE E*SrNG SYSIT3A BETWEENI IHDWI CANYON AND SUNRISE WAY.CdAACTOR SHALL EXCABAT AS NEEDED TO INSTALL NEW LATERALA RISERS AND OTHER EOUIP ENT AS INDICATED.ALL EXCAVATED AREAS SHALL BE BRCUOIR TO A LKE NEW CONDITION TO MATCH THE ADJACENT OAf DE AFTER COMRETICN CF FNGATION WOPoC O IRRIGATION—SCHEDULE Q SYMBOL MANUFACTUREIRMODEUDESCRIPTION ARC PSI GPM RADIUS DETAIL RAIN ORD Xf K-1432 SINGLE OUTLET DRIP EMITTER I y ¢ SINGLE OUTLET,PRESSURE COMPENSATING DRI P F se Rae EMITTERS. FLOW RATES OF 8.5GPH=BLUE, F w 1BGPH=BLACK,AND 2.0GPH=RED. COMES WITH A 10.32ul 111 IRRIGATION LATERAL TINE:PVC PIPE.ONLY L 05D A 21 O PVC TRANSITION PIPE SIGATIONNDAOVE LATERAL TRANSITION PIPE SIZES 1"AND ABOVE ARE INDICATED SPECIFICATICRVS ON THE PLAN,WITH ALL OTHERS BEING 3'A"IN SIZE. SHEET EIOOK■ PROJECT MANAGER TM DRAWI3 AC CHECKED BK PROJ.NO: M1425 DATE: 10/t4/14 SCALE: -_ 1/8'�1•-0' REVI£KONLS NR 0- DWA LANDSCAPE APPROVAL A- LJ w.v�•em a roam+».a..a•i..�w„m,wa;». SHEET No- NOHfii aw.m.. SCALE:1/8"=1'-13" L-3.27 GRAPHIC SCALE wATE WWNn E»ExrCPAR 1ENT 3n' 16' 6' ♦ 0 Ymm mvu�w.44.M NO1B Q' a w ^ v.rn.ermnay. ///��� x.r...=n.ae.xn.cm.Ios��ma I.vm m•'••L,vW_••'•••�'••.ar.m 1 S a nn:ua.a� ay.a.�......mx.®nxQ yL ®.ermawnrricv.� � ]9061 EEW 9181E 210 APE WC PALM O0)W CA 92280 L PNgsRLRL AgcvumR O) 56E FAX a .0 x...,en.xxuu .u...a.ms:x n xr.u.nvaic.aw,x.n..roYR..arX.. :on OBBrgaw -pdv oruQxoc exo c M I4 MKs a E-MAIL,:IaeTpa-pdcan VAS SP&PIIMpC BPAGpC ON PVMpG IPG@IO � rpw wRxa�lwoal.r� wn wl�:ixrxmra YAL MOON IT VJIJxmILRnMn MOsl161l NYLl OCl6 V IF IEYHO EMITTER PIPE BEING CHART y m:a.ocne a.rn:na w.:...xa t V t RW FW IDhTIAYq N3N9�Hlq 1/2"PIPE 1 TO IBO CPH r.r�m mw nlYa:ace :awoo NT9J0 [t �yy�Tq 0/4'PIPE M TO S80 CPH W Eb.MBYrLLmoPq T284 I" PIPE SRI TO Rao GPH .0 neumnoro.muw 1-I/d` PIPE Bal TO 1440 CPN P. co 2 RIM 9pICC6pRQ RYREIR®1 UFI[i1X A9KUIWl El mnruia 1. INSTALL ONE EMITTER PER PUNT(UNLESS OTHEHXLSE NOTED) AT UP mrR.vrtuvraooawcuem.a ouua. HILL SIDE OF EACH PUNT. J IL 2. DUE TO THE HICH QUANTITIES OF EVITTEPS. ALL EMITTERS ARE NOT u R PICRIIH]®aBy YS WIA SHOIM ON PLAN. IT SHALL BE THE IRRIGATION CONTRACTORS RDPONSIBMT TO CONSULT WITH LANDSCAPE ARCHTTH.T TO OBTAIN 6 Iyrypp yyY;IRN KIYRFX WE ACTUAL NUMBER OP PUNTS TOR THE PROJECT. IS61ILYll9l Q 7. 3. IT SHALL BE THE SIZE ION UTTEPIPE CONTRACTORS R6PoART STIT N ACCURATELY PIPE SIZE ALL EYITI'ER PIPE SIZE CHART SHOYN ON PLANS. J DRIP EMMEi M TYPICAL EWTTER LAYOUT DETAIL zZ 0 OIL Si",Ong Trenching Z [n 6 a l RARDSCAPE(TYP)1FIMNH GRABS 2. CLAN BACHPUJ - 90% COMPACTION 2iIDPa XPoee 3 SAND U Q (TTP) //) 0. NON-PRESSURE RES LITERAL LINE SLEEVE (BIER PER z N v 5.CHART)/NON PRESSURE LATERAL Z rL C PRESSURE MAINLINE SLEEVE (SIZE PER O CHARTTROL WINE HAIRLINE S CONTROL SLE SLEEVE E SCENT TO MAINLINE S SLEEVE. ALL BEYOND TO BE SCI[RD PVC. E%'TENO Z SLEEVES S BEYOND ECCE OF SLEEVES ON M BOTH ENDS. RECLAIMED HATER SLEEVES TO BE S d O y S MINIMUM S WHERE DEEP ( OR PER HATER DISTRICT 1 SECTION /ELEVATION STANDARDS WHERE APPIJCABLE). 90% COMPACTION REQUIRED- SEE SPECS O TRENCHING/SLEEVING DETAIL F ECIFICATIONS SHEET❑ EKJOK■ PROJECT MANAGER: TM DRAWPD AC CHECKER EIK PROJ.NO: RUt25 DATE: SCALE: PER DETAIL RENSIONS NIT DWA LANDSCAPE APPROVAL - xw» w rteWkaaY.�,nN�x neKwn�x+m��oorc�,m���..°m n. SHEET NR mn u�.�s.u•:ro'cCF u'wunvl. mw�..l w a.ate.wµYu wrnn.:m a:.ne:anlmye.Pwex�x ewq.n L-4.20 wA,PR.N .P.T�IART.P.r To ee:aa.Eo +A z .'. T3061APASEO,9.111E 210 �O w ®q Exfto ` (-- (7MAL T/3-SKIS PAx 4 OO O M Q I E : +p pQcan o� o TOM I N I W co 604 Z a Q 10 I z 9 I Z Qco I _. ..._ T�N Lno WCTO�A PAK OO OI COR TO BE g gS 2 PAMW OWN S AWJO KK TAN 2 2 COMRACrOR SF4ALL PEAIOVE AND O6P06E OF EX61N6 PLAN19 AB ORECTBJ 6f THE Cfll' a - NBPECTOR AMER COAPLEIICN eF PLANTNQ CONIBACTOB SHALL FNE GRADE A! 7"N EIM1SI lSfAA 2 NCFE3 OF IdATCH E DEOOLPOS®GBANIE TO MATCH ATE A GAS NEEDED,OFi ADD COBBLE TO MATCH EX61N6 A9 N�®,N ORDHi TO CflEATE A`.AAOOTH W I TRN:BffK1N NRH THE E%BINO LMD9CAPE. � r W m a SPECIFICATIONS ..I I SHEET❑ BOOK■ PROJECT MANAGER TM DRAWN AC CHECKEQ BK PROJ.Na. R1425 _ DATE: ID/U/w SCALE: REYISIONS Nrf NORTH SCALE:1/8"=1'-0" - GRAPHIC SCALE ze +e e 4 or T o DWA LANDSCAPE"APPROVAL - 0 I e.:.rn�.»w �., SHEET NO T ..n " U Td.1G11� W punry eRun hM Ye<pi" NwnvNM � 10 w m bul pav<�.o<o«vlc+ve rAMrv�. 'd W w roen•y a n,<a,,..o ur o.:A N.nm<,u T.- b .. m. .. " mun L_______________"_-__J Q .m�seN<.«.�<.Mn wn exw.wnmu mxew M�<. KEY MAP ° L-5.20 NOTE:SEE SHEET L-5.27 FOR PLANT LEGEND AND NOTES. 'M ' ER MAa GEbENT DEPAR7MENT *o * M.� m 3EXMT V m I - To eE ra.n.� To ee m1o.Eo ARGFIE(:15,W. I A W�4 I AS CD Z Q J � U 0 O z zCIO L I I a w W N OTES III a t CLEAN EXPOSED SURFACES OF THE WALL AND SPAN ALL EXPOSED SURFACES OF THE I d CONCFEIE WALL WITH LITIIDCHiOLE CHBASTAN,COLOR TO BE CS-2 PAFDFE BROWN,SPAN THE NONiETAF1l0 PORTION OF WALLS TO A PORT FOUR INCHES BELOW GRADE SPECgCATKJNS 2 CONTRACTOR SHALL REMOVE AND DISPOSEa EXISIN3 PLANTS AS DRECTED BY THE CRY INSPECTOR.AFTER OONPLETION CF P1ANINO CONTRACTOR SHALL FIFE GRADE AND THEN EITHER INSTAL-2 NC-ES OF COAPACTED DECOXPO,D CAAHTE TO MATCH E(BRIG AS i SHEET❑ BOOK 0 TEED®,OR ADD COBBLE TO MATCH EXISTING AS HEED®,N ORDER TO CREAM A BMOOTH 1 ' iRAN9ffX)N WT H TIE EXBIRD LANDSCAPE H PROJECT MANAGER; TM DRAWN: AC CHECKER} BK PROJ.NC: R1425 DATE 10/M/14 - SCALE; 1/8,-1'-0' REVISIONS: NIT ... -. SCALE:1/8"_1._0,. Q- - - GRAPHIC SCALE - RO' PLANT SCHEDULE (INDIAN CANYON To SUNRISE WAY) DWA LANDSCAPE APPROVAL �' - r_______________T SHRVBS BOiPNICAL iUME COMMON NAME $I2E WPiER VSE OiY Q I p p brx�wrrYq aq�y(CMer Ce.Myl[eee,5xwn655Fxy, SHEET NQ W LL BTG BOAINNEAX'TORCH GLOW TORCXG LO W BUSH BOUGAINNLLE0. 15 GAL M0005 NIB revuY�eReeNYmwpe aee npxmee.rannvomeraYon wMVK E. EREMOPHILA GIABRA$$I.CARNOSA WINTER BIA2E EMU BUSH SGAL LOW a.] )0 U�- �W - I TGXWITZ CMTdJ W4T �� E.G EREMOPHIL GLBRA MINGENEW GOLD JOUIRACK SUNRISE EMU SGAL LOW EI JR1 1rl lMpmrtlMMaemxy eV VNA mnfaee rcrmnWwwarpgprw�aMlm HE HESPERALCEPARNFLCRA PUNTA BRAKELIGHTS BRAKEEIG;5REOYUCCA SGAL LOW 0.2 1215 JW W lW ren eiMrNrtaManybWRmay wtlNgaMeeawlmlaMelnGWP IT ICR.E.RIGIOP SANDPAPER VERBENA IGAL LOW 0,2 26l Q r ...... n wrMeItlmayMbM firuaeuYvp an - - �. R. ,m L-5.21 NOTE:SEE SHEET L-5.27 FOR PLANE NOTES L---------------- KEY MAP —'T RMAB-1.1NT I—TMeRT II _ 7"8_PASEO,SUM= � W Ap PAW DESHiT,CA MW Om7 Se mm I '.� beT)T13:515 FAX lou Q � era � EMN.:rysY9n'Pdcan P N �w a aLLI � I Q Q Z (6 �.,. ,., z oOwo O oaP a (W) _ _ I Z era ma vR 00� O 4P BP 1 , 1 M �� O Z f!) yp em �. rs:� )DOG �. ••g= O_ ent _ °I°. �, O I �=.. Z J em w S Q 9R I C —D Q w II w a SPECIRCATIONS SHEET❑ BOOK PROJECT MANAGER TM Ei Is DAWN: AC s. O R I CHECKEQ BK PROJ.NO: R1425 DATE ,O/w 4 SCALE: 1/8'-1'-0' REVISIONS: R NOTES L CLEAN EXP ALL WITH Ln 611E WALL A STAN ALL SE 2 SUIFACE3 OF TFE NORTH CgJCfETE WALL WTM L11,IOG-ROLE CHENSTA!{C0.0R IN H CS-2 PAFOPE Sf10YlN.STAN TIE N TRACT 94 PORTION OF WALLS TO A PO E FOUR NCIE9 S S CiVADE. ^ _ 2 CONAMCTOR SHALL RBAOYE AND PLANTDW0SE OF EXTRACT PLANE AS OEECTED BY D T CRY SCALE IC _,'D" /'\- - NSPECTOA AFfiHi COAFLETKN of PLANRIq CONTRACTOR SHALL FINE OMLE AND hBT GRAPHIC SCALE - 13 F NMALL 2 HCHES OP C AC DC-CCAPOS®CAARAE TO MATCH ENSANT AS - t�®, ADD COP-5 TO MATCH EMSTNG AS NEEDIED,N CrmER TO CREATE A 3AIOOTH ie Is e a o IA- PNAM" WE LANT ENcuss ERE oPnlLu cueaA SNNGENE DGOID "^"rEcewuE SEUEeVscaiNvluea 551AL ooWla cslt oar LANDSCAPE APPROVAL TRAN3AgN WAM TIE F_XISINT LAIDSCAPE PLANT SCHEDULE (INDIAN CANYON TO SUNRISE WA B�V U. r--- T DWA ......•Po.na n SHEET NO TGr ITZ CNiYRJ WAT V npenrlW mmmMLCe > Q MESPERALDE PARVIILCRA PEavn saANEu4NTs 6aAIfEUGNTsaEovuccN sGaL Lowaz z15 JI RP a' U woro.nnRN n„N.rt ev OxAu.rtm..b.o.w,..00,w.lro VR I VERRENF RIGIGA ..PAPER VERBENA I LOW 0,1 1G4 W w J U z R•.:.N.n.m.e...ei..v l..a m+v p:a oNn.a n.u:r.e.DxA al a I I ,m uceR..:<�.n N,Nno..,r ammr.N..m„nP.. �na eDW. L-5.22 KEY MAP NOTE:SEE SHEET L-527 FOR PLANT NOTES. ,n w ER.AN GEnENTDEPARTUENT O...w.. OCVCL RnENTSERNOESre—TUENT iE.,T� 1� LANDSCAPE�M INC. Oo eE SU]3061 B-PASEO, RE 21D�rt •:,I PALM DESERT,CA 92280 EMAL:R�9s'PAoom YN mT HIT, r : HIT WT u _ TV DE a I w � o i a TV z 1 Ir MA -j a a o "gin l i. m a -O Y. M, SPECIFICATIONS T SHEET❑ BOOK m PROJECT MANAGER TM DRAWN! AC CHECKED BK PROD.NO R1425 DATE: 10/M/M SCALE: NOTES REVISIONS: NR L CLEAN EXPOS®8MFACES OF TIE WALL AND STAIN ALL EXPOSED SIXEACES CF TILE CCNCREIE WAIL W H LRHOCHid.E CHEN3TAN,COLOR TO IE CS-2 PATORE BROWN,STAIN THE NONiEfAM1G PORTION CF WALLS TO A PONE FOUR INCHES BELOW CRUDE. 0- 2.COMRACTOR HULL RBAO4E AND DS QoE OF E%ISINO R1JR3 AS DYECTED BY TILE CM NORTH INSPECTOR AFT TER COAFLETION OF MLA M CO CTCR SHALL FRE GTUDE AND THEN EITHER NETALL 2INCFES OF CCNPACTED GECOM'QS®CRAATE TO IAATOI SMTN i AS SCALE.1/8"=V-0" - - - IEEOED.OR ADD COHf.E TO HATCH EXl2fNO AS MHl®.IN ORDBi TO CREATE A SIAOOIH GRAPHIC SCALE rflAN9lgN riRH TFE EXHINO LANDSCAPE. PLANT SCHEDULE (INDIAN CANYON TO SUNRISE WAY) n-_ - SXRVBS BOTANICAL NAME AME SQE WATER USE OTY _____________________ 0 o :5 WL MOD OS f13 _BTG BOUGAINVILLEA%TORCH GLOW TORCHGLOw BUSH BOUGAINVLLEA D W EGC I EREMOPHRAGLABRASSP.CARNOSA YANTER BLAZE EMU BUSH 5GAL LOW 0.2 IO EMG EREMovHlu unBRA'MBUGENew Gom ouTBACR sunRISE EMM sGAL Low o.x Bx F)WA LANE)SCAPE APPROVAL __ a w Aa•Kr T4OJITZ C4NTGN WAY Ji� - --- HP HESPERALOE PARNFLORA-PERPA BRANEUGHTS BRARELIGHTS RED YUCCA EGAL jTOW o1 215 w wn6Y9T.1 < VR VERBENA RIGIDA SA R.,Ap.VERBENA 62 —.rJ — rM SHEET NQ 4 U M9 M�emgaX+l'R4R v C,uW. Eeai+.A,R'R.m p ov. w U G,—A NNme0 b/SGNABMeRCxaNrnaTAula apprwYle DUI I� � �� �IMY.Ynear�na,wh,am L ____ Ja NOTE:SEE SHEET L-5.2 FOR PLANT NOTES .2,oa..,...o,,,,,1•""0"'"�"`""a' "I"'"°haa KEY MAP �m L-5.23 LAND$WE PACIiIECTBr NO T,1061 S-PA .smE m PALM OE9Hif.CA 922W (]BO)588-3824 Oat-)T/3�615 FAK G�$ .A�•. EMAL rgeYge-pdedn CV NI L1J co a f 1 T �� ..... .. GI IL i y 1 � Z � z Q c' Y3 Q U a I ^ A l SPE 1..L 1rL�V iev k S Y a CIFICATIONS SHEET❑ BOOK PROJECT MANAGERS TM SI J DRAWN AC CHECKED SK PROJ.NO, RW25 DATE: 10/14/14 O '.� un OO`J SCALE' 1/w-1'-O' O w ma REVKNJS. R FY {S 0 >>I o 40 o o= 0 0 0 _____ NOTEs _ _ t CLEAN E>w�®nACEy of rHE WUL nw srAN ALL E�osED sur�FACEy of rrF DWA LANDSCAPE APPROVAL - CONCRETE WALL WRH Lffl-IOChHCLE CHEM9TAN COLOii TO BE C 2 PAFEW BROM STAN T.,,<wr+n...eaN,,. ..a w I �P T,E N FETAM4 FOR"OF WALLS TO A POffT FOUH N(.YE9 98-ON CN•DE ; .nePo�.� ..o w.rep e,.m��°o.r,rr�.mm BFEEf N6 �- I TA.ITZ CANYor+war O 2 COMItACTOR BHALL IEMCW A DL'POBE OF EXSiNO PLANTS AB DfECTED W THE CRY NBPECTOR AFTI61 COMPLEIgN OF PLANING CONIIi4CTOR SHALL FNE GRADE AlD THEN FIRER NSTA 2 N OF C ACTED DECOAPC$ED CIMM TO MATCH E61NG A8 NORTH p j N®®.IXi ADD COBBLE TO MATCH E%141NCi AS NB3�®,N OPDER TO C TE A:MOOTH u i TRAN9RION WITH THE EASTW LANDBCAFE SCALE:1/8"=1'-0" L-5.24 I j GRAPHIC SCALE --J o,u w TER MNNN EMENT DEPr TMENT - ------------- - A NOTE_SEE SHEET L-5.27 FOR PLANE LEGEND AND NOTES. KEY MAP �:�� ► — ► 'CV� � ► ► � swE m PALM DESHR,CA 9PS50 ABW 5S8-3Fi24 ,�, rf � � � � -�a�%. Y � /' ► EMAL:�PYOay#ean O OOIO fl 0 ► To�� I N W I I co 2 ► To Z a � � � O �O � � o � � ► a � U 4PO _ O _ Z BR rm Z./ M M. O 0e.+l ►. g /T W,0z LLB. R w. ��o U I I rl 0- O ( ► w O � � ► W O O O o .E.aT wTrim E.e.w.o-m �E SPECIFICATIONS ► Toce roio eo To ee w.oreo ► To SHEEP❑ BOOK y I C I PROJECT MANAGER: TM DRAWN AC ► , ,. .. . ► CHECKED BK n PROD.NO R1425 ► O C I DATE: 10fl4A4 Boc a° SCALE: 1 REVISIONS: NET 1 I m eo O � _ ► a�� I o= _ NOS 1-')WA LANDSCAPE APPROVAL - w jr T T CLEAN E WALLD SH LITHO OF TIE I-EN AI SCAN ALL EXPOS®P FFACB9 OF .S CONCRETE WALL WITH Llfl-K)O WA S TO A PM COLOR TO BE C94 PARCfE SROVM,SCAN T d`pmw;ve`ww a pynMco-ee'.sm�•,A°�m`zr —.J Z C NTRACTAISK'PpRX)N OF WALL9 TO A POM FOIN NCFE9 B30W GRADE "w .rno-bs...a .w,e.:�tl�o�.,,�w,w,u. SHEET NQ I *Auawrz eA�rq.l wa. o j 2 CCMRACTOR 8F Wl RBAOVE AFD DI9P09E OF EXI311N0 RJJI19 A8 DfECCBJ BY TFE QTY m a NSPER WALL INCESOFTIONOFTEDDE GOHCRACTORNrrE MACH EXAIO AS UNO ERlER NSCALL 2 NCH OF COMPACTEA DECOMPOSED GA>NIE TO MATCH E%SINt'AS p --_ NEEDED.OR ADD COBBLE TO MATCH EXL4RN3 AS NEEOEi),N ORDER TO CFEATE A SMOOTH .. nn ` ar,aY�nmu enMeue.q. h r TFFM611gN WFCH TIE EASCNG LAN[XgCgpE SCALE: 1/87'=l'-O" ' L-5.25 GRAPHIC SCALE a L ______—_- NOTE:SEE SHEET L-527 FOR F ANT LEGEND AND NOTES. = i= w Tew.. t. E.TDEPAAT.ENT KEY MAP �• s < �EA��oEPA�TWE�T GI rcl 0LANDSCAPE AP04rECTS » M .M PALM DES ,,CACA 9 w *4 OQW SBI524 w I � o ono I N i W _ � NI co TZ IAM.... M -•.�lw O .. _. _.. !=yl O. Bq ,O � q`r M M 'ITS Q co sA. . s;r O M M emCL Z Ta TOE z Q �' J U a �I IL RE M � I CHECSKPEEQCT CATIONS SHEET 0 BOOK ■ RO OECT DWN: C FI -.—AM`e.,+. "T l^rr; PROJ.NO. RI425 DATE: 1D/14/14 SCALE: 1 i RE\A90N3 NR 106 U (g`Jp ram •, �v HP NOTES DWA LANDSCAPE APPROVAL 0- - - TAKNITZ cwraN u l I 2 CONTRACTOR SHALL REMOW AND D DECOA EXW PLANTSNTE A MAIECTTOi AD BY THE A5 , w wow SHEET NO al INSPECTOR AFTTER C�APLEIKNI OF PLANTING,CONTRACTOR SHALL FINE GRADE AND THEN roo�.m.rmMm.row viw __ •,•� NORTH IFID®.CR ADD 00833E TO MATCH EXISTING AS NEEDED.N CTDFA TO CREATE A 9MOOT}I m.w�nne,..Y..xNYa i ev ~ 1 'L ____J TRM6ffION WITH THE EXWNGlNNDSCAPE SCALE.1/8"=T'-O" `-5.26 GRAPHIC SCALE KEY MAP NOTE:SEE SHEET L-527 FOR PLANT LEGEND AND NOTES. w E.MaAaEMENTDEPARTMENT ,... ,i NDSCAPE INC. r�ALMID�T Mw (7W) -5616 FAX BN pr Lnbw P AIN-'r9a'r9ecan re a c E HP ,oXN� co a_ z Q j U I 1' I iANl.AIIII G6VTCN WGT , - W _ Z Oz L______________ ______J KEY MAP Z Q CA U -J Q a NOTES J L CLEAN EXP�I-YiMHFACE9 OF TFE WAII.A!D SfAN ALL EXP09ED PARDREE9 OF K S THE NO TE WALL WfM RTION OF WALLS S TO A POI COLIXi TO BE CS-2 OW GRADE. Bfi. 9TAN THE NOfH CTANNG PORTION OF WALLS TO A POINT FUUi NCIES BELOW O TM D 2 CONIFiACTOFt SHALL iBAOVE AND DfSPQRE OF NlTRkCO R SHALL AS O GRADE Sf TIE EN NSPECTOFL FETTER CCAPLET%k!OF R-AIIINCA CONTRACTOR SHALL f�GRADE AND TEN HIiEA N3rALL 2 NCFES OF Cp.PACT®DECOAPC��(vTiAN1E TO MATCH FJ(61NG A3 NEEDED OR ADD COBBLE TO MATCH E)USTNO AB rgDEJ.N OFOET1 TO CFEATE A aN00TH 2 PLANT SCHEDULE (INgAN CANYON TO SUNRISE WAY) TRNhTgN 11TTI-I TiE FJU3TN0 LANDSCAPE Q srveuBs Boinxl[AL NAME 2B MON BE SIZE WATER USE Oiv BTG BOWAINNLLEAX'TORCH GLOW iORCXGLOW BV3M BOVGINN LLEA 15WL YOB.1 EGC EREMOPHILA GLABRA SSP.CARNOSA lwNTER Bl EEMU BUSH SGAL LOW 42 ]B EMG EREMOPHILA GLABRA MINGENEW GBLO OV,BACR SVNRISE EMU SGAL LOW 0.2 fi2 NG HESPERALCE°ARNELORA'°E RPA'BRANEUGHTS BRANELIGHi3 REV VVCCA SGAL LOW 42 213 F VH VERBENARIGIOA SANDPAPER VERBENA JIGAL LOW B.2 WWWV � a m a PLANT NOTES: SPECIFICATIONS 1.PLANT QUANTITY:List is provided for the convenience of the contractor/client and is not intended for SHEET❑ BOOK■ accurate bidding purposes. 2.PLANT ALLOWANCE:The contractor shall provide$258 to be used for additional plant material not PROJECT MANAGER TM Indicated on the legend which may be deemed necessary by the landscape architect and approved by DRAWN AC the owners representative.such plant material will be specified and field located by the landscape CFECKEfl, BK architect. if this allowance is not used,or is only partially used,the unused portion shall be credited to the owner. F'ROJ.NR IRt425 3.LANDSCAPE ARCHITECT: Shall field review all plant locations prior to planting. Plants shall be DATE: 10/14/M placed in their intended locations while still in their contamers/boxes. SCALE: REVISIONS. NITd.UNIT PRICES:Landscape Contractor shall furnish unit prices for all plant material and irrigation _ material when submitting his bid to the owner. _ 5.WARNING:Plant material listed may or may not have been approved by the Agricultural Commissioner's office. Landscape Contractor,please contact the Agricultural Commissioner for approval. Plant material not conforming with quarantine laws may be _ destroyed and civil action taken. All plant material is subject to inspection at the discretion of the Agricultural Commissioners Office. fi.Mounding:All mounding indicated on this planting plan shall be considered decorative,and is not intended to be a part of the site drainage system.All mounding shall be installed so that the toe of the TWA LANDSCAPE APPROVAL �- mound is a minimum of 18 inches from curb.Mounding slopes shall not be steeper than 3:1. UFMH SHEET NO: •,.Pvh..,M,m SCALE:1/8"=1'_0 GRAPHIC SCALE L-5.27 HATER YAii +EwU BEPARTMENT 24 1a B W n p top Imp RI€ 19 a �I ; t � 9 R Mal � m � o e D ^ D r z� a 6$11 Z D R a Say' m °R y DWI s 3 `gTd gg >z� z D �p SHEET TT -Et Z r' Q o PLANTING DETAILS m j�€9 > v D m D PROJECT p S 1$ 8 TAHOUITZ CANYON WAY PHASE 2 - J/ X 5 ■ PALM SPRINGS, CA