HomeMy WebLinkAboutA5650 - RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT COOP AGR CP 05-20 LINE 8, LATERAL 8A Sabrina Kaye From: Carrie Rovney Sent: Monday, November 03, 2014 2:22 PM To: Kathie Hart; Dave Barakian Cc: Jay Thompson; Savat Khamphou;Tabitha Richards Subject: RE:A5650 - Riverside County Flood YES, you may close this agreement Ht'b Lr From: Kathie Hart Sent: Thursday, October 23, 2014 4:25 PM To: Dave Barakian Cc: Jay Thompson; Savat Khamphou; Carrie Rovney; Tabitha Richards Subject: FW: A5650 - Riverside County Flood This agreement is for Storm Drain Line, Lateral 8 & 8A Project No. 6-0-00302 & 00226 CP 05-20. Has this project been completed? May I close the agreement file? Please advise. Thank you. Kathie Hort, MMC Chief Deputy City Clerk City of Palm Springs Mr(760)323-8206 3200 E Tahquitz Canyon Way L-93(760)322-8332 Palm Springs, CA 92262 k'y4Kathie.14artdQPa1mSpringsCA.9ov Please note that City Hall is open 8 a.m. to 6 pm,. Monday through Thursday, and closed on Fridays at this time. 1 i�soss a 1 COOPERATIVE AGREEMENT F L7a60, jj'112, i_ ";� PALM SPRINGS MDP LINE 8 AND LATERAL 8A C;fiICFFXI ✓SPR2N1QS (Project Nos. 6-0-00302 and 6-0-00226) E03, 740 ?i;,Lnf S?;FIN! S,CA =_ 65 4 The RIVERSIDE COUNTY FLOOD CONTROL AND WATER 5 CONSERVATION DISTRICT, hereinafter called "DISTRICT" and the CITY OF PALM 6 SPRINGS, hereinafter called "CITY", hereby agree as follows: 7 RECITALS 8 A. CITY has budgeted for and plans to construct certain stormwater 9 management facilities identified in DISTRICT'S Palm Springs Master Drainage Plan (MDP) as 10 11 "LINE 8" and "LATERAL 8A" to provide continued flood protection for CITY'S roads and 12 adjacent propertie- LINE 8 and LATERAL 8A are hereinafter altogether called "DISTRICT 13 DRAINAGE FACILITIES" and drain into an existing DISTRICT maintained storm drain 14 system known as Baristo Wash Storm Channel, Project No. 6-00020, Drawing 6-135, Sheet 15 Number 6 of 8; and 16 B. The MDP facilities work includes construction of(i) approximately 4,215 17 lineal feet of underground storm drain system, hereinafter called "Line 8", as shown in concept 18 19 in blue on Exhibit "A" attached hereto, and made a part hereof, and (ii) approximately 109 lineal 20 feet of underground storm drain system, hereinafter called "Lateral SA", as shown in concept in 21 red on Exhibit "A" attached hereto and made a part hereof. 22 C. Associated with the construction of DISTRICT DRAINAGE 23 FACILITIES is the construction of certain catch basins and connector pipes that will be located 24 within CITY'S rights of way, hereinafter called "APPURTENANCES". DISTRICT 25 DRAINAGE FACILITIES and APPURTENANCES are hereinafter altogether called 26 27 "PROJECT",- and 28 - 1 - MAY 1 3 2008 tt.z r ll8058 4 1 D. The proposed PROJECT includes integral and critical segments of 2 DISTRICT'S Palm Springs Master Drainage Plan and continues the orderly development of 3 CITY'S drainage and storm water management infrastructure, and 4 E. CITY will act as the sole CEQA lead agency for the PROJECT and, as 5 such will have the corresponding responsibility to fulfill the obligations of a CEQA lead agency 6 with respect to the PROJECT. 7 s F. CITY desires DISTRICT to ultimately accept ownership and 9 responsibility for operation and maintenance of DISTRICT DRAINAGE FACILITIES. 10 Therefore, DISTRICT must review and approve plans (as shown on District Drawing No. 6- 11 355) and specifications, herein after called "PLANS and SPECIFICATIONS" and subsequently 12 inspect the construction of DISTRCT DRAINAGE FACILITIES; and 13 G. DISTRICT desires CITY to accept ownership and responsibility for the 14 15 operation and maintenance of APPURTENANCES. Therefore, CITY must review and approve 16 PROJECT PLANS and SPECIFICATIONS and subsequently inspect the construction of 17 APPURTENANCES; and is H. DISTRICT is willing to: (i) review and approve PROJECT PLANS and 19 SPECIFICATIONS in accordance with DISTRICT and CITY standards, (ii) inspect the 20 construction of DISTRICT DRAINAGE FACILITIES, and, (iii) accept ownership and 21 responsibility for the operation and maintenance of DISTRICT DRAINAGE FACILITIES upon 22 23 completion of PROJECT construction; and 24 1. CITY is willing to: (i) prepare PLANS and SPECIFICATIONS, (ii) 25 secure all right of way and regulatory permits, licenses and rights of entry necessary to 26 construct, inspect, operate and maintain PROJECT, (iii) advertise and administer PROJECT and 27 construction contract, (iv) pay all costs associated with PROJECT'S design and construction, (v) 23 - 2 - 11805$_4 1 perform all required environmental studies and obtain all necessary regulatory permits, (vi) 2 accept ownership and responsibility for the operation and maintenance of APPURTENANCES, 3 and (vii) accept ownership and sole responsibility for the operation and maintenance of 4 PROJECT following completion of PROJECT until such time as DISTRICT accepts ownership 5 and responsibility for the operation and maintenance of DISTRICT DRAINAGE FACILITEIS; 6 and 7 8 J. DISTRICT and CITY acknowledge that it is in the public interest to 9 proceed with the construction of PROJECT which is necessary to minimize flooding within 10 street rights of way, reduce the hazards caused by flooding and preserve the ability of the I I traveling public to safely use CITY'S street rights of way. 12 NOW, THEREFORE, the parties hereto mutually agree as follows: 13 SECTION I 14 CITY shall: 15 16 1. Pursuant to CEQA, act as the sole Lead Agency for preparation, circulation 17 and adoption of all necessary and appropriate CEQA documents pertaining to the construction, 18 operation and maintenance of PROJECT and as such, will have the corresponding responsibility 19 to fulfill the obligations of a CEQA lead agency with respect to the PROJECT. 20 2. Secure, at its sole cost and expense or cause to be prepared, PLANS and 21 SPECIFICATIONS in accordance with CITY and DISTRICT standards. 22 23 3. Secure, at its sole cost and expense all necessary rights of way, rights of 24 entry and temporary construction easements necessary to construct, operate and maintain 25 PROJECT. 26 4. Secure, at its sole cost and expense all necessary permits, approvals and/or 27 agreements, licenses and rights of entry as required by any Federal or State resource or 28 - 3 - 11805$_3 1 regulatory agencies pertaining to the construction, inspection, operation and maintenance of 2 PROJECT. Such documents, hereinafter called "REGULATORY PERMITS", include but are 3 not limited to, a Section 404 permit issued by USACOE, a Section 401 Water Quality 4 Certification issued b the California Regional Water y g Quality Control Board (CRWQCB), a 5 Section 1601 Streambed Alteration Agreement issued by the California Department of Fish and 6 Game, and National Pollutant Discharge Elimination System Permits issued by the State Water 7 8 Resources Control Board or CRWQCB. Furnish DISTRICT with copies of all permits, 9 approvals and/or agreements required by any Federal, State Resources, and/or regulatory agency 10 for the constriction, operation and maintenance of DISTRICT DRAINAGE FACILITIES_ 11 Such documents include but are not limited to those issued by the U-S. Army Corps of 12 Engineers, California Regional Water Quality Control Board, California State Department of 13 Fish and Game and State Water Resources Control Board. 14 15 5. Prior to advertising for bids, provide DISTRICT an opportunity to review 16 and comment on all REGULATORY PERMITS prior to submittal to regulatory agencies. 17 6_ Prior to awarding a public works construction contract for PROJECT, 18 provide DISTRICT an opportunity to review and approve PLANS and SPECIFICATIONS_ 19 7_ Construct PROJECT pursuant to a CITY administered construction 20 contract, in accordance with PLANS and SPECIFICATIONS approved by CITY and 21 DISTRICT. 22 23 8. Furnish or cause its construction manager to furnish, all constriction 24 survey and materials testing services necessary to construct PROJECT. 25 9. Provide DISTRICT with written notice that CITY has awarded a 26 construction contract for PROJECT. 27 28 -4 - 1180984 1 10. Prior to commencing PROJECT construction, furnish DISTRICT with a 2 final set of mylars of PLANS and assign their ownership to DISTRICT prior to the start of 3 PROJECT construction- 4 11. Not permit any change to or modification of the PLANS and 5 SPECIFICATIONS without the prior written permission and consent of DISTRICT. 6 12. Prior to commencing PROJECT construction, CITY shall schedule and 7 8 conduct a mandatory pre-construction meeting between CITY, CITY'S construction manager, 9 CITY'S construction contractor(s), DISTRICT and other affected entities. CITY shall notify 10 DISTRICT (Attention: Design and Construction Division — Contract Administration) in writing 11 at least twenty (20) days prior to conducting the pre-construction meeting_ 12 13. Require its PROJECT constriction contractor(s) to procure and maintain 13 comprehensive liability insurance which shall protect DISTRICT and County of Riverside from 14 claims for damages for personal injury, including accidental or wrongful death, as well as from 15 16 claims for property damage, which may arise from CITY'S construction of PROJECT or the 17 performance of its obligations hereunder, whether such construction or performance be by 18 CITY, the aforementioned construction contractor(s) or any subcontractors to said construction 19 contractor(s), or by anyone employed directly or indirectly by said construction contractor(s) or 20 subcontractors. Such insurance shall provide for coverage limits of not less than two million 21 dollars ($2,000,000) per occurrence and shall name DISTRICT and County of Riverside as 22 23 additional insureds with respect to this Agreement and the obligations of CITY hereunder. Said 24 insurance coverage shall be provided by an insurance company licensed to transact insurance 25 business in the State of California and shall be evidenced by a certificate (or certificates) of 26 insurance indicating that the insurance is in full force and effect, and that DISTRICT and 27 County of Riverside are named as additional insureds. Said certificate(s) of insurance shall 28 - 5 - 1190584 1 contain the covenant of the insurance carrier(s) that sixty (60) days written notice shall be 2 provided to CITY and DISTRICT prior to any modification, cancellation or reduction in 3 coverage of said insurance. 4 Prior to CITY issuing a Notice to Proceed to its construction contractor(s) 5 to begin construction of PROJECT, an original certificate of insurance evidencing the required 6 insurance coverage shall be provided to DISTRICT. 7 8 14. [This Section Intentionally I,efl Blank.] 9 15. Require its construction contractor(s) to comply with all Cal/OSHA safety 10 regulations, including regulations concerning confined space and maintain a safe working 11 environment for all CITY and DISTRICT employees on the site. 12 16. Require its construction contractor to furnish DISTRICT a confined space 13 procedure specific to PROJECT. The procedure shall comply with requirements contained in 14 California Code of Regulations, Title 8, Section 5158, Other Confined Space Operations, 15 16 Section 5157, Permit Required Confined Space and DISTRICT Confined Space Procedures, 17 SOM-18. The procedure shall be provided to DISTRICT prior to start of construction. 18 17. Grant, by execution of this Agreement, the right to inspect, operate and 19 maintain DISTRICT DRAINAGE FACILITIES within CTTY rights of way. 20 18. [This Section Intentionally Left Blank.] 21 19. Upon completion of PROJECT construction but prior to DISTRICT'S 22 23 acceptance of DISTRICT DRAINAGE FACILITIES for ownership, operation and maintenance, 24 provide DISTRICT with appropriate engineering documentation necessary to establish that 25 DISTRICT DRAINAGE FACILITIES were constructed in accordance with CITY and 26 DISTRICT approved PLANS and SPECIFICATIONS. 27 28 - 6 - i i aoss_a 1 20. Assume ownership and sole responsibility for the operation and 2 maintenance of PROJECT until such time as DISTRICT accepts ownership and responsibility 3 for the operation and maintenance of DISTRICT DRAINAGE FACILITIES as set forth herein. 4 21. Within two weeks of completing PROJECT construction, provide 5 DISTRICT with written notice (Attention: Contract Administration Section) that PROJECT 6 construction is substantially complete and requesting that DISTRICT conduct a final inspection 7 of PROJECT. 8 9 22. Upon completion of construction of PROJECT but prior to acceptance of 10 PROJECT for ownership, operation and maintenance, CITY'S civil engineer of record or 11 construction civil engineer of record, duly registered in the State of California, shall provide 12 DISTRICT a redlined "as-built" copy of PLANS. After DISTRICT approval of the redlined 13 "as-built" drawings, CITY'S engineer shall schedule with DISTRICT a time to transfer the 14 redlined changes onto DISTRICT'S original mylars at DISTRICT'S office, after which the 15 16 engineer shall review, stamp and sign PLANS "AS-BUILT". 17 23. Accept sole responsibility for the adjustment of all PROJECT manhole 18 rings and covers located within CITY rights of way which must be performed at such time(s) 19 that the finished grade along and above the underground portions of PROJECT is improved, 20 repaired, replaced or changed. It being further understood and agreed that any such adjustments 21 shall be performed at no cost to DISTRICT. 22 SECTION 11 23 24 DISTRICT shall: 25 L Act as a Responsible Agency under CEQA and take all necessary and 26 appropriate action to comply with CEQA. 27 2. Review and comment on all necessary REGULATORY PERMITS prior to 28 - 7 - 118058_4 1 CITY advertising for bids. 2 3. Review and approve PLANS and SPECIFICATIONS prior to CITY'S 3 award of the PROJECT construction contract- 4 4. Inspect DISTRICT DRAINAGE FACILITIES construction for quality 5 control purposes. 6 7 5. Accept sole responsibility for ownership, operation and maintenance of 8 DISTRICT DRAINAGE FACILITIES upon (i) DISTRICT acceptance of DISTRICT 9 DRAINAGE FACILITIES as being complete, (ii) receipt of appropriate engineering 10 documentation as set forth in Section 1.19., (iii) receipt of"as-built" construction drawings as set I I forth in Section 1.22_, and (iv) CITY acceptance of APPURTENANCES. 12 6. Upon DISTRICT'S acceptance of DISTRICT DRAINAGE FACILITIES 13 construction as being complete, provide CITY with a reproducible duplicate copy of the "as- 14 built" PLANS. 15 16 SECTION III 17 It is further mutually agreed: is I_ Except as otherwise provided herein, all construction work involved with 19 DISTRICT DRAINAGE FACILITIES shall be inspected by DISTRICT and shall not be 20 deemed complete until approved and accepted as complete by DISTRICT. 21 2. CITY personnel may observe and inspect all work being done on 22 23 DISTRICT DRAINAGE FACILITIES, but shall provide any comments to DISTRICT 24 personnel who shall be solely responsible for all quality control communications with CITY'S 25 construction contractor(s) during the construction of DISTRICT DRAINAGE FACILITIES. 26 3. Each party, as to any claim or liability arising out of any act or omission 27 with reference to any work to be performed by or authority delegated to such party as a result of 28 - 8 - �isoss_a 1 this Agreement, shall save, defend, indemnify and hold harmless the other party and its officers 2 and employees from all liability for death or injury to person, or damage to property, or claim 3 therefor. CITY shall require its prime contractor to include DISTRICT as an additional insured 4 under the liability insurance coverage required by CITY'S construction contract for PROJECT. 5 4. Any notices sent or required to be sent to either party shall be mailed to the 6 following addresses: 7 S RIVERSIDE COUNTY FLOOD CONTROL CITY OF PALM SPRINGS AND WATER CONSERVATION DISTRICT Post Office Box 2743 9 1995 Market Street Palm Springs, CA 92263-2743 Riverside, CA 92501 Attn: Marcus Fuller 10 11 5. If any provision of this Agreement is held by a court of competent 12 jurisdiction to be invalid, void, or unenforceable, the remaining provisions will nevertheless 13 continue in full force without being impaired or invalidated in any way. 14 6. This Agreement is to be construed in accordance with the laws of the State 15 of California. 16 7. This Agreement is the result of negotiations between the parties hereto and 17 with the advice and assistance of their respective counsel. The ,fact that this Agreement was 18 19 prepared as a matter of convenience by DISTRICT shall have no import or significance. Any 20 uncertainty or ambiguity in this Agreement shall not be construed against DISTRICT because 21 DISTRICT prepared this Agreement in its final form_ 22 S. Any waiver by DISTRICT or CITY of any breach by the other of any one 23 or more of the terms of this Agreement shall not be construed to be a waiver of any subsequent 24 or other breach of the same or of any other term thereof. Failure on the part of DISTRICT or 25 26 CITY to require from the other exact, full and complete compliance with any terms of this 27 Agreement shall not be construed as in any manner changing the terms hereof or estopping 28 - 9 - 118058_4 1 DISTRICT or CITY from enforcement hereof. 2 9. This Agreement is intended by the parties hereto as their final expression 3 with respect to the matters herein and is a complete and exclusive statement of the terms, and 4 conditions thereof. This Agreement shall not be changed or modified except by the written 5 consent of both parties hereto. 6 7 8 9 10 11 12 13 14 15 16 17 1s 19 20 21 22 23 24 25 26 27 28 - 10 - 1180Sft 4 1 IN WITNESS WHEREOF, the parties hereto have executed this Agreement 2 on mAY jI na 2008 (to be filled in by Clerk of the Board) 3 4 RECOMMENDED FOR APPROVAL: RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT 5 lz_ �` By /Vtlq `-'2^ 'U 6 ej&ARIZEN D. WILLIAMS MARION ASHLEY, Chairman �4�/' General Manager-Chief Engineer Riverside County Flood Control and Water 7 Conservation District Board of Supervisors 8 APPROVED AS TO FORM: ATTEST: 9 JOE S. RANK NANCY ROMERO 10 1 County Counsel Clerk of the Board I I By By 12 NEAL KIPNIS Deputy Deputy County Counsel 13 (SEAL) 14 15 16 RECOMMEND PROVAL: CITY OF PALM SPRINGS 17 � f- 18 DAVID J. BARAKIAN DAVID H_ READY 19 Director of Public Works/City,Engineer City Manager 20 APPRO AS TO FOO ATTEST: -- -- 21 By By DOLT LAS C- HOLLAND ES THOMPSON 7 22 City ttorney ,ty Clerk -® 7 1 ( Opp: _ 23 (SEAL) 24 APPROVED QY CITY COUNCIL 25 26 27 2/28/08 TLC:blj 28 - 11 - 116058_4 I IN WITNESS WHEREOF, the parties hereto have executed this Agreement 2 on MAY 1 0) 2008 (to be filled in by Clerk of the Board) 3 4 RECOMMENDED FOR APPROVAL: RIVERSIDE. COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTR^I�CT 5 By 6 WARREN D. WILLIAMS MARION ASHLEY, Chairman General Manager-Chief Engineer Riverside County Flood Control and Water 7 Conservation District Board of Supervisors 8 APPROVED AS TO FORM: ATTEST: 9 JOE S. RAW NANCY ROMERO 10 County, set Clerk of�the �Board � p / / I I By BY �/ lit � L'6 /vim' 12 NEAL KIPNIS Deputy Deputy County Counsel _- 13 (SEAL) 14 15 16 RECOMMEND FOR APPROVAL: CITY OF PALM SPRINGS 17 By 18 DAVID J. BARAKIA DAVID H. READY pp Director of Public Wo s/City Engineer Gity M#raaer 19 6 r 20 APPROVED AS TO F � +-�--�-- 21 BY BY DOUGLAS C. HOLLAND JAMES THOMPSON 22 City Attorney City Clerk 23 (SEAL) 24 25 26 27 2/28/08 TLC:blj 28 - 11 - EXHIBIT A 1a N O N y Z o ENO PROJECT E ANOREAS ROAD w x E TAHQUITZ CYN WAY z I E TAHQUITZ CYN WAY 191 E ARENAS ROAD I LATERAL SAS `r E BARISTO ROAD W Li E BARISTU ROAD BARISTO WASH Z j CHANNEL J I1I E RAMOIV ROAD 4�` � E RAMON ROAD LATERAL L8-1 LI a SEC/N PROJECT 13 I/� J L � E MESQUITE AVE N INDEX MAP Q NTS w s w E MESQUITE AVE 'I IVQQ COOPERATIVE AGREEMENT CITY OF PALM SPRINGS PALM SPRINGS MDP LINE 8 MASTER DRAINAGE PLAN AND LATERAL 8A LINE 8 AND LATERAL. 8A VICINITY MAP EXHIBIT A .SZ9—t7+oo.ao ' B ' 1 w tl cn U1 c->j 1 m ~ � U N � m ' + x o I} N LINE 8 o PLAN I 50 -SO EL CIELO ROAD COOPERATIVE AGREEMENT PALM SPRINGS MRP LINE 8 218 EXHIBIT A 50' S0' -MATCH LINE 8' LLB 7 Q N ' m U N _Z � X O S � � N � s--- Q 0i U) LINE 8 PLAN RAMON RO s w� MATCH LINE $TA. 17+00.00 50 50 COOPERATIVE AGREEMENT PALM SPRINGS MDP LINE 8 318 EXHIBIT A 50' 50� Ia. n' I w Q C-31 3: Ln O x H- 3: U' z m Q C) o I x o LINE 8 PLAN CJ Z m Q MATCH LINE eta' STA. 24+00.00 U COOPERATIVE AGREEMENT PALM SPRINGS MAP LINE 8 4/8 EXHIBIT A MATCH I_INF ITII I FI W U7 Z U) >- � ¢ N I xO �� } in -' z r 00ma C-3i � � LINE 8 PLAN I nazism rzo MA7CH LINE -,..eta STA. 31+00,00 so so COOPERATIVE AGREEMENT PALM SPRINGS MDP LINE 8 518 EXHIBIT A MATCH LINE STA. 45+50.00 _ _ C WON RD _ TAHgWTT I LJJ I � AV— Z N in O x � � z gyof m ¢ LINE 8 AND LATERAL SA PLAN ARFN RD �"- MATCH LINE ETA- 38-i-ob-oo so so COOPERATIVE AGREEMENT PALM SPRINGS MOP LINE 8 AND LATERAL 8A 6/8 EXHIBIT A FIND p 50' S0' a z 0 I co CD c) a , (Z�l U� w C � z z Q Lo Q c� co o LINE 8 0i cn PLAN MATCH LINE 5TA. 4:ii•50.00 �o so COOPERATIVE AGREEMENT PALM SPRINGS MDP LINE 8 7/8 EXHIBIT A /00or Ln TAHQUITZ w c3, LATERAL SA PLAN COOPERATIVE AGREEMENT PALM SPRINGS MDP LATERAL SA 818