1F City Council Staff Report
QORa '
DATE: December 17, 2014 NEW BUSINESS
SUBJECT: EXTENSION OF HOTEL INCENTIVE PROGRAM PARTICIPATION FOR
NEW CHURCH II, LLC AND 750 LOFTS, LLC FOR THE ORCHID TREE
HOTEL, 261 SOUTH BELARDO ROAD, AND THE 750 LOFTS
PROJECT, 750 NORTH PALM CANYON DRIVE FOR A PERIOD OF
ONE (1) YEAR FOR PROJECT ENTITLEMENT, WITH CONSTRUCTION
COMMENCING NO LATER THAN DECEMBER 31, 2017.
FROM: David H. Ready, Esq., Ph.D., City Manager
BY: Community & Economic Development Department
SUMMARY
In January, 2008, the City Council adopted the Hotel Incentive Program which consisted
of two primary incentive components: 1) the construction of new hotels and, 2) the
renovation and upgrading of existing hotels. The Ordinance was extended in May,
2013, with a deadline for qualifying for participation in the Program December 31, 2014,
both for Qualified Renovation Programs and for New Hotels.
These requests to extend the program are from the developers of the Orchid Tree Hotel
on Belardo Road, Downtown and the 750 Lofts Hotel, located on Palm Canyon in the
core of the Uptown Design District. Both projects are well into the design review
process but have had additional time added to their processing time due to historic
preservation issues and community input, given their sensitive locations. This action
would only extend the eligibility of the two projects to participate in the Hotel Incentive
Program but does not approve any actual agreement or amend the Ordinance.
Covenants documenting the agreements would return at a future meeting for Council
approval once the projects are completed with the entitlement process.
RECOMMENDATION:
1. Approve eligibility for participation in the Hotel Incentive Program by New Church
ll, LLC for the Orchid Tree Inn & Spa, located at 261 South Belardo Road for a
period of one year, extending the deadline for project entitlement until December
ITEM NO. ��
Hotel Incentive Program Eligibility
December 17, 2014
Page 2
31, 2015; the deadline for commencing construction remains on December 31,
2017; and
2. Approve eligibility for participation in the Hotel Incentive Program by 750 Lofts,
LLC for the 750 Lofts hotel project, located at 750 North Palm Canyon Drive for a
period of one year, extending the deadline for project entitlement until December
31, 2015; the deadline for commencing construction remains on December 31 ,
2017.
BACKGROUND:
In January, 2008, the City Council adopted the Hotel Incentive Program which consisted
of two primary incentive components: 1) the construction of new hotels and, 2) the
renovation and upgrading of existing hotels. Generally, the program provided for up to
a rebate of a portion of TOT to developers of new hotels for prescribed periods of time,
based on the quality of the hotel. For those hotels undergoing renovation, the City
would keep the historical "base" TOT and share a portion of the TOT above the base.
The 2008 Hotel Incentive Program originally expired at the end of December 2012,
having stimulated an incredible renovation of more than 1,600 Palm Springs hotel
rooms and generating in excess of a $180 million investment in the renovation and
upgrading of hotel properties throughout the City. The exception was the category of
new first class hotels: that class of hotels will expire at the end of 2013.
In September 2012, prior to the original expiration date, Staff asked Council to allow it to
negotiate one-on-one Hotel Incentive Agreements with developers of hotel properties
based on a number of factors: (1) the need for the particular hotel product in the City's
inventory; (2) the demonstrated financial need for the incentive by the Developer; and
(3) the public benefit provided through the development or redevelopment of the hotel.
As Section 5.26.010 ("Purpose"], subdivision (c) of the Hotel Operations Incentive
Program states:
"(c) It is in the best interest of the City of Palm Springs to induce and encourage
the, operation, and maintenance of hotel facilities that would not otherwise exist,
thereby creating new sources of tax revenues for the city's general fund which
supports the public services that the city provides its residents."
In May, 2013, the City Council extended the Program, establishing the following new
deadlines:
"Qualified renovation program" means a property improvement program
undertaken by an existing hotel which invests no less than fifteen thousand
dollars per room, or invests no less than one million dollars in ancillary non-hotel
room facilities and/or space. The property improvement program shall be
comprehensively executed in a single renovation project on the property and be
02
Hotel Incentive Program Eligibility
December 17, 2014
Page 3
under construction no later than December 31 , 2014 and completed no later than
December 31 , 2015.
"New hotel," "first class new hotel," and "comfort new hotel" means a hotel
or first class hotel or comfort hotel that is or was fully entitled as a hotel after
January 1, 2008, but before December 31, 2014 and which is under construction
prior to December 31, 2017. The term "new hotel" does not include all, or any
portion of, or addition to, an existing hotel.
But for the deadlines noted above, these two hotel projects would be eligible to
participate in the City's Hotel Incentive Program. Both the Orchid Tree and 750 Lofts
projects fit the legislative intent of the Ordinance. One project represents both a
new hotel and the retrofit and renovation of two Class 1 historic sites, and the other
project proposes a high quality designed small hotel located in a historic district and an
opportunity to redevelop obsolete properties in the Uptown Design District.
Orchid Tree Inn & Spa
The Orchid Tree Inn & Spa Project proposes the renovation and adaptive reuse of the
Orchid Tree Inn "Bungalow Court Cottages" on West Baristo Road and the historic
Community Church at South Cahuilla Rd. Both the Church and Bungalows are Class 1
historic sites. The Project proposal also includes a new hotel complex of approximately
80 rooms; a restaurant; a banquet and meeting facility; a bar and lounge; a spa; and,
the use of underground and above-ground on-site parking.
The applicant for the Orchid Tree Project, New Church Il, LLC, filed its application as a
Project with the City on June 10, 2014. However, the Developer began working with the
City on a number of general plan and community participation challenges several
months earlier.
• On May 11th the Developer presented again to the Historic Preservation Board
where they received positive feedback on their design.
• Although they received positive feedback when presenting to HPSB in May, on
October 14`h when they officially presented to the Historic Preservation Board
they received a lengthy list of comments and requested changes.
• On November 18th the Developer presented again to HPSB after redesigning the
main hotel building to better suit the HSPB's concerns. The HSPB members
were satisfied with the direction of the project but still had some requests which
the developer is now working to incorporate into the project design.
• The Project was scheduled to return before the Historic Site Preservation Board
(HSPB) on December9, 2014.
03
Hotel Incentive Program Eligibility
December 17, 2014
Page 4
Besides the natural difficulty of redeveloping an older hotel in an established neighborhood, the
Developer is trying to satisfy the community's desire to save the historic church. The
project would combine the restoration and reuse of two historic resources while
facilitating the revitalization of a blighted area in the Tennis Club neighborhood. The
Project will incur costs beyond a normal hotel development, due to the Community
Church retrofit alone because of its substantial damage in a fire in September 2013.
Although they have been advised by multiple structural engineers that it would be more
economical to demolish the church and rebuild due to its structural issues, it is something
they do not want to do. As a result, the Developer would spend approximately $2.5
million to preserve the church to a state that is safe for it to be located on the property of
an operating hotel.
In addition to trying to maintain our damaged historic structure, they have also worked
with the community to develop a project that is appealing to the neighbors as well as
financially possible for the operator. The Developer is working with their architects to
design a first class hotel and is now "costing out" the revisions that have been
requested by the neighbors — such as putting in over half of the parking underground,
which will cost over $1 million.
The Project in the entitlement process today represents the best opportunity to get this
challenging property redeveloped in a first class manner. The Ordinance deadline risks
the loss of this Project and all that it brings to the Tennis Club Neighborhood and the
Downtown area. Without the Hotel Incentive Program it is likely the property could
remain vacant and blighted another decade or more.
750 Lofts
The project is located in a fully developed part of the city in the Uptown D e s i g n
District. It is bounded roughly by North Palm Canyon Drive on the west, East Granvia
Valmonte on the south, North Indian Canyon Drive on the east and Tamarisk Road on
the north. The site is currently developed with a building that previously was
occupied by the Security Pacific National Bank, but has been vacant for several years.
The proposed 750 Lofts hotel project is a mixed use development comprised of a
new four-story structure with commercial/retail space on the first floor fronting Palm
Canyon Drive, a restaurant on the first floor fronting Indian Canyon Drive and parking
at grade for 62 new off-street parking spaces and trash rooms. At the second level is
proposed a spa for hotel guests and 38 new hotel rooms and eight (8) 2-story loft units.
The fourth floor is a sun deck, pool, bar, toilets and support spaces. An existing two
story commercial (bank) building and surface parking lot built in the eighties is proposed to
be demolished to redevelop the site.
In addition to the lot merger, the project is proposed to be connected by a north-south
pedestrian walkway to the existing Alcazar Hotel which is immediately south of the
subject site. The Alcazar has 33 existing hotel rooms and 34 existing parking spaces.
An east-west pedestrian passageway linked to a mid-block cross walk at Indian
04
Hotel Incentive Program Eligibility
December 17, 2014
Page 5
Canyon Drive is proposed to encourage pedestrian connectivity between Palm
Canyon and the neighborhoods and hotels to the east of the site.
The spa on the second floor is proposed for hotel guests only and the fourth floor bar is
proposed to be open to the public.
The proposed project is located within the Las Palmas Business Historic District
(LPBHD). Pursuant to Municipal Code Section 8.05.185, persons wishing to initiate
new construction within a historic district must submit an application for approval to the
Historic Site Preservation Board (HSPB). The required historic site review, as well as
the neighborhood meeting process, has created some additional timing issues in the
approval of the project. In terms of the elements of the entitlement application, the
proposed project is comprised of the following:
• A preliminary PDD in lieu of a change of zone to change the underlying zoning
from C-1/R-3/PDD 104 to PDD 374 and seek relief from the development
standards of those zones and the high-rise ordinance;
• A General Plan Amendment (GPA) to change the general plan land use
designation from Neighborhood Community Commercial (NCC) to Mixed-
Use/!Multi-use Uptown (0.5 FAR, 15du/ac, 30 du/ac w/PDD);
• A Conditional Use Permit(CUP)to engage the High-Rise Ordinance; and
• A lot merger of the subject parcel with the parcels on which the Alcazar Hotel
are sited for purposes of establishing a floor area ratio (FAR) for the
resultant lot that conforms to the General Plan.
So far, after a significant redesign of an earlier plan, the project has been very well
received through the reviewing bodies and through the neighborhood. The major
project milestones so far have been:
• Submittal of PDD Application occurred on 7.16.14 and 8.13.14.
• Neighborhood Meeting was held on 9.1.14.
• AAC Approval of the PDD (6-0 Vote) occurred on 10.6.14.
• On October 14, 2014, HSPB reviewed the proposed development against the
factors outlined in PSMC Section 8.05.190 and the LPBHD Conceptual Design
Guidelines for New Commercial Construction & Major Remodels (11-5-1985) and
approved conceptual PDD (6-1 Vote).
• Major Architectural Application Submittal. Major Architectural Application was
submitted on 11-10-14 and Final Planned Development Application will be
submitted at a later date. Color, materials, specific landscape material and plant
05
Hotel Incentive Program Eligibility
December 17, 2014
Page 6
selections still to be reviewed. The Developer is awaiting hearings to be
scheduled with AAC and HSPB; the application also needs to go to Planning
Commission, and the schedule begins to run into the holiday schedule for staff
review and for meeting dates.
• The Developer anticipated the proposed Preliminary PDD to be final and CD's for
plan check by 1.15.15, just beyond the December 31, 2014 deadline.
The action before Council is merely to establish that, pursuant to Section 5.26.010 (c)
("Purpose"), that it is in the best interests of the City to find and declare that, based on the
importance of the two projects within their neighborhoods or districts, and based on the
significant design work and review already undertaken on the respective projects, that the
City Council would find and declare the two projects to remain eligible for participation in the
Hotel Incentive Program for a period of one year, extending the deadline for entitlement
until December 31, 2015, but not extending the deadline for the commencement of
construction, which remains on December 31, 2017.
Furthermore, neither action makes any findings regarding either project's approval or
entitlement status, and neither project is deemed "approved" under the Zoning Code or under
the Hotel Incentive Program by this action. If completed through the entitlement stage, each
Hotel Operations Covenant would require approval at a noticed public hearing by the City
Council at a future date.
David H. Ready, Esq., h.D. Jo n S. y Director
City Manager Co nity & Economic Development