Loading...
HomeMy WebLinkAbout2/4/2015 - STAFF REPORTS - 2.N. a��P P LM Sp4 iy c V N q q gMggfFO F°"` City Council Staff Report Date: February 4, 2015 CONSENT CALENDAR Subject: APPROVE A PURCHASE ORDER WITH PALM SPRINGS WELDING IN THE AMOUNT OF $62,725 (PLUS APPLICABLE SALES TAX) FOR REPLACEMENT OF DAMAGED METAL SCULPTURES WITHIN THE GENE AUTRY TRAIL MEDIAN From: David H. Ready, City Manager Initiated by: Office of the City Manager SUMMARY This action would authorize staff to coordinate with Palm Springs Welding to fabricate replacement of eight metal "mountain" sculptures and one metal "sail' sculpture for a total amount not to exceed of$62,725, plus applicable sales tax. RECOMMENDATION: 1) In accordance with Section 7.04.030 "Special expertise procurement," of the Palm Springs Municipal Code, determine that Palm Springs Welding is uniquely qualified and an approved sole source for fabrication of metal "mountain" and "sail' sculptures originally installed in the Gene Autry Trail medians in 2003; and 2) Approve a Purchase Order in the amount of $62,725 (plus applicable sales tax) with Palm Springs Welding; and 3) Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS: In 2000, the Public Works and Engineering Department secured over $570,000 in federal funding to install landscaping within the Gene Autry Trail medians (from Vista Chino to Mesquite Avenue) and in Ramon Road (from Vella Road to San Luis Rey Drive). Included as part of the median landscaping was the fabrication and installation of several metal "mountain" sculptures and metal "sail' sculptures at various locations within the medians. The median landscaping and sculpture installation was originally completed in 2003 at a total cost of over $900,000. ITEM NO._kt4---- City Council Staff Report February 4, 2015 - Page 2 Authorize Purchase Order to Palm Springs Welding Over the last 6 years, various accidents have occurred along Gene Autry Trail where vehicles have crossed over the landscaped medians, damaging several of the "mountain" sculptures, and one of the "sail" sculptures. Unfortunately, all of these accidents went unreported (was a "hit and run"), or the driver did not have automobile insurance, and the City has been unable to obtain funding from the responsible drivers to replace the damaged sculptures. It is also important to note that the City's Public Art Fund did not participate in the design, fabrication or installation of these metal sculptures; the City utilized its Gas Tax Funds for the local match to the federal funding secured for the median landscaping and sculpture installation. Although staff considers these sculptures as public art and pursued filing an insurance claim for replacement of them, the City's insurance policies require payment of a minimum $10,000 deductible per incident. At the December 17, 2014, City Council meeting, Council Member Mills requested that staff pursue replacement of the damaged or missing sculptures in the Gene Autry Trail medians. On the basis that the City Council directs staff to have these sculptures replaced, staff has coordinated with Palm Springs Welding for the cost to have the damaged sculptures fabricated. Palm Springs Welding was the original fabricator of the metal sculptures installed in the Gene Autry Trail medians in 2003. On this basis, staff recommends that the City Council determine Palm Springs Welding as uniquely qualified with special expertise to fabricate the replacement sculptures as originally designed. The City Council may authorize procurement to a sole source with special expertise in accordance with Section 7.04.030 "Special expertise procurement," of the Palm Springs Municipal Code, which states: A contract may be awarded without competition when it is determined that an unusual or unique situation exists, in that due to experience and expertise demonstrated in prior contracts with the city a particular contractor is uniquely qualified for a particular task, that makes the application of all requirements of competitive sealed bidding or competitive sealed proposals contrary to the public interest. Any special procurement under this section shall be made with such competition as is practicable under the circumstances. FISCAL IMPACT: Currently, there are various metal "mountain" panels to replace: (1) large panel, (3) medium panels, and (4) small panels; and there is one sail sculpture to replace. Palm Springs Welding has provided the City with a proposal to fabricate and install eight of the metal "mountain" sculpture panels, and one of the metal "sail" sculptures, for a total cost not to exceed of$62,725 (plus applicable sales tax). 02 City Council Staff Report February 4, 2015 - Page 3 Authorize Purchase Order to Palm Springs Welding As a matter of reference, each "mountain" sculpture includes five separate metal panels: two small, two medium, and one large. The current pricing from Palm Springs Welding is: $6,200 for each small "mountain" panel; $6,750 for each medium "mountain" panel; and $7,750 for each large "mountain" panel. Therefore, the total current price of an entire "mountain" sculpture with all five of its panels is $33,650. The current price from Palm Springs Welding to refabricate the damaged metal "sail" sculpture is $9,925. Staff recommends that the City's Risk Management Fund (Fund 540) be used to replace these sculptures, given that the damage was due to an uncollected claim as a result of a vehicular accident. Sufficient funds to encumber for the Purchase Order in the amount of$62,725 (plus applicable sales tax) is available in Risk Management Fund account number 540-5904-48685 (Claims Expense). SUBMITTED Prepared by: Wti1 Marcus L. Fuller, MPA, P.E., P.L.S. Assistant City Manager/City Engineer Approved by: David H. Ready, Esq., Ph.D City Manager Attachments: 1. Map of Locations 2. Palm Springs Welding Quote 03 ^. 03-07-11 Two Mountain Sculptures a-small 1-medium E" .g 08-11 09 Two Mountain Sculptures i-large 1-medium 10-06-08 Two Mountain Sculptures 1-medium 1-small sM.., F 04-24-13 Sail Sculpture i-large 04 ANGM Palm Springs Welding Inc. 1189 Valdivia Way Palm Springs,CA 92262 760-323-4449 Fax: 760-323-2802 CA CONTRACTOR,5 LICENSE NO.265516 TO: PROPOSAL#: 128151 Page 1 PHONE: 760-778-8408 TE: i/28/15 City of Palm Springs BA Attn: Jennifer Henning JOB NAME/LOCATION: P.O. Box 2743 Sculptures Palm Springs, CA 92263-2743 Email: jennifer.henning@paimsprings-ca.gov FAX#: 760-322-8325 CELL#: We hereby submit specifications and estimates for: NOTICE TO OWNER: By signing and returning this proposal, you agree: 1) to acknowledge receipt of this proposal along with the attached exhibits A, B and C; 2) to all of the provisions and conditions contained in exhibits A, B and Q and 3) to adopt the arbitration clause in paragraph 4 of exhibit A. SCOPE OF WORK: Fabrication and installation of sail and mountain sculptures as follows: 1. Eight(8) MOUNTAIN sculptures: a. One(1) large: $7,750.00 each b. Three (3) medium: $6,750.00 each c. Four(4) small: $6,200.00 each 2. One (1) SAIL sculpture: $9,925.00 STANDARD NOTES: Please sign and return one copy of this proposal and any additional paperwork (i.e. HOA approval letter, approved shop drawings, etc.) if and when you choose our company to provide your ornamental iron requirements. A deposit is required with written approval and should not exceed $1,000 or ten percent (10%) of contract price. Work will not begin on your project until these requirements are met. This includes, but is not limited to, the ordering of materials required to fabricate your project. If your project totals more than $5,000.00, we will file a preliminary twenty day notice. This is to protect your interests, as well as ours. At the completion of the project, we will provide conditional releases at the time of billing. When the final payment is made, we will provide unconditional lien releases, relieving you of lien liability. Many cities require permits and inspections when any work is performed on your residence. If you live in a gated community or a community which is governed by a homeowners association, you may be required to also obtain their approval prior to any new installation of ironwork at your residence. Unless otherwise contracted and agree, Palm Springs Welding, Inc. will not be responsible for obtaining permits or HOA approval for the work that we will do for you. All material is guaranteed to be as specified. All work to be completed in a professional manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements are contingent upon strikes, accidents or delays beyond our control. Owner is to carry fire, tornado and other necessary insurance. Our workers are fully covered by Worker's Compensation insurance. 05 �S Palm Springs Welding,Inc. 1189 Valdivia Way Palm Springs,CA 92262 760-323-4449 Fax: 760-323-2802 CA CONTRACTOR'S LICENSE NO.265516 TO: PROPOSAL#: 128151 _ Page 2 PHONE: 760-778-8408 DATE: 1/28/15 City of Palm Springs Attn: Jennifer Henning JOB NAME/LOCATION: P.O. Box 2743 Sculptures j Palm Springs, CA 92263-2743 Email: jennifer.henning@palmsprings-ca.gov FAX#: 760-322-8325 CELL#: I I Palm Springs Welding, Inc. stands behind the work performed by our employees. All materials and workmanship are guaranteed for the period of one year, including finish paint, from the date of completion of installation, typically the date of the invoice. Shop drawings provided upon request and acceptance of proposal only unless architect has provided drawings whereas those specifications will be used. Job installation date will be four (4) to six (6) weeks from receipt of deposit and signed proposal and approved drawings, if provided. For jobs being powder coated, please allow an additional two (2) weeks for installation. If there is any problem with your new ironwork after installation is complete, or if there is any dispute with the amount or type of work invoiced, please notify us IMMEDIATELY. Terms of sale are clearly stated on both the proposal and the invoice; we will not consider disputed charges after a period of thirty (30) days after the date of the invoice. As our company is not a bank or finance company, we will void any warranty on accounts more than sixty days past due. RIGHT TO CANCEL: You, the buyer, may cancel this transaction at any time prior to midnight of the third business day after the date of this transaction. See the attached notice of cancellation from for an explanation of this right. This proposal may be withdrawn by us if not accepted within thirty (30) days. We propose hereby to furnish matgJan or- complete in accordance with the above specifications, for the sum of: / $6�2725.00 J nn Fraancisco,VP of Operations 4 EPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Signature: Date of Acceptance: 06 PLEASE KEEP WITH YOUR FILES '.. EXHIBIT A patty's control. Each party shall use and agreed, Palm Springs Welding, reasonable diligence to avoid any such Inc., will not be responsible for 'I. Contractor shall commence work on delay or default and to resume performance obtaining permits or prior the project within one hundred twenty under this Contract as promptly as possible I-lomeownei's Association approval (120) calendar days after execution of after any such delay or default, It is also for the work that we perform for this Contract and, unless de acknowledged and understood that any you. We also are not responsible layed by one or more of the causes nrlayed by changes in the plans and specifications for any permit or approval fees. All entioed in Paragraph 3 of this Contract, made by either the Owner, Contractor, of material and workmanship are complete construction of the project is any governmental agency will extend the guaranteed for the period of one ('1) not more than six (6) months. It is time in which the Project will be completed year from the date of completion of understood that the thirty (30) day Pursuant to Paragraph 1 above. installation, typically the date of the time period for commencement of 4. If any dispute arises between the parties invoice, except for c❑vcr finish work specified above does not begin concerning this contract or the performance Paint, hardware or any damage to until after all plans have been thereof, the parties agree to dismiss the the ironwork after installation is approved by the applicable dispute to binding arbitration with the complete. There is no warranty for governmental agency and all permits American Arbitration Association pursuant those items. issued by said governmental to its rules. The arbitration venue shall he in agencies. Additionally, it is Palm Desert, California. Contractors are required by law to understood that if the Owner procures be licensed and regulated by the construction financing for the project NOTICE: BY SIGNING THE PROPOSAL, YOU Contractors Stale License Board that the failure to have such ARE AGREEING TO HAVE ANY DISPUTE which has jurisdiction to investigate construction financing in full force and ARISING OUT OF THE MATTERS INCLUDED complaints against contractors if a IN THE 'ARBITRATION OF DISPUTES' complaint regarding patent act of effect pursuant to the requirements a PROVISION DECIDED BY NEUTRAL p 9 g a the financing agency may delay the ARBITRATION. AS PROVIDED BY omi imi is fled within four (4)ss project. Substantial commencem Brit is CALIFORNIA LAW AND YOU ARE GIVING UP years of the date of the alleged defined as when Iron-inddental ANY RIGHTS YOU MIGHT POSSESS TO HAVE violation. A complaint regarding a physical work begins on the project: THE DISPUTE LITIGATED IN A COURT OR latent act or omission pertaining to The failure by Contractor without JURY TRIAL. YOU ALSO GIVE UP YOUR structural defects must be filed with ( ) y lawful excuse to substantially 10 JUDICIAL RIGHTS TO DISCOVERY AND ten ears of the dale of the commence work within twenty (20) APPEAL, UNLESS THOSE RIGHTS ARE alleged violation. Any questions days from the date which the work is SPECIFICALLY INCLUDED THE concerning a contractor may be ARBITRATION OF DISPUTES' PROVISION. SION. IF to commence as set forth herein is a YOU REFUSE TO SUBMIT TO ARBITRATION referred to the registrar,contractor's violation of the Contractor's State AFTER AGREEING TO THIS PROVISION, YOU State License Board, P.O. Box License Law. MAY BE COMPELLED TO ARBITRATE UNDER 26000, Sacramento, CA 95826. 2. - Should Owner fail to pay to Contractor THE AUTHORITY OF THE BUSINESS AND within five (5) days after it becomes PROFESSIONS CODE OR OTHER APPLICABLE LAWS. YOUR AGREEMENT TO EXHIBIT B due any amount payable by Owner to THIS ARBITRATION PROVISION IS Contractor pursuant to this Contract, VOLUNTARY. NOTICE TO OWNER Contractor may by giving five (5)days' written notice thereof to Owner WE HAVE READ AND UNDERSTAND THE terminate his services under this FOREGOING AND AGREE TO SUBMIT "Under the California Mechanics Lien Contract, stop we fk oil the DISPUTES ARISING OUT OF THE MATTERS Law, any contractor, subconhactor, Contractor's Project, and/or use all INCLUDED IN THE 'ARBITRATION OF laborer, supplier, or other person or lawful means, includingwithout DISPUTES' PROVISION TO NEUTRAL entity who helps to improve your limitation actions labor or ARBITRATION". property, but is not paid for Ills or her c❑n!raclors associations induced by work or supplies, has a right to place a Contractor, to prevent further work 5. Should any litigation be commenced lien on your home, land, or property from being done on the Project until between the parties to this Agreement where the work was performed and to all past due payments have been concerning the Project, any provision of this sue you in court to obtain payment. received by Contractor and Owner Contract, or the rights and obligations of has posted a bond satisfactory to either in relation thereto, the party prevailing This means that after a court hearing, Contractor for the payment of all in the litigation shall be entitled, in addition your home, land, and property could be aim❑❑nts that will thereafter become to such other relief as may be granted, to a sold by a court officer and the proceeds clue to Contractor under this Contract. reasonable sum as and for that patty's of the sale used to satisfy what you owe, attorney's fees in the litigation. This can happen even if you have paid 3. Either party, Contractor or Owner, G Statutory Notices are attached as It your contractor in full if the contractor's , shall be excused for any delays or subcontractors, laborers, or suppliers defaults by that party in the B" hereto. remain unpaid. performance of this Contract 7. Many cities require permits and inspections unavoidably caused by the act of the when any work is performed on your To preserve their rights to file a claim or other, the act of any agent of the residence. If you live in a gated community lien against your property, certain other, the act of any governmental or a community, which is governed by a claimants such as subcontractors or authority,the act of any public enemy, Homeowner's Association, you may be material suppliers are each required to acts of God, the elements, war, war required to also obtain their approval prior to provide you with a document called e defense conditions, litigation, strikes, any new installation of ironwork at your "Preliminary Notice'. Contractors and walkouts, or other causes beyond that residence. Unless otherwise contracted 0 7 i I PLEASE KEEP WITH YOUR FILES laborers who contract with owners directly OR MORE (INCLUDING LABOR AND do not have to provide such notice since (3) Issue joint checks for payment, made out to MATERIALS). YOU are aware of their existence as an both your contractor and subcontractors or owner. A preliminary notice is not a lien material suppliers involved In the project. The against your property. Its purpose is to joint checks should be made payable to the LICENSED CONTRACTORS ARI_= notify you of persons or entities that may persons or entities which send preliminary have a right to file a lien against your notices to you. Those persons or entities have REGULATED BY LAWS DESIGNED properly if they are not paid. In order to indicated that they may have lien rights on your TO PROTECT THE PUBLIC. IF YOU perfect their lien rights, a contractor, property, therefore,you need to protect yourself. subcontractor,supplier, or laborer must file This will help to ensure that all persons due CONTRACT WITH SOMEONE WI-10 a Mechanic's Lien with the county payment are actually paid. DOES NOT HAVE A LICENSE, THE recorder, which then becomes a retarded lien against your property. Generally, the (4) Upon making payment on any completed CONTRACTOR'S STATE LICENSE '.. maximum nine allowed for filing a phase of the project, and before making any BOARD MAY BE UNABLE 1-0 ASSIST Mechanic's Lien against your property is further payments, require your contractor to ninety (90) days after substantial provide you with unconditional "Waiver and YOU WITH A COMPLAINT. YOUR completion of your project. Release" forms signed by each material ONLY REMEDY AGAINST AN supplier, subcontractor, and laborer involved in Other than residential homeowners of that portion of the work for which payment was UNLICENSED CONTRACTOR MAY BE dwellings containing fewer than five units, made. The statutory lien releases are set forth IN CIVIL COURT, AND YOU MAY BE private project owners must notify the in exact language in Section 3262 of the Civil original contractor and any lien claimant Code. Most stationery stores will sell the LIABLE FOR DAMAGES ARISING OUT who has provided the owner with a "Waiver and Release" forms if your contractor OF ANY INJURIES TO THE preliminary 20-day lien notice in does not have them. The material suppliers, accordance with Section 3097 of the Civil subcontractors, and laborers that you obtain CONTRACTOR OR HIS OR HER Code that a notice of completion or notice releases from are those persons or entities who EMPLOYEES. of cessation has been recorded within 10 have filed preliminary notices with you. If you days of its recordation. Notice shall be by are not certain of the material suppliers, registered mail, certified mail, or first-class subcontractors, and laborers working on your YOU MAY CONTACT THE mail, evidenced by a certificate of mailing. project, you may obtain a list from your Failure to notify will extend the deadlines contractor. On projects involving improvements CONTRACTOR'S STATE LICENSE to record a lien. to a single-family residence or a duplex awned BOARD TO FIND OUT IF THIS by individuals, the persons signing these TO ENSURE EXTRA PROTECTION releases lose the right to file a Mechanic's Lien CONTRACTOR HAS A VALID FOR YOURSELF AND YOUR claim against your property. In other types of LICENSE. THE BOARD HAS PROPERTY,YOU MAY WISH TO construction, this protection may still be TAKE ONE OR MORE OF THE important, but may not be as complete. COMPLETE INFORMATION ON THE FOLLOWING STEPS: HISTORY OF LICENSED '.. To protect yourself under this option, you must '.. (1) Require that your contractor supply be certain that all material suppliers, CONTRACTORS, INCLUDING ANY you with a payment and performance bond subcontractors, and laborers have signed the POSSIBLE SUSPENSIONS. (not a license bond), which provides that "Waiver and Release"form. If a Mechanic's Lien the bonding company will either complete has been filed against your property, it can only REVOCATIONS, JUDGMENTS, AND the project or pay damages up to the be voluntarily released by a recorded "Release CITATIONS. THE BOARD HAS amount of the bond. This payment and of Mechanic's Lien signed by the person or '..... perforinance bond as well as a copy of the entity that filed the Mechanic's Lien against your OFFICES THROUGHOUT construction contract should be filed with property unless the lawsuit to enforce the lien CALIFORNIA. PLEASE CHECK the county recorder for your further was not timely filed. You should not make any protection. The payment and performance final payments until any and all such liens are THE GOVERNMENT PAGES OF THE bond will usually cast from 1 to 5 percent removed. You should consult an attorney if a WHITE PAGES FOR THE OFFICE of the contract amount depending on the lien is filed against your property". contractor's banding ability. If a contractor NEAREST YOU OR CALL 1-800-32'1- cennot obtain such bonding, it may EXHIBIT C -CSLa (2752) FOR MORE indicate his or her financial incapacity. INFORMATION". (2) Require that payments be made "STATE LAW REQUIRES ANYONE WHO directly to subcontractors and material suppliers through a joint control. Funding CONTRACTS TO PERFORM CONSTRUCTION services may be available, for a fee, in WORK TO BE LICENSED BY THE your area, which will establish voucher or other means of payment to your CONTRACTOR'S STATE LICENSE BOARD IN contractor. These services may also THE LICENSE CATEGORY IN WHICH THE provide you with lien waivers and other forms of protection. Any joint control CONTRACTOR IS GOING TO BE WORKING - agreement should include the addendum IF THE TOTAL PRICE OF THE JOB IS $300.00 approved by the registrar. 08