HomeMy WebLinkAbout3/4/2015 - STAFF REPORTS - 2.G. iy c V N yo a rrovrv^'O Y cgOpost �Pr City Council Staff Report Date: March 4, 2015 CONSENT CALENDAR Subject: ACCEPTANCE OF THE LIFT STATIONS COMMUNICATIONS UPGRADE, CITY PROJECT NO. 14-11 From: David H. Ready, City Manager Initiated by: Department of Public Works & Engineering SUMMARY: Formal City Council acceptance of the Sewer Systems Lift Stations Communications Upgrade, City Project No. 14-11, is required to document the completion of the public works improvement, and to allow the City's filing of a Notice of Completion with the Riverside County Recorder in accordance with Section 9200 of the California Civil Code. RECOMMENDATION: 1) Accept the public works improvement identified as the Lift Station Communications Upgrade Project, City Project No. 14-11, is completed; and 2) Authorize the City Engineer to execute and file for recordation with the Riverside County Recorder a Notice of Completion for the Lift Stations Communications Upgrade, City Project No. 14-11; 3) Authorize release of retention to Veolia 32 days after the recordation of the notice of completion, if no claims are submitted. STAFF ANALYSIS: On July 16, 2014, the City Council approved a Notice to Proceed for Veolia Water West Operating Services in the amount of $35,000 for the Lift Stations Communications Upgrade, City Project No. 14-11. Copy of the July 16 staff report is included as Attachment 1. Veolia has completed the project on September 30, 2014. Staff recommends that the City Council accept the Lift Stations Communications Upgrade, City Project No. 14-11, ITEM NO. City Council Staff Report March 4, 2015 - Page 2 Acceptance of the Lift Stations Communications Upgrade (CP 14-11) as required by Section 9200 of the California Civil Code, authorizing the City Engineer to file and record a Notice of Completion within 15 days of the City Council's action. A copy of the Notice of Completion to be submitted to the County is included as Attachment 2. ENVIRONMENTAL IMPACT: Section 21084 of the California Public Resources Code requires Guidelines for Implementation of the California Environmental Quality Act ("CEQA"). The Guidelines are required to include a list of classes of projects which have been determined not to have a significant effect on the environment and which are exempt from the provisions of CEQA. In response to that mandate, the Secretary for Resources identified classes of projects that do not have a significant effect on the environment, and are declared to be categorically exempt from the requirement for the preparation of environmental documents. In accordance with Section 15301 "Existing Facilities," Class 1 projects consist of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public structures, facilities, mechanical equipment involving negligible or no expansion of use beyond that existing at the time of the lead agency's determination. Therefore, in accordance with Section 15301(a), staff determined that the Lift Station Communications Upgrade, City Project No. 14-11, was considered categorically exempt from CEQA. FISCAL IMPACT: The City Council originally approved a total project budget of $35,000 funded by the Wastewater Treatment Plant Fund (Fund 420). The final construction contract amount is $34,846.19; there were no Change Orders issued. The following table 1 is a summary of the total costs incurred for the construction of the Lift Stations Communications Upgrade, City Project No. 14-11. City Project No. 14-11 Total Construction Phase Approved Approved Final Cost Budget Budget 07/01/14 Southland Water $ 26,547.00 $ 26,547.00 $ 26,409.95 Tech. Subcontractor Veolia Labor 4904.00 4904.00 $4,904.00 Gen. Liability Ins. $231.00 $231.00 $231.00 Veolia 12.5% Markup $ 3318.00 $ 3318.00 $ 3,301.24 Project Total Cost $35,000.00 $35,000.00 $34,846.19 Remaining Balance $153.81 Table 1 02 City Council Staff Report March 4, 2015 - Page 3 Acceptance of the Lift Stations Communications Upgrade (CP 14-11) The Lift Stations Communications Upgrade, City Project No. 14-11, was funded through the following sources as shown in Table 2: Fund Name =Account Actual Wastewater Treatment Plant 420-6800-57038 $34,846.19 Total Expenditures for Project $34,846.19 Project Budget $35,000.00 Remaining Budget $153.81 The City is holding retention of $1,742.31 for Veolia Water West Operating Services, Inc. pending acceptance of the project and filing of the Notice of Completion with the County Recorder's office. Since this project is a maintenance effort, the Finance Department does not need to add the cost of this project to the City's fixed asset system, as no new assets have been created in compliance with Governmental Accounting Standard Board (GASB) 34 Standards for Financial Reporting of Infrastructure Assets. SUBMITTED Prepared by: Marcus L. Fuller, MPA, P.E., P.L.S. Assistant City Manager/City Engineer Approved by: David H. Ready, Esq., City Manager Attachments: 1. July 16, 2014, City Council staff report 2. Notice of Completion 03 ATTACHMENT 04 �QP'LM Sp u N 4 °4`rPr°wN�P City Council Staff Report Date: July 16, 2014 CONSENT CALENDAR I Subject: APPROVAL OF A NOTICE TO PROCEED FOR VEOLIA WATER WEST OPERATING SERVICES, INC., FOR THE LIFT STATIONS COMMUNICATIONS UPGRADE, CITY PROJECT 14-11 From: David H. Ready, City Manager Initiated by: Public Works and Engineering Department SUMMARY Approval of this item will authorize Veolia Water West Operating Services, Inc., ("Veolia") to proceed to upgrade the communication and alarming capabilities to the five (5) lift stations they maintain for the Palm Springs Waste Water Treatment Plant. RECOMMENDATION: Authorize the Director of Public Works/City Engineer to issue a Notice to Proceed for Veolia Water West Operating Services, inc., in the amount of $35,000 for the Lift Stations Communications Upgrade Project, City Project No. 14-11. STAFF ANALYSIS: The current communication system is based on telephone lines and modems. While it works in its current state, it is problematic and not 100% reliable. Veolia staff uses pagers to receive alarms; however they have problems with the phone lines quite often. The loss of communications to the Lift Stations lead to gaps in monitoring that increases the potential for a Sanitary Sewer Overflow. Veolia has had communication failures at least once a month for the last 6 months. The failure periods last from 1 day up to 5 days. During the outage periods Veolia staff is only able to do spot checks once or twice a day. The phone lines are all City lines and as such the repairs have to go through to the City. The existing modem system as connected to the PLC (Programmable Logic Controller — industrial strength computers to monitor and control the plant) is problematic as well. There is feedback from the modem that corrupts the data files in the PLC causing the modem polling to fail, resulting in loss of communications to the Lift Stations. This problem is very intermittent. Veolia staff have been unable to resolve this problem after extensive research and troubleshooting with the equipment manufacturers and vendors. Attached are two reports from Veolia's computerized maintenance systems for your reference. ITEM NO. Z-Z _ 05 City Council Staff Report July 16, 2014 -Page 2 Veolia Notice To Proceed for Lift Station Communications Upgrade (CP 14-11) The new Mission system that is proposed is based on cellular carrier signals; the vendor claims 99.9% reliability. This will be a web based system, which we would log in to a website to see the status of pumps, wet well levels, etc. This new system also calls a telephone number and notifies the user of what the alarm is and requires a response before it is cleared. The price is for an installed system at each of the five (5) lift stations. Also included is the software to allow us to bring the Lift Station data from the vendor's servers to the Supervisory Control and Data Acquisition (SCADA) system. The M800 Service Package is initially included in this proposal, but will have an annual fee of $2,817 to maintain the service package per year moving forward. j This annual service fee will be included in Veolia's new 15 year contract as part of the Operations and Maintenance costs. Per agreement with Veolia, "the City agrees not to solicit or retain any Person other than Veolia to design, construct, manage or supervise any Capital Project without inviting Veolia to make a first proposal to do so . ." Their proposal follows this staff report. FISCAL IMPACT: Sufficient funds are available in account No. 420-6800-TBA (Lift Stations Communications Upgrade)and account No. 420-6800-50000 (Unscheduled Capital Projects). SUBMITTED: Prepared by: Recommended by: Savat Khamphou David J. Barakian Assistant Director of Public Works Director of Public Works/City Engineer Approved by: David H. Ready, City Mega Attachments: 1. Veolia's Proposal: Palm Springs 2014 Lift Stations Communications Upgrade 2. Veolia's Job + Monthly Maintenance Report 3. Veolia's Loss of Communications Report 06 OVEOLIA WATER April 22, 2014 City of Palm Springs 2014 Lift Station Communications Upgrade — Project Proposal Veolia Water West Operating Services, Inc. is pleased to submit the following proposal to upgrade the communication and alarming capabilities to the (5) lift stations that we maintain. Our current system is based on telephone lines and modems. While it works in its current state, it is problematic and not 100% reliable. Veolia staff uses pagers to receive alarms; however we have problems with the phone lines quite often. They are the Cities phone lines so we have to contact the City for repairs, causing additional delay to get the repairs made. The new Mission system is based on cellular carrier signals; the vendor claims 99.9% reliability. This is a web based system, which we would log in to a website to see the status of pumps, wet well levels, etc. This new system also calls a telephone number and notes the user of what the alarm is and requires a response before it is cleared. The price is for an installed system at each of the (5) lift stations. Also included is the software to allow us to bring the Lift Station data from the vendor's servers to our SCADA system. The M800 Service Package is initially included in this proposal, but will have an annual fee of$2,817 to maintain the service package per year moving forward. Our proposal includes: Communications Unit Mission Communications M800 RFU in Flatpak enclosure w/Digital Expansion Board (5) Mission Service Package for one year Dual Band Low Profile Antenna(5) Mission Communications SCADA integration software Construction Management Services Coordinate installationfintegration activities. Monitor daily progress. Monitor schedule. Provide monthly reports. Monitor construction safety. General Liability Insurance Veolia general liability insurance We have negotiated a firm price with Southland Water Technologies (proposal included for reference) who will also complete the installation and integration at the (5) lift stations over a 7 day period. Veolia Water West Operating Services,Inc. O 4375 E.Mesquite Ave Palm Springs.CA g2264 IW veoliawalerna.com Palm Springs 2014 Lift Station Communication Upgrade 2 Our base not to exceed fee for the project is $35,000. Thank you for the opportunity to present this proposal for the 2014 Lift Station Communications Upgrade Project. We look forward to working with you on this project. Please do not hesitate to contact me should you have any questions or need additional information on this proposal. Sincerely, { i i Michelle McLey Project Manager Veolia Water West Operating Services, Inc. 562-397-5706-cell Ved1 Water West Operating Scrvices,Inc, 4575E Mesquite Ave palm Spnngs,(:A 92264 w .veoMwatemamm 08 Southland Water Technologit . ,,, QUOTATION 2588 El Camino Real SWIALANDWATM Quote Number. W1013-13MC Carlsbadd,,CA 92008 Suite F- T k c H r o k o G I k s r . c Quote Date: Jan 30.2014 C r United States Page; 1 Voice: 760-230-5231 Fax: 760-431-7397 Drop Shipment UPS Ground Veolia Water North America eolia Wafer- City of Palm Springs 115 W.Washington Street Palm Mesquite Avenue Suite 1450S alm Springs,CA 92264 Untied States I Indianapolis, IN 46204 i --J Veolia Water NA Y1114 Net 30 Days KB QUOTED TO DOUG LOAR-CITY OF PALM SPRINGS WASTEWATER OPERATIONS 5.00 M803C Mission Communications M800 RTU in 1,996.00 9,975.00 FlatPak Enclosure, includes battery,charger, antenna with bracket,Dallas Keys 5.00 580 M800 Service Package 1 yr 503.40 2,817.00 5.00 650 Digital Expansion Board 495.00 2,475.00 5.00 581 Single Expansion Board Service Adder 60.00 300.00 47.00 AB-70&HK36A1 General purpose Slim Line Relay, 16 Amp 18.00' 846.00 contact,SPOT, 120V 5W60Hz 47.00,AB-700-HN121 Mini 5-Blade Base Socket, Screw Terminals, 17.00 799.00 Guarded Touch Safe Terminal Construction 5-00 j 415C Mission Communications ultra low bss 104.00 520.00 antenna cable-25 feet 5.00 411 3db Gan Low Profile Antenna Without 87.00 436.00 Cable. Dual band tamper resistant without cable.Comes with N to TNC female connector 1.00 550 New Account Setup Fee 250.00 250.00 5.00 651 Mission Communication wet well module- 165.00 825.00 ! includes two current sensors 1.00 586 Mission Communications SCADA OPC 1,790,00 i 1,790-00 integration software Subtotal _ Continued Sales Tax Continued Freight Continued 09 Southland Water Technologit; AfthkQUOTATION 2588 El Camino Real SOU THLANDWATFR Quote Number. 091013.13MC Suits F- i F C H N O I O G 1 E S t I C Carlsbadd,,CA s2oo6 Quote oaten Jan 30, 2014 United Sues Page 2 Voice: 760-230-5231 Fax: 760-431-7397 Drop Shipment UPS Ground eolia Water-City of Palm Springs Veolia Water North Amer ca 75 Mesquite Avenue 115 W.Washington Street Palm Springs,CA 92264 Suite 14505 United States Indianapolis, IN 46204 Veolia Water NA 311/14 Net 30 Days KB 40.00 Labor I Labor Esti hated 8 Hours Per Station, 95.00 3,800.00 Inclusive of Travel I i —I I I 1 1 Subtotal _ _ 24,832.00 Sales Tax 1,589.85 Freght—`—j �T 125.00 .fiy 10 ., 1.4 S.€S, ,fi e 3d6........S bye S€ 6 SE ofiSt 6 8$_gevod sa moo s rd' S «__«. « - r««r« w « lit —s E E 1 O VEOl1A JOB COST ESTIMATE WATER d AOo0 cods Coot Coda Lad" 64ecd00on OnglnN Change Crowco'na t CM Bud041 Coal BIt69a1 603125 16W NIA 0 - 3 603126 IN7 NIA 0 3 $ i 603125 IN$ WA 0 3 f $ 603125 1309 WA 6 $ 3 601126 1310 WA 0 E $ S $01125 1"1 NIA 0 $ 3 3 60112E 1512 WA 0 $ 3 i 6W126 1613 WA 0 3 E 3 - 603125 4114 WA 1 0 3 5 3 603125 161E WA 0 i 3 5 E 603020 `:.leaf WA L _ 3 _ f - 60Wm 1602 WA - $ - L - E 03020 1W3 WA E f 1 603020 16464 WA f 9 f 0 6 20 1605 WA - $ 3 - i 60 - f 3 5 603m 8W m WA s 1 WA $ s 6030m 1BW WA $ 3 5 5 603020 1W9 WA 3 f 60= 1810 WA is $ 606N0 2001 N/A 0 f... 3 . . 5 60M10 2002 NIA $ 3 60M10 2003 NIA $ $ i 60M10 2W4 WA - f - f - S W5410 20M WA y 3 8 306410 206 WA f - $ f 60M10 2W7 WA - 3 smic 2006 NIA 3 i $ 6oM10 DO WA E i $06410 m10 WA $ $ $ W64f0 2011 NIA $ $ i 606f16 20/2 WA Is 3 S smio 2013 WA S $ i BMW 2014 WA f 3 3 SOM10 201E WA E 60M70 2316 WA f $ 60M10 2017 WA $ 3 3 e 10 2015 WA 3 s 3 606410 2019 WA Is S M410 mZ0 WA $ 3 666410 � 2101 WA - - 0 W6410 21a2 WA $ 3 3 IM410 21W WA 3 $ f SM410 2/04 WA 3 $ S0M10 210 WA 3 3 S r q. 006410 Vw MI WA $ E $ 60M70 2202 WA i S B 410 2m3 WA i d $ WM10 2204 WA $ i 10 220E WA $ i ,�, .... - 50e41a 2Wf N/A 0 f E 3 60M10 2W2 NIA 3 $ 3 WMta 23031 WA 3 S $ ()410 2WI WA E 3 f 606410 am WA f f 30 R. Wi02 3000 WA P N01.Mide0aM $ 4903.79 f i 490379 W1362 $ a WTMs s Total 4 sA4].b $ W1026 1001 NIA PM No.2 3 $ $ W1302 5 3 3 f 3 3 Talel4 - - - 13 306 r 601025 M01 WA SR.PM Ne.1 3 f S Job Cost ESNnate Page 2 of 4 Jce 'J.tl: CF.`9utld nf� a{r i • � ..... .ti lA ll.L.} i�.L'.� 'IL� � 4aA�l. um�® • .r•�....�a�m: .: mmwmm �:� if.k`�..ti:#I:�'i.6�..:°iiiX$€�?P`d. .. 3..;,'i� .....s�:•.'��- t �'.•.7;��;$;��%�al'{i�°a9�,f.+..1�.>::': Fs, -z.^z'�^�.ilk?xflCs'.��:..ii '•4�a�.......s„ 'n. .:,��..: a. .;.�t#�:_:�5 .., ..' :•.�7' .:ss.^;4 �#''ldS.��'n%:Ni Palm Springs Monthly Maintenance Report 0612612013 To 07/1012014 Date Complete WO# Equipment Task Description Assigned To Hours 7/10/2013 31550 PLC-MCB-PLC, 'CMU- Doug Loar 0.5 Admin CORRECTIVE MAINTENANCE- UNPLANNED WO Notes: Problem: Phone bill for Lift Station Dialer was higher than normal again. Check dialer settings in PLC. Corrective Action: Found extra character in dialer string. Removed extra character. Downloaded to PLC. Back in service. 7/15/2013 27249 PLC-MCB-PLC, PM-Bi-Annual PLC Dave Sopko 1 Admin Battery Replacement WO Notes: (x) Replace battery on processor board. 2/1712014 33403 PLC-MCB-PLC, 'CMU- Maintenance 3 Admin CORRECTIVE Crew MAINTENANCE- UNPLANNED WO Notes: Problem:Alarm failure, No comminucations at All Lift Stations.. Corrective Action: Reset CPU at Administration Office, Doug programed and cleared system with the Laptop, Put back system on line...All lift Stations are comminucating.. System Good. 311712014 33686 PLC-MCB-PLC, 'CMU- Dave Sopko 3 Admin CORRECTIVE MAINTENANCE- UNPLANNED WO Notes: Problem: Lift stations loss of comunication, Scada data wire framed Corrective Action: check lift stations for proper operation, reboot plc, (still wire framed) download known good program to replace corrupted program on scada.test run ok at this time. 4/12014 34201 PLC-MCB-PLC. 'CMU- Dave Sopko 4 Admin CORRECTIVE MAINTENANCE- UNPLANNED WO Notes: Problem: intermittent loss of communication for lift stations Corrective Action: replace back plane on plc. nessesary to upload program and reprogram when done 4/112014 34277 PLC-MCB-PLC, 'CMU- 1.5 Admin CORRECTIVE MAINTENANCE- UNPLANNED WO Notes: Problem: loss of communication to all lift stations Corrective Action: Verify problem install known good program into PLC,Test OK 411812014 34307 PLC-MCB-PLC, 'CMU- Domingo Felix 7 Admin CORRECTIVE MAINTENANCE- UNPLANNED WO Types C-Corrective P-Preventative S-Skipped Page 1 of 2 15 Date Complete WO# Equipment Task Description Assigned To Hours WO Notes: Problem: PLC loss of communications to lift stations Corrective Action: Reset PLC power. Hard fault. Reset power Soft fault. PLC lost program, reprogram PLC with known good saved program. Run OK. 4124@014 34357 PLC-MCB-PLC, `CMU- Dave Sopko 3 Admin CORRECTIVE MAINTENANCE- UNPLANNED WO Notes: Problem: Loss of communication to all lift stations Corrective Action: Cycle power to plc. reprogram plc test ok at this time 5116/2014 34951 PLC-MCB-PLC, `CMU- 10 Admin CORRECTIVE MAINTENANCE- UNPLANNED WO Notes: Problem: Loss of communicatins from LS-04, 05. Corrective Action: Switched modems. Reset PLC. Reloaded program into PLC. Switched phone lines at the plant. Nothing seems to work. Intermittent communications failures. Left message for Randy Cobb at the City to contact Verizon. Phone lines were fixed the following Wednesday.All back to normal. Summary Total#of WO's 9 Total Hours 33.00 I i I WO Types C-Corrective P-Preventative SSkipped Page 2 of 2 16 Lift Station loss Communication Report L9pi100 OE1V6WeaLKLtai IaLL6ptW C4Nypa14aluue a gppyq +6d TMmleader WUSRmBWO Ce OIl Asdfl1T,p9 U63 U(W) COMP COMFAIL 6/1/1p1414m "MIA 19115 LOPEZ 6/2/20I4Ill 1IS Nola U M ULM) COMP COM FAIL 6/3/2014 4 al 6/M14 37:30 LOPEZ Rl Ill 10 U63 U(W) WMP CUM FAIL 6/2/f0141dW 6, W2141T:02 LOP[2 6/2/201417N I UO2 ULM COMP CUM FAIL Will I'm 6/2/MI4 I6:30 LOPE, 6/21M1417DI I Check the LS am make lvrc the pumps.wovelit". UPI UICO) COMP CUM FAIL 6/2/201414:00 5/3/2014IBM aPEE 6/2/201436:30 I IS CMekbe lSaMmake tun the rr9 UM ULCOI COMP COM FAIL S/S/2014 it 5/5/10141}.W KNOUS S/5/201419W IIS Ryat the PamPl areworkl IS" Bill COMP CUM FAIL 5013011 U:W 513/2014 U:W KNOUS S/31201A 1tW I Ratat he UM U(CUI WMp COM FAIL 4127131415:30 V21/201415:30 KNOLES 4/2 712 014 17:00 I RtAel ties AAS UIWI Camp CUM FAN UM/MM 9t5 4/24/30149:OS HUNRINGER 4/24120MIAA2 1LS AP Uwent down,at Dave know 1OM caul llnlMm,UM t5ICO1 CAMP CUBA FAR 4/24/20149:04 4/2412014904 HUNTMJGER 41`24/}014I0:40 lU All U rood,down,let Dave know so he tol EIK Mem. ISO Uleol COMP CUM FAIL 4/241W]49:03 4/24/SO1n Rall HU4721AOER 4/24)MI41A31 I All IS went Eons,let Urge know,.M tool Liiebem. UNI LSIWI COMP COMFAIL 4/241=49:02 4/24120149:02 HUNCLUBIGER 4/24/2014 14:26 1IS All IS al l down,let Dm know,,he bjWJ xLMm. UPI U(W) WMp CUM FALL 4/M/2014"I 4/M/M149:02 HUNTSINGER Mal 14:23 1U Al lS went dawn,let Dave know a he touW&them, IS RI U(W) COMP COMFAL 4/14/2014(l 4114/M140:W HUNlifiel 4/WW14 o:W I All U wmdawnOmame In PM la town.UO2 a(W) Cap CUM FAIL 4/I4/SC342S0 4/fl/20140:W NUNRINGFR 4/141WI40:W I is AIIUvemtdgeolama Bland IN them.UM U(W) WmP WMIAIL 4114/20142:W 41141M140:W HUpkil OER 4/14/2014OW I AN U were down Diva alemandf them,UN U(CO) COMP WMFAIL 4/14120M T:W 4114/20all HUNEINGEA 4/14/M540W 1l5 ppUwm[dewn OeveomelnaM IN Mem. URs U(CO) Camp WMFAIL l/U/10M):W 4/14120240:W HUNRIHOER 4/u/2014 O,W I U An IS wmi dawn bangs,ale in and f.them. UY$ U(CO) CampWMFAIL V3 012 0 14 10:22 4/10/W1410:22 HOITZINGER V10/20141154 Its AHU wm[d.we,Fat Om knwls.Mtoold Eutlwm. UM UICOI WMP CUM FAIL 4/10Ia1M 10:10 V101201410.12 HUNTIINGER 4/10120M 11'03 I All IS ii down,W Doe I.to M caald Na them, ua3 ULM WMp WM FAN 411002014I0:30 4110/201410:10 HVNit1NGER V10120,,11:01 1Is AN IS went dawn,pot Doe moose he caul lklMm.UO2 UICal WMp COMFAII 4/IO/20149:59 4/2011014 T59 HVIRMWER 4110120M 10:59 !U AN Uwmldaw',We UP.knew go he tool fielhem. li UPI LSIWI COMP CUM FAIL 4/10/2014 9:5a 411020149l HUNRINGER 4/JO/pM 10:55 to make s 1L5 NlUwen[Qawn,lot Dave 4rlmYleM mold fl¢tM1em.U92 LSI WI COMP COM FAIL 1/30/}OL B:A$ 3/30/20141i1O KN]US 31WW149:40 IU NI lIN Stalbm Md Cammunka,lane Ailed,Dave vwMnpt Fp,06uddy[Md e11 Uure ewryNlnBaM iam wor4inF mndftiM. UR2 U(W) Cp WMFAIL 3/30/A19: 3/W/20111:3B RIgIES 3/YJ/10M 934 lU NILtNallon,had Communicate.,Wall,Dove caul rrot ON w Aigift .4U1a mate woo everytMnEeM Is in worklnl[enti0, UK U(CD) Camp CIXN FAIL 41217120119 12' 3/M/20M6:21 M�OM 3/30/MM a27 lU All UN Stglom had CgmdvinKNbn,Faped.0.,mold rot INsoauddyched e9 IS to make um o—ymim,else it in wtrklm,mMition. UM U(CO) Camp COM FAIL 6/30(M4 at0 3ANX146:36 aNOU5 3/30/2X1148:36 1U All Lhe Station,had CwnmuMadend Wed.0eve[wld not Ns.Buddy thylBY Uto m.a.sure e,,Minp eM is In warkinp USE U(CO) COMP roM4i.n. U U(W) COMP CUM FAIL 3/301}014A'W 3/30/XIM634 KNOLES 3/30/LllA 8;31 ]U All Wt Shah,Md CwnauNuli.m Feled,Dmcarld not U 0 tool sum everylNrMee[itin worMy mrMiti.n. YS Ica) WMFAIL 3/29/SOl4}D:M 3/39/30142(I;I4 RNOIES 3/191201421:M 1U AILMStations Md CpmmmUlleru FaiW,Bltld,-I'DavktowmewnaMlNthem. UM U(CO) Camp WMIAII 3/b/20M M:23 9/29/M14p43 PAWS 3/29/2p1421:23 1 U AN Lift Respond had CommunnRom Fnkd.Buddy tall DaYM is tome out aM he them. 0A3 UICO) WMP COM FAIL 3/29/20M10:00 3/29/}0142P.20 KN0LES 3/29IM1421:" I A6LINSLatromhad Commenlutl.ns Faild.RuddvaM OavM 1.mmeom aM fn them.IS 02 AIM) COMP COM FAIL 3/2snOI420:U 3/29/201430:12 NNOLU 3/29/M342hll Ia All GNRatlm had Communications Failed.BuddyallDaMl.cnmeaut Pnd¶ethem. us) UIWI WMp COM FALL 3/2912014 Al 3/29/101410t14 KNOLLS 3/nnil 4 I All UNSta6ma hadCommunlmiom Filial Buddy all Well tittle out.M R.,,am. UM aIW) COMP COM FAIL 3/19/MM 11:00 1/1912014/R30 KNOUS 1/191201420:03 1U ISM UlW1 WMp COM FAIL 1/19/21)Ma:W ]/19/M149:30 KNOUS 1/19,201411:01 1 IS UM UICal WMp COM FAIL 1/IN20141YW 1112IM141510 KNOLES 1111/M6[11:0 lU LSM U(WI WMp CUM FAIL 1/17/2014 JIM 1/IA/M11 11:33 KWLES I/Iq/M1413:0 1I LSM Li l WMP CUM FAIL 12/27/20I319:45 I2/27/MU 21:45 KNOLES 1212?/M1322AS 1A UBe U(W) WMP COM FAIL 12121/M1310:W IV21/2013 EAS RYMER 12/21/2111311:011 1U U0 U(CO) COMP CUM FAIL 11/14IM1311:00) 11/14/M1311:W RYMER 11/14/20I311t5 1 U RoetIl lS UPI U(M) COMP COAL FAIL 11/13/Mlllltl 103/21313ILOI KWER 11/13/W131195 ]U UA9 U(CO) COMP CUM FAIL 11/141201311:03 11/13/M1311:03 RYMER 11/13/M1311MS 1 U UM U(CO) COMP CUM FAIL 11/1312 013 11W 11/13/W1311:M RYMER 31/13/203311A5 IIS UM U(CO) COMP COM FAIL 11/9/201317:W 11/9/H1131636 KNOUS 11/9,lU:W I UM U(Cal COMP CUM FAIL 11/6/20131036 11/7/201310;36 KNOLLS 11/9/MU 1136 ILS "set the U. LEW a(COl WM➢ CUM FAIL 13/13/201311t2 IIIUMIJ 11S2 RYMER 11161.1311:M 10 UM UICO) COMB, CUM FNI ]0/11/M136:0D 10/1}/M33 TM WYMFR IW17120131:W IS" tSI 5 vel ltM we(wellaM rv4e lure the Pump,ate wwkiry.WI COMP 30/1A/MU 23S0 10/14/2013 UW RYMER ID/14/20130:W 4 I L IS Cfec Chec4kReady l Rlion UM LSIWI Camp COM FAIL10/19/M13U:34 10/231301313:33 RYMER 10/U1201319:33 lU tl4cY hall fAbe wrtvnll.M make ore be pomM are workiM. l5M UIWI COM!, COM FAIL 10/1:1/W336M 10/11/2011&.31 RYMER 1011MIC231:31 lU Ge[Y level intM wvtw911 ortl make wra[M Pdmpsare worked. ISM U(CO) WMP COM FAIL 110/1/W11 A00 10/12/201311:30 RYMER IOJ1 212 01 3 1 9:30 lU Check Ideal N the wee wellaN make wane gesnelar.wor". l5M U(CO) COMP CUM FAIL 3 0113/20 1 3 6.W l0/1(IMUfi:W RYMF0. 10/22120139:W lU Checkal n the wal well and make ore the olmmanw.rkf,. UM M(CO) WMP COM FAIL 10/11IM1324:0 ]0/Ill 13:24 RYMER 10/11/M1314:24 1U Re,M eM LS LSM U(W) Camp COM FAIL 10/11120139W 10/11/MU 9:2D RYMER- 10/1I/203310:M 3U U13 U(CO) COMP COM FAIL 10/3/20U 4:43 1013/10134:421 KNOIES 10/3/20135.43 3U R..eheU UM IS(CO) COMP COM FAIL 9/n/1Y132D:W 9/22/W1319l RYMER 9/u/M13 M41 SLS ReleltMU. UM IS Ica) WMp CUM FAIL 9/11/10136:00) 9/22/2033BASRYMER 9/22/30139:18 lU Resettle U. UM Is Ica) WMP CUM FAIL 9/21/2013 21:00 9/11/20133.W RYMER 9/21/W3I 21W I peselthe Is. UM UIW) COMP CUM FAIL 9/21/201320:00 9/21/2013 M:W RYMER 9131IM13 I1W I IS pages the U. UA4 UW) COMP CUM FAIL 9/2D/2013IB:M 912CV201316:IlO RYMER 9/20/Ell ILS Reul the B. 15 R1,a2,13 U 1W) WMp COM FAIL 9/3/M1319:56 9/3/2V3319:52 Ali W3/201322,11 lU C.mmuni[.tmmFalladatall U.BuddYalH6oched dl LSlp make ton evenM1inE i,runnln9. AIIG.adl USA IS IWI WMp COM FAIL 9/1/MI33IH5 9/2/2013 VAS KNOLS 9/2/}OU 16A5 IU Resettle U. LSRS UIW Camp COM FALL9/1/M1312U 9/I/201312:15 KNOtES 9/I/MI313:15 1IS Rout the U. U54 l5(Wl COMP COM FAIL 9/1/M139:W 9/1120139:110 KNOLLS 9/1/201310:0 lU ReuttM IS U54 U(COI COMP COM FAIL 9/1/203311.13 411/20135:011 kill 1/3/20136:131, lU Reset the _ I PrepP.ed by Ron,Humlireer 7/1/M14 Lift Station Loss Communk tlon Report Laoilm 65iYo1mpagdPt Sl» glNp el NlMe pat9�l.pn10>y Seam NWer OEl>a�pICM EAR "um Milan UM COMP COM FAIL 9/1/2013 LAP 9/1/2013IAP KNOUS, 9/1/M133A0 115 Rayt Ae LS, LS Y9 "(CO) GIMP COM FFJL 2/25120131&30 01291301116:SO FROM 8/29IM1317:05 1IS Maet the U. "at LS(CO2 COMP COM FAIL MVM1316:W W12M1314:M NUNItEWER 6/l3/M1315:W I R.ew.nd werylhiry is wOrNry. Ua5 U(CO) COMP COMFAIL In1/M1312:35 3/33n0U 14:4S NUN WER I/3F/203315.15 IU Ra.ttMU Ups U(CO) DaHP OOM FAIL I/91/M13 W:D0 I/31/M13 1000 NUNTnNGat I/31IM310:31 3 L5 ".,the U Ups UICO) COMP COM FAIL 3130/M13A:W ?IMIN13e:W KNOLES 2130/2013 S,W I Reset the LS I565 LS 1w) COMP WM FAIL 1/26FM133A9 3/2612S,133.0 KNOLES 2/2G/2sM4A9 1IS RWt tha IS I3 PS IS(wi COMP WM FAIL 1/16/M1334:W VU/2111315:15 RYMER 711WZ0131S30 ILS ResettheU "as IS Coal WRAP WM FAIL 7/WW33 RAS 7/15/M136:45 NIINMRKER 7115/20111W 1Lt R..V,a S UNS IS(W) COMP WM FAIL I(13/201330A] 2/13/MI310:1111 RYMER 7101201311:0 1L5 Resettheu UPS LS IWI COMP COM FAIL 6AS'"1316U1 6/36/M13 U:02 KNOLES 6/161201319:59 1L2 pytaM.wrythlq bpood. UPS LS(W) COMP COM FM NR/20139w yW201310W RYMER 6/R/M1312:W IU "PettlNNallen URl BIDS) COMP COM FAIL SAl/20137'00 5/31/M131DO KWUS 5/31IM33I:30 IIS Bpi U(w) COMP COM FAIL 5/31/2013 RIM 5/31/M336A2 KKVIFS 5/33/M13I:15 I RUET THE 12 Bpi IS(w) COMP COM FAIL S/IW01312:25 5/19/MI311:1e KNOUS 5/19/M1316:11 IIS U's L51C0) WMp WMFML 5/1/3013 M:00 5/3/M3336:00 RYMER S/1/M13140w 1Is UP2 is(CO) COMP COM FAIL SAJ2013115e 5/1120o 13:54 RYMER 5/1/MI313:Sa ILS MIS U(C01 COMP WM FAIL S/VNU 12:32 5/1/MI1IY.32 RYMER S/l/M131212 ILS 1541 L51W1 COMP COMFALL 4/111"1322:00 4/901201322'W RYMER 4130/M3323:50 1L5 WLcammrnlo[bns, FA[rtut Me Band NtOm Lmwofthe bsicomminitationt. At UN Statia UIWI COMP COM FAIL 12/13/202212:55 1VIII201216:SS RYMER 12/13/M1219:M IIS Loss Cynmuniratlon.NlRl mryeaq AR Lin SNIN LS IWI COMP COM FAIL IVIZIM12IN 12/12/31N2 I:W KNOLES IVL212011 A SO 1L5 IeasCwnmuNutlon.RtMevarymlq AII LIN Sbtb l5 lCOl COMP COM FAR 1212/W2130:A5 I217/201210:95 WM IV2/201212]2 ILS less CMnmoNMMn.Rest.vaMM1iry All Aft SMtb U lw) CpAP COM FM 12/1/M32430 12/V20129:30 LOPE2 IU00121130 1L5 Less CommuMtltbo.Reset evs"W, All LIFT Statlo IS JW) COMP WMkt 11/29fM1217:" it/n/M1219:27 lolea 11/29/201221:27 1U Lest COmmunlotbn,A.,.v.ryeMry All Let Slade U(CO) COMP COM FAIL 121W20122000 M/WM32 M:W LOPU 11/26/M1222'.W lU Lett Cemnvnketbn.Reytw.rylM1iry Up163 U(W) COMP OM FAIL 11/1S/20129.00 I1f2S/M129:00 KNOUS 11nVM1210:M 3U feu COmmunkatbn.R.yLmrytMnP Bpi LS(W) COMP WM FAIL 11/23/201216:69 11/23/2012 MA9 KNOLES 11/23/M1210:15 ILS Lab Communkalbn.R..,avavFd., Upi U(W) WMP COM FAIL 11/26/2012In 11/23/20128:M KNO16 11n31MII2O011 1U Lab C.mnwnkatien,ReylmMMnp UO2 IS(M NbIP COM FAIL W231M322:49 IV33/M322:49 KWW 11/23/2012In 10 Iets Communkuien.Peak np U62 IS(COl WMP COM FAIL LWZ/X)126:W 11/22/M12643 KNOIES I1/22120128a5 1u bb CCmnwrica .RasatmrylMiy. Uhl is(col Dame WMFAIL 11nV2p122:W 11111/MIl 242 KNOIES 11/211W126K10 ]U Less Cam.nocIlian.RP tmryMRIR UR2 EsfWI COMP CpM FAIL 11/20/M129:21 IVNIM2211.M MISS 11/201301223M IIS Las.CwnmuMtaldo,Rea —"" Ual UIWI COMP WMFAIL 1VW20129:17 11/M/10t219:M KNOUS 1V20/101221W lU led,C.n,..n ,pR..R6y,nerylMq UR6 121WI COMP COMFA6 1VM/M123:01 11129/30123:05 KNOtES I1/2D/M12e92 lU bat CaMnunWlbn.ReutavaryWq IS N IS IWI WMP WMFAIL IIIISVM1219:51 12/191201219:51 KNO S I1/19/20133R39 I IS Leal Cormnulautlm.Rest ewrylMq UM UICOI WMP COM FAIL 1VM20123:I9 11/19120123.11 PNOLES 11119/2013A60 lU Less CommuMptlao MyreveMhlry LSM IS1w1 COMP COM FAIL 11/16/M3216:19 1V111=211:19 RNOLES IV1pn0122Y:W 1L5 Lobc..Nutlar,Ruetev.rymiry U.l LS IW) COMP OM FAIL I1/1C1M1210.11 ll/I4/M3218:10 KNOLES 11/1.13012 M,10 I Lou CommunlM,bn Reseteve"in, LSO L51W1 COMP MM FAR 11112M1230:05 11112/M122:30 RYMER 11112/20123:45 IU L.CammunWlbn.Rete,FyalpMry All III Subs U(CO) COMP COM FAIL 11/11/$113220.02 ll/1LM12 II:OD RYMER 11/1VM32 M:00 All IU Lob C.mM�nWlNn.ptse{eyeryNvry AI I LM SU(0) COMP COM FAIL 11/10/M126:W 11110JM126:30 RYMER 1111WM127:30 IU Lws CenvlMnbtbn.R.yl.wrytMry Rt S4.Wtatlo U(W) COMP CIXd FAIL lOnO1112:00 11/9/M3212M RYMER IM201213:30 1 U Lob Ce nit'atbn Rayl averyllyry 6K l3ICE) Camp WM IAIIL U17/201116:00 11MM1212:06 RYMER IWIN12 M:30 115 Leb[emmvnkatien LS 02 Is(CO) COMP COM FAIL 1117MIJ M:W UPIMI12 IS:OF GUWARA 1112/MI216:15 1l5 Lob C.,n.nkatbn ups LS(CO) COMP OM FAIL 11n1201215:W 11/7/301215:A5 KWLU Lin/M1216:02 IIS Lv11Commankatl- Ua1.3,3,e,SUlw) COMP WM FAIL 9/12/M2216:w 3/12/M2216:W KNOUS S/12/Ml219,W 1U MadewndllAviatbnsare bark..h'M. LSRl,3,3A,9U1W) WMp COM FAIL R/1LM12H:10 8/32/Ml1 ljd Kwus 8/12/M321CM ILS Lost wm.ni.tid.at aL lNt NatimS UP UIWI COMP MM FAIL 8/5/M1211:21 A/S/M22 law KNOIES 6151=2 U.30 IU Wst wmmunkatives UK2 UIWI COMP WM FAIL R/VM1211:19 11/4/MA219W KNOUS E/6/M322190 1 IS LnrtmmmenWtlona IS 12 UIWI COMP MM FAIL NOD1213:17 R/6/201214:00 KNOLES 1/e/M1216:W i L$ Lw[mmmunicalbm ISa2 UIWI COMP COMFAIL 2/19/M122SM I/19/201123:W LOPEI 2/19/M3213',55 1 IS Lwtwmmunkativnl L512 IS1w1 WMP COM FAIL NW201220M 712912012 213,30 LOPE? 7/29/M3221 J,, lU lottwi pkaticns IS" IS 1COl WMP COM FAIL 6/4/M3234 W 614/201234:W NUNRINGER SIS1201111:M l U is OR U(Wl COMP COM FAIL SYZVW12IG40 5/26nD1211:W KNOLES V2 6/2012 13:W 1 LS UM IS IWI COMP COM FAIL 5/19/21)3211:42 S/19/2D1215:W RYMER 5119/2 012 16:W 1I5 URS IS(all COMP COM FAIL 5/16IM1210.W 5/16/203210:W BMW 5/16/203230:30 IU LIA Communiolbo Reset the lS Up2 Is(COI Camp COM FAIL 2/201=24:12 2/M)M122:30 RUNZNGER 2/2/20U Ipo, I W Frtpat.d by%en Munte,.r 0/I/Mla Palle 2 ATTACHMENT 19 Recording Requested By: When Recorded Mail To: Name: City of Palm Springs Street Address: 3200 E Tahquitz Canyon Way City& State: Palm Springs, CA 92262 SPACE ABOVE THIS LINE FOR RECORDERS USE NOTICE OF COMPLETION (CA Civil Code §§ 8180-8190, 8100-8118, 9200-9208) NOTICE IS HEREBY GIVEN THAT: 1. The undersigned is an owner of an interest of estate in the hereinafter described real property,the nature of which interest or estate is: Fee 2. The full name and address of the undersigned owner or reputed owner and of all co-owners or reputed co- owners are: Name Street and No. City State City of Palm Springs, 3200 E Tahquitz Canyon Way,Palm Springs, CA 92262 3. The name and address of the direct contractor for the work of improvement as a whole is: Veolia Water West Operating Services, Inc., 23654 Network PI,Chicago, IL 60673 4. This notice is given for(check one): W Completion of the work of improvement as a whole. Completion of a contract for a particular portion of the work of improvement(per CA Civ. Code §8186). 5. If this notice is given only of completion of a contract for a particular portion of the work of improvement (as provided in CA Civ.Code §8186),the name and address of the direct contractor under that contract is: 6. The name and address of the construction lender, if any, is: Not Applicable 7. On the 30 day of September,2014,there was completed upon the herein described property a work of improvement as a whole(or particular portion of the work of improvement as provided in CA Civ. Code §8186)a general description of the work provided: City Project No. 14-11,2014 Lift Station Communication Upgrade Project 8. The real property herein referred to is situated in the City of Palm Springs ,County of Riverside State of California,and is described as follows: APN: 680-020-052 9. The street address of said property is: Palm Springs Wastewater Treatment Plant,4375 Mesquite Avenue, Palm Springs,CA 92264 10. If this Notice of Completion is signed by the owner's successor in interest,the name and address of the successor's transferor is: Not Applicable I certify(or declare)under penalty of perjury the laws of the State of California that the foregoing is true and correct. Date: By: Signature of Owner or Owner's Authorized Agent Print Name 20 VERIFICATION 1, Marcus Fuller ,state: I am the Assistant City Manager/City Engineer("Owner"."President", Authorized Agent","Partner",etc.)of the Owner identified in the foregoing Notice of Completion. I have read said Notice of Completion and know the contents thereof,the same is true of my own knowledge. 1 declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed on (date), at (City), (State). Signature of Owner or Owner's Authorized Agent A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy,or validity of that document. STATE OF CALIFORNIA COUNTY OF On (date),before me, Notary Public (name and title of officer)personally appeared who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s)acted,executed the instrument. I, certify under PENALTY OF PURJURY under the laws of the State of California that the foregoing paragraph is true and correct. Witness my hand and official seal. Signature 21