HomeMy WebLinkAbout3/4/2015 - STAFF REPORTS - 2.I. 40�pALM SA9 iy V N + rrova.co. Cq�IFORN,P City Council Staff Report DATE: March 4, 2015 CONSENT CALENDAR SUBJECT: APPROVAL OF PROPOSAL FOR AN AMOUNT NOT TO EXCEED $36,000 FOR DESIGN SERVICES BY MSA CONSULTING, INC. FOR THE TAHQUITZ CREEK TRIANGLE GATEWAY, CITY PROJECT NO. 14-16 FROM: David H. Ready, City Manager BY: Public Works & Engineering Department SUMMARY: Approval of this item will approve the proposal and authorize MSA Consulting, Inc. to design plans and estimate for construction of Tahquitz Creek Triangle Gateway, City Project No. 14-16, in accordance with their on-call agreement no. 6445. RECOMMENDATION: 1. Approve the proposal from MSA Consulting, Inc. for an amount not to exceed $36,000 for design services for Tahquitz Creek Triangle Gateway, City Project No. 14-16; and 2. Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS: On November 6, 2013, City Council approved Agreement No. 6445 with MSA Consulting, Inc. for On-Call Civil Engineering Design Services on an as needed basis. When design services are needed, the agreement authorizes staff to seek a proposal from one of the on-call firms. Council may then approve the proposal, thereby authorizing staff to prepare a purchase order for the design services. Staff sought proposals for design plans, specifications and estimate for Tahquitz Creek Triangle Gateway, City Project No. 14-16. In July of 2014, City Council Subcommittee directed staff to initiate the first phase of design, develop a preliminary concept plan for Tahquitz Creek Triangle Gateway project, using an on-call engineering firm. Staff received a proposal from MSA ITEM NO. �� City Council Staff Report March 4, 2015 -- Page 2 Approval of Proposal for Design Services by MSA Consulting, Inc. for Tahquitz Creek Triangle Gateway, City Project No. 14-16 Consulting, Inc. for $23,500 to develop a preliminary concept plan. On December 17, 2014 City Council approved a change order for $9,000 adding a hydrology study, so that Riverside County Flood Control (RCFC) can be contacted for approval of undergrounding drainage. Staff received a letter of support from RCFC on December 30, 2014, Attachment 1. On February 2, 2015 staff met with City Council Subcommittee to review concept plans, Attachment 2, and hydrology study provided by MSA Consulting, Inc. City Council Subcommittee agreed with preliminary concept plans and directed staff to request a proposal for final design. The proposal cost for Tahquitz Creek Triangle Gateway design services is not to exceed $36,000, Attachment 3. This proposal will deliver final design plans and construction estimate for the triangular parcel of land located between Riverside Drive and South Palm Canyon Drive south of Sunny Dunes Road. Construction of this project will convert the existing open surface flow to an underground storm drain system to improve the RCFC owned triangle parcel as a trail head; establish a bike path and landscaping. CVLink improvements such as: charging station, shade structures, associated hardscape, lighting, electrical design, benches and other amenities are being deferred to CVAG to install as part of the CVLink Project. Once design is complete staff will submit plans to Riverside County Flood Control (RCFC) for final review and approval, CEQA action and cooperative agreement to perform construction, on RCFC's parcel. FISCAL IMPACT: Sufficient finds are available in Measure J account No. 260-4500-59447. Recommended by: Approved by: A MareA L. Fuller David H. Rea Manager Assistant City Manager/City Engineer Attachments: 1. RCFC letter of support 2. Preliminary Concept Plan 3. MSA Consulting, Inc. Proposal 02 ATTACHMENT 03 WARREN D. WILLIAMS 1995 MARKET STREET Cicncrd titauager-ChieCEnginccr RIVERSIDE:.CA 92501 95 L .1200 FAX 951.78R9965 wuw.refl ood.01 167086 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT December 30, 2014 Mr. Marcus L. Fuller City Engineer City of Palm Springs 3200 E. Tahquitz Canyon Way Palm Springs, CA 92262 Dear Mr. Fuller: Re: Tahquitz Creek "Dail Triangle Gateway Project On behalf of the District,. I am writing to express our support for the City of Palm Springs' Tahquitz Creek Trail Triangle Gateway Project which will establish a trail head on the District's parcel located on South Palm Canyon Drive and Sunny Dunes Road adjacent to Tahquitz Creek. The City's consultant has developed alternatives for consideration that include re-routing the storm flows currently tributary to this area into an underground system which would allow for the development of the trail head. 'The preliminary analysis also recommends that the City address stormwater treatment options for eliminating polluted runoff into "Tahquitz Creek with the installation of Best Management Practices to treat the hydrocarbon pollutants load associated with the three (3) acre watershed tributary to this site. The City is proposing to implement this project and is applying for State Department of Water Resources urban Streams Restoration Program funds. The District supports the application and implementation of the project. Many years ago the County Board of Supervisors recognized the trail potential associated with many District properties. The Board mandated that when and where feasible, practical and safe, the District enter into cooperative agreements (which explicitly assigns the cost and liability associated with all recreational activities to the partnering agency)that will result in the dual use of District properties. Based on our past successes and the continuing need for recreation trails throughout the County, the District is committed to continue to seek these opportunities. Please accept this letter as my support for the project. Once the project is ready to move forward, please contact the District so we can begin the final approval process, which will involve the review and approval of the plans, the District's CEQA action (based on the City's CEQA document) and the development and execution of the cooperative agreement. Should you have any questions, please feel free to contact Zully Smith, Chief of Operations and Maintenance Division at 951.955.1280 or email zsmith(r),rcflood.org. V u yo t 'ARREN D. WILLIAMS General Manager-Chief Engineer cc: Jason l;hley Zully Smith lmad Guirguis /.S:rlp 04 ATTACHMENT 05 DRAFT Site Plan - Sheet 1 — ? Tahquitz Triangle Gateway Palm Springs,CA I December 2014 i Imara nrs neeeee i N 40 8 0 40 - dre<t Orel si9e � j O 0R I , 3' 14' 3' 10' 10' 8' shared-use travel lane travel lane parking path MEF..... 36 chic RIVCRSIM DR F amund 1 � � '- eev.tree ca) Hew ie�e , placation sue n x�,} " J� Y tmc _l _ c O as DRAFT Site Plan - Sheet 2 Tahquitz Triangle Gateway Palm Springs,CA I December 2014 N F-------1_____j O 0 40 soft O LL VdI4 ' Q .. y , z i LL __ Co deL athw r � � / o "r ' "lam' O %<;`•� DRAFT Details - Sheet 3 P. Tahquitz Triangle Gateway ' Palm Springs,CAI December 2014 YS ALUMINUM .. 'btl • ALL METAL IS POWDERLOAT �;. FINISHED ALUMMM • BAC1 SS STYLE WLONO • ALLMEfALISPOWDERCOAF FINISIILD BENCH R3 BMf RACK IRECTIONAL COLOR AVAILABLE hk E I n n,h lcubm MI,hrs evelaeYl splNau Bbtl ConshucWn Satln flaeN • 6"EYmeM mlumn .•. ..: � `�, • LED YmpnlwsYm wbm evaMtlb) L TYB6WIttICUSTOMCDLORINSERT `J SMAR POWERED LED CENTERLINE MA 0 DRAFT Details - Sheet 4 Tahquitz Triangle Gateway - "'—.- Palm Springs,CA December 2014 15#0'SHADE PANEL • TWO LSEV PARKING SPACES AND MOUNTED WITH SOLAR CHARGING UNITS PER STATION SHADE STRUCTURE VATH SOLAR PANELS SEAT WALL • T K 1S'PER LSEV PARKING SPACE IT v 1Y MINIMUM) EV CHARGING STATION FF1 T 5' 15.5 VEHICLEORIENTED 5115' • INTERNALLY LIT CHANNELIZED LETTERS AT PATHWAY INTERSECTIONS • GRAPHIC MAP ON REVERSE IDENTITY WON DIRSCMILALSRRI Q f ATTACHMENT 10 PLANNING ■ CIVIL ENGINEERING ■ LAND SURVEYING February 23, 2015 Mr. Marcus Fuller CITY OF PALM SPRINGS 3200 E. Tahquitz Canyon Way Palm Springs, CA 92262 Subject: Revised Proposal for On-Call Civil Engineering Services (RFP 6033) Tahquitz Triangle Gateway Final design Dear Mr. Fuller: In response to your recent request, MSA Consulting, Inc. (MSA) is pleased to provide you with this scope and fee for developing final design and improvement plans for the triangular parcel of land located between Riverside Drive and South Palm Canyon Drive south of Sunny Dunes Road under our On-Call Engineering contract. Our proposal is based upon the information provided to us by Allen Smoot in a letter dated February 4, 2015, and our understanding of the City of Palm Springs expectations and requirements. Revisions to the proposal address your comments of February 19. Scheduling for the work will commence upon receipt of a signed copy of a Purchase Order. All terms of our On-Call Civil Engineering Agreement dated November 18, 2013, shall apply. We have included in both our scope and fee subconsultant work by Buccino Associates, as requested. We hope the attached scope and fee are consistent with your requirements. We appreciate the opportunity and would be pleased to answer any questions. Very trours, odR ney R. Reed, P.E. Senior Project Manager MSA Consulting, Inc RRR:rp Enclosures Exhibit A — Scope of Services Exhibit B— Compensation ,R MFJW Tw gle Gala Fo azis.+sm Via Electronic Mail 11 34200 BOB HOPE 17RIVF ■ RANCHO MIRAGE ■ CALIFORNIA ■ 92270 760-320-9811 ■ 760-323-7893 FAX 0 www.MSACGNSULTING1NC.COM City of Palm Springs On-Call Civil Engineering Services Tahquitz Triangle Gateway Final Design Page 2 February 23, 2015 EXHIBIT "A" SCOPE OF WORK MSA (Consultant) proposes to perform the following tasks: Plans, Specifications and Estimates Additional Base Survey and Topography 1. Conduct field survey to collect additional topographic data along Riverside Drive; process data and create AutoCAD drawing file. Final Improvements Design 2. Based on compiled existing utility and field survey information, prepare a Precise Grading and Paving Plan at a scale of 1"=20', based on approved site plan from Alta. The Plan shall include the proposed Shared-Use Path along Riverside Drive to Calle Palo Fierro and improvements to the area between Riverside Drive and South Palm Canyon Drive, with CVLink improvements (charging station shade structures and associated hardscape, lighting and electrical design, etc.) shown only as reference to future design; process Plan through City for approval. 3. Prepare Storm Drain Plan for undergrounding of existing storm drain ditch; submit and process through City for approval. Final Hydrologic/Hydraulic Analysis 4. Update and revise Preliminary Hydrology Analysis to reflect final improvements. 5. Perform hydraulic analysis of final storm drain configuration. Cost Estimate 6. Prepare an Opinion of Probable Cost of project construction. Landscape Design (by subconsultant Michael Buccino) 7. Prepare a landscape plan, including landscape lighting and irrigation design; process through the City for approval. Please note that the Preliminary Landscape Design included in the scope and budget of the Preliminary Concept Plan contract was not used and will not be invoiced. 34200 BOB HoPF .DRIVE ® RANCHO MIRAGE 0 CALHFORMA M 92270 �. 2 760-320-9811 n 760-323-7893 FAX ® www,MSACONSIA_TIIvGINC.COA4 City of Palm Springs On-Call Civil Engineering Services Tahquitz Triangle Gateway Final Design Page 3 February 23, 2015 CLIENT RESPONSIBILITIES and ASSUMPTIONS The following has been taken into consideration in the preparation of this proposal: 1. City to provide access to site. 2. City to provide City Improvement and Utility Plans. 3. City to provide baseline specifications. 4. City to coordinate electrical connection for landscape lighting and irrigation. 5. It is assumed that the existing concrete drainage flume from Riverside Drive into the Tahquitz Creek Channel, roughly 250' east of South Palm Canyon Drive, will be extended to the new curb line (if necessary) rather than replaced by new underground storm drain facilities. EXCLUSIONS Consulting services relating to any of the following tasks are presently specifically excluded from the agreement. Some items, if required, may be provided by Consultant by separate written proposal with additional fees approved by the Client: 1. Agency fees/research costs. 2. Potholing/Pothole coordination. 3. Utility relocation coordination. 4. Boundary survey. 5. Geotechnical studies or soils report. 6. Any new special studies, including environmental, traffic, etc. 7. Plotting of easements. 8. Construction staking. 9. Bid documents, specifications, bidding assistance or construction administration. 10.Improvement plans other than those listed in scope. 11.Electrical design. 12.Lighting design, other than landscape lighting. 13.Plan and profile drawings of Shared-Use Path. 14.Fugitive Dust Control Plan (PM-10). 15.Custom water quality BMP coordination. 34200 B06 HOPE DRIVE z RANCHO MIRAGE N CALIFORNIA ■ 92270 13 760-320-9811 ■ 760-323-7893 FAX N www,MSACONSULTINGINC.COM City of Palm Springs On-Call Civil Engineering Services Tahquitz Triangle Gateway Final Design Page 4 February 23, 2015 EXHIBIT "B" COMPENSATION Client agrees to compensate Consultant for such services as follows: Task/Description Fee Plans, Specifications and Estimates......................................................$36,000 1 Base Survey and Topography............................................... $2,500 2 Precise Grading and Paving Plan ....................................... $12,000 3 Storm Drain Plan................................................................... $8,000 4-5 Final Hydrologic/Hydraulic Analysis...................................... $3,400 6 Cost Estimate........................................................................ $1,700 7 Landscape Design (by subconsultant Michael Buccino)....... $7,400 Reimbursable Allowance (Reproduction) ........................................ $1,000 The proposed fee would include all labor, materials and incidental expenses such as vehicle mileage, postage, toll calls, CADD computer time, and survey materials. Not included are title company charges, special mailing charges, application, and filing or permit fees. 34200 BOB HOPE DRIVE ® RANCHO MIRAGE Q CALIFORNIA M 92270 I 760-320-9811 s 760-323-7893 FAX L www.MSACONsuLTINGINC.COM