HomeMy WebLinkAbout4/1/2015 - STAFF REPORTS - 2.I. AOt I?ALMS'. iy c u a ' Cq`I`ORN`P, City Council Staff Report Date: April 1, 2015 CONSENT CALENDAR Subject: ACCEPTANCE OF THE PALM TREE REMOVAL AND REPLACEMENT, CITY PROJECT NO. 13-09 From: David H. Ready, City Manager Initiated by: Department of Maintenance and Facilities SUMMARY Formal City Council acceptance of the Palm Tree Removal and Replacement, City Project No. 13-09, is required to document the completion of the public work of improvement, and to allow the City's filing of a Notice of Completion with the Riverside County Recorder in accordance with Section 9200 of the California Civil Code. RECOMMENDATION: 1) Accept the public work of improvement identified as the Palm Tree Removal and Replacement, City Project No. 13-09, and is completed; and 2) Authorize the City Engineer to execute and file for recordation with the Riverside County Recorder a Notice of Completion for the Palm Tree Removal and Replacement, City Project No. 13-09. STAFF ANALYSIS: On October 15, 2014, the City Council awarded a construction contract to Coachella Valley Construction and Engineering, in the amount of $141,141.00 for the Palm Tree Removal and Replacement, City Project No. 13-09. The Contractor satisfactorily completed the project on March 6, 2015. Staff has conducted a final inspection and found the work to be in compliance with the plans, specifications and standards of the City of Palm Springs. Staff recommends that the City Council accept the Palm Tree Removal and Replacement, City Project No. 13-09, as required by Section 9200 of the California Civil Code, authorizing the City Engineer to file and record a Notice of Completion within 15 days of the City Council's action. A ITEM NO. City Council Staff Report April 1, 2015— Page 2 Acceptance of the Palm Tree Removal and Replacement, City Project 13-09 copy of the Notice of Completion to be submitted to the County is included as Attachment 2. ENVIRONMENTAL IMPACT: Section 21084 of the California Public Resources Code requires Guidelines for Implementation of the California Environmental Quality Act ("CEQA"). The Guidelines are required to include a list of classes of projects which have been determined not to have a significant effect on the environment and which are exempt from the provisions of CEQA. In response to that mandate, the Secretary for Resources identified classes of projects that do not have a significant effect on the environment, and are declared to be categorically exempt from the requirement for the preparation of environmental documents. In accordance with Section 15301 "Existing Facilities," Class 1 projects consist of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public structures, facilities, mechanical equipment involving negligible or no expansion of use beyond that existing at the time of the lead agency's determination. Therefore, in accordance with Section 15301(a), staff determined that the Palm Tree Removal and Replacement, City Project No. 13-09, was considered categorically exempt from CEQA. FISCAL IMPACT: The City Council originally approved a total project budget of $141,141.00 funded by Measure J Funds (Fund 260). The original and final construction contract amount is $147,743.50; there were two Change Orders issued totaling $6,602.50. The following Table 1 is a summary of the total costs incurred for the construction of the Palm Tree Removal and Replacement, City Project No. 13-09. City Project City Project City Project No. 13-09 No. 13-09 No. 13-09 Total Phase Approved Approved Approved Approved Final Cost Budget Budget Budget Budget (07/01112) (07/01113) (07/01/14) Administration $ 344.64 $ 2,293.21 $ 781.42 $ 3,419.27 $ 3,419.27 Construction $ 0.00 $ 0.00 $141,141.00 $141,141.00 $141,141.00 Change Orders $ 0.00 $ 0.00 $ 6,602.50 $ 6,602.50 $ 6,602.50 Design $ 0.00 $ 5,582.70 $ 0.00 $ 5,582.70 $ 5,582.70 Project Total Cost $ 344.64 $ 7,875.91 $148,524.92 $156,745.47 $156,745.47 Remaining Balance $ 0.00 Table 1 02 City Council Staff Report April 1, 2015— Page 2 Acceptance of the Palm Tree Removal and Replacement, City Project 13-09 The Palm Tree Removal and Replacement, City Project No. 13-09, was funded through the following sources as show in Table 2: Fund Name Account Actual Measure J 260-4500-59412 $149,425.59 Measure J 001-2451-43240 $7,319.88 Total Expenditures for Project $156,745.47 Project Budget $156,745.47 Remaining Budget $0.00 Table 2 The City is holding retention of $7,057.05 for Coachella Valley Construction and Engineering pending acceptance of the improvements and filing of the Notice of Completion with the County Recorder's office. Since this project is a maintenance effort, the Finance Department does not need to add the cost of this project to the City's fixed asset system, as no new assets have been created in compliance with Governmental Accounting Standard Board (GASB) 34 Standards for Financial Reporting of Infrastructure Assets. SUBMITTED Prepared by: Marcus L. Fuller, MPA, P.E., P.L.S. Assistant City Manager/City Engineer Approved by: David H. Ready, Esq., P City Manager Attachments: 1. October 15, 2014, City Council staff report 2. Notice of Completion 03 Attachment 1 04 Recording Requested By: When Recorded Mail To: Name: City of Palm Springs Street Address: 3200 E Tahquitz Canyon Way City& State: Palm Springs, CA 92262 SPACE ABOVE THIS LINE FOR RECORDERS USE NOTICE OF COMPLETION (CA Civil Code §§ 8180-8190, 8100-8118, 9200-9208) NOTICE IS HEREBY GIVEN THAT: 1. The undersigned is an owner of an interest of estate in the hereinafter described real property, the nature of which interest or estate is: Fee 2. The full name and address of the undersigned owner or reputed owner and of all co-owners or reputed co-owners are: Name Street and No. City State City of Palm Springs, 3200 E Tahguitz Canyon Way Palm Springs, CA 92262 3. The name and address of the direct contractor for the work of improvement as a whole is: Coachella Valley Construction & Engineering. PO Box 1182, Thermal, CA, 92274 4. This notice is given for(check one): ®Completion of the work of improvement as a whole. ❑Completion of a contract for a particular portion of the work of improvement (per CA Civ. Code §8186). 5. If this notice is given only of completion of a contract for a particular portion of the work of improvement (as provided in CA Civ. Code §8186), the name and address of the direct contractor under that contract is: Not applicable 6. The name and address of the construction lender, if any, is: Not Applicable 7. On the 6th day of March, 2015, there was completed upon the herein described property a work of improvement as a whole (or particular portion of the work of improvement as provided in CA Civ. Code§8186) a general description of the work provided: City Project No. 13-09, Palm Tree Removal and Reolacement 8. The real property herein referred to is situated in the City of Palm Springs. County of Riverside. State of California, and includes various City streets as identified on the attached Exhibit A. 9. The street address of said property is: Exhibit A 10. If this Notice of Completion is signed by the owner's successor in interest, the name and address of the successor's transferor is: Not Applicable I certify (or declare) under penalty of perjury the laws of the State of California that the foregoing is true and correct. Date: By: Signature of Owner or Owner's Authorized Agent Marcus Fuller Print Name � ' VERIFICATION I, Marcus Fuller, state I am the Assistant City Manager/City Engineer of the Owner identified in the foregoing Notice of Completion. I have read said Notice of Completion and know the contents thereof, the same is true of my own knowledge. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed on at Palm Springs, California. Signature of Owner or Owner's Authorized Agent A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness , accuracy, or validity of that document. STATE OF CALIFORNIA COUNTY OF RIVERSIDE On before me, Notary Public, Marcus Fuller personally appeared who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. I, certify under PENALTY OF PURJURY under the laws of the State of California that the foregoing paragraph is true and correct. Witness my hand and official seal. Signature EXHIBIT A PALM TREE LOCATIONS 1. North Palm Canyon Drive, North of Yorba Road, East side (One Palm) 2. North Palm Canyon Drive at Cabrillo, East side (One Palm) 3. North Palm Canyon Drive South of Via Olivera, East side (One Palm) 4. North Palm Canyon Drive at 2000 North Palm Canyon Drive, East side (One Palm) 5. North Palm Canyon Drive across from 1875 North Palm Canyon Drive at Billy Reeds (One Palm) 6. North Palm Canyon Drive at fourth tree South of Vista Chino, west side (One Palm) Changed location to Dog Park 7. 1050 North Palm Canyon Drive, East side (One Palm) 8. Chino Road West, Center Island (Two Palms) 9. 491 North Palm Canyon Drive West Side, 3`tl Palm So. of Alejo (One Palm) 10. 333 North Palm Canyon Drive, In front of suite 205 North of Amado West Side (One Palm) 11. North Palm Canyon Drive at Amado, South East corner, (Remove One Palm Tree) 12. South Palm Canyon Drive, second and third trees south of Baristo Road, East side. (Two Palms) 13. South Riverside Drive at bridge, two trees at stop sign (Two Palms) 14. South Palm Canyon Drive, North of Morongo Road second tree north, west side .Changed location to Co Gen Plant 15. East Palm Canyon Drive, West of Via Entrada, North side (One Palm) 16. South Indian Canyon Drive at 446 South Indian Canyon Drive, East side (One Palm) 17. South Indian Canyon Drive in front of Hard Rock Hotel, East side (One Palm) 18. North Indian Canyon Drive, across from Fire Station Number one, East side (One Palm) 19. North Indian Canyon Drive, North of Amado, East side (One Palm) 20. South Palm Canyon Drive-Center island at 675 So. PCD at Allen Tire Co. (Two Palms) 07 PALM TREE REMOVAL AND REPLACEMENT CITY PROJECT NO.CP 13-09 Attachment 2 08 se-, City Council Staff Report DATE: OCTOBER 15, 2014 CONSENT CALENDAR SUBJECT: APPROVE CONTRACT FOR THE PALM TREE REMOVAL AND REPLACEMENT PROJECT, A MEASURE J FUNDED CAPITAL PROJECT. FROM: David H. Ready, City Manager BY: Maintenance and Facilities Department SUMMARY This Measure J project provides for palm tree removal and replacement at various locations throughout the City. Staff is seeking authorization from the City Council to accept the qualified lowest responsive bid from CV Construction & Engineering in the amount of$141,141.00. RECOMMENDATION: 1. Find the bid from Golden Valley Construction non-responsive and award a unit price contract with CV Construction & Engineering in the amount $141,141.00 for the removal and replacement of Palm Trees. 2. Authorize the City Manager to execute the purchase order. STAFF ANALYSIS: The Maintenance and Facilities department identified twenty one (21) locations and Twenty-six (26) palm trees for removal and replacement City staff contracted with the local Landscaping Architectural firm, Michael Buccino & Associates, to prepare bid specifications for the project which was estimated at $131,000. The Procurement and Contracting Department worked closely with the Maintenance and Facilities Department to conduct the unit price formal invitation for bids for the removal and replacement of Palm Trees at various different locations throughout the City. The bid was publicly advertised, posted to the City's website, and notices distributed to potential contractors. Two (2) contractors responded and the 09 i i i I City Council Staff Report July 16, 2014— Page 2 Approve Tree Replacement results of the bid are tabulated as follows: Vendor Price Quote Golden Valley Construction $117,418.75 (non-responsive) CV Construction and Engineering $141,141.00 City staff reviewed the two bids and in consultation with the City Attorney determined the bid from Golden Valley Construction to be non-responsive for failure to properly execute the formal bid documents and provide their Unit Pricing as was required. Staff is recommending the City Council approve the lowest, responsive, responsible bid from CV Construction & Engineering. FISCAL IMPACT: The original staff suggested estimated "place holder" project amount approved by the Measure J commission and City Council was $130,000. To date, $6,043.00 has been expended for design and preparation of plans and specifications. An additional $17,184 will be utilized for the project from Measure J Capital Improvement Account No. 260- 4500-59412 —for a project total of$147,184. atrick Sweeney, Faciliti Director David H. Ready, CiNjAgwiler Attachment: Copy of bid from CV Construction & Engineering 10 BID BID TO: CITY OF PALM SPRINGS, CALIFORNIA The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the City in the form included in the Contract Documents (as defined in Article 4 of the Agreement)to perform the Work as specified or indicated in said Contract Documents entitled: PALM TREE REMOVAL AND REPLACEMENT PROJECT CITY PROJECT NO. 13-09 Bidder accepts all of the terms and conditions of the Contract Documents, including without limitation those in the Notice Inviting Bids and the instructions to Bidders dealing with the disposition of the Bid Security. This Bid will remain open for the period stated in the Notice Inviting Bids, unless otherwise required by law. Bidder will enter into an Agreement within the time and in the manner required in the Instructions to Bidders, and will furnish the insurance certificates, Payment Bond, Performance Bond, and all Permits required by the Contract Documents. Bidder has examined copies of all the Contract Documents, including the following Addenda (receipt of which is hereby acknowledged): Number Date ��I tl 151 Number Date Number Date Number Date Bidder has familiarized itself with the nature and extent of the Contract Documents, the Work, the site, the locality where the Work is to be performed, the legal requirements (federal, state, and local laws, ordinances, rules, and regulations), and the conditions affecting cost, progress, or performance of the Work, and has made such independent investigations as Bidder deems necessary. In conformance with the current statutory requirements of California Labor Code Section 1860, at seq.,the undersigned confirms the following as its certification: I am aware of the provisions of Section 3700 of the Labor Code, which require every employer to be insured against liability for workers compensation, or to undertake self- insurance in accordance with the provisions, before commencing the performance of the Work of this Contract. To all the foregoing, and including all Bid Schedule(s), List of Subcontractors, Non-collusion Affidavit, Bidder's General Information, and Bid Bond contained in these Bid Forms, said Bidder further agrees to complete the Work required under the Contract Documents within the Contract Time stipulated in said Contract Documents, and to accept in full payment therefore the Contract Price based on the Lump Sum or Unit Bid Price(s) named in the aforeVV.t6y#A6jMrjVER&Iaee4ag Schedule(s)- P.O.Box 1182 Thermal CA 92274 7W989-2299 ph.9S1445-i 21k. Dates: 9 aj Bidder: email 6y L (Signal ) Title: &12 ".A/r PALM TREE REMOVAL AND REPLACEMENT 610(PROPOSAL) CrTY PROJECT NO.13-09 SID FORMS-PAGE 2 **REVISED** Bid Schedule of Prices for the Construction of the: PALM TREE REMOVAL AND REPLACEMENT PROJECT CITY PROJECT NO. 13-09 in Palm Springs, California Item Description Estimated Unit Unit Amount No. Quantity Price 1. Initial Mobilization 25 LS 2. Traffic Control 21 Sites 3. Remove Existing Palms 16 EA Remove Existing PCC Concrete 160 SF Remove Existing Curb and Gullet 49 LF 4. Plant New Palm Trees 25 EA !•- 5. Construct Curb and Gutter 49 LF i 6. Construct Sidewalk 105 SIF T. Irrigation 49 EA �/�d ►� 8. Remove and Reinstall Lighting is EA 3 70. 9' Install Rock At Palm Trees 560 SF a d D 10. Remove and Reinstall Signs 4 EA 11. 90 Day Maintenance Period 25 Trees TOTAL COST$ ZY 11W. of • l�h44.n � _k �� PRICE IN WORDS QUANTITIES OF WORK: A)/": The quantities of work or material stated in the unit price items of the Bid Schedule are supplied only to give an indication of the general scope of the Work. The City does not expressly nor by implication agree that the actual amounts of work or material will correspond therewith, and reserves the right after award to increase or decrease the quantity of any unit price bid item, by an amount up to 25 percent of increase or decrease, without a change in the unit prices, and shall have the right to delete any bi item In its entirety, and receive full credit in the amount shown in the Bid Schedule for th deleted item of Work. CY, C�N 5 70+'u io g l�c-r CnI C7f N ,C'"j/U le7 � Name of Bidder or Firm 0 y- "IMPORTANT NOTE: PLEASE BE SURE THAT YOU SUBMIT ONLY THIS REVISED MANDATORY PRICING PAGE. FAILURE TO SUBMIT THIS REVISED MANDATORY PRICING PAGE WILL RESULT IN A NOW RESPONSIVE SUBMITTAL. 12 PALM TREE REMOVAL AND REPLACEMENT UNIT PRICE BID SCHEDULE CITY PROJECT NO. 13-09 BID FORMS-PAGE 3 of $,AIM SA CITY PROJECT # 13-09 PALM TREE REMOVAL AND REPLACEMENT 4 N ADDENDUM NO. 1 C¢f1FOlt This Addendum is being issued for the following changes and Informational items: THE FOLLOWING REVISIONS AND/OR ADDITIONS TO THE SPECIFICATIONS AND INSTRUCTIONS ARE TO BE INCLUDED IN THE ORIGINAL DRAWINGS AND SPECIFICATIONS. THIS ADDENDUM SHALL TAKE PRECEDENCE OVER ANYTHING CONTRARY ON THE PREVIOUSLY ISSUED SPECIFICATIONS AND INSTRUCTIONS AND SHALL BE REFERRED TO HEREINAFTER AS PART OF THE CONTRACT DOCUMENTS. Q 1: In the section N-6 the license required are "A" or"C-27 and C-8". What if we only have "C-27 and D-49"? A 1: The license requirements are as stated in the Bid Document. If you only have a C-27 but do not have the C-8 required to go with the C-27,you must have a sub-contractor that has the C-8 classification and will be listed as a sub-contractor in your bid submittal along with all documentations. Q 2: What does C-8 license cover? A 2: As per the California Code of Regulations, C-8— Concrete Contractor. A concrete contractor forms, pours, places, finishes and Installs specified mass, pavement, fiat and other concrete work:and places and sets screeds for pavements or fJatwork. This class shall not include contractors whose sole contracting business is the application of plaster coatings or the placing and erecting of steel or bars for the reinforcing of mass,pavement, plat and other concrete work. CLARIFICATIONS/REVISIONS OF IFB DOCUMENT: BID SCHEDULE: A "REVISED*" Bid Schedule of Prices for the Construction . of the PALM TREE REMOVAL AND REPLACEMENT PROJECT are hereby included in this addendum and shall replace the original City Project 13-09 Unit Price Bid Schedule — Page 3. The changes include updated Palm Tree counts and estimated quantities of work to be done. In addition, a revised list of the locations of palm trees have been included with corresponding photographs of existing trees at the locations for removal and replacements. **IMPORTANT NOTE: PLEASE BE SURE THAT YOU SUBMIT ONLY THE REVISED MANDATORY PRICING PAGE. FAILURE TO SUBMIT THE REVISED MANDATORY PRICING PAGE WILL RESULT IN A NON-RESPONSIVE SUBMITTAL. 13 PALM TREE REMOVAL AND REPLACEMENT UNIT PRICE BID SCHEDULE CITY PROJECT NO. 13-09 BID FORMS.PAGE 1 APPENDIX—A AND NEW SITE LOCATION 21: Specification Contents Part III Appendix—A Project Drawings Is duplicated as Appendix—C Project Drawings. By this Addendum the City is hereby deleting duplicate Appendix—C and replacing Appendix—A (attached)that has been updated with one(1) additional location (#21). The City is hereby attaching project drawing #21 for this additional location. APPENDIX—E The City by this addendum is hereby deleting Appendix—E site images and is replacing Appendix—E with new site images (attached). This corrects some photo errors and provides site addresses and locations. BY ORDER OF THE CITY OF PALM SPRINGS,CALIFORNIA Leigh Gileno Procurement Specialist II C V DATE: September 18, 2014 p•Q Box 1182 Tbantal CA 92274 ADDENDUM ACKNOWLEDGMENT- 760""9-22"pL"1445-n42IL cvcspres�aoLoom email Proposer Firm Name: Authorized Signature: Date: Acknowledgment of Receipt of Addendum 1 is required by signing and returning a copy of this addendum with your response. Failure to acknowledge this Addendum may result in your IFB being deemed non-responsive. 14 PALM TREE REMOVAL AND REPLACEMENT UNIT PRICE BID SCHEDULE CITY PROJECT NO. 13-09 BID FORMS-PAGE 2 INFORMATION REQUIRED OF BIDDER LIST OF SUBCONTRACTORS As required under Section 4100, at seq., of the Public Contract Code, the Bidder shall list below the name, Contractor's License number and business address of each subcontractor who will perform Work under this Bid in excess of one-half of one percent of the Contractor's Total Bid Price,or$10,000.00, whichever is greater,and shall also list the portion of the Work which will be done by such subcontractor. After the opening of Bids, no changes or substitutions will be allowed except as otherwise provided by law. The listing of more than one subcontractor for each Rem of Work to be performed with the words"and/or"will not be permitted. Failure to comply with this requirement will render the Bid as non-responsive and may cause its rejection. Special Note: The Prime Contractor shall Perform not less than 50% of the Work identified in this Bid. In the event a Bidder lists subcontractors who will perform Work under this Bid in excess of 50%of the Work identified in this Bid,the Bid shall be considered non-responsive. Bidders shall list the total %of Work to be performed by the Prime Contractor HERE:_Z.'j_116(shall not be less than 50%). Contractors Percent License of Total Work to be Performed Number) Contract Subcontractor's Name&Addre/sss 24 &E 72,V 1-t4lI11aA Sf. li2zl �'1'rtt /44. a9 /Y e 2. 3. 4. 5. 6. 7. 8. LIST OF SUBCONTRACTD BID FORMS-PAGE 1 5 LOCAL BUSINESS PREFERENCE PROGRAM - GOOD FAITH EFFORTS City Project No.: CP 13-09 Bid Opening Date: September 23, 2014 The contract for this project is subject to the provisions of Palm Springs Ordinance No. 1756, and Section 7.09.030 of the Palm Springs Municipal Code, "Local Business Preference Program", subsection (5) "Local Preference in Public Works Contracts(Sub-Contracting)",which states: The prime contractor shall use good faith efforts to sub-contract the supply of materials and equipment to local business enterprises and to sub-contract services to businesses whose work force resides within the Coachella Valley. The prime contractor shall submit evidence of such good faith efforts at the time of submission of bids. Good faith efforts may be evaluated by placing advertisements inviting proposals in local newspapers, sending request for proposals to local sub-contractors, or by demonstrating that no local sub-contracts are qualified to perform the work or supply the materials or equipment. Any notice inviting bids which may require the use of sub-contractors shall include notification of this subsection. The City Council or Director may reject as non-responsive the bid of any contractor proposing to use sub- contractors that fail to comply with the requirements of this subsection. Bidders shall provide sufficient information to demonstrate that they have made good faith efforts to comply with Palm Springs Ordinance No. 1756. In the event no local firm (as defined in Ordinance No. 1756) is listed as a subcontractor on the "List of Subcontractors" submitted with its Bid, Bidders shall identify local subcontractors not required to be Identified on the List of Subcontractors, and/or shall identify local firms with whom the Bidder has solicited to furnish materials and supplies for incorporation into the work of this project. Local Subcontractors not listed on the List of Subcontractors: J Jyr Local firms that will furnish materials or supplies yyto the Bidder for this project: /,A1 .i .a �Crt/LA963 , IAik rX e4 ar Ar �(c 4, 1wrrw ! L" Z;q 16 PALM TREE REMOVAL AND REPLACEMENT LOCAL BUSINESS PREFERENCE PROGRAM CITY PROJECT NO. 13-09 GOOD FAITH EFFORTS BID FORMS-PAGE 5 LOCAL BUSINESS PREFERENCE PROGRAM-GOOD FAITH EFFORTS(CONTINUED) In the event no local firms (as defined in Ordinance No. 1756) will provide services, or furnish materials and supplies to the Bidder for this project, the Bidder shall provide information sufficient to demonstrate its good faith efforts to retain to hire local firms to (a) provide services and (b) to furnish materials and supplies for this project. Examples of information accepted by the City to demonstrate good faith efforts shall be included below: A. The names and dates of each publication in which a request for participation by local firms for this project was placed by the bidder (please attach copies of advertisements or proofs of publication): Publications Dates of Advertisement B. The names and dates of written notices sent to local firms soliciting bids for this project and the dates and methods used for following up initial solicitations to determine with certainty whether the local fines were interested (please attach copies of solicitations, telephone records, fax confirmations, etc.): Names of Date of Follow Up Methods and firms Initial Dates Solicited Solicitation �C4 /94/..* o f z.7//y C. The items of work which the bidder made available to local firms, including, where appropriate, any breaking down of the contract work items(including those Items normally performed by the bidder with its own foroes) into economically feasible units to facilitate participation by local firms. Items of Work Bidder Normally Breakdown of Items Amount Percentage Performs Item (Y!N) ($) Of Contract Tr+>l1.`�� �eo/n+/��li-y%trI � �c5 �f. lank° L'1nu,T A'r"�'°'� 9.31. ' • 7 �' i 41 &•-0 °7<r� c'�"+�i.< <;I�S �✓u �G/.� J'c�t /As/..s! f 3�.37f ash+ 17 PALM TREE REMOVAL AND REPLACEMENT LOCAL BUSINESS PREFERENCE PROGRAM CITY PROJECT NO.13.09 GOOD EFFORTS 810 FORMS-PAGE 6 D. The names, addresses and phone numbers of rejected local firms, the reasons for the bidder's rejection of the local firms, the firms selected for that work (please attach copies of quotes from the firms involved), and the price difference for each firm if the selected firm is not a local firm: Names, addresses and phone numbers of rejected local firms and the reasons for the bidder's rejection of the local firms: Names, addresses and hone numbers of firms selected for the work above: /,1hN F NOTE: USE ADDITIONAL SHEETS OF PAPER IF NECESSARY. I III, 18 PALM TREE REMOVAL AND REPLACEMENT LOCAL BUSINESS PREFERENCE PROGRAM CITY PROJECT NO. 13-09 GOOD FAITH EFFORTS BID FORMS-PAGE 7 BID BOND KNOW ALL MEN BY THESE PRESENTS, That David Cordero dba Coachella Valley Construction and Engineer*Principal.and Western Surety Company as Surety, are held and firmly bound unto the City of Palm Springs, hereinafter called the"City'In the sum of: Ten percent of the total bid amount (10%) dollars (not less than 10 percent of the total amount of the bid) for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors,and assigns,Jointly and severally, firmly by these presents. WHEREAS,said Principal has submitted a Bid to sald City to perform the Work required under the Bid Schedule(s)of the Citys Contract Documents entitled: PALM TREE REMOVAL AND REPLACEMENT PROJECT CITY PROJECT NO. 13-09 i NOW THEREFORE, If said Principal Is awarded a Contract by said City, and within the time and In the manner required In the "Notice Inviting Bids" and the "Instructions to Bidders" enters Into a written Agreement on the Form of Agreement bound with said Contract Documents, furnishes the required Certificates of Insurance, and furnishes the required Performance Bond and Payment Bond, then this obligation shall be null and void, otherwise it shall remain In full force and effect. In the event suit is brought upon this Bond by said City, and City prevails, said Surety shall pay all costs incurred by said City in such suit, including a reasonable attorneys fee to be fixed by the court. SIGNED AND SEALED,this 23rd day of September , 2014. PRINCIPAL: (Chen one: cmpwaaon) (CwPwatf"teq**tft Ngnaturea:am fore Sad,of the ro oOv groups:A.Chalrow of Board,Presldard,w any Vka President;AND B. SeaeWy,Assletent Secretary.Tnmw .w.Assistant Treasurer,or CNef FYw cw Olfmr). By Coachella Valley Construction and Engineering SURETY: signature(NOTARIZED) Western Surety Company Print Name and Title: t By F � By Signature(NOTARIZED) Signature(' TARIZED) Print Name and Title Print Name and Title: Diane Marie Nielsen, Attorney in Fact �grret jt, noIA-z PALM TREE REMOVAL AND REPLACEMENT BID BOND(BID SECURITY FORM) CITY PROJECT NO. 13-09 BID FORMS-PAOFy1Q Western Surety Company POWER OF ATTORNEY-CERTIFIED COPY Bond No. 62166446 . Know All Men By These Presents, that WESTERN SURETY COMPANY, a corporation duly organized and existing under the laws of the State of South Dakota,and having its principal office in Sioux Falls,South Dakota(the"Company"),does by these presents make,constitute and appoint Diane Marie Nielsen its true and lawful attorney(e)-in-fact,with full power and authority hereby conferred,to execute,acknowledge and deliver for and on its behalf as Surety,bonds for: Principal: David Cordero dba Coachella Valley Construction and Engineering Obligee: City of Palm Springs Amount: $500,000.00 - and to bind the Company thereby as fully and to the same extent as if such bonds were signed by the Senior Vice President,sealed with the corporate seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said attormey(s)-in-fact may do within the above stated limitations. Said appointment is made under and by authority of the following bylaw of Western Surety Company which remains in full force and effect I "Section 7. All bonds,policies, undertakings,Powers of Attorney or other obligations of the corporation @hall be executed in the corporate name of the Company by the President,Secretary, any Assistant Secretary, Treasurer, or any Vice President or by such other officers as the Board of Directors may authorize- The President, any Vice President,Secretary,any Assistant Secretary,or the � Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bonds,policies,or undertakings in the name of the Company- The corporate seal is not neceseary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile." All authority hereby conferred shall expire and terminate,without notice,unless used before midnight of December_22 nd , 2014 ,but until such time shall be irrevocable and in full force and eflect. In Witness Whereof,Western Surety Company has caused these presents to be signed by its Vice President,Paul T.Brufiat,and its corpo vufhbe affixed this—..23-rd_day of---s59Pt ember , _._2014 - A ' D% WES SUR Y COMPANY Paul T ruflat,Vice President S A COOU AHA i es On this 23rd day of September ,in the year 2014 ,before me,a notary public,personally appeared Paul T. Bruflat, who being to me duly sworn, acknowledged that he signed the above Power of Attorney as the aforesaid officer of WESTEflLSUhI C64and ackne}Y]edged said instrument to be the voluntary act and deed said corp lion. i S. PETRIK +/RNOTARY PUBLIC aSRL i SOUTH DAKOTA r NotWbl.. uth Dakota M \Co.mmrlion \pl4fe�a�•�v44vti August 11,1018 I the undersigned officer of Western Surety Company,a stock corporation of the State of South Dakota,do hereby certify that the attached Power of Attorney is in full force and efibct and is irrevocable,and furthermore,that Section 7 of the bylaws of the Company as set forth in the Power of Attorney is now in force. - In testimony whereof,I have hereunto set my hand and seal of Western Surety Company this 23rd . .. day of September 2014 WES R SURE Y COMPANY T Foam F0306-&2012 Paul T ruflat,Vice Pre t ❑ Acknowledgment of Principal ❑X Acknowledgment of Surety (Attorney-in-Fact) STATE OF California COUNTY OF P l�?XtC�P ee L n On -2.5[1 1 before me, L itria koch (I fb1a(7-1 YL[(.l 'cC date here maert name snot titWy the officer personally appeared ❑i Ma ie N1e1 n names)of eigner(e) ' who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that helshe/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted,executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is tru and correc LINDA ROCHA commission # 1950006 WITNE ban a tal seal, W'. otary Public -California ip�t��(/�� Riverside County Signatu _ (SeaComm. Expires Now 20.2015 (The balance of this page Is Intentionally left blank.) I Wastam surety company Form 1900-1-2e0e 21 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California l County of Riverside J} On 231`14 before me, Linda Rocha, Notary Public Dab Hem Imert Nama Srid Thle of the 014mr personally appeared ' V I C6f de i'0 N e 01 Slon"N who proved to me on the basis of satisfactory evidence to be the person(s) whose names) ls/are subscribed to the within instrument and acknowledged to me that }�+-�+��•-- - he/she/they executed the same in his/herMair authorized i LIN )A ROCHA capacity(ies), and that by Ns/herAheir signature(s) on the Commission x 19580os z instrument the person(s), or the entity upon behalf of z@MY Notary Public•California z Riveraide County which the person(s) acted, executed the instrument. Comm.Expires Nov20.2015 I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS y d and o cial eCa"l"��//S Place Naary Seel Mow Signatu a Urs of rl.tary PublC OPTIONAL Though the informailDn below is nor required by few,it may prove valuable to persons retying on ate document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s)Other Than Named Above: Capacity(fes) Claimed by Signer(s) Signer's Name: Signer's Name: ❑ Individual ❑Individual ❑ Corporate Most —Title(s): ❑Corporate Officer—Title(s): ❑ Partner—❑limited O General ❑Partner—❑Limited ❑General ❑ Attorney in Fact ❑Attorney in Fact • Trustee Top of thumb here ❑Trustee Top M thumb hate ❑ Guardian or Conservator ❑Guardian or Conservator ❑ Other: ❑Other, Signer Is Representing: Signer Is Representing: 62 National Nomry Aeeoritlon•93mDo 9om Am.,P.O.BM 2A02 vOhamwdh,CA 91313-2402•w XlvlomlNdagarg Ikm NS9e7 NeerEer:CMTbj.R"jAeo4mS. Yr NON-COLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID State of California ) 2lt(r6iV ss. V&4 County of ) I, LD(Aerp , being first duly swam, deposes and says that he or she is t ilnPl of CVCOAq+rRCfItt ^IgAneenlG the party making the foregoing Bid, that the Bid is not made in the interest of, or on be' alf of, any undsdosed person, partnership, company, association, organization, or corporation; that the Bid Is genuine and not collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham Bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham Bid, or that anyone shall refrain from bidding; that the Bidder has not in any manner, directly or indirectly, sought by agreement, communication,or conference with anyone to fix the Bid price of the Bidder or any other Bidder,or to fix any overhead, profit, or cost element of the Bid price, or of that of any other Bidder,or to secure any advantage against the public body awarding the Contract of anyone interested in the proposed Contract;that all statements contained in the Bid are true; and, further, that the Bidder has not, directly or indirectly, submitted his or her Bid price, or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any Corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham Bid. Bidder g� ns ��r �i,ydlnCvr)G` By Title Organization 1?1`U //1j/1 z 0 k rev M S Address y� 3 ��r'f1lg,-,/Ay 23 PALM TREE REMOVAL AND REPLACEMENT NON-COLLUSION AFFIDAVIT CITY PROJECT NO. 13-08 BID FORMS-PAGE8 ALL-PURPOSE ACKNOWLEDGMENT State of CAL(r—bF-AJ 1 A County of �l V,�/ 451 ! On 9'/I��J/1 - before me, �I(r16t (�xha i, �r§� flbI/C �a Date' N me.Tide of Officer Y personally appeared 1/lA CGr P. NAMES)OF SIGNER who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) istare subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/hedtheir authorized capacity(les), and that by his/herAheir signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted,executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. W ass hand and (al seal. r LINDA ROCHA Commission # 1958006 ,� Notary Public-California i Ignature of otary z Riverside County > My Comm.Expires Nov 20,2015 ATTENTION NOTARY: Although the information requested below is OPTIONAL,It could prevent fraudulent attachment of this certificate to unauthorized document. / //�� !!�p 1 _ I ' L THIS CERTIFICATE Title or Type of Document j�/� CNIQSt Rf cttw1T MUST BE ATTACHED TO THE DOCUMENT Number of Pages_DATE of DOCUMENT DESCRIBED AT RIGHT: Signer(s)Other Than Named Above PALM TREE REMOVAL AND REPLACEMENT NON-COLLUSION AFFIDAVIT CITY PROJECT NO.13-09 BID FORMS-PAGE9 BIDDER'S GENERAL INFORMATION The Bidder shall furnish the following information. Failure to complete all Items will cause the Bid to be non-responsive and may cause its rejection. 1. B[DDER/CONTRACTOR'S Name and Street Address: CV.c�lun""&Rog*@"Illt Zir C _✓_ �' P.O. 'iTe11'am%,A 7"14 UA iNl ph.95' Suu 7W _ 83 ��.,-f cvcspres@"Leoar small 3e.H .,ar/ CjJ -9 L L L-3 2. CONTRACTOR'S Telephone Number. (910 ) Facsimile Number: ( ya`/ ) 3. CONTRACTOR'S License: Primary Classification State License Number(s) V'/d- 3fe Supplemental License Classifications 4. Surety Company and Agent who will provide the required Bonds on this Contract Name of Surety -o e, Y l/�fYA Address 57o 4'T Surety Company 4 n V ft Telephone Numbers: Agent( k ) (Z D — lurety{ ) 7DD 5. Type of Firm(Individual, Partnership or Corporation): �"'a'iria'.�� 19'61fvcjlrr` ll 6. Corporation organized under the laws of the State Gf: to I)es'k.ctn' 7. List the names and addresses of the principal members of the firm or names and titles of the principal officers of the corporation or firm: ���<�7 /l• CatrtYr/!i �b3 �l�frr>7�� lk,.0 .��.�� .lA �i1773 III 25 PALM TREE REMOVAL AND REPLACEMENT BIDDER'S GENERAL INFORMATION CITY PROJECT NO. 13-D9 BID FORMS-PAGE 11 I I BIDDER'S GENERAL INFORMATION(Continued) 8. Number of years'experience as a contractor in this specific type of construction work: 9. List at least three related projects completed to date: a. Owner C� �"�` �*Sri Address���i. l7ar,�Z Cp i Contact,94"a 5, 4At Class of Work cele, /_^4X 3z•�(�. h�ati� Phone( 7411) C 9y vS3G Contract Amount 5� Project :s` �G. � Date Completed 1.; Contact Perron hs Telephone number( 3 VX-6&�* b. Owner A4 3P1_; Address /,,- -1c& z2L ; C), 6.4' Contact V`'`""''9 01, Class of Work 15-, ' , �lhGs/r, t,:Z�Cell,r14,0� Phone �'T/� ?S�- ,I-v Contract Amount � i 4.•e1 Project lrl3iw: rd/�x. droi+r. Date Completed V�/%)'F Contact Person 1A A Telephone number( 5f_) 9 5 r- 5-/fz C. Owner /'7 r Z i6Mi,/&d. Address Contact OkrACr Class Of Work '9d a� r✓e. H /U if h j/,5 Phoned 4y5J •7"�t°� ContractAmount � 6aa 'u" `` (e3v✓, Project/1c 14.4 krylA Date Completed Contact Person 001A6- Telephone number 10. List the name and title of the person who will supervise full-time the proposed work for your firm: '.JQ�ic/ �• ��rG(C�d - (�Y✓ �� 11. Is full-time supervisor an employee contract services 12. A financial statement or other information and references sufficiently comprehensive to permit an appraisal of your current financial condition may be required by the Engineer. 26 PALM TREE REMOVAL AND REPLACEMENT BIDDER'S GENERAL INFORMATION CITY PROJECT NO. 13-09 BID FORMS-PAGE 12