DATE: May 20, 2015 CONSENT CALENDAR
SUBJECT: APPROVAL OF PLANS, SPECIFICATIONS AND ESTIMATE AND
AUTHORIZATION TO BID FOR THE DEMUTH PARK AND RUTH
HARDY PARK SECURITY PATH LIGHTING IMPROVEMENTS, CITY
PROJECT NO 14-19
FROM: David H. Ready, City Manager
BY: Public Works & Engineering Department
SUMMARY
The City Council previously appropriated funding in the amounts of $50,000 from the
Measure J Capital Project Fund, $50,000 from the Measure Y Parks Improvement Fund
and $40,000 from General Fund (Park Maintenance) for a total budget of$140,000 for a
capital project to install security path lighting improvements at Demuth Park and Ruth
Hardy Park. Approval of the plans, specifications and estimate will allow staff to proceed
with bidding of this capital project, with an estimated cost of $275,000.
RECOMMENDATION:
Approve the plans, specifications and estimate and authorize staff to advertise and
solicit bids for the Demuth Park and Ruth Hardy Park Security Path Lighting
Improvements, City Project No. 14-19.
STAFF ANALYSIS:
As part of the Fiscal Year 2007/08 budget, the City Council appropriated $50,000 as
budget for security path lighting at Demuth Park. Subsequently, on November 7, 2012,
the City Council approved project expenditures of $4.7 Million for various Fiscal Year
2012/13 Measure J capital projects. At that time, a capital expenditure of $50,000 was
budgeted for the Ruth Hardy Park Security Path Lighting, with the following project
description:
Currently, there is minimal night lighting in the park, except for the tennis courts and
basketball courts. This request will provide for `path lighting" in walk way areas. It
appears that at one time there were lights throughout the park as there are
pedestals with poles, but no light fixtures. Prior to any light fixture installation, the
ITEM NO. 2. 14,_—_
City Council Staff Report
May 20, 2015-- Page 2
Approval of CP14-19, Demuth Park/ Ruth Hardy Park Security Path Lighting
appropriate lighting specialists will be consulted to provide an optimal plan for
Council's approval.
On October 14, 2013, the City retained MRC Engineering, Inc., through a Consulting
Service Agreement to provide electrical engineering and lighting design services for
security path lighting improvements at Demuth Park and Ruth Hardy Park, identified as
City Project No. 14-19, (the "Project"). The scope of work is to install new parking lot
lighting improvements within two parking lots at Demuth Park, and to install new parking
lot lighting at Ruth Hardy Park, consisting of all new underground conduit, conductors,
electrical services, light poles and foundations, and LED light fixtures. The LED light
fixtures have been specified as Bradley Lighting #HPW141001-T3 or Cree Lighting
#BXSP-B-HT-3ME-A-40K-US-UL on 16 feet high poles.
Pursuant to Section 94.04.00(E), of the Palm Springs Zoning Code, exterior lighting
plans require a Minor Architectural approval by the Planning Services Department; the
Director of Planning Services issued a Minor Architectural approval for the Project. The
construction drawings prepared by MRC Engineering, Inc., have been reviewed and
approved by the City's Building Department, and are ready to formally solicit
construction bids for the Project; a copy of the construction drawings is included in
Attachment 1.
With the City Council's approval, staff will advertise the project in the Desert Sun,
submit the Notice Inviting Bids to plan rooms, and provide the bid documents available
free of charge to prospective bidders. A copy of the construction drawings and contract
specifications for the Project are on file with the Public Works & Engineer Department.
The following tentative schedule has been identified for the bid process:
Notice Inviting Bids posted and issued: May 21, 2015
Deadline for receipt of bids: 3:00 PM, June 25, 2015
Contract awarded by City Council: July 15, 2015
ENVIRONMENTAL IMPACT:
Section 21084 of the California Public Resources Code requires Guidelines for
Implementation of the California Environmental Quality Act ("CEQA"). The Guidelines
are required to include a list of classes of projects which have been determined not to
have a significant effect on the environment and which are exempt from the provisions
of CEQA. In response to that mandate, the Secretary for Resources identified classes
of projects that do not have a significant effect on the environment, and are declared to
be categorically exempt from the requirement for the preparation of environmental
documents. In accordance with Section 15301 "Existing Facilities," Class 1 projects
consist of interior or exterior alterations involving such things as interior partitions,
plumbing, and electrical conveyances; therefore, the Demuth Park and Ruth Hardy Park
Security Path Lighting Improvements, is considered categorically exempt from CEQA,
and a Notice of Exemption has been prepared and will be filed with the Riverside
County Clerk. A copy of the Notice of Exemption is included as Attachment 2.
02
City Council Staff Report
May 20, 2015 -- Page 3
Approval of CP14-19, Demuth Park/ Ruth Hardy Park Security Path Lighting
FISCAL IMPACT:
A total of $140,000 was previously budgeted for the Project through a combination of
the Measure J Capital Project Fund (Fund 260), Measure Y Parks Improvement Fund
(Fund 261) and General Fund (Park Maintenance — Fund 001). The final construction
estimate for the Project is $275,000 as shown in Attachment 3.
The Project budget and incurred expenditures are identified in Table 1. As shown in
Table 1, an additional appropriation of $167,969 will be required to fully fund the
estimated cost of the Project.
Table of Project Costs Amount
FYI 2/13 Measure J Fund $50,000
FY07/08 Measure Y Fund $50,000
FY14/15 General Fund — Park Maintenance $40,000
Design Services $26,750
Project Administration (through 5/7/15 $219
Project Administration Estimated $1,000
Construction Inspection Estimated $5,000
Construction Contract $275,000
Budget Deficit $167,969
Table 1
Staff recommends that the City Council authorize bidding of the Project to obtain final
costs, allowing staff to identify funding alternatives for City Council consideration at the
time a contract is scheduled for award.
SUBMITTED:
Prepared by: Approved by:
Marcus L. u ler, PA, P.E., P.L.S. David H. Ready, Eby} ,
Assistant City Manager/City Engineer City Manager
Attachments:
1 . Construction Drawings
2. CEQA Notice of Exemption
3. Construction Estimate
03
ATTACHMENT
04
�ww, ,.,�� .� a� w„w.a�� ..,®nm.m.wwwm.,�n o .� :,�•m �ww.�w„-w�
4 tiw mw �w ,. m
�...a w.w. mn.� �i.,�..�w.Q �iu.web.a waA «iw...ertn<aw�•.m.uimve � LIGHT FIXTURE SCHEDULE 3
a. �� � m.,,.wwaa�wa..�^•a,aa..aw,m• � 1 w,.wm.a a c (9 I
D
Y �a wn X naw rr m wrim re w,rs waw m�maum. may v m rwma .0 mau,as
xuoa,. �, wn.auuwumuww.�mn �"6'0��
PARKING LOT POLE BASE DETAIL 5 EXTERIOR LIGHTING CONTROI. DIAGRAM P
131
Fg wm w nE - ue.un
eb wamaart avn. mwrt[wuam[wwn wwma n<wrwm.sma.n mmi "'°ram'm""'^' eno<+m9
fl- ..,,r,.r ww no _ - ELECTRICAL em
- 14'""'"`M1°'a GENERAL NOTES
€of w.:.m..-a.=—A.a
8� GENERAL NOTES a.. "6 ELECTRICAL ABBREVIATIONS� `- 4 ELECTRICAL LEGEND a` 1 E 1 .0
S®
0
a g. .sue a
Q
> Z
p0
a � Q
� cC9
Z
PANEL SCHEDULE- RUTH HARDY PARK
a Z 2
_ wn Q (D
L — p
a
sA PULL BOX DETAIL 5 PANEL SCHEDULE-DEMUTH PARK WEST 2
Br
lo
m
.��
NRZ w�� A "ems ELCTRICALe gem
PANEL SCHEDULES
z°gZ
a® SINGLE NINE DIAGRAM-RUTH HARDY PARK "4 PANEL SCHEDULE - DEMUIH PARK EAST ` 1 E1 .1
d
KEYED NOTES
.................
Y
c
Q
a
0Z
c0
� Q I_
a = Q
1J* 1
H
c---------------------
a I � Z
i i J
' Si
,
3 a a W
-----------
----------Q----------- ---------Q_______J
4
Is
�s
p}' EiEcralcAL„�
y UGHTNlG PLAN
a DEMUTH EAST PARKING
ffY
jo EZ.O
ELECTT K SITE LIGHTING PLAN-DEMUTH PARK EAST PARKING LOT �e I
0
—SO OM.c Fxc� ...�-ro 'wrm Ova MIM AMWL-MgF21.E1LCIfMAL YFiW�-fBMM 91E M0lGW
r-------------------a----------#_______i .
� I
13j-
Cl
I
I
;
I
;
I
� I
I
a I
b
I
S
p I
I
I
� I
I
a i
c,
I
I
I ;
I
I
' I
I
I ,
I
I
I
t � T
I 1
I ' �
d^
;
I ;
I ;
I '
I '
I
e -m °9
T t $a PALM SPRINGS
DEMUTH AND RUTH HARDY PARKS `
' LIGHTING ADDITION '
60
m
,
§ ) �
PALM SPRI mB ° q
G / ! . DEMUTH ANDa H HARDYPARKS 9 )
LIGHTING ADDITION g
! _ %
ATTACHMENT
10
NOTICE OF EXEMPTION
To: ❑ Office of Planning and Research From: City of Palm Springs
1400 Tenth Street, Room 121 3200 E. Tahquitz Canyon Way
Sacramento, CA 95814 Palm Springs, CA 92262
® Clerk of the Board
County of Riverside
P.O. Box 751
Riverside, CA 92502-0751
Project Title: Demuth and Ruth Hardy Parks Lighting Addition, City Proiect No. 14-19
Project Applicant: City of Palm Springs
Project Location(Specific): Demuth Park: 3965 E Mesquite Ave(south-side of Mesquite/Nueva Vista).
Ruth Hardy Park: 700 Tamarisk Lane(north-west comer of Avenida Cabal lerosframarisk).
Project Location(City): City of Palm Springs Project Location(County): Riverside
Project Description: The scope of work is to install parking lot lighting in two lots at Demuth Park, currently there are no lights
in the Tennis court lot and at the little league field lot. Also scheduled to install parking lot lighting at Ruth Hardy park main
entrance lot were currently no lighting exists. All lots will require underground electrical, concrete bases, poles and LED fixtures.
Name of Public Agency Approving Project: City of Palm Springs
Name of Person or Agency Carrying Our Project: City of Palm Springs, Public Works& Engineering Department
3200 E. Tahquitz Canyon Way, Palm Springs, CA 92262
Exempt Status: (check one)
❑ Ministerial(Sec.21080(b)(1); 15268);
❑ Declared Emergency(Sec. 21080(b)(3); 15269(a));
❑ Emergency Project(Sec. 21080(b)(4); 15269(b)(c));
® Categorical Exemption. State type and section number: 15303 Class 3(d)—New Construction or Conversion of
Small Structures
❑ Statutory Exemptions. State code number:
Reasons why project is exempt: Class 3 consists of construction and location of limited numbers of new, small facilities or
structures; installation of small new equipment and facilities in small structures; and the conversion of existing small structures
from one use to another where only minor modifications are made In the exterior of the structure. Water main, sewage,
electrical, gas, and other utility extensions, including street improvements, of reasonable length to serve such construction.
Therefore, the Demuth and Ruth Hardy Parks Lighting Addition, City Project No. 14-19, is considered categorically exempt from
CEQA.
Lead Agency Contact Person: Savat Khamphou, P.E. Area Codefrelephone/Extension: (760)323-8744. ext. 8744
If filed by applicant:
1.Attach certified document of exemption finding.
2.Has a Notice of Exemption been filed by the public agency approving the project? ❑ Yes ❑ No
Signatur Date: � �hTitle: Asst. Director of Public Works/Asst. City Engineer
® Signed by Lead Agency❑Signed by Applicant
Authority cited: Sections 21083 and 21110, Public Resources Code Date received for filing at OPR:
Reference: Sections 21108, 21152, and 21152.1, Public Resources Code.
11
ATTACHMENT
12
Prepared by: PALM SPRINGS DEMUTH RUTH HARDY PARKS May 11,2015
MRC ENGINEERING,INC.
343W GatevaYD ids Suite 120 ENGINEERS COST ESTIMATE
Palm Desert,CA.92211
]60 14 9005
PALM SPRINGS DEMUTH 8 RUTH HARDY PARKS COST ESTIMATE
LIGHTING COST MATERIAL COST CONSTRUCTION COST LINE TOTALS
DESCRIPTION OTY. UNIT
MATERIALUNR MATERIAL UNIT CONSTRUCTION LINE ITEM TOTAL
NET PRICE TOTAL COST TOTAL HOURS HOURLY RATE TOTAL NET TOTAL TOTAL COSTT07AL
TYPE A LIGHTING FIXTURE 32 ea. $ 1,800,W $ 66600.00 E 200,00 $ 7�490,00 6 j$ WOO S 11.100.00 $ BE 600.00 $ 7,4DO 00 $ 11.100.00 $ 85,10000
TYPE A FIXTURE BASE FOUNDATION 37 ea. $ - $ - E 500.W $ 16,50D 00 4 $ 50.00 $ 7,40000 $ - $ 16,500.DO $ 7.400.00 $ 25,900.00
TYPE BLIGHTING FIXTURE 4 ea. $ 1800.00 $ 72W.00 $ 200.00 $ Boom 6 'i $ WDO $ 1.200.00 $ 7,200.W $ 8wDO $ 1,200DO S 9,200,00
TYPE B FIXTURE BASE FOUNDATION 4 ea. $ - $ - $ 500.00 $ 2.W0.00 4 S 50.00 E W0.00 S - $ 2.OW.00 $ WO00 $ 2800O0
ELECTRICAL PULL BOX 37 ea. S - $ - $ 325.00 $ 12,02500 3 $ W.00��$ 150,00 $ - $ 12,025.00 $ 150,00 $ 12,175.00
UGHTING CONTROL SYSTEM 3 ea. S - $ E 1,6W.W $ 4,83000 6 $ W.DO E 30000 $ - 4 4,8W.00 S W0.00 $ 5,1 00.00
EXISTING PANEL B 1 bt $ - $ - g 300.00 S 300.00 12 $ 50.00 $ 600,00 $ - $ 3W OO $ W0.00 $ 9DOD0
NEW PANEL 1 bl $ - $ - g 900.00 $ WODO 16 $ W.00,$ 80000 $ - $ 900.D0 $ WO00 $ 17W 00
EXISTING PANEL BBB 1 h S - $ - $ 300.00 $ W0O0 12 $ 50.00 $ 600,00 $ - $ 3W 00 S W0O0 $ 900.00
EXISTING PANEL 1 ft. $ - $ - $ 300.W $ W0.00 12 $ 5000 $ 600.00 S - $ 3W.00 $ W0O0 $ 9W.00
I INCH CONDUIT 600 S. $ - $ - $ 0.45 $ 220.00 35 $ 50.00 $ 1750,00 S - $ 270DO $ 1.750,00 $ 202000
3I41NCH CONDUIT 3040 1 $ - $ - $ 0.30 $ 912D0 160 $ 50.00 $ 8,000.00 $ - $ 912DO $ 8,1XI0.00 $ 8912.00
OR COPPER CONDUCTORS 3000 0. $ - S - S 0.65 $ 1,950.00 150 $ 5001) E T,500.W $ - $ 1,950.00 S 7,500.00 S 9,4W.W
#10 COPPER CONDUCTORS 11000 ft. $ - 8 - $ 0.45 $ 4,950.00 400 $ 5000 $ 20,000.00 $ - $ 4,95000 $ 20,W0.00 $ 24.950.00
CUT AND PATCH 4000 fl $ - $ - $ 1.25 $ 5,00000 250 $ 50.00 $ 12,500.00 $ - $ 5..OW00 $ 12,W000 $ 17,500.00
SUB-TOTAL $ 73,80000 $ 60,407.00 E 73,300.00 $ 23,800.00 $ 604D7.00 $ 73,30000 $ 20750].W
CONTINGENCY(misc.Matenals and labor) 25% E 18450,00 $ 15,101,75 $ 18,325.00 $ 16,450.00 $ 15,101.75 $ 18.32500 $ 51,876,75
SALES TAX 9% E 8302.50 $ 6,795.79 NA $ 8.302,50 g 6795J9 NA $ 15,098.29
ENGINEERS COST ESTIMATE TOTAL $ 100,552,50 $ I 91,625.00 $ 100,552.50 $ 82,304.54 $ 91,625.00 $ 274,482.04
w
Page 1 of 1
R (OUVEU
i Of ALM SPu,s<
STATE OF CALIFORNIA-THE RESOURCES AGENCY'� .5 JUL 2G 1p'IR72 2I
DEPARTMENT OF FISH AND GAME
ENVIRONMENTAL FILING FEE CASH RECEIPTJVA:I* T WN y L;pr
Y K Receipt#: 1540491
State Clearinghouse# (if applicable):
LeadAgencY: CITY OF PALM SPRINGS Date: 0 6/1 212 01 5
CounivAgencyofFiling: RIVERSIDE DX21mveNo: E-201500486
Project Title: DEMUTH AND RUTH HARDY PARKS LIGHTING ADDITION, PROJECT 14-19
ProjectApphcant Name: CITY OF PALM SPRINGS Pho-Number (760) 323-8744
ProjectApphcantAddress; 3200 E TAHQUITZ CANYON WAY, PALM SPRINGS, CA 92264
ProjeciAppBrnnt: LOCAL PUBLIC AGENCY
CHECKAPPLICABLE FEES:
❑Environmental Impact Report
❑Negative Declaration
❑Application Fee WaterDversion(Side WarerResources Connnl Board Only)
❑Project Subject to CerlifiedRegulatoryPrograms
®CounryAdministrationFee $50.00
❑Project that is exempt from fees(DFG No Effect Determination (Form Attached))
®Project that is"emptfromfees(Notice ofE'"niptiorr)
Total Received $50.00
Signature and title ofperson receiving payment: Deputy
Notes:
ACR 533(Est.12/2013)
` NOTICE OF EXEMPTION
To: ❑ Office of Planning and Research From: City of Palm Springs
1400 Tenth Street, Room 121 3200 E. Tahquitz Canyon
Sacramento, CA 95814 Palm Springs, CA 92
® Clerk of the Board
County of Riverside
P.O. Box 751
Riverside, CA 92502-0751 t,0�
Project Title: Demuth and Ruth Hardy Parks Lighting Addition City Project No. 1
Project Applicant: City of Palm Springs
Project Location(Specific): Demuth Park: 3965 E Mesquite Ave(south-side of Mesqu eva Vista).
Ruth Hardy Park: 700 Tamarisk Lane(north-west corner of Avenida CaballeroslTamarisk .
Project Location(City): City of Palm Spring s Project Location(County): Riverside
Project Description: The scope of work is to install parking lot lighting in two lots at Demuth Park, currently there are no lights
in the Tennis court lot and at the little league Feld lot. Also scheduled to install parking lot lighting at Ruth Hardy park main
entrance lot were currently no lighting exists. All lots will require underground electrical, concrete bases, poles and LED fixtures.
Name of Public Agency Approving Project: City of Palm Springs
Name of Person or Agency Carrying Our Project: City of Palm Springs, P& F I L E D / P 0 S T E D
3200 E. Tahquitz Canyon Way, Palm Springs, CA 92262 County or Riverside
Peter nldana
Exempt Status: (check one) Assessor-County Clerk-Recorder
E-201500486
06/12/2015 02:37 PM Fee: $ 0,00
❑ Ministerial(Sec. 21080(b)(1); 15268); Page t or 1
❑ Declared Emergency(Sec. 21080(b)(3); 15269(a)); d'!"Remove 1 6 illo s Deo,ty
El Emergency Project(Sec. 21080(b)(4); 15269(b)(c)); 12�'III �1 ' � rill III
® Categorical Exemption. State type and section number: 15303�,aa�o iu/— I.Uw �Ul btu U�LIUI I U1 �Ul1VMb1U1I Ul
Small Structures
❑ Statutory Exemptions. State code number:
Reasons why project is exempt: Class 3 consists of construction and location of limited numbers of new, small facilities or
structures; installation of small new equipment and facilities in small structures; and the conversion of existing small structures
from one use to another where only minor modifications are made in the exterior of the structure. Water main, sewage,
electrical, gas, and other utility extensions, including street improvements, of reasonable length to serve such construction.
Therefore, the Demuth and Ruth Hardy Parks Lighting Addition, City Project No. 14-19, is considered categorically exempt from
CECA.
Lead Agency Contact Person: Savat Khamohou, P.E. Area CodefTelephone/Extension: (760)323-8744. ext. 8744
If filed by applicant:
1.Attach certified document of exemption finding.
2.Has a Notice of Exemption been filed by the public agency approving the project? ❑Yes ❑ No
!�QSignatur fAM Date: ��✓Title: Asst. Director of Public Works/Asst. City Engineer