Loading...
HomeMy WebLinkAbout10/7/2015 - STAFF REPORTS - 2.W.City Council Staff Report DATE: October 7, 2015 CONSENT CALENDAR SUBJECT: APPROVAL OF PLANS, SPECIFICATIONS AND ESTIMATE (PS&E) AND AUTHORIZATION TO BID FOR THE RAMON ROAD PAVEMENT REHABILITATION, CITY PROJECT NO. 14-02, FEDERAL AID PROJECT NO. STPLN-5282 (043) FROM: David H. Ready, City Manager BY: Public Works & Engineering Department SUMMARY: The Public Works & Engineering Department received federal funding in the amount of $395,729 requiring a local match contribution of $51,271 from the Local Measure A fund to rehabilitate the existing asphalt concrete pavement on Ramon Road generally located between Sunrise Way and El Cielo Road. The plans and specifications are completed, and in accordance with 7.03.040 of the Procurement and Contracting Code the Council is required to approve and adopt plans, specifications and working details, and authorize the bid request for all public projects in excess of $100,000. Approval of plans, specifications and estimate will allow staff to proceed with bidding of this capital project, with an estimate cost of $500,000. RECOMMENDATION: Approve the plans, specifications and estimate and authorize staff to advertise and solicit bids for the Ramon Road Pavement Rehabilitation, City Project No, 14-02. STAFF ANALYSIS. In early 2013, the Riverside County Transportation Commission (RCTC) approved a Call for Projects for RCTC and its member jurisdictions using RCTC's allocation of Moving Ahead for Progress in the 21s` Century (MAP-21) funds made available through the current federal transportation bill, the Surface Transportation Program (STP). On March 28, 2013, the Public Works and Engineering Department responded to RCTC's Call or Projects for MAP-21 funding, requesting consideration of funding for pavement rehabilitation and associated improvements on Ramon Road extending generally from Sunrise Way to El Cielo Road. The purpose of the City's request is to repair a severely weathered heavily traveled major arterial roadway. The proposed improvements would grind and overlay the existing asphalt concrete pavement and Item No. 2. W . City Council Staff Report October 7, 2015 -- Page 2 Approval of CP14-02, Ramon Road Pavement Rehabilitation related improvements. The Public Works Department requested $395,729 in STP federal funds for an estimated $500,000 project. RCTC received a number of requests for MAP-21 funding from its member jurisdictions, requesting a total of $52,000,000 in funding available in Fiscal Year's 2013/14 through 2015/16. The requests were evaluated by a Review Panel, and the City's request was ranked in 13th place of the 23 requests that were approved. The RCTC Executive Committee subsequently approved the list of projects to receive STP funding, and the projects were later added to the Regional Transportation Improvement Plan. The Ramon Road Pavement Rehabilitation, City Project No. 14-02, (the "Project"), will cold mill the existing asphalt concrete pavement, prepare and repair existing cracks, construct asphalt concrete overlay, install inductive loop vehicle detectors, and remove, reconstruct, and upgrade curb ramps to conform to current ADA standards throughout the Project limits. A location map is provided below. A vicinity map illustrating a 500-ft radius from the roadway segment is included as Attachment 1. Location Map The City operates under a "Master Agreement" with the state of California, through its Department of Transportation ("Caltrans"), identified as the "Administering Agency — State Agreement No. 08-5282" for use of federal funds on City projects. Under the terms of the Master Agreement, the City is required to comply with certain state and federal requirements, including pre -approval and authorization to proceed with construction prior to bidding a project. Staff has successfully coordinated with Caltrans to obtain authorization to proceed with construction of the Project; a copy of the Caltrans authorization letter is included as Attachment 2. The contract bid documents were prepared by the Public Works & Engineering Department and are ready to formally solicit construction bids for the Project. With the City Council's approval, staff will advertise the project in the Desert Sun, submit the Notice Inviting Bids to plan rooms, and provide the bid documents available free of charge to prospective bidders. A copy of the contract bid document for the Project is on file with the Public Works & Engineer Department. 02 City Council Staff Report October 7, 2015 -- Page 3 Approval of CP14-02, Ramon Road Pavement Rehabilitation The specifications identify the following tentative schedule for the bid process: Notice Inviting Bids to be posted: October 8, 2015 Deadline for receipt of bids: 3:00 PM, November 12, 2015 Contract awarded by City Council: December 2, 2015 ENVIRONMENTAL IMPACT: Section 21084 of the California Public Resources Code requires Guidelines for Implementation of the California Environmental Quality Act ("CEQA"). The Guidelines are required to include a list of classes of projects which have been determined not to have a significant effect on the environment and which are exempt from the provisions of CEQA. In response to that mandate, the Secretary for Resources identified classes of projects that do not have a significant effect on the environment, and are declared to be categorically exempt from the requirement for the preparation of environmental documents. In accordance with Section 15301 "Existing Facilities," Class 1 projects consist of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities; therefore, the Ramon Road Pavement Rehabilitation, City Project No. 14-02, is considered categorically exempt from CEQA, and a Notice of Exemption has been prepared and has been filed with the Riverside County Clerk. A copy of the Notice of Exemption is included as Attachment 2. FISCAL IMPACT: The City has received $395,729 in federal aid funds for the Project, as shown in the Caltrans authorization; these funds will be allocated to the Capital Project Fund (Fund 261) in Account No. 261-4491-50322. The City Council previously appropriated $51,000 from the Local Measure A Fund (Fund 134) in the 2014-2015 Fiscal Year, and an additional $100,000 in the 2015-2016 Fiscal Year. The final construction estimate is $500,000. The Project budget and estimated expenditures are identified in Table 1 below. Table 1 Table of Project Costs STP Funding Measure A Fund Project Administration (FY14/15) Project Administration (Estimated) Construction Inspection/Admin. (Estimated) Construction Cost (Estimated) Balance Remaining Amount $395,729 $151,000� ($3,705)� ($5,000)1 ($25,000)1 ($500,000) 1 $13,024 1 03 City Council Staff Report October 7, 2015 -- Page 4 Approval of CP14-02, Ramon Road Pavement Rehabilitation SUBMITTED: Marcus L. Fuller, MPA, P.E., P.L.S. Assistant City Manager/City Engineer Attachments: 1. Vicinity Map 2. Caltrans Authorization 3. Notice of Exemption David H. Ready, Esq. City Manager 04 Attachment 1 05 r �'""'•. Department of Public Works and Engineering Vicinity Map w Ramon Road Rehabilitation CP. 14-02 g ANDREASRD O U 3 E IAHQUITZ CANYON WAY ARENAS RD v� CALIF LILETA PASEO DE GRACIA i BARISTO RD VIA VAQUERO RD. I } a RANCHERORD q - O C �xxxxxxuxx'xr'xkxx'xkuX'xkXx'xkkxxxxxxxxx RAMQK(tp LLI FeSUNSHINE CIR N Cx o 1 - q W U SUNSHINE IIIW i " w w SUNSNatyE CfR S qi & Z �.a o' o' .$ Z SUNNYDUNESRD SAN LUCAS RD CASITAS V1WY ' MESQUITE AVE Legend OAK CREST DR 500' Radius ALTA LOMA DR ® Site CITY OF PALM SPRINGS 06 Department of Public Works and Engineering Vicinity Map Ramon Road Rehabilitation CP. 14-02 TARENAS RD vn P-'4),r-f jLtiL-f F! PM_ ANMFnsRn o _. i E TAHQUITZ CANYON WAY j p CALLS LILETA PASEO DE GRACIA BARISTO RD U 5 U VIA VAQUERO RD RANCHERORD > o C uj xxxxxxxxx.. W, : ; RAMON RD., .I O !' SUNSHINE OR N w o w � 7Z SUNSHINE WAY ¢ W U J U SUNSH'VE CIR SF L a m o a "� Z z Q SUNNYDUNESRD SAN LUCAS RD Legend 17-1 500' Radius ® Site. } I CASITAS WAY MESQUITE AVE -- OAK CREST DR {{�� ,�,•. ---��_ F jt ' ALTA LOMA CITY OF PALM SPRINGS rn Attachment 2 07 STATF.OFCAI.IFORNIAJni51NFNS IRANSV Rr4"i'ION AMP 11QU$INQ AQEKY DEPARTMENT OF TRANSPORTATION DIVISION OF PLANNING AND LOCAL ASSISTANCE 464 W. 4m STREET, 6" Floor, MS-760 SAN BERNARDINO, CA 92401-1400 PHONE (909) 383-4030 PAX (909)383-5936 PIY 711 www.dot.ca.gov/dist8i September 16, 2015 Marcus L. Fuller Director of Public Works / City Engineer City of Palm Springs 3200 E. Tahquitz Canyon Way Palm Springs, CA 92262 Dear Mr. Fuller: - l;DMUNDG HROWNI C 08-RIV-0-PSP STPLN-5282 (043) Pavement Rehabilitation Along Ramon Road from 650' West of Sunrise Way to 700' East of Compadre Road We have reviewed and processed your obligation submittal for the above -referenced project through Caltrans Headquarters and the Federal Highway Administration (FHWA). You are hereby authorized to begin the Construction phase of your project. Enclosed is a copy of the authorizing document (E-76) for your records. Flex your pon'er l Be energy effiaenl Please consult your Local Assistance Procedures Manual (LAPM), Chapter 15, for proper Advertising and Award procedures. The City shall follow its normal procedure in awarding the contract to the lowest responsible bidder and assuring us that all federal requirements have been met, including an approved Quality Assurance Program. Please notify this office in writing of the date of the bid opening. After the bid opening and award, please send us the following items: • A complete award package as outlined in Chapter 15, section 15.7. • One copy of plans and specifications, as advertised. Prospective bidders should be reminded of the Disadvantage Business Enterprise (DBE) requirements contained in Chapter 9 of the Local Assistance Procedures Manual. Please be reminded of the invoice processing requirements and reimbursement process in Chapter 5 of the LAPM. Invoices for reimbursement cannot be submitted until after funds are encumbered via an executed Program Supplemental Agreement (PSA) and/or an executed Finance Letter. If you have any questions, please call me or my staff- Alberto Vergel De Dios at (909) 809-3944. Sincerely, s-Xa-- Sean Yeung, P.E. District Local Assistance Engineer Attachment: E-76 c: Grace Alvarez, RCTC Anna Alonso, Caltrans Construction Oversight Engineer Savat Khamphou, City of Palm Springs George Farago, City of Palm Springs Page 1 of I 08 FEDERAL AID PROGRAM DLA LOCATOR: 08-RIV-0-PSP PREFIX: STPLN PROJECT NO: 5282(043) SEQ NO: 1 STATE PROJ NO:0814000219L-N AGENCY: PALM SPRINGS ROUTE. TIP DATA MPO: SCAG FSTIP YR: 14115 $TIP REF 209.40004164 DISASTER NO: BRIDGE NO'S: FROG CODE LINE NO M23E 30 M23E 31 FUNDING SUMMARY PHASE AUTHORIZATION I AGREEMENT SUMMARY - (E-76) CALIFORNIA DEPARTMENT OF TRANSPORTATION PROJECT LOCATION: RAMON ROAD FROM 650 FEET WEST OF SUNRISE WAY TO 700 FEET EAST OF COMPADRE ROAD TYPE OF WORK: PAVEMENT REHABILITATION PREV AUTH / AGREE DATES: FED RR NUS: PE: PUC CODES: R/W' PROJ OVERSIGHT: DELEGATED/LOCAL ADMIN CON: ENV STATUS I DT; DELEG TO STATE USC 326fSEC 6004 12/1112014 SPR: RW STATUS I DT: 1 0712312015 MCS. INV RTE'. 000000000000 OTH. BEG MP: 0 END MP: 0 IMPV TYPE FUNC SYS URBAN AREA URB/RURAL DEMO ID O6 P MAP21 INDIO-CATHEDRAL CITY URBAN 17 P MAP21 INDIO-CATHEDRAL CITY URBAN PROJECT COST FEDERAL COST PREV. OBLIGATION $0.00 $0.00 PE THIS REQUEST KOO $0.00 SUBTOTAL $0.00 $0.00 PREY. OBLIGATION $0.00 $0.00 R1W THIS REQUEST $0 DO $0.00 SUBTOTAL $o.DO $O.DO PREV OBLIGATION $0.00 MOO CON THIS REQUEST $447,U00.00 $395.729.00 SUBTOTAL $447,000.00 $395,729.00 TOTAL: $447,00000 $395.729.00 AC COST 50.00 $0 00 $0.00 $0.00 $0.00 $D.OD $0 00 $0.00 SOAO $0 DO STATE REMARKS 08/27/2015 SEQ 1 This is a request for Construction and Construction Engineering funding using the Regional Surface Transportation Program funds for pavement rehabilitation of Ramon Road from West of Sunrise Way to East of Compadre Road. The project is programmed for FY 14-15 in RCTCs lump sum listing RIV130402 in Amendment p4 approved on 41OW15 to SCAG's 2015 FTIP The original NEPA decision approved on 12M V2014 was re -validated on 08126I2015 Maximum reimbursement redo of 88.53%on a pro-rata basis. 08127/2015 SEQ 1 Agreement End Date Is on June 30, 2018 09/0812015 This is a request for construction and construction engineering funding for the rehabilitation and associated work of Ramon Road from approximately 660 feet west of Sunrise Way to approximately 700 feet east of Compadre Road in the City of Palm Springs using Regional Surface Transportation Program (RSTP) funds programmed for FY 14-15 in RCTC's FTIP ID RN730402 lump sum listing in Amendment 94 approved on 4108115 to SCAG's 2015 FTIP. The original NEPAdecision approved on 12JI1114 was ra-validated on 8126/15. Federal funding is capped at $396,000 for construction with maximum reimbursement ratio of 88 53%. Reimburse with M23E RSTP funds at approximately 50.5% on a lump sum reimbursement basis up to the federal amount shown for construction and construction engineering FEDERAL REMARKS AUTHORIZATION AUTHORIZATION TO PROCEED WITH REQUEST: CON FOR: CONSTRUCTION 8 CENG. DOCUMENT TYPE: AAGR 4 co PREPARED IN FADS BY: VERGEL DE DIOS, ALBERTO ON 08/2712015 806-3944 REVIEWED IN FADS BY: LOUIE, PATRICK ON 09/08/2015 653-7349 SUBMITTED IN FADS BY: LOUIE, PATRICK ON 09/0912015 FOR CALTRANS PROCESSED IN FADS BY: FOGLE, JERILYNN ON 0911412015 FOR FHWA APPROVED IN FMIS BY: TASIA PAPAJOHN ON O9/1612015 SIGNATURE HISTORY FOR PROJECT NUMBER 5282(043) AS OF 09118/2015 FHWA FMIS 4.0 SIGNATURE HISTORY MOD # SIGNED BY SIGNED ON 0 JERILYNN FOGLE 0911512015 ZYLKIA MARTIN-YAMBO 09/18/2015 TASIA PAPAJOHN 09/18I2015 FHWA FMIS 3.0 SIGNATURE HISTORY CALTRANS SIGNATURE HISTORY DOCUMENT TYPE SIGNED BY SIGNED ON AUTH/AGREE LOUIE, PATRICK 0910912015 r c=) Attachment 3 II NOTICE Of EXEMPTION To: ❑ Office of Planning and Research From: City of Palm Springs 1400 Tenth Street, Room 121 3200 E. Tahquitz Canyon Way Sacramento, CA 95814 Palm Springs, CA 92262 ® Clerk of the Board County of Riverside P.O. Box 751 Riverside, CA 92502-0751 Project Title: Ramon Road Pavement Rehabilitation. Citv Proiect No. 14-02 Project Applicant: Citv of Palm Sorinas Project Location (Specific): Ramon Road from Sunrise to Compadre Project Location (City): Citv of Palm Sorinas Project Location (County): Riverside Project Description: The scope of work consists of cold milling existing asphalt concrete (AC) pavement; installation of AC in designated pavement cracks; construction of asphalt concrete overlay; removal and reconstruction of AC pavement; installation of inductive loop vehicle detectors; removal, reconstruction, and upgrade of ADA curb ramps; traffic striping and markings and all other appurtenant work. Name of Public Agency Approving Project City of Palm Springs Name of Person or Agency Carrying Our Project: City of Palm Springs, Public Works & Engineering Department IF I L E D /POSTE O Exempt Status: (check one) County of Riverside Peter Aldana ❑ Ministerial (Sec. 21080(b)(1); 15268); Assessor -county Clerk -Recorder ( () O O); 0-201500012 ❑ Declared EmergencySec. 21080 b 3 ; 15269 a C-20150041 e1 :01 PM Fee*, $ 5 .Oe El Emergency S of 1 Emergency Project (Sec. 21080(b) (4); 15269 (b)(c)); '''' Remiul U 1 2015 eY 1� Dep� v ® Categorical Exemption. State type and section number: 15301 (c) 'III A ^� kS6lry��yy' ❑ Statutory Exemptions. State code number. Reasons why project is exempt: The Project consists of the repair and maintenance of existing City streets, involving negligible or no expansion of use beyond that existing at the time of the CiVs determination. Therefore, the Project is considered Categorically Exempt from CEQA pursuant to Section 153010 of the CEQA Guidelines. Lead Agency Contact Person: Savat Khamohou. P.E. Area Code/relephone/Extension: 7�Q1 323.8744. ext. 87444 If filed by applicant: 1.Attach certifi cu ant o emption finding. 2. Has a Not! of !x pti n filed by the public agency approving the project? ❑ Yes ❑ No Signature: ( Date: Title: Asst. Director of Public Works/Asst Citv Engineer ® Signed by Lead Agency []Signed by Applicant Authoritycited: Sections 21083 and 21110, Public Resources Code Date received for filing at OPR: Reference: Sections 21108. 21152, and 21152.1, Public Resources Code. 12