Loading...
HomeMy WebLinkAbout11/4/2015 - STAFF REPORTS - 2.N. iy c V N M y0 a 4O111ifv if9 c�``F°"��P City Council Staff Report DATE: November 4, 2015 CONSENT CALENDAR SUBJECT: APPROVAL OF PLANS, SPECIFICATIONS AND ESTIMATE AND AUTHORIZATION TO BID FOR THE POLICE DEPARTMENT REMODEL, CITY PROJECT NO 15-05 FROM: David H. Ready, City Manager BY: Public Works & Engineering Department SUMMARY The City Council previously appropriated funding in the amount of $450,000 from the Measure J Capital Project Fund for a capital project to remodel the Police Department Lobby and Records area, Detective Bureau room, and Police Training Center. Additional architectural design services to remodel the Men's and Women's Locker rooms as well as Report Writing Room and Dispatch Center have been included into this project. The construction documents (Plans, Specifications and Estimate) are completed and, in accordance with 7.03.040 of the Procurement and Contracting Code the Council is required to approve and adopt plans, specifications and working details, and authorize the bid request for all public projects in excess of $100,000. Approval of this project will allow staff to proceed with this public project, with an estimated cost of approximately $2,000,000. RECOMMENDATION: Approve the plans, specifications and estimate and authorize staff to advertise and solicit bids for the Police Department Remodel, City Project No. 15-05; STAFF ANALYSIS: As part of the Fiscal Year 2013/14 budget, the City Council appropriated $450,000 as budget through Measure J Capital Project Funds for the Police Department Remodel, City Project No. 15-05 (the "Project"). On December 18, 2013, the City Council approved a Professional Services Agreement (A6465), with Urrutia Architects, for the preparation of remodeling plans at the Police Department Lobby and Records area, Detective Bureau room and Police Training Center. On April 16, 2014, the City Council approved Amendment No. 1 to the ITIRM NO. City Council Staff Report November 4, 2015 -- Page 2 Approval of CP15-05, Police Department Remodel Agreement to include additional architectural design services for the remodel of the Men's and Women's Locker rooms. On October 15, 2014, City Council approved Amendment No. 2 to include additional architectural design services for the remodel the Report Writing Room, Dispatch Center and other miscellaneous items at the Police Station. Copies of these staff reports are included as Attachment 1. The proposed work includes, but is not limited to, the replacement of existing floor surface with new flooring, replacement of existing plumbing fixtures, redesign of existing ceiling lighting, repaint existing walls and HVAC registers, repaint existing metal lockers, upgrade areas to meet current ADA requirements, installation of furniture, surveillance cameras, security doors, blinds, ceiling vents, room signage and all other appurtenant work. A location map of the site is identified below and a vicinity map is included in Attachment 2. 77 of � • S f +i x •t•' C fi.�t�� ���.—� �sf A. ��r y '1, a. 1 UIll Z4- 17 .i 711161011111— V..r.• •.r. 0+ 1 6.. � � 'h rLlt`TYti.� Location Map A general overview of the scope of the improvements included with the Project is included in Attachment 3. This presentation provides a brief overview of the proposed improvements for the Police Department which comprises of renderings, exhibits and construction drawing layouts. A complete set of plans (110 sheets) is available for review with the City Engineer. 02 City Council Staff Report November 4, 2015 -- Page 3 Approval of CP15-05, Police Department Remodel The construction drawings prepared by Urrutia Architects are currently under review by the Building Department for compliance with required Building Codes. Staff recommends that, subject to final approval by the Building Official, the City Council approve the plans and authorize staff to formally solicit construction bids for the Project. With the City Council's approval, staff will advertise the project in the Desert Sun, submit the Notice Inviting Bids to plan rooms, and provide the bid documents available free of charge to prospective bidders. A copy of the construction drawings and contract specifications for the Project are on file with the Public Works & Engineer Department. The following tentative schedule has been identified for the bid process: Notice Inviting Bids posted and issued: November 19, 2015 Deadline for receipt of bids: 3:00 PM, January 7, 2016 Contract awarded by City Council: January 20, 2016 ENVIRONMENTAL IMPACT: Section 21084 of the California Public Resources Code requires Guidelines for Implementation of the California Environmental Quality Act ("CEQA"). The Guidelines are required to include a list of classes of projects which have been determined not to have a significant effect on the environment and which are exempt from the provisions of CEQA. In response to that mandate, the Secretary for Resources identified classes of projects that do not have a significant effect on the environment, and are declared to be categorically exempt from the requirement for the preparation of environmental documents. In accordance with Section 15301 "Existing Facilities," Class 1 projects consist of interior or exterior alterations involving such things as interior partitions, plumbing, and electrical conveyances; therefore, the Police Department Remodel, City Project. No. 15-05, is considered categorically exempt from CEQA, and a Notice of Exemption has been prepared and will be filed with the Riverside County Clerk. A copy of the Notice of Exemption is included as Attachment 4. FISCAL IMPACT: A total of $450,000 was previously budgeted for the Project through the Measure J Capital Project Fund (Fund 260). The current construction estimate for the Project prepared by Urrutia Architects is $1,660,784 as shown in Attachment 5. The estimated Project budget and incurred expenditures are identified in Table 1. 03 City Council Staff Report November 4, 2015-- Page 4 Approval of CP15-05, Police Department Remodel Table of Project Costs Amount FY13/14 Measure J Fund $450,000 Design Services $157,940 Project Administration (through 10/26/15) $7,228 Project Administration Estimated $10,000 Construction Support Estimated $200,000 Construction Contract Estimated $1 ,700,000 Construction Contin enc 'ay $170,000) Additional Budget Required $1,775,168 Table 1 As identified in Table 1, an additional budget of $1.8 Million will be required to fully fund the estimated cost of the Project. In its adoption of the Fiscal Year 2015/2016 budget, the City Council authorized a $1,000,000 loan from the General Fund to the Measure J Fund for the Project to be repaid within three fiscal years. Staff has kept the Measure J Commission appraised of the additional costs — which the Commission has requested to be discussed further once an actual bid amount is received, for additional funding. Following bidding of the Project, staff will revise and identify the final additional budget required, with use of the $1 Million General Fund loan to allow award of a construction contract to occur within the current fiscal year. SUBMITTED: Prepared by: Approved by: Marcus L. Fuller, MPA, P.E., P.L.S. David H. Ready, Esq., P . Assistant City Manager/City Engineer City Manager Attachments: 1. Prior Staff Reports 2. Vicinity Map 3. Power Point Presentation 4. CEQA Notice of Exemption 5. Construction Estimate 04 ATTACHMENT 1 G5 { �pALM spp iy ti O V N a r ,r r kOAaunv` CITY COUNCIL STAFF REPORT DATE: December 18, 2013 CONSENT CALENDAR SUBJECT: POLICE DEPARTMENT REMODEL ARCHITECTURAL DESIGN AGREEMENT FROM: David H. Ready, City Manager BY: Special Projects Coordinator SUMMARY The proposed action would result in an Architectural Design Contract for remodel work at the police Department building. RECOMMENDATION: 1. Approve an architectural design contract for the remodel of the Police Department lobby/records area, the detective bureau, and the training center with Urrutia A.I.A. and Associates, Inc. in an amount not to exceed $79,700. 2. Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS: The Police Chief and his staff have requested that three areas of the Police building be considered for remodel. First, the lobby/records area which is under sized, provides no privacy for patrons and provides little or no security for the staff; Second, the detective bureau which is over-crowded and has a very "closed in" feeling; and Third, the training center which is in need of acoustical and cosmetic upgrades as well as a complete audio visual upgrade. Staff has met with Frank Urrutia of Urrutia AIA and Associates to discuss the various needs of the building and Mr. Urrutia has provided three separate proposals for upgrades to the three problems areas identified by the Police Department. Mr. Urrutia's firm is one of the City's existing on-call architectural firms, with offices located in Palm Springs. The proposals delineate the three tasks as follows: i ITEM NO.„ �u Us City Council Staff Report December 18 2013-Page 2 Police Department Remodel Architectural Agreement Task 1 Records and Lobby Remodel Design (See attached Proposal) Task 2 Detective Bureau Remodel Design (See attached Proposal) Task 3 Police Training Center Remodel Design (See attached Proposal) FISCAL IMPACT: The maximum contract under the three proposals totals $79,700.00, broken down as follows: Schedule of Compensation Compensation for design and professional architectural services shall be lump sum as follows: Work Items Task 1 Task 2 Task 3 Pre-Design Site Analysis T 2,200 $ 1,600 $ 8,000 Schematic Design $ 4,900 $ 2,000 $ 2,000 Construction Documents $17,050 $10,050 $12,500 Bidding $ 800 $ 600 $ 600 Construction Admin. 5,760 2,950 3,200 TOTAL $30,700 $17,200 $26,300 Reimbursable Expenses` $ 2,500 $ 1,500 $ 1,500 At cost plus 10% Funds for this work are available through Measure "J" accounts 260-4500-59440 and 59452. fI. Allen Smoot, 8pecidf Projects Coordinator David H. Ready, nager Attachment: 1. Proposals (3) 2. Timeline 67 165 Luring Drive Palm Springs.CA92262 urrUTIH 766.327.6860 766.327.6813 fax designQurrutiawhitecss cm November 21, 2013 Mr_ Allen Smoot Special Projects Coordination -City Manager's Office City of Palm Springs 3200 E. Tahquitz Canyon Way Palm Springs, CA. 92263-2743 RE: Proposal for Professional Design and Engineering Services - Palm Springs Police Department-Records and Lobby Remodel Palm Springs, CA. Dear Mr. Smoot: Urrutia Architects is pleased to provide the City of Palm Springs with our proposal for professional architectural and engineering services to include the redesign of the existing Lobby and Records Department. The proposal will include the expansion of the existing Lobby toward the street. Scone of Work The following will summarize our understanding of the scope of work. The City Police Department is proposing to enlarge the existing Lobby area and to redesign the existing Records Department. A conceptual plan was submitted (see attached) by the Department as a starting point which includes an expanded Lobby, vestibule area, and added reception booths for the records personnel. Based on the above description, the following shall be included in the scope of work; • Two fully functional work stations with privacy.Should be designed for sit down desk height. • Soundproof glass between the two new stations for privacy. • Replace existing hard surface flooring with more sound absorbing type flooring. • New blinds for Lobby glass to provide privacy between Records Department and Lobby. • Remove some glass between Records Department and Lobby for visual privacy. • New Waiting area with new furniture and finishes. • New secure doors at new entrance. Possible secured vestibule, Consider 08 Records and Lobby Remodel Pdm Springs Police Department Pokn Springs,CA November 20.2013 electronic activated locks at entrance doors. • New signage and information dispensers in entry area. • Upgrade these areas to meet current ADA requirements. • Cameras in Records/Lobby areas to allow surveillance of persons entering Lobby. • Provide door opening release buttons at every desk in the records Department. • Pull out drawer in copy machine room work table. • New ceiling vents. • New desks in Records Department. • New flooring in all Records and Break Room. • Paint all walls in these areas. • Consider a new air purification system. We are assuming that the project will be subject to review by only the following agencies/departments: o City of Palm Springs Police Department c City of Palm Springs Planning Department and Architectural Review Commission o City of Palm Springs Building Department o Meet 2013 CBC codes and 2013 Title 24 requirements. Scope of Services Based on the above Scope of Work, Urrutia Architects will provide Architectural and Engineering Services including Design and Construction Documents to include the following services: • Architectural • Electrical Engineering • Mechanical Engineering • Structural Engineering A. Pre-Design/Site Analysis Phase: a. Urrutia Architects and their consultants shall provide the fallowing services: • Architectural design shall include review of existing construction documents and record drawings furnished by the City of Palm Springs. Assumption is that drawings are available for review and use in preparing existing CADD based drawings. Once a base plan is prepared of the existing facility, a site visit shall be conducted to verify existing conditions match the original drawings. • Electrical and mechanical engineering shall consist of a site visit to document the existing power sources, electrical panels, and HVAC systems and loads for this area. j i _ 2 if9 i i Records and Lobby Remodel Palm Springs Police Department Palm Springs,CA November 20,2013 B.Schematic Design Phase: a. Urrutia Architects shall prepare schematic design drawings which will consist of the following: • Architectural design shall include a proposed floor plan layout, furniture layout, finish floor plan, reflected ceiling plan, exterior elevations, and finish material selections. The Architect shall be responsible for the coordination of all consultants work; provide the City Police Department with delineated layouts for review and comment; attend all meetings, including City review meetings; and scheduling of all consultant's work. C. Construction Document Phase: a. For the purpose of this proposal, all construction documents created for this project shall be a part of a single set of construction drawings for this project. Phasing the project was not considered in this proposal. Urrufia Architects and their consultants shall prepare detailed construction documents based on the final design drawings approved by the City of Palm Springs and the Police Department, which will, in general, consist of the following: • Title sheet with code analysis and ADA requirements. • Partial Site Plan to Identify location of work in the overall building. • Site Remodel and Demolition Plan. • Demolition Floor Plan, including temporary construction walls. • Remodel floor plan and finish schedule. • Reflected ceiling plan and details. • Exterior elevations. • Sections. • Structural drawings and details. • Electrical demolition plan and remodel plan, Mechanical Plan including load calculations to determine added heat load effect on existing mechanical system; analysis to determine if new unit is required for additional area. - 3 - IO i Records and Lobby Remodel I Palm Springs Police Deporime t j Patin springs,CA November 20,2013 • Furniture plan and floor finish plan. • Specifications prepared in CSI format, • Attend meetings as required. D. Bidding Phase: a. Urrutia Architects shall assist the City of Palm Springs In soliciting and obtaining bids from general contractors for this project as an overall single project through the public noticing process. During the course of the bidding process, if requested by the City of Palm Springs, the architect shall prepare and issue addenda, respond to bidders' RFI's, review bids, and make final recommendations. E. Construclion Admintstrafion Phase: a. Urrutia Architects shall provide professional services during the course of construction that shall include the following: • Provide clarification and interpretive drawings to the contractor, • Review and respond to RFI's from the contractor, • Review submitted changes in construction and costs proposed by the contractor. Process any Change Orders during the construction phase. • Review Applications for Payment from the Contractor and make recommendations for payments. • Visit the job site bi-weekly to review the progress of work and answer any questions the contractor may have. Document the site visits with photographs and written memos which will be distributed. • Review and process shop drawings and submittals. • Prepare punch lists during substantial completion and final punch Ibis to close out the project. • Documentation of all warranties, guarantees, and operation manuals, -4- � i i i Records and Lobby Remodel j Palm Springs Polloe Departrnerrf j Palm springs,CA November 20,2013 F. Proposed Compensation To provide the services described in this proposal, the following compensation is proposed: A total fixed cost of$30,70o.o0, plus reimbursable expenses. A. Pre-Design/Site Analysis Phase: A fixed sum of$2,200.00, plus reimbursable expenses. B. Schematic Design Phase: A fixed sum of$4,900.00, plus reimbursable expenses. C. Construction Document Phase: A fixed sum of$17,050.00, plus reimbursable expenses. D. Bidding Phase: A fixed sum of$800.00,plus reimbursable expenses. E. Construction Administration Phase: A fixed sum of$5,750.00, plus reimbursable expenses. Reimbursable Expenses: Reimbursable Expenses are in addition to the Architect's compensation, and include actual expenditures made by the Architect and the Architect's employees and Consultants in the interest of the Project for the expenses listed in the following Subparagraphs: • Long distance communications; • Fees paid in securing approvals of authorities having jurisdiction over the Project; • Reproductions of drawings, specifications and other documents; • Postage and special handling of documents; • Finish/ detailed models requested by the Client, We are proposing an estimated budget of$2,500.00 for reimbursable expenses. 5 _ 12 i Record]and Lobby Remodel Palm SpriNjs Police Department Palm Springs,CA November 20. 2013 Exclusions include the following: • Geotechnical reports or testing, Landscape or Irrigation Design. Assumptions include the following: • The City of Palm Springs shall provide the Architect with copies of "as built" drawings of remodel area, including structural, architectural, mechanical, and electrical data or any other drawings of scope related information relevant to this project that may assist the Architect in the preparation of their drawings. • The City of Palm Springs, through the City Procurement Process, will prepare and provide the City's "boiler plate" specificctions and general condition requirements for bid and construction purposes. The Architect will provide performance specifications for materials specified. If our proposal is acceptable, please have the City prepare an agreement for our services. Should you have any questions, please call me. I look forward to hearing from you. Sincerely, ch ects tio, AIA/FARA Pr side alifornia License # C7A67 -6- I3 165 Luring Drive Patin Springs. CA 92262 UffUT1e 760-327.6800 760.327.fi81313 fax designQurrutiaarchitemcoin November 21, 2013 Mr, Allen Smool Special Projects Coordination-City Manager's Office City of Palm Springs 3200 E. Tahquitz Canyon Way Palm Springs, CA. 92263-2743 RE: Proposal for Professional Design and Engineering Services - Palm Springs Police Department-Detective Bureau Remodel Palm Springs, CA. Dear Mr. Smoot: Urrutia Architects is pleased to provide the City of Palm Springs with our proposal for professional architectural and engineering services to include the redesign of the existing Detective Bureau area within the Police Department. Scone of Work The following will summarize our understanding of the scope of work. The City Police Department is proposing to have the existing Detective Bureau area re-designed to be more efficient with regard to space layout and energy. A conceptual plan was submitted by the Department (see attached) as a starting point which includes repositioning of office cubicles and work spaces to improve the work flow. Based on the above description, the following shall be included in the scope of work: • Provide separate space for storage. • Provide space plan for thirteen offices. • Natural light is important in considering space plan for offices. • Redesign existing lighting in ceiling to provide for more efficient lighting for work spaces. • Replace existing floor surfaces with new flooring. • Select new furniture systems for space plan. Include system design that will provide for more natural lighting, such as glass panels. • New signage for offices. • Ensure these areas will meet current ADA requirements. • Provide selections for new furniture. desks, flooring, and wall finishes. • Re-paint oil walls in these areas. �a Detective Burew Remodel Palm Springs Police Depadment Palm Springs,CA November 2a 2013 • Provide seismic anchorage of all heavy storage (file) units or equipment. We are assuming that the project will be subject to review by only the following agencies/departments: o City of Palm Springs Police Department o City of Palm Springs Planning Department and Architectural Review Commission o City of Palm Springs Building Department o Meet 2013 CSC codes and 2013 Title 24 requirements. Scone of Services Based on the above Scope of Work, Urrutla Architects will provide Architectural and Engineering Services including Design and Construction Documents to include the following services: • Architectural • Electrical Engineering • Structural Engineering (For seismic anchorage only) A. Pre-Design/Stle Analysis Phase: a. Urrutia Architects and their consultants shaft provide the following services: • Architectural design shall include review of existing construction documents and record drawings furnished by the City of Palm Springs. Assumption is that drawings are available for review and use in preparing existing CADD based drawings. Once a base plan is prepared of the existing facility, a site visit shall be conducted to verify existing conditions match the original drawings. Electrical engineering shall consist of a site visit to document the existing power sources, data sources, lighting fixtures and controls, and electrical panels for this area. B. Schematic Design Phase: a. Urrutia Architects shall prepare schematic design drawings which will consist of the following: • Architectural design shall include a proposed Floor plan layout, reflected ceiling pion, furniture layout, and finish material selections. The Architect shall be responsible for the coordination of all consultants work: provide the City Police Department with delineated layouts for review and comment; attend all meetings, including City review meetings; and scheduling of all consultant's work. -2 - i 15 i Deteative Bureou Remodel Palm Springs Polloe Department Palm Springs.CA November 20,2013 C. Construction Document Phase: a. For the purpose of this proposal, all construction documents created for this project shall be a part of a single set of construction drawings for this project. Phasing the project was not considered in this proposal, Urrutia Architects and their consultants shall prepare detailed construction documents based on the final design drawings approved by the City of Palm Springs and the Police Department, which will, in general, consist of the following: • Title sheet with code analysis and ADA requirements. • Partial Site Plan to identify location of work in the overall building. • Demolition Floor Plan, including temporary construction walls, if required. • Remodel floor plan and finish schedule. • Reflected ceiling plan and details. • Structural anchorage details. • Electrical demolition plan and remodel plan. • Furniture plan and floor finish plan. • Specifications prepared in CSI formot. • Attend meetings as required. D. Bidding Phase: a. Urrutia Architects shall assist the City of Palm Springs in soliciting and obtaining bids from general contractors for this project as an overall single project through the public noticing process. During the course of the bidding process, if requested by the City of Palm Springs, the architect shall prepare and Issue addenda, respond to bidders' RFI's, review bids, and make final recommendations. _ 3 . 16 i i Detective Burew Remodd Palm Springs Police Depertrnent Palm Springs,CA November 20,2013 E. Construction Administratton Phase: a. Urrutia Architects shall provide professional services during the course of construction that shall include the following: e Provide clarification and Interpretive drawings to the contractor, Review and respond to RFI's from the contractor. Review submitted changes in construction and costs proposed by the contractor. Process any Change Orders during the construction phase. i Review Applications for Payment from the Contractor and make recommendations for payments. Visit the job site bi-weekly to review the progress of work and answer any questions the contractor may have. Document the site visits with photographs and written memos which will be distributed. e Review and process shop drawings and submittals. e Prepare punch lists during substantial completion and final punch lists to close out the project. Documentation of all warranties, guarantees, and operation manuals. -4- 17 I Detective Bureau Remodel Pdm Sprhgs Police Department Palm Sprlrgs,CA November 20,2013 F. Proposed Compensation To provide the services described in this proposal, the following compensation is proposed: A total fixed cost of$17,200.00,plus reimbursable expenses. i A. Pre-Design/Site Analysis Phase: A fixed sum of$ 1,600.00, plus reimbursable expenses. B. Schematic Design Phase: A fixed sum of$2,000.00, plus reimbursable expenses. C. Construction Document Phase: A fixed sum of$10,050.00,plus reimbursabie expenses. D. Bidding Phase: A fixed sum of$600.00, plus reimbursable expenses. E. Construction Administration Phase: A fixed sum of$2,950.00,plus reimbursable expenses. Reimbursable Expenses: Reimbursable Expenses are in addition to the Architect's compensation, and include actual expenditures made by the Architect and the Architect's employees and Consultants in the interest of the Project for the expenses listed in the following Subparagraphs: • Long distance communications; • Fees paid in securing approvals of authorities having jurisd'rctlon over the Project; • Reproductions of drawings, specifications and other documents; • Postage and special handling of documents; • Fnish/detailed models requested by the Client, We are proposing an estimated budget of$1,500.00 for reimbursable expenses. - 5- 1 Delective Bureau Remodel Palm Springs Police Deportment Palm SpringS,CA November 20.2010 Exclusions include the following: • Geotechnical reports or testing. • Mechanical Design. Assumptions include the following: • The City of Palm Springs shall provide the Architect with copies of "as built" drawings of remodel area, including structural, architectural, and electrical data or any other drawings of scope related information relevant to this project that may assist the Architect in the preparation of their drawings. • The City of Palm Springs, through the City Procurement Process, will prepare and provide the City's "boiler plate" specifications and general condition requirements for bid and construction purposes. The Architect will provide performance specifications for materials specified. If our proposal is acceptable, please have the City prepare an agreement for our services. Should you have any questions, please call me. i look forward to hearing from you. Sincerely, itec ra ' co ti , AIA/FARA Presi ornia License ff C7467 - 6 - I9 165 luring Drive urrurle Palm Springs.CA 92262 760.327.6800 760.327,6813 fax ' - 3esigr urrvliaarchllecrs.Com November30, 2013 (Revised) Mr. Allen Smoot Special Projects Coordination-City Manager's Office City of Palm Springs 3200 E. Tahquitz Canyon way Palm Springs, CA, 92263-2743 RE: Proposal for Professional Design and Engineering Services - Palm Springs Police Department-Training Center Remodel (Revised) Palm Springs, CA. Dear Mr. Smoot: Urrutia Architects is pleased to provide the City of Palm Springs with our proposal for professional architectural and engineering services o include the redesign of the existing Training Center, Scope of Work The following will summarize our understanding of the scope of work. The City Police Department is proposing to have the existing Training Center ceilings enhanced and remodeled. In addition, the existing operable partitions between rooms are leaking sound between rooms which wfi; require an acoustical analysis of the existing conditions. The following shall be included in the scope of work: • Redesign the existing ceilings to make them more aesthetically pleasing. • New ceiling HVAC registers. • Repaint all walls in these areas. • Coordinate electrical with AV system to be provided by others. • Study sound isolation between rooms for the existing operable partitions. Evaluation of the existing performance of the operable partitions, determine if the acoustical seals are allowing sound leakage and to what extent. • Provide recommendations for acoustical materials to be included in the ceiling design. May include acoustical wall panels. 20 Training Canter Remodel Palm Springs Poike Department Palm Springs,CA November 30,2013(Reviised) We are assuming that the project will be subject to review by only the following agencies/departments: o City of Palm Springs Police Department o City of Palm Springs Planning Department and Architectural Review Commission o City of Palm Springs Building Department • Meet 2013 CBC codes and 2013 Title 24 requirements. Scope of Services Based on the above Scope of Work, Urrutia Architects will provide Architectural and Engineering Services including Design and Construction Documents to include the following services: • Architectural • Electrical Engineering • Mechanical Engineering • Acoustical Engineering A. Pre-Design/Site Analysis Phase: a. Urrutio Architects and their consultants shall provide the following services: • Architectural design shall include review of existing construction documents and record drawings furnished by the City of Palm Springs. Assumption is that drawings ore available for review and use in preparing existing CADD based drawings. Once a base plan is prepared of the existing facility, a site visit shall be conducted to verify existing conditions match the original drawings. • Electrical and mechanical engineering shall consist of a site visit to document the existing power sources, electrical panels, and HVAC registers and systems for this area. I • Acoustical engineering shall include an evaluation of the existing operable partition system and shall include the fallowing: i. Measurement of the Noise Insulation Class of the operable partitions and provide test reports. This will include assessing the sound over the top of the track. li. Assess the acoustical leaks and their locations, and include in test reports, iii. Tape over the acoustical leaks, re-measure the NIC •o indicate the best possible performance for the operable walls, in the event their acoustical seals can be refurbished. _2 21 f Training Center Remodel I l Palm springs Ponce Department Polm Springs,CA November 30, 2013(Revised] iv. Provide recommendations as to whether the seals can be refurbished or if the operable partitions need to be replaced. Y. Provide recommendations regarding locations where acoustical leakage or sound flanking paths were discovered. B. Schematic Design Phase: a. Urrutio Architects shall prepare schematic design drawings which will consist of the following: • Architectural design shall include a proposed reflected ceiling plan and finish material selections. The Architect shall be responsible for the coordination of all consultants work; provide the City Police Department with delineated layouts for review and comment; attend all meetings, including City review meetings;and scheduling of all consultant's work. • Integration of acoustical recommendations for ceiling and wall materials that will enhance the acoustical qualities within each room. C. Construction Document Phase: a. For the purpose of this .proposal, all construction documents created for this project shall be a part of a single set of construction drawings for this project. Phasing the project was not considered in this proposal. Urrutia Architects and their consultants shall prepare detailed construction documents based on the final design drawings approved by the City of Palm Springs and the Police Department, which will, in general, consist of the following: • Title sheet with code analysis and ADA requirements. • Paetial Site Pan to identify location of work in the overall building, • Demolition Reflected Ceiling Plan. I • Remodel Reflected ceiling plan and details. • Electrical demolition plan and remodel plan. • Mechanical demolition and remodel plan. • Specifications prepared in CSI format. • Attend meetings as required. 3 22 i Training Center Remodel Palm SWlrgs Polce Department Palm Sprlrgs,CA November 30,2013(Revised) . D. Bidding Phase: i a. Urrutia Architects shall assist the City of Palm Springs in soliciting and obtaining bids from general contractors for this project as an overall single ' j project through the public noticing process. During the course of the i bidding process, if requested by the City of Palm Springs, the architect shall prepare and issue addenda, respond to bidders' RFI's, review bids, and make final recommendations. E Construction Administration Phase: a. Urrutia Architects shall provide professional services during the course of construction that shall include the following: • Provide clarification and Interpretive drawings to the contractor. • Review and respond to RFI's from the contractor. • Review submitted changes in construction and costs proposed by the contractor. Process any Change Orders during the construction phase. • Review Applications for Payment from the Contractor and make recommendations for payments. • Visit the job site bi-weekly to review the progress of work and answer any questions the contractor may have. Document the site visits with photographs and written memos which will be I distributed. • Review and process shop drawings and submittals. • Prepare punch lists during substantial completion and final punch lists to close out the project. i • Documentation of all warranties, guarantees, and operation j manuals. I I _4_ 23 Training Center Remodel Palm Springs Police Department Palm Springs,CA November 30,2013[Revised) F. Proposed Compensation To provide the services described in this proposal, the follovdng compensation is proposed: II A total fixed cost of$26,300.00, plus reimbursable expenses. i A. Pre-Design/Site Analysis Phase: I A fixed sum of$8,000.00, plus reimbursable expenses. B. Schematic Design Phase: A fixed sum of$2,000.00, plus reimbursable expenses. I C. Construction Document Phase: A fixed sum of$12,500.00, plus reimbursable expenses. D. Bidding Phase: A fixed sum of$ 600.00,plus reimbursable expenses. E. Construction Administration Phase: A fixed sum o` $3,200.00, plus reimbursable expenses. Reimbursable Expenses: Reimbursable Expenses are in addition to the Architect's compensation, and include actual expenditures made by the Architect and the Architect's employees and Consultants In the interest of the Project for the expenses listed in the following Subparagraphs: • Long distance communications; • Fees paid in securing approvals of authorities having jurisdiction over the Project; • Reproductions of drawings, specifications and other documents; • Postage and special handling of documents; • Finish/detailed models requested by the Client, We are proposing an estimated budget of$1,500.00 for reimbursable expenses. i - 5- 24 I i i I Tralning Center Remodel Palm Springs Police Department Palm Springs,CA ' November 30,2013(Revised) Exclusions include the .`ollowin 9� I Geotechnical reports or testing. i I I Assumptions include the following: I • The City of Palm Springs shall provide the Architect with copies of "as built' drawings of remodel area, including structural, architectural, mechanical, and electrical data or any other drawings of scope related information relevant to this project that may assist the Architect in the preparation of their drawings. j The City of Palm Springs,through the City Procurement Process, will prepare and provide the City's "boiler plate" specifications and general condition requirements for bid and construction purposes. The Architect will provide performance specifications for materials specified. If our proposal is acceptable, please have the City prepare an agreement for our services. Should you have any questions, please call me. I look forward to hearing from you. Sincerely, ct IA/FARA Preside Cs Licensse # 7467 I I I E i I I I - 6- 15 %.m ispwratadom S6— x�Y WA.:s.. ilf 5/]WII" R.e Oesy^/91rnv'.nb Rm.. so— 11.:/]!la w.e ll8/34 ...0 SOas 1,IfW%J WrnVVB' LL� 5 I t:M/KN[nLn[ein9 Jalrs ,i 111/m Wef.O;A a Mrrn..:r lErx,rM.nre Jdrya fnl/]/I. wrd V20 1- t YMrMII[Op{I(r1%rau xx drys rnp l/9/u M.Mljl. Iae,V reu Inal;9/14 wed W91W _ > { Cede UeGatmnn Pp,prwdr Ra.n Ma^lao/Ia wed 2/29pa H { GryVlanmryapptttab lasC Revew 6 d M 1VI 1?114 W$r4gVL [ \I [umbu[Wn 0.'cuT[M pl4fe 62d, Mu2/22/1. MSIH/1J x { F.,kAw,l 11 dap I 2/l]/1e hi.IIV14 H { FMtrkalFryireerrrq lldap ilw 1/21114 Ria/18/1. y { Mnnanr:altremeer,re 3ldaes TM 2Rt/1. r.l./111/I. H { $INfurd lrk,rcrnr,e fund x11 2J27/14 fll</18/ll ] H { id<[0[{anm[rrt A{w 2.d F.11M1J tAV H { au brre]evanmem aeo.,..al Ndan mVld/la u { Gbn rT^6 corm^n )a.n xlu5r 22/11 11.5/30114 0C tl It j•&dd,n,P. ii drp IMd/i/f4'"W 712/14 c H � _Aware Cn V II W,�_y=_< � .. �ar"r9•l��l�.^�{�1.V1�i ^ •.--., lH! � 1 MVMre H lt— ~ 107dna M11V14 0n5/3UA ]{' �' (M.O.C9M1<M1lslle Marin,aBM[ sdan 1 11V14 wee IM14 ' seen R 112l14 w[d IM14 LJ 1p rn!/1/ta wee lm!r. I r I it kM1emxk W54n RI,aY Lean en l/1( 4 N'atl 21wm p It 111,1M,W l)dan fn Llp/1. WN 2112/14 ..H_. { Vol,rr Oroanr„rrt Approval ia,r. Mo J wOdl/2 a! � m..,l.euier,poawnem R2Mu ndm 2fx.VUTA2/ax/x. rd s/xvl.H y-� { amner'W .leap rnu 2/IVIa rn Ne/l. e ] M ,{ Elavial f,rM.rc.rng 6dm d R rM,l/t 1r.1/I8/fd [ ] M { eolke DeWrlmera Approval 6da/x/"I. / /M [� -rf If ouddrr,a oroanmrm eoerwal xamn In Jpep ..d J wes/2l/lJ p- { Plan(Mrk CwrMwnt 2daVs 'Pus/23ita I 5.rl0ila C ] 'I —_ - e ir.. - Mm.b'ula wrdlNxa L�..r..a r14 - i TiI rralm SernF Y - ♦ ,ru[1u.MiMlon. MMYMSMrnrlM1--- _ MMLne rrgwkr.warrf��a 9r� nr..wxm � nxv..s,..rr.i ...Nus,rmmn Rrx+.• wsmfWLu wsmnr enem.aMrne.,. Mnuarrak --- soda+. c pannrV kuu.efarl wrarewwY IMarn.N 2 N r 26 I I i } 's 33 b ��i1i'i'i�k14 kP44r4t44'k4ti44'44� �� �Y?i?-S i i6�i O�R1C�7 S.SR ili�iiR ,CC�i�il f 22 *?ALM Sp9 .y Q u N g Folto CITY COUNCIL STAFF REPORT DATE: April 16, 2014 CONSENT AGENDA SUBJECT: POLICE DEPARTMENT REMODEL DESIGN SERVICES AMENDMENT NO. 1 —OFFICER'S LOCKER ROOMS FROM: David H. Ready, City Manager BY: Special Projects Coordinator SUMMARY The proposed action would approve a design services amendment to include the Officer's Locker Rooms/Restrooms in the Police Department remodel project. RECOMMENDATION: 1. Approve Amendment No. 1 to Agreement No. A6465, with Urrutia A.I.A. and Associates, Inc., to add architectural and engineering design services for the remodel of the officer's locker rooms/restrooms to the Police Department remodel project. 2. Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS: Local architect Frank Urrutia is under contract to develop plans and specifications for the remodel of the Police Department Training Center, Records Office, Main Lobby and Detective Bureau. As that project began it was determined that additional remodel work was also needed in the officer's locker rooms/restrooms area of the building. The architect was asked to provide a proposal for that work and a copy of that proposal is attached as part of the proposed amendment. Total cost of this additional assignment comes to $24,800 bringing the entire project design cost to $104,500. �r 28 ITEM NO. City Council Staff Report April 16, 2014- Page 2 Amendment No.1,Agreement No. A6465 FISCAL IMPACT: Funds for this additional design work are available in Measure "J" account 2604500- 59444. QM4��— Allen F. Smoot Special Projects Coordinator David H. Ready City Manager Attachments: 1. Amendment/Proposal II 29 i i AMENDMENT NO. 1 TO AGREEMENT NO. A6465 ARCHITECTURAL DESIGN SERVICES THIS FIRST AMENDMENT TO Agreement No. A6466 for consulting services, (herein "Amendment") made and entered Into on the _ day of , 2014, by and between the CITY OF PALM SPRINGS (herein "City") and URRUTIA A.I,A. AND ASSOCIATES, INC. (herein "Consultant") is hereby amended effective April 17, 2014, as follows: RECITALS WHEREAS, City and Consultant entered Into that certain Architectural Design Services Agreement No. A6465 for Design Services related to the Police Department ("Agreement"), as duly amended from time to time; and WHEREAS, the parties wish to amend the Agreement to add additional design services related to the officer's locker room; and NOW, THEREFORE, for good and sufficient consideration, the parties agree as follows: Section 1. Scope of Services is hereby amended to add design and engineering services for remodel of the basement men's/women's locker rooms and restrooms as more specifically defined in the Proposal dated March 29, 2014 attached hereto. Section 2. Exhibit"D" Schedule of Compensation is hereby amended to add Task 4 as follows: Tasks from Proposal Task 4 Pre-Design Site analysis $2,000 Schematic Design $3,700 Construction Documents $12,300 Bidding Phase $ 800 Construction Admin. $4,500 Total $23,300 Reimbursable Expenses $1,500 MAXIMUM TOTAL CONTRACT$104,500 Section 3. Timeline shall remain unchanged. Section 4. Full Force and Effect: Except as previously modified herein, all other provisions of the Agreement shall remain unmodified in full force and effect. i i Amend 1 to A6465 1 30 i i IN WITNESS WHEREOF, the parties have executed and entered into this Amendment as of the date first written above. ATTEST: CITY OF PALM SPRING a municipal corporation By: City Clerk City Manager APPROVED AS TO FORM: City Attorney CONTRACTOR: Check One: _ Individual Partnership -.4 Corporation URRUTIA A.I.A AND AS IATES, INC. u J Tit Amend 1 [ 4 o A8 65 2 3 16S Luring Drive UfYUt1A Palm Springs,CA92262 780.327.8800 760.327.6813 fax eesi9n@urrutiaanhitects.ram March 29, 2014 Mr. Allen Smoot Special Projects Coordination-City Manager's Office City of Palm Springs 3200 E.Tahquitz Canyon Way Palm Springs, CA. 92263-2743 RE: Proposal for Professional Design and Engineering Servk es - Palm Springs Police Department- Basement Men's/Women's Lockers and Restrooms Remodel Palm Springs, CA. Dear Mr. Smoot: Urrutia Architects is pleased to provide the City of Pam Springs with our proposal for professional architectural and engineering services to include the redesign and upgrades for the existing Men's and Women's Lockers and Restrooms located in the Basement. Scope of Work The following will summarize our understanding of the scope of work. The City Police Department is proposing to upgrade and modernize the existing Men's and Women's Lockers and Restrooms located in the Basement of the Police Department facility. Based on a preliminary walk thru of the facility and meeting to discuss the requirements of the PD, the following shall be included in the scope of work: 1. Men's Lockers and Restrooms: • Refinish existing fixed benches located in Dressing/Lockers area. • Repaint the existing metal lockers. • New flooring throughout the locker area. • New paint on all walls and hard surface Ceilings/soffits. • Cleanup/Paint existing storage cabinets and concrete flooring located in "sleep room". • Where possible, upgrade the restroom areas to meet current ADA requirements. This will include vanities, sinks, showers, etc. • Provide new finishes for sink countertops and splashes. Remove existing recessed towel dispensers (not being used); replace existing plumbing fixtures with new water efficient fixtures, and new mirrors. 32 i E Basement Men's/Women's Lockers and Reslrooms Remodel Palm Springs Pollce Department Palm Springs,GA March 29,2D14 I • Refinish existing shower with new wall and floor finishes and new plumbing fixtures. • Existing sauna will remain as is. • Review efficiency of exiting lighting and add new fights in shower. • Add new receptacles that meet current GFCI code requirements at sink area. 2. Women's lockers and Restrooms: • Refin;sh existing fixed benches located in Dressing/Lockers area. • Repaint the existing metal lockers. • New flooring throughout the locker area. • New point on all walls and hard surface ceilings/soffits. • Where possible, upgrade the restroom areas to meet current ADA requirements.This will include vanities,sinks, showers, etc. • Provide new finishes for sink countertops and splashes. Remove existing recessed towel dispensers (not being used): replace existing plumbing fixtures with new wafer efficient fixtures, and new mirrors. • Refinish existing showers with new wall and floor finishes and new plumbing fixtures. • Existing sauna will remain as is. • Review efficiency of existing lighting and add new lights where necessary. • Add new receptacles that meet current GFCI code requirements at sink area for hair dryers, etc. We are assuming that the project will be subject to review by only the following agencies/departments: o City of Palm Springs Police Department o City of Palm Springs Building Department o Meet 2013 CBC codes and 2013 Title 24 requirements. i Scope of Services Based on the above Scope of Work, Urrutia Architects wN provide Architectural and Engineering Services including Design and Construction Documents to include the j following services: • Architectural • Electrical Engineering • Mechanical (Plumbing) Engineering i i -2 - 33 i Basement Men's/Women's Lockers and Restrooms Remodel Palm SpdWs Police Department i Palm SpdnQs, CA March n,2014 A. Pre-Destgn/Site Analysls Phase: a. Urrutta Architects and their consultants shall provide the following services: i • Architectural design shall include review of existing construction documents and record drawings furnished by the City of Palm Springs. Assumption is that drawings are available for review and use in preparing existing CADD based drawings. Once a base plan is prepared of the existing facility, a site visit shall be conducted to verify existing conditions match the original drawings. • Electrical and mechanical engineering shall consist of a site visit to document the existing power sources, electrical panels, and plumbing fixtures and systems for this area. B. Schematic Design Phase: a. Urrutia Architects shall prepare schematic design drawings which will consist of the following: • Architectural design shall include a proposed floor plan layout, finish floor plan, reflected ceiling plan, interior elevations, and finish material selections. The Architect shall be responsible for the coordination of all consultants work; provide the City Police Department with layouts for review and comment; attend all meetings, including City review meetings; and scheduling of all consultant's work, C. Construction Document Phase: a. For the purpose of this proposal, all construction documents created for this project shall be a port of a single set of construction drawings for this project. Phasing the project was not considered in this proposal. Urrutia Architects and their consultants shall prepare detailed construction documents based on the final design drawings approved by the City of Palm Springs and the Police Department, which will, in general, consist of the following: i Title sheet with code analysis and ADA requirements. i • Partial Site Plan to identify location of work in the overall building. • Demolition Floor Plans, including temporary construction walls. • Remodel Floor plans and finish schedule. i • Reflected ceiling plans and details. j I i - 3 - 3 4- i Basement Men's/Women's Lockers and Restrooms Remodel Palm Springs Police Department Palm Springs,CA March 27,2014 I • Interior elevations. • Electrical demolition plan and remodel plan.. I • Plumbing demolition plan and remodel plan including fixture ! Schedule. • Floor finish plan. i i • Specifications prepared in CSI format. • Attend user meetings as required. D. Bidding Phase: a. Urrutia Architects shall assist the City of Palm Springs in soliciting and obtaining bids from general contractors for this project as an overall single project through the public noticing process. During the course of the bidding process, if requested by the City of Palm Springs, the architect shall prepare and issue addenda, respond to bidders' RFI's, review bids, and make final recommendations. E. Construction Administration Phase: a. Urrutia Architects shall provide professional services during the course of construction that shall include the following: • Provide clarification and interpretive drawings to the contractor. . Review and respond to RFI's from the contractor. • Review submitted changes in construction and costs proposed by the contractor. Process any Change Orders during the construction phase. • Review Applications for Payment from the Contractor and make recommendations for payments, i • Visit the job site biweekly to review the progress of work and answer any questions the contractor may have. Document the site visits with photographs and written memos which will be distributed, i • Review and process shop drawings and submittals. i • Prepare punch lists during substantial completion and final punch 4 I 35 i Basement Men's/Women's Loc.CerS and Reftoms Remodel Palm Springs Police DepwIment Palm Springs,CA March 29,2014 lists to close out the project. • Documentation of all warranties, guarantees, and operation manuals. F. Proposed Compensation To provide the services described in this proposal, the following compensation is proposed: A total fixed cost of$23,300.00, plus reimbursable expenses. A. Pre-Design/Site Analysis Phase: A fixed sum of$2,000,00, plus reimbursable expenses. B. Schematic Design Phase: A fixed sum of$3,700,00, plus reimbursable expenses. C. Construction Document Phase: A fixed sum of$12,300.00, plus reimbursable expenses. D. Bidding Phase: A fixed sum of$800.00, plus reimbursable expenses. E. Construction Administration Phase: A fixed sum of $4,500.00, plus reimbursable expenses. Reimbursable Expenses. Reimbursable Expenses are in addition to the Architect's compensation, and include actual expenditures made by the Architect and the Architect's employees and Consultants in the interest of the Project for the expenses listed in the following Subparagraphs: • Long distance communications; • Fees paid in securing approvals of authorities having jurisdiction over the Project; • Reproductions of drawings, specifications and other documents; • Postage and special handling of documents; i We are proposing an estimated budget of$1,500.00 for reimbursable expenses. I i I - 5- 36 i I Basement Men's(Women's Lockers and Reslroonis Remojel Palm Springs Police Oeparlment Palm Springs,CA March 29,2014 Exclusions include the following: • Geotechnical reports or testing. • Structural or Mechanical (HVAC) engineering Assumptions include the following: • The City of Palm Springs shall provide the Architect with copies of "as built" drawings of remodel area, including structural, architectural, mechanical, and electrical data or any other drawings of scope related information relevant to this project that may assist the Architect in the preparation of their drawings. • The City of Palm Springs, through the City Procurement Process, will prepare and provide the City's "boiler plate" specifications and general condition requirements for bid and construction purposes. The Architect will provide performance specifications for materials specified. If our proposal is acceptable, please have the City prepare an agreement for our services. Should you have any questions, please call me. I look forward to hearing from you. Sincerely, Urrutia Architects Fran sco J. rutia, AIA/FARA President California License # C7467 6 37 :_I'YP sruo WAJ.L PU7Uf� G;KMrgI�fBlOIY '. a j i LOCKS 9YIP , j !-7 15 19 I ws tttttpttt i 26 14. i 11 � FIVI Ck I 0 s UN ,,� 38 �,�� 12 ZYIQ �.�,..., � ncrnnnc'ce+ui,lm aim ■ ■ Will ■ rC ;9'"Y.T:i■al�'G1���Sj}a"`F/��E�_ X $Y. ems♦ � am _ T V N e'c4l FoaN�p' CITY COUNCIL STAFF REPORT DATE: October 15, 2014 CONSENT AGENDA SUBJECT: POLICE DEPARTMENT REMODEL DESIGN SERVICES AMENDMENT NO. 2 — REPORT WRITING AND DISPATCH ROOMS FROM: David H. Ready, City Manager BY: Special Projects Coordinator SUMMARY The proposed action would approve a design services amendment to include the Report Writing Room, Dispatch Center and other miscellaneous items in the Police Department remodel project. RECOMMENDATION: 1, Approve Amendment No. 2 to Agreement No. A6465, with Urrutia A.I.A. and Associates, Inc., to add architectural and engineering design services for the remodel of the Report Writing Room, Dispatch Center and other miscellaneous items to the Police Department remodel project. 2. Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS: Local architect Frank Urrutia is under contract to develop plans and specifications for the remodel of the Police Department Training Center, Records Office, Main Lobby and Detective Bureau. As that project has moved forward it was determined that additional remodel work was also needed in the officers report writing room, the dispatch center and other miscellaneous areas of the building. The architect was asked to provide a proposal for that work and a copy of that proposal is attached as part of the proposed amendment. Total cost of this additional assignment comes to $28,550 bringing the entire project design cost to $133,050, 40 ITEM NO.-.--- City Council Staff Report October 15, 2014- Page 2 Amendment No.2, Agreement No.A6465 FISCAL IMPACT: Funds for this additional design work are available in Measure "J" account 260-4500- 59444. l Allen F. Smoot, Special Projects Coordinator David H. Ready, CI ger Attachments: 1. Amendment/Proposal i _ 41 AMENDMENT NO. 2 TO AGREEMENT NO. A6465 ARCHITECTURAL DESIGN SERVICES THIS SECOND AMENDMENT TO Agreement No A6465 for consulting services, (herein "Amendment") made and entered into on the _ day of 2014, by and between the CITY OF PALM SPRINGS (herein "City") and URRUTIA A.I.A. AND ASSOCIATES, INC. (herein "Consultant') is hereby amended effective as follows: RECITALS WHEREAS, City and Consultant entered into that certain Architectural Design Services Agreement No. A6465 for the Design Services related to the Police Department Remodel ("Agreement"), as duly amended from time to time; and WHEREAS, the parties wish to amend the Agreement to add additional design services related to consolidation of files, the records break room, dispatch center, new data roam and sanitary facilities in training center, and for temporary facilities planning for construction period needs; and NOW, THEREFORE, for good and sufficient consideration, the parties agree as follows: Section 1. Scope of Services is hereby amended by adding: a) Design services for remodel of the Records break area and consolidation of existing files; and b) Design services to add a double door beyond the interview rooms; and c) Design services related to remodel of the Report Writing Room; and d) Design services related to the remodel of the Dispatch Center; and e) Design services to develop a new data room in the Training Center; and f) Design services to and a new sink and plumbing in the Training Center: and g) Design services related to temporary facilities for construction period coordination. All as more specifically described in Proposals dated September 29, 2014 and Section 2. Exhibit "D" Schedule of Compensation is hereby amended to add a Task 5, Miscellaneous Projects, as follows: Tasks from Proposals Cost Break Roam/Files/Report Writing/Dispatch $12,900 Training Center Data Room/Sink $ 6,000 Temporary Facilities 8,650 Total $27,550 Reimbursable Expenses 1,100 Total Amendment $28,550 42 MAXIMUM TOTAL CONTRACT $133,050 Section 3. Timeline shall remain unchanged. Section 4. Full Force and Effect: Except as previously modified herein, all other provisions of the Agreement shall remain unmodified in full force and effect. IN WITNESS WHEREOF, the parties have executed and entered into the Amendment as of the date first written above. ATTEST: CITY OF PALM SPRINGS A municipal corporation By: City Clerk City Manager APPROVED AS TO FORM: City Attorney CONTRACTOR: Check One: _ Individual _Partnership _Corporation URRUTIA A.I.A. AND ASSOCIATES, INC. By: (Signature) Title: 43 165 Luring Drive WPM Palm Springs, CA.92262 7603 ?.6e00 /■/■'� g�rA r , (� lj$�, yr�$!.q . 760.3'7.6613 fax ■� 9A C tly' 5 r'e.igi,41WWiearcnil^_uccam ADDITIONAL WORK AUTHORIZATION Job No. 1368.00 Date of this authorization is: September 29,2014 In accordance with the written Agreement dated as of 1 1/1912 01 3, between URRUTIA ARCHITECTS and CITY OF PALM SPRINGS for the following project: Palm Springs Police Department—Training Center 200 S.Civic Drive Palm Springs,CA The Owner hereby authorizes the Architect to: ❑ Proceed with Additional Services ® Proceed with revised Scope of Services ❑ Incur Reimbursable Expenses Described as follows: 1. Extend the Scope of Work to Include the new Data Room. Includes coordination with IT consultant; and mechanical and electrical engineering for new dedicated fan coil unit. 2. Extend the Scope of Work to Include new sink cabinet and plumbing. Includes plumbing engineering. Compensation shall be based on the following: A fixed cost of$6,000.00, plus reimbursable expenses. No work shall commence until this Authorization has been executed and returned. Upon return of fully executed Authorization,this Authorization shall become a part of the Agreement identified above. APPROVED BY OWNER APPROVED BY ARCHITECT City of Palm Springs URRUTIA ARCHITECTS Date Francisco J. Urrutia, FARA September 29,2014 President License#C7467 44 165 i.ruing Drive 1P_ Uf f UTIN Peim S7.EKO :A.92282 �u 7 5u. li.8S6U U6 5 T 0m y e 41is 60 0756 .fax ADDITIONAL WORK AUTHORIZATION Job No. 1356.00 Date of this authorization is: September 29,2014 In accordance with the written Agreement dated as of 11/1 91201 3,between URRUTIA ARCHITECTS and CITY OF PALM SPRINGS for the following project: Palm Springs Police Department—Records and Lobby 200 S. Civic Drive Palm Springs,CA The Owner hereby authorizes the Architect to: ® Proceed with revised Scope of Services Described as follows: 1. Extend the Scope of Work to include the new Break Room which Is the current file room. Consolidate all files including existing files in other locations within the building and outside of the building Into a single file room with high density files storage systems.Includes new structural design, calculations,and details for reinforcing beam and column connections to support additional file loads. 2. Extend the Scope of Work to include adding a double door beyond the Interview Rooms. Rework the storefront system for the last Interview Room. 3. Extend the Scope of work to include the existing Records Room. New space plan, finishes,electrical/data,and cabinetry for this room. 4. Extend the Scope of work to include the existing Dispatch Room. New space plan, finishes,electrical/data,and cabinetry to accommodate new consoles. 5. Design and incorporate temporary entrance into existing Jail area to be constructed with wood framing,siding, lighting,and wall HVAC unit. Add temporary wall and door Into Interior area.Add to specifications for temporary construction and removal at completion of work. Compensation shall be based on the following: • A fixed cost of$21,550.00,plus reimbursable expenses. No work shall commence until this Authorization has been executed and returned. Upon return of fully executed Authorization,this Authorization shall become a part of the Agreement identified above. APPROVED BY OWNER APPROVED BY ARCHITECT City of Palm Springs URRUTIA ARCHITECTS Date Francisco J. Urrutis, FARA September 29,2014 President License#C7467 45 i ATTACHMENT 2 46 O�OPLM Sq9 Department of Public Works and Engineering W F Vicinity Map r4gsOeH�p 5 J ANDREASRD O U S U E TAHQUITZ CANYON WAY �! C d BARISTO RD —_ ir -I W Legend � I ® Site �i j CITY OF PALM SPRINGS 47 ATTACHMENT 3 48 CitySpringsof Palm Police Department Remodel PROJECT 100 - TRAINING CENTER PROJECT 200 - LOBBY & RECORDS PROJECT 300 - DETECTIVE BUREAU PROJECT 400 - MEN 'S & WOMEN'S LOCKER ROOMS CD -- MEN's & WOMEN's LOCKERS (BASEMENT) DETECTIVE Overall Site Plan FIRING BUREAU RANGE LIBRARY TRAINING CTR. LOBBY & RECORDS CIVIC DRIVE pRlV CP 0 wwIrr 1 wl!! *! w W9 " 99 ! wwww ii ii 1 " " " ii IT; • • 51 r I• 1Y=6.1J I, - P � P 9 I E� ff l_._...... • • Cd 0 O G ® B 9 3 O • • • • LL • / 0 n 52 L/ t 1 I �:-�w-•C"' � Jam'' � _. __ _ ' / :,� a✓�I IMF I r..as� �- � I pia Io- • • • • 53 x� i _ � I ...: � � � , ..� - i � � _ __- ���6� � �_ ,i '.`% � � .. — s .� . � � — �� . . III N � ii�il ''� / .� __ ..: 1 __ _� �, � �. ^� _ , .'+�• � r'` °� _ I a IT I ilk t i z � �rmw ' � N I - - - - -- - - - - • 55 *d Ili 11 U ! 7 o - Q N . • O I� Y G • • LO 1 1 .• 0 57 00 r� I I �N61M 13 - - - - - - - - - - - - - - m.omx_ — _ _ _ _ _ — _ _ _ _ _ — U O OO / r - - - - - - - - -- - - t Cl I • • • 1 1 • • � S. r) 59 } � I ' O 4 -J � I i 6o ATTACHMENT 4 61 NOTICE OF EXEMPTION To: ❑ Office of Planning and Research From: City of Palm Springs 1400 Tenth Street, Room 121 3200 E.Tahquitz Canyon Way Sacramento,CA 95814 Palm Springs, CA 92262 ® Clerk of the Board County of Riverside P.O. Box 751 Riverside, CA 92502-0751 Project Title: Police Department Remodel City Project No. 15-05 Project Applicant: City of Palm Springs Project Location(Specific): Palm Springs Police Department is located at 200 S. Civic Dr. Project Location (City): City of Palm Springs Project Location (County): Riverside Project Description: The scope of work includes remodeling the existing Police Department Records and Lobby area, Detective Bureau room, Police Training Center and Men's and Women's Locker rooms. The work shall comprise of replacing the existing floor surface with new flooring, replace existing plumbing fixtures, redesign existing ceiling lighting, repaint existing walls and HVAC registers, repaint existing metal lockers, upgrade areas to meet current ADA requirements, installation of furniture, surveillance cameras,security doors,blinds,ceiling vents,room signage and all other appurtenant work. Name of Public Agency Approving Project: City of Palm Springs Name of Person or Agency Carrying Our Project:City of Palm Springs, Public Works&Engineering Department 3200 E.Tahquitz Canyon Way, Palm Springs, CA 92262 Exempt Status:(check one) ❑ Ministerial (Sec. 21080(b)(1); 15268); ❑ Declared Emergency(Sec. 21080(b)(3); 15269(a)); ❑ Emergency Project(Sec. 21080(b) (4); 15269(b)(c)); ® Categorical Exemption. State type and section number: 15301 Class 1 (a)—Existing Facilities ❑ Statutory Exemptions. Stale code number. Reasons why project is exempt: Class 1 consists of operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features. Interior or exterior alterations involving such things as interior partitions, plumbing, and electrical conveyances, therefore, the Police Department Remodel,City Project No. 15-05, is considered categorically exempt from CEQA. Lead Agency Contact Person: Savat Khamphou Area Code/Telephone/Extension: (760)323-8253x8744 If filed by applicant: I.Attach certifi d ment of exemption finding. 2.Has a Noll of lion been filed by the public agency approving the project?❑ Yes ❑No Signature: Date: 0/27/15 Title: Asst. Director of Public Works! Asst. City Engineer ® Signed by Lead Agency[]Signed by Applicant Authority cited: Sections 21083 and 21110, Public Resources Code Date received for filing at OPR: Reference: Sections 21108.21152,and 21152.1,Public Resources Code. 62 ATTACHMENT 5 63 PALM SPRINGS POLICE DEPARTMENT- PRELIMINARY COST ESTIMATE (10.12.15) Report Locker Detective Training Site Work Records File Storage Break room Lobby Writing Rooms Bureau Center Totals Sub Totals $ 25,010.00 $ 12,607.00 $ 34,345.00 $ 16,791.00 $ 260,244.00 $ 26,483,00 $ 181,370.00 $ 85,380.00 $ 303,425.00 $ 945,655.00 Profit and Overhead 7.0% $ 1,750.70 $ 982.49 $ 2,404.15 $ 1,175.37 $ 19,217.08 $ 1,853,91 $ 12,695.90 $ 5,976.60 $ 21,239.75 $ 66,195.85 Liability Insurance 1.0% $ 250.10 $ 126.07 $ 343.45 $ 167.91 $ 2,602.44 $ 264.83 $ 1,813.70 $ 853.80 $ 3,034.25 $ 9,456.55 Bonds 3.2% $ 800.32 $ 403.42 $ 1,099.04 $ 537.31 $ 8,327.81 $ 847.46 $ 5,903.84 $ 2,732.16 $ 9,709.60 $ 30,260.96 Total $ 27,811.12 $ 14,018.98 $ 38,191.64 $ 18.671.59 $ 289,391.33 $ 29,449.10 $ 201,683.44 $ 94,942.56 $ 337,408.60 $ 1,051,568.36 Contingency 15.0%1 $ 4,171.67 $ 2,102.85 $ 5,728.75 $ 2,800.74 $ 43,408.70 $ 4,417.36 $ 30,252.52 $ 14,241.38 $ 50,611.29 $ 157,735.25 Construction Total $ 31,982.79 $ 16.121.83 $ 43,920.39 $ 21,472.33 $ 332,800.03 $ 33,866.46 $ 231,935.96 $ 109,183.94 $ 388,019.89 $ 1,209,303.61 Spacesaver File Systems $ 81,840.00 $ 81,840.00 Spacesaver Rotary File Systems $ 71,940,00 $ 71,940.00 Furniture $ 6,000,00 C $ 6,000.00 Chairs and Cubicles $ 50,200.00 S 125,500,00 $ 175,700.00 Tables and Chairs $ 116,000,00 $ 116,000.00 TOTAL $ 1,660,783.61 � I