c�``F°"��P City Council Staff Report
DATE: November 4, 2015 CONSENT CALENDAR
SUBJECT: APPROVAL OF PLANS, SPECIFICATIONS AND ESTIMATE AND
AUTHORIZATION TO BID FOR THE POLICE DEPARTMENT
REMODEL, CITY PROJECT NO 15-05
FROM: David H. Ready, City Manager
BY: Public Works & Engineering Department
SUMMARY
The City Council previously appropriated funding in the amount of $450,000 from the
Measure J Capital Project Fund for a capital project to remodel the Police Department
Lobby and Records area, Detective Bureau room, and Police Training Center.
Additional architectural design services to remodel the Men's and Women's Locker
rooms as well as Report Writing Room and Dispatch Center have been included into
this project. The construction documents (Plans, Specifications and Estimate) are
completed and, in accordance with 7.03.040 of the Procurement and Contracting Code
the Council is required to approve and adopt plans, specifications and working details,
and authorize the bid request for all public projects in excess of $100,000. Approval of
this project will allow staff to proceed with this public project, with an estimated cost of
approximately $2,000,000.
RECOMMENDATION:
Approve the plans, specifications and estimate and authorize staff to advertise and
solicit bids for the Police Department Remodel, City Project No. 15-05;
STAFF ANALYSIS:
As part of the Fiscal Year 2013/14 budget, the City Council appropriated $450,000 as
budget through Measure J Capital Project Funds for the Police Department Remodel,
City Project No. 15-05 (the "Project").
On December 18, 2013, the City Council approved a Professional Services Agreement
(A6465), with Urrutia Architects, for the preparation of remodeling plans at the Police
Department Lobby and Records area, Detective Bureau room and Police Training
Center. On April 16, 2014, the City Council approved Amendment No. 1 to the
ITIRM NO.
City Council Staff Report
November 4, 2015 -- Page 2
Approval of CP15-05, Police Department Remodel
Agreement to include additional architectural design services for the remodel of the
Men's and Women's Locker rooms. On October 15, 2014, City Council approved
Amendment No. 2 to include additional architectural design services for the remodel the
Report Writing Room, Dispatch Center and other miscellaneous items at the Police
Station. Copies of these staff reports are included as Attachment 1.
The proposed work includes, but is not limited to, the replacement of existing floor
surface with new flooring, replacement of existing plumbing fixtures, redesign of existing
ceiling lighting, repaint existing walls and HVAC registers, repaint existing metal lockers,
upgrade areas to meet current ADA requirements, installation of furniture, surveillance
cameras, security doors, blinds, ceiling vents, room signage and all other appurtenant
work. A location map of the site is identified below and a vicinity map is included in
Attachment 2.
77
of
� • S f +i x •t•' C fi.�t�� ���.—� �sf A. ��r y '1,
a. 1
UIll
Z4-
17
.i 711161011111—
V..r.• •.r. 0+ 1
6..
� � 'h rLlt`TYti.�
Location Map
A general overview of the scope of the improvements included with the Project is
included in Attachment 3. This presentation provides a brief overview of the proposed
improvements for the Police Department which comprises of renderings, exhibits and
construction drawing layouts. A complete set of plans (110 sheets) is available for
review with the City Engineer.
02
City Council Staff Report
November 4, 2015 -- Page 3
Approval of CP15-05, Police Department Remodel
The construction drawings prepared by Urrutia Architects are currently under review by
the Building Department for compliance with required Building Codes. Staff
recommends that, subject to final approval by the Building Official, the City Council
approve the plans and authorize staff to formally solicit construction bids for the Project.
With the City Council's approval, staff will advertise the project in the Desert Sun,
submit the Notice Inviting Bids to plan rooms, and provide the bid documents available
free of charge to prospective bidders. A copy of the construction drawings and contract
specifications for the Project are on file with the Public Works & Engineer Department.
The following tentative schedule has been identified for the bid process:
Notice Inviting Bids posted and issued: November 19, 2015
Deadline for receipt of bids: 3:00 PM, January 7, 2016
Contract awarded by City Council: January 20, 2016
ENVIRONMENTAL IMPACT:
Section 21084 of the California Public Resources Code requires Guidelines for
Implementation of the California Environmental Quality Act ("CEQA"). The Guidelines
are required to include a list of classes of projects which have been determined not to
have a significant effect on the environment and which are exempt from the provisions
of CEQA. In response to that mandate, the Secretary for Resources identified classes
of projects that do not have a significant effect on the environment, and are declared to
be categorically exempt from the requirement for the preparation of environmental
documents. In accordance with Section 15301 "Existing Facilities," Class 1 projects
consist of interior or exterior alterations involving such things as interior partitions,
plumbing, and electrical conveyances; therefore, the Police Department Remodel, City
Project. No. 15-05, is considered categorically exempt from CEQA, and a Notice of
Exemption has been prepared and will be filed with the Riverside County Clerk. A copy
of the Notice of Exemption is included as Attachment 4.
FISCAL IMPACT:
A total of $450,000 was previously budgeted for the Project through the Measure J
Capital Project Fund (Fund 260). The current construction estimate for the Project
prepared by Urrutia Architects is $1,660,784 as shown in Attachment 5.
The estimated Project budget and incurred expenditures are identified in Table 1.
03
City Council Staff Report
November 4, 2015-- Page 4
Approval of CP15-05, Police Department Remodel
Table of Project Costs Amount
FY13/14 Measure J Fund $450,000
Design Services $157,940
Project Administration (through 10/26/15) $7,228
Project Administration Estimated $10,000
Construction Support Estimated $200,000
Construction Contract Estimated $1 ,700,000
Construction Contin enc 'ay $170,000)
Additional Budget Required $1,775,168
Table 1
As identified in Table 1, an additional budget of $1.8 Million will be required to fully fund
the estimated cost of the Project. In its adoption of the Fiscal Year 2015/2016 budget,
the City Council authorized a $1,000,000 loan from the General Fund to the Measure J
Fund for the Project to be repaid within three fiscal years. Staff has kept the Measure J
Commission appraised of the additional costs — which the Commission has requested to
be discussed further once an actual bid amount is received, for additional funding.
Following bidding of the Project, staff will revise and identify the final additional budget
required, with use of the $1 Million General Fund loan to allow award of a construction
contract to occur within the current fiscal year.
SUBMITTED:
Prepared by: Approved by:
Marcus L. Fuller, MPA, P.E., P.L.S. David H. Ready, Esq., P .
Assistant City Manager/City Engineer City Manager
Attachments:
1. Prior Staff Reports
2. Vicinity Map
3. Power Point Presentation
4. CEQA Notice of Exemption
5. Construction Estimate
04
ATTACHMENT 1
G5
{ �pALM spp
iy
ti O
V N
a r
,r
r kOAaunv`
CITY COUNCIL STAFF REPORT
DATE: December 18, 2013 CONSENT CALENDAR
SUBJECT: POLICE DEPARTMENT REMODEL ARCHITECTURAL DESIGN
AGREEMENT
FROM: David H. Ready, City Manager
BY: Special Projects Coordinator
SUMMARY
The proposed action would result in an Architectural Design Contract for remodel work
at the police Department building.
RECOMMENDATION:
1. Approve an architectural design contract for the remodel of the Police
Department lobby/records area, the detective bureau, and the training center with
Urrutia A.I.A. and Associates, Inc. in an amount not to exceed $79,700.
2. Authorize the City Manager to execute all necessary documents.
STAFF ANALYSIS:
The Police Chief and his staff have requested that three areas of the Police building be
considered for remodel. First, the lobby/records area which is under sized, provides no
privacy for patrons and provides little or no security for the staff; Second, the detective
bureau which is over-crowded and has a very "closed in" feeling; and Third, the training
center which is in need of acoustical and cosmetic upgrades as well as a complete
audio visual upgrade.
Staff has met with Frank Urrutia of Urrutia AIA and Associates to discuss the various
needs of the building and Mr. Urrutia has provided three separate proposals for
upgrades to the three problems areas identified by the Police Department. Mr. Urrutia's
firm is one of the City's existing on-call architectural firms, with offices located in Palm
Springs. The proposals delineate the three tasks as follows:
i
ITEM NO.„ �u
Us
City Council Staff Report
December 18 2013-Page 2
Police Department Remodel Architectural Agreement
Task 1 Records and Lobby Remodel Design (See attached Proposal)
Task 2 Detective Bureau Remodel Design (See attached Proposal)
Task 3 Police Training Center Remodel Design (See attached Proposal)
FISCAL IMPACT:
The maximum contract under the three proposals totals $79,700.00, broken down as
follows:
Schedule of Compensation
Compensation for design and professional architectural services shall be lump
sum as follows:
Work Items Task 1 Task 2 Task 3
Pre-Design Site Analysis T 2,200 $ 1,600 $ 8,000
Schematic Design $ 4,900 $ 2,000 $ 2,000
Construction Documents $17,050 $10,050 $12,500
Bidding $ 800 $ 600 $ 600
Construction Admin. 5,760 2,950 3,200
TOTAL $30,700 $17,200 $26,300
Reimbursable Expenses` $ 2,500 $ 1,500 $ 1,500
At cost plus 10%
Funds for this work are available through Measure "J" accounts 260-4500-59440 and
59452.
fI.
Allen Smoot, 8pecidf Projects Coordinator
David H. Ready, nager
Attachment:
1. Proposals (3)
2. Timeline
67
165 Luring Drive
Palm Springs.CA92262
urrUTIH 766.327.6860
766.327.6813 fax
designQurrutiawhitecss cm
November 21, 2013
Mr_ Allen Smoot
Special Projects Coordination -City Manager's Office
City of Palm Springs
3200 E. Tahquitz Canyon Way
Palm Springs, CA. 92263-2743
RE: Proposal for Professional Design and Engineering Services - Palm Springs Police
Department-Records and Lobby Remodel
Palm Springs, CA.
Dear Mr. Smoot:
Urrutia Architects is pleased to provide the City of Palm Springs with our proposal for
professional architectural and engineering services to include the redesign of the
existing Lobby and Records Department. The proposal will include the expansion of the
existing Lobby toward the street.
Scone of Work
The following will summarize our understanding of the scope of work. The City Police
Department is proposing to enlarge the existing Lobby area and to redesign the existing
Records Department. A conceptual plan was submitted (see attached) by the
Department as a starting point which includes an expanded Lobby, vestibule area, and
added reception booths for the records personnel. Based on the above description, the
following shall be included in the scope of work;
• Two fully functional work stations with privacy.Should be designed for sit down
desk height.
• Soundproof glass between the two new stations for privacy.
• Replace existing hard surface flooring with more sound absorbing type
flooring.
• New blinds for Lobby glass to provide privacy between Records Department
and Lobby.
• Remove some glass between Records Department and Lobby for visual
privacy.
• New Waiting area with new furniture and finishes.
• New secure doors at new entrance. Possible secured vestibule, Consider
08
Records and Lobby Remodel
Pdm Springs Police Department
Pokn Springs,CA
November 20.2013
electronic activated locks at entrance doors.
• New signage and information dispensers in entry area.
• Upgrade these areas to meet current ADA requirements.
• Cameras in Records/Lobby areas to allow surveillance of persons entering
Lobby.
• Provide door opening release buttons at every desk in the records
Department.
• Pull out drawer in copy machine room work table.
• New ceiling vents.
• New desks in Records Department.
• New flooring in all Records and Break Room.
• Paint all walls in these areas.
• Consider a new air purification system.
We are assuming that the project will be subject to review by only the following
agencies/departments:
o City of Palm Springs Police Department
c City of Palm Springs Planning Department and Architectural Review
Commission
o City of Palm Springs Building Department
o Meet 2013 CBC codes and 2013 Title 24 requirements.
Scope of Services
Based on the above Scope of Work, Urrutia Architects will provide Architectural and
Engineering Services including Design and Construction Documents to include the
following services:
• Architectural
• Electrical Engineering
• Mechanical Engineering
• Structural Engineering
A. Pre-Design/Site Analysis Phase:
a. Urrutia Architects and their consultants shall provide the fallowing services:
• Architectural design shall include review of existing construction
documents and record drawings furnished by the City of Palm
Springs. Assumption is that drawings are available for review and
use in preparing existing CADD based drawings. Once a base plan
is prepared of the existing facility, a site visit shall be conducted to
verify existing conditions match the original drawings.
• Electrical and mechanical engineering shall consist of a site visit to
document the existing power sources, electrical panels, and HVAC
systems and loads for this area. j
i
_ 2 if9
i
i
Records and Lobby Remodel
Palm Springs Police Department
Palm Springs,CA
November 20,2013
B.Schematic Design Phase:
a. Urrutia Architects shall prepare schematic design drawings which will consist
of the following:
• Architectural design shall include a proposed floor plan layout,
furniture layout, finish floor plan, reflected ceiling plan, exterior
elevations, and finish material selections. The Architect shall be
responsible for the coordination of all consultants work; provide the
City Police Department with delineated layouts for review and
comment; attend all meetings, including City review meetings; and
scheduling of all consultant's work.
C. Construction Document Phase:
a. For the purpose of this proposal, all construction documents created for
this project shall be a part of a single set of construction drawings for this
project. Phasing the project was not considered in this proposal. Urrufia
Architects and their consultants shall prepare detailed construction
documents based on the final design drawings approved by the City of
Palm Springs and the Police Department, which will, in general, consist
of the following:
• Title sheet with code analysis and ADA requirements.
• Partial Site Plan to Identify location of work in the overall building.
• Site Remodel and Demolition Plan.
• Demolition Floor Plan, including temporary construction walls.
• Remodel floor plan and finish schedule.
• Reflected ceiling plan and details.
• Exterior elevations.
• Sections.
• Structural drawings and details.
• Electrical demolition plan and remodel plan,
Mechanical Plan including load calculations to determine added
heat load effect on existing mechanical system; analysis to
determine if new unit is required for additional area.
- 3 -
IO
i
Records and Lobby Remodel I
Palm Springs Police Deporime t j
Patin springs,CA
November 20,2013
• Furniture plan and floor finish plan.
• Specifications prepared in CSI format,
• Attend meetings as required.
D. Bidding Phase:
a. Urrutia Architects shall assist the City of Palm Springs In soliciting and
obtaining bids from general contractors for this project as an overall single
project through the public noticing process. During the course of the
bidding process, if requested by the City of Palm Springs, the architect
shall prepare and issue addenda, respond to bidders' RFI's, review bids,
and make final recommendations.
E. Construclion Admintstrafion Phase:
a. Urrutia Architects shall provide professional services during the course of
construction that shall include the following:
• Provide clarification and interpretive drawings to the
contractor,
• Review and respond to RFI's from the contractor,
• Review submitted changes in construction and costs proposed by
the contractor. Process any Change Orders during the
construction phase.
• Review Applications for Payment from the Contractor and make
recommendations for payments.
• Visit the job site bi-weekly to review the progress of work and
answer any questions the contractor may have. Document the site
visits with photographs and written memos which will be
distributed.
• Review and process shop drawings and submittals.
• Prepare punch lists during substantial completion and final punch
Ibis to close out the project.
• Documentation of all warranties, guarantees, and operation
manuals,
-4-
� i
i
i
Records and Lobby Remodel j
Palm Springs Polloe Departrnerrf j
Palm springs,CA
November 20,2013
F. Proposed Compensation
To provide the services described in this proposal, the following compensation is
proposed:
A total fixed cost of$30,70o.o0, plus reimbursable expenses.
A. Pre-Design/Site Analysis Phase:
A fixed sum of$2,200.00, plus reimbursable expenses.
B. Schematic Design Phase:
A fixed sum of$4,900.00, plus reimbursable expenses.
C. Construction Document Phase:
A fixed sum of$17,050.00, plus reimbursable expenses.
D. Bidding Phase:
A fixed sum of$800.00,plus reimbursable expenses.
E. Construction Administration Phase:
A fixed sum of$5,750.00, plus reimbursable expenses.
Reimbursable Expenses:
Reimbursable Expenses are in addition to the Architect's compensation, and include
actual expenditures made by the Architect and the Architect's employees and
Consultants in the interest of the Project for the expenses listed in the following
Subparagraphs:
• Long distance communications;
• Fees paid in securing approvals of authorities having jurisdiction over the Project;
• Reproductions of drawings, specifications and other documents;
• Postage and special handling of documents;
• Finish/ detailed models requested by the Client,
We are proposing an estimated budget of$2,500.00 for reimbursable expenses.
5 _ 12
i
Record]and Lobby Remodel
Palm SpriNjs Police Department
Palm Springs,CA
November 20. 2013
Exclusions include the following:
• Geotechnical reports or testing,
Landscape or Irrigation Design.
Assumptions include the following:
• The City of Palm Springs shall provide the Architect with copies of "as built"
drawings of remodel area, including structural, architectural, mechanical, and
electrical data or any other drawings of scope related information relevant to this
project that may assist the Architect in the preparation of their drawings.
• The City of Palm Springs, through the City Procurement Process, will prepare and
provide the City's "boiler plate" specificctions and general condition requirements
for bid and construction purposes. The Architect will provide performance
specifications for materials specified.
If our proposal is acceptable, please have the City prepare an agreement for our
services. Should you have any questions, please call me. I look forward to hearing from
you.
Sincerely,
ch ects
tio, AIA/FARA
Pr side
alifornia License # C7A67
-6-
I3
165 Luring Drive
Patin Springs. CA 92262
UffUT1e 760-327.6800
760.327.fi81313 fax
designQurrutiaarchitemcoin
November 21, 2013
Mr, Allen Smool
Special Projects Coordination-City Manager's Office
City of Palm Springs
3200 E. Tahquitz Canyon Way
Palm Springs, CA. 92263-2743
RE: Proposal for Professional Design and Engineering Services - Palm Springs Police
Department-Detective Bureau Remodel
Palm Springs, CA.
Dear Mr. Smoot:
Urrutia Architects is pleased to provide the City of Palm Springs with our proposal for
professional architectural and engineering services to include the redesign of the
existing Detective Bureau area within the Police Department.
Scone of Work
The following will summarize our understanding of the scope of work. The City Police
Department is proposing to have the existing Detective Bureau area re-designed to be
more efficient with regard to space layout and energy. A conceptual plan was
submitted by the Department (see attached) as a starting point which includes
repositioning of office cubicles and work spaces to improve the work flow. Based on the
above description, the following shall be included in the scope of work:
• Provide separate space for storage.
• Provide space plan for thirteen offices.
• Natural light is important in considering space plan for offices.
• Redesign existing lighting in ceiling to provide for more efficient lighting for
work spaces.
• Replace existing floor surfaces with new flooring.
• Select new furniture systems for space plan. Include system design that will
provide for more natural lighting, such as glass panels.
• New signage for offices.
• Ensure these areas will meet current ADA requirements.
• Provide selections for new furniture. desks, flooring, and wall finishes.
• Re-paint oil walls in these areas.
�a
Detective Burew Remodel
Palm Springs Police Depadment
Palm Springs,CA
November 2a 2013
• Provide seismic anchorage of all heavy storage (file) units or equipment.
We are assuming that the project will be subject to review by only the following
agencies/departments:
o City of Palm Springs Police Department
o City of Palm Springs Planning Department and Architectural Review
Commission
o City of Palm Springs Building Department
o Meet 2013 CSC codes and 2013 Title 24 requirements.
Scone of Services
Based on the above Scope of Work, Urrutla Architects will provide Architectural and
Engineering Services including Design and Construction Documents to include the
following services:
• Architectural
• Electrical Engineering
• Structural Engineering (For seismic anchorage only)
A. Pre-Design/Stle Analysis Phase:
a. Urrutia Architects and their consultants shaft provide the following services:
• Architectural design shall include review of existing construction
documents and record drawings furnished by the City of Palm
Springs. Assumption is that drawings are available for review and
use in preparing existing CADD based drawings. Once a base plan
is prepared of the existing facility, a site visit shall be conducted to
verify existing conditions match the original drawings.
Electrical engineering shall consist of a site visit to document the
existing power sources, data sources, lighting fixtures and controls,
and electrical panels for this area.
B. Schematic Design Phase:
a. Urrutia Architects shall prepare schematic design drawings which will consist
of the following:
• Architectural design shall include a proposed Floor plan layout,
reflected ceiling pion, furniture layout, and finish material selections.
The Architect shall be responsible for the coordination of all
consultants work: provide the City Police Department with
delineated layouts for review and comment; attend all meetings,
including City review meetings; and scheduling of all consultant's
work.
-2 - i
15
i
Deteative Bureou Remodel
Palm Springs Polloe Department
Palm Springs.CA
November 20,2013
C. Construction Document Phase:
a. For the purpose of this proposal, all construction documents created for
this project shall be a part of a single set of construction drawings for this
project. Phasing the project was not considered in this proposal, Urrutia
Architects and their consultants shall prepare detailed construction
documents based on the final design drawings approved by the City of
Palm Springs and the Police Department, which will, in general, consist
of the following:
• Title sheet with code analysis and ADA requirements.
• Partial Site Plan to identify location of work in the overall building.
• Demolition Floor Plan, including temporary construction walls, if
required.
• Remodel floor plan and finish schedule.
• Reflected ceiling plan and details.
• Structural anchorage details.
• Electrical demolition plan and remodel plan.
• Furniture plan and floor finish plan.
• Specifications prepared in CSI formot.
• Attend meetings as required.
D. Bidding Phase:
a. Urrutia Architects shall assist the City of Palm Springs in soliciting and
obtaining bids from general contractors for this project as an overall single
project through the public noticing process. During the course of the
bidding process, if requested by the City of Palm Springs, the architect
shall prepare and Issue addenda, respond to bidders' RFI's, review bids,
and make final recommendations.
_ 3 .
16
i
i
Detective Burew Remodd
Palm Springs Police Depertrnent
Palm Springs,CA
November 20,2013
E. Construction Administratton Phase:
a. Urrutia Architects shall provide professional services during the course of
construction that shall include the following:
e Provide clarification and Interpretive drawings to the
contractor,
Review and respond to RFI's from the contractor.
Review submitted changes in construction and costs proposed by
the contractor. Process any Change Orders during the
construction phase.
i
Review Applications for Payment from the Contractor and make
recommendations for payments.
Visit the job site bi-weekly to review the progress of work and
answer any questions the contractor may have. Document the site
visits with photographs and written memos which will be
distributed.
e Review and process shop drawings and submittals.
e Prepare punch lists during substantial completion and final punch
lists to close out the project.
Documentation of all warranties, guarantees, and operation
manuals.
-4-
17
I
Detective Bureau Remodel
Pdm Sprhgs Police Department
Palm Sprlrgs,CA
November 20,2013
F. Proposed Compensation
To provide the services described in this proposal, the following compensation is
proposed:
A total fixed cost of$17,200.00,plus reimbursable expenses. i
A. Pre-Design/Site Analysis Phase:
A fixed sum of$ 1,600.00, plus reimbursable expenses.
B. Schematic Design Phase:
A fixed sum of$2,000.00, plus reimbursable expenses.
C. Construction Document Phase:
A fixed sum of$10,050.00,plus reimbursabie expenses.
D. Bidding Phase:
A fixed sum of$600.00, plus reimbursable expenses.
E. Construction Administration Phase:
A fixed sum of$2,950.00,plus reimbursable expenses.
Reimbursable Expenses:
Reimbursable Expenses are in addition to the Architect's compensation, and include
actual expenditures made by the Architect and the Architect's employees and
Consultants in the interest of the Project for the expenses listed in the following
Subparagraphs:
• Long distance communications;
• Fees paid in securing approvals of authorities having jurisd'rctlon over the Project;
• Reproductions of drawings, specifications and other documents;
• Postage and special handling of documents;
• Fnish/detailed models requested by the Client,
We are proposing an estimated budget of$1,500.00 for reimbursable expenses.
- 5-
1
Delective Bureau Remodel
Palm Springs Police Deportment
Palm SpringS,CA
November 20.2010
Exclusions include the following:
• Geotechnical reports or testing.
• Mechanical Design.
Assumptions include the following:
• The City of Palm Springs shall provide the Architect with copies of "as built"
drawings of remodel area, including structural, architectural, and electrical data or
any other drawings of scope related information relevant to this project that may
assist the Architect in the preparation of their drawings.
• The City of Palm Springs, through the City Procurement Process, will prepare and
provide the City's "boiler plate" specifications and general condition requirements
for bid and construction purposes. The Architect will provide performance
specifications for materials specified.
If our proposal is acceptable, please have the City prepare an agreement for our
services. Should you have any questions, please call me. i look forward to hearing from
you.
Sincerely,
itec
ra ' co ti , AIA/FARA
Presi
ornia License ff C7467
- 6 -
I9
165 luring Drive
urrurle Palm Springs.CA 92262
760.327.6800
760.327,6813 fax
' - 3esigr urrvliaarchllecrs.Com
November30, 2013 (Revised)
Mr. Allen Smoot
Special Projects Coordination-City Manager's Office
City of Palm Springs
3200 E. Tahquitz Canyon way
Palm Springs, CA, 92263-2743
RE: Proposal for Professional Design and Engineering Services - Palm Springs Police
Department-Training Center Remodel (Revised)
Palm Springs, CA.
Dear Mr. Smoot:
Urrutia Architects is pleased to provide the City of Palm Springs with our proposal for
professional architectural and engineering services o include the redesign of the
existing Training Center,
Scope of Work
The following will summarize our understanding of the scope of work. The City Police
Department is proposing to have the existing Training Center ceilings enhanced and
remodeled. In addition, the existing operable partitions between rooms are leaking
sound between rooms which wfi; require an acoustical analysis of the existing
conditions. The following shall be included in the scope of work:
• Redesign the existing ceilings to make them more aesthetically pleasing.
• New ceiling HVAC registers.
• Repaint all walls in these areas.
• Coordinate electrical with AV system to be provided by others.
• Study sound isolation between rooms for the existing operable partitions.
Evaluation of the existing performance of the operable partitions, determine if
the acoustical seals are allowing sound leakage and to what extent.
• Provide recommendations for acoustical materials to be included in the
ceiling design. May include acoustical wall panels.
20
Training Canter Remodel
Palm Springs Poike Department
Palm Springs,CA
November 30,2013(Reviised)
We are assuming that the project will be subject to review by only the following
agencies/departments:
o City of Palm Springs Police Department
o City of Palm Springs Planning Department and Architectural Review
Commission
o City of Palm Springs Building Department
• Meet 2013 CBC codes and 2013 Title 24 requirements.
Scope of Services
Based on the above Scope of Work, Urrutia Architects will provide Architectural and
Engineering Services including Design and Construction Documents to include the
following services:
• Architectural
• Electrical Engineering
• Mechanical Engineering
• Acoustical Engineering
A. Pre-Design/Site Analysis Phase:
a. Urrutio Architects and their consultants shall provide the following services:
• Architectural design shall include review of existing construction
documents and record drawings furnished by the City of Palm
Springs. Assumption is that drawings ore available for review and
use in preparing existing CADD based drawings. Once a base plan
is prepared of the existing facility, a site visit shall be conducted to
verify existing conditions match the original drawings.
• Electrical and mechanical engineering shall consist of a site visit to
document the existing power sources, electrical panels, and HVAC
registers and systems for this area.
I
• Acoustical engineering shall include an evaluation of the existing
operable partition system and shall include the fallowing:
i. Measurement of the Noise Insulation Class of the operable
partitions and provide test reports. This will include assessing
the sound over the top of the track.
li. Assess the acoustical leaks and their locations, and include
in test reports,
iii. Tape over the acoustical leaks, re-measure the NIC •o
indicate the best possible performance for the operable
walls, in the event their acoustical seals can be refurbished.
_2 21 f
Training Center Remodel I
l
Palm springs Ponce Department
Polm Springs,CA
November 30, 2013(Revised]
iv. Provide recommendations as to whether the seals can be
refurbished or if the operable partitions need to be replaced.
Y. Provide recommendations regarding locations where
acoustical leakage or sound flanking paths were discovered.
B. Schematic Design Phase:
a. Urrutio Architects shall prepare schematic design drawings which will consist
of the following:
• Architectural design shall include a proposed reflected ceiling plan
and finish material selections. The Architect shall be responsible for
the coordination of all consultants work; provide the City Police
Department with delineated layouts for review and comment;
attend all meetings, including City review meetings;and scheduling
of all consultant's work.
• Integration of acoustical recommendations for ceiling and wall
materials that will enhance the acoustical qualities within each
room.
C. Construction Document Phase:
a. For the purpose of this .proposal, all construction documents created for
this project shall be a part of a single set of construction drawings for this
project. Phasing the project was not considered in this proposal. Urrutia
Architects and their consultants shall prepare detailed construction
documents based on the final design drawings approved by the City of
Palm Springs and the Police Department, which will, in general, consist
of the following:
• Title sheet with code analysis and ADA requirements.
• Paetial Site Pan to identify location of work in the overall building,
• Demolition Reflected Ceiling Plan.
I
• Remodel Reflected ceiling plan and details.
• Electrical demolition plan and remodel plan.
• Mechanical demolition and remodel plan.
• Specifications prepared in CSI format.
• Attend meetings as required.
3 22
i
Training Center Remodel
Palm SWlrgs Polce Department
Palm Sprlrgs,CA
November 30,2013(Revised) .
D. Bidding Phase: i
a. Urrutia Architects shall assist the City of Palm Springs in soliciting and
obtaining bids from general contractors for this project as an overall single '
j project through the public noticing process. During the course of the
i bidding process, if requested by the City of Palm Springs, the architect
shall prepare and issue addenda, respond to bidders' RFI's, review bids,
and make final recommendations.
E Construction Administration Phase:
a. Urrutia Architects shall provide professional services during the course of
construction that shall include the following:
• Provide clarification and Interpretive drawings to the
contractor.
• Review and respond to RFI's from the contractor.
• Review submitted changes in construction and costs proposed by
the contractor. Process any Change Orders during the
construction phase.
• Review Applications for Payment from the Contractor and make
recommendations for payments.
• Visit the job site bi-weekly to review the progress of work and
answer any questions the contractor may have. Document the site
visits with photographs and written memos which will be I
distributed.
• Review and process shop drawings and submittals.
• Prepare punch lists during substantial completion and final punch
lists to close out the project.
i
• Documentation of all warranties, guarantees, and operation j
manuals.
I
I
_4_ 23
Training Center Remodel
Palm Springs Police Department
Palm Springs,CA
November 30,2013[Revised)
F. Proposed Compensation
To provide the services described in this proposal, the follovdng compensation is
proposed:
II
A total fixed cost of$26,300.00, plus reimbursable expenses.
i
A. Pre-Design/Site Analysis Phase:
I
A fixed sum of$8,000.00, plus reimbursable expenses.
B. Schematic Design Phase:
A fixed sum of$2,000.00, plus reimbursable expenses.
I
C. Construction Document Phase:
A fixed sum of$12,500.00, plus reimbursable expenses.
D. Bidding Phase:
A fixed sum of$ 600.00,plus reimbursable expenses.
E. Construction Administration Phase:
A fixed sum o` $3,200.00, plus reimbursable expenses.
Reimbursable Expenses:
Reimbursable Expenses are in addition to the Architect's compensation, and include
actual expenditures made by the Architect and the Architect's employees and
Consultants In the interest of the Project for the expenses listed in the following
Subparagraphs:
• Long distance communications;
• Fees paid in securing approvals of authorities having jurisdiction over the Project;
• Reproductions of drawings, specifications and other documents;
• Postage and special handling of documents;
• Finish/detailed models requested by the Client,
We are proposing an estimated budget of$1,500.00 for reimbursable expenses.
i
- 5- 24
I
i
i
I
Tralning Center Remodel
Palm Springs Police Department
Palm Springs,CA '
November 30,2013(Revised)
Exclusions include the .`ollowin
9� I
Geotechnical reports or testing.
i
I I
Assumptions include the following: I
• The City of Palm Springs shall provide the Architect with copies of "as built'
drawings of remodel area, including structural, architectural, mechanical, and
electrical data or any other drawings of scope related information relevant to this
project that may assist the Architect in the preparation of their drawings. j
The City of Palm Springs,through the City Procurement Process, will prepare and
provide the City's "boiler plate" specifications and general condition requirements
for bid and construction purposes. The Architect will provide performance
specifications for materials specified.
If our proposal is acceptable, please have the City prepare an agreement for our
services. Should you have any questions, please call me. I look forward to hearing from
you.
Sincerely,
ct
IA/FARA
Preside Cs Licensse # 7467 I
I
I
E
i
I
I
I
- 6-
15
%.m ispwratadom S6— x�Y WA.:s.. ilf 5/]WII"
R.e Oesy^/91rnv'.nb Rm.. so— 11.:/]!la w.e ll8/34
...0 SOas 1,IfW%J WrnVVB' LL�
5 I t:M/KN[nLn[ein9 Jalrs ,i 111/m Wef.O;A
a Mrrn..:r lErx,rM.nre Jdrya fnl/]/I. wrd V20
1- t YMrMII[Op{I(r1%rau xx drys rnp l/9/u M.Mljl.
Iae,V reu Inal;9/14 wed W91W _
> { Cede UeGatmnn Pp,prwdr Ra.n Ma^lao/Ia wed 2/29pa
H { GryVlanmryapptttab lasC Revew 6 d M 1VI 1?114 W$r4gVL [
\I [umbu[Wn 0.'cuT[M pl4fe 62d, Mu2/22/1. MSIH/1J
x { F.,kAw,l 11 dap I 2/l]/1e hi.IIV14
H { FMtrkalFryireerrrq lldap ilw 1/21114 Ria/18/1.
y { Mnnanr:altremeer,re 3ldaes TM 2Rt/1. r.l./111/I.
H { $INfurd lrk,rcrnr,e fund x11 2J27/14 fll</18/ll ]
H { id<[0[{anm[rrt A{w 2.d F.11M1J tAV
H { au brre]evanmem aeo.,..al Ndan mVld/la
u { Gbn rT^6 corm^n )a.n xlu5r 22/11 11.5/30114 0C
tl It j•&dd,n,P. ii drp IMd/i/f4'"W 712/14 c
H � _Aware Cn V II W,�_y=_< � .. �ar"r9•l��l�.^�{�1.V1�i ^ •.--.,
lH! � 1 MVMre
H
lt— ~ 107dna M11V14 0n5/3UA
]{' �' (M.O.C9M1<M1lslle Marin,aBM[ sdan 1 11V14 wee IM14 '
seen R 112l14 w[d IM14 LJ
1p rn!/1/ta wee lm!r. I
r I it kM1emxk W54n RI,aY Lean en l/1( 4 N'atl 21wm
p It 111,1M,W l)dan fn Llp/1. WN 2112/14
..H_. { Vol,rr Oroanr„rrt Approval ia,r. Mo J wOdl/2
a! � m..,l.euier,poawnem R2Mu ndm 2fx.VUTA2/ax/x. rd s/xvl.H
y-� { amner'W .leap rnu 2/IVIa rn Ne/l. e ]
M ,{ Elavial f,rM.rc.rng 6dm d R rM,l/t 1r.1/I8/fd [ ]
M { eolke DeWrlmera Approval 6da/x/"I. / /M [�
-rf If ouddrr,a oroanmrm eoerwal xamn In Jpep ..d
J wes/2l/lJ
p- { Plan(Mrk CwrMwnt 2daVs 'Pus/23ita I 5.rl0ila C ] 'I
—_
- e ir.. - Mm.b'ula wrdlNxa L�..r..a
r14 -
i
TiI rralm SernF Y - ♦ ,ru[1u.MiMlon. MMYMSMrnrlM1--- _ MMLne
rrgwkr.warrf��a 9r� nr..wxm � nxv..s,..rr.i ...Nus,rmmn Rrx+.•
wsmfWLu wsmnr enem.aMrne.,. Mnuarrak --- soda+. c
pannrV kuu.efarl wrarewwY IMarn.N 2
N
r
26
I
I
i
}
's 33
b
��i1i'i'i�k14 kP44r4t44'k4ti44'44� ��
�Y?i?-S i i6�i O�R1C�7 S.SR ili�iiR ,CC�i�il f 22
*?ALM Sp9
.y
Q
u N
g
Folto CITY COUNCIL STAFF REPORT
DATE: April 16, 2014 CONSENT AGENDA
SUBJECT: POLICE DEPARTMENT REMODEL DESIGN SERVICES AMENDMENT
NO. 1 —OFFICER'S LOCKER ROOMS
FROM: David H. Ready, City Manager
BY: Special Projects Coordinator
SUMMARY
The proposed action would approve a design services amendment to include the
Officer's Locker Rooms/Restrooms in the Police Department remodel project.
RECOMMENDATION:
1. Approve Amendment No. 1 to Agreement No. A6465, with Urrutia A.I.A. and
Associates, Inc., to add architectural and engineering design services for the
remodel of the officer's locker rooms/restrooms to the Police Department
remodel project.
2. Authorize the City Manager to execute all necessary documents.
STAFF ANALYSIS:
Local architect Frank Urrutia is under contract to develop plans and specifications for
the remodel of the Police Department Training Center, Records Office, Main Lobby and
Detective Bureau. As that project began it was determined that additional remodel work
was also needed in the officer's locker rooms/restrooms area of the building. The
architect was asked to provide a proposal for that work and a copy of that proposal is
attached as part of the proposed amendment. Total cost of this additional assignment
comes to $24,800 bringing the entire project design cost to $104,500.
�r 28
ITEM NO.
City Council Staff Report
April 16, 2014- Page 2
Amendment No.1,Agreement No. A6465
FISCAL IMPACT:
Funds for this additional design work are available in Measure "J" account 2604500-
59444.
QM4��—
Allen F. Smoot
Special Projects Coordinator
David H. Ready
City Manager
Attachments:
1. Amendment/Proposal
II
29
i
i
AMENDMENT NO. 1
TO AGREEMENT NO. A6465
ARCHITECTURAL DESIGN SERVICES
THIS FIRST AMENDMENT TO Agreement No. A6466 for consulting services, (herein
"Amendment") made and entered Into on the _ day of , 2014, by and
between the CITY OF PALM SPRINGS (herein "City") and URRUTIA A.I,A. AND
ASSOCIATES, INC. (herein "Consultant") is hereby amended effective April 17, 2014,
as follows:
RECITALS
WHEREAS, City and Consultant entered Into that certain Architectural Design Services
Agreement No. A6465 for Design Services related to the Police Department
("Agreement"), as duly amended from time to time; and
WHEREAS, the parties wish to amend the Agreement to add additional design services
related to the officer's locker room; and
NOW, THEREFORE, for good and sufficient consideration, the parties agree as follows:
Section 1. Scope of Services is hereby amended to add design and engineering
services for remodel of the basement men's/women's locker rooms and restrooms as
more specifically defined in the Proposal dated March 29, 2014 attached hereto.
Section 2.
Exhibit"D" Schedule of Compensation is hereby amended to add Task 4 as follows:
Tasks from Proposal Task 4
Pre-Design Site analysis $2,000
Schematic Design $3,700
Construction Documents $12,300
Bidding Phase $ 800
Construction Admin. $4,500
Total $23,300
Reimbursable Expenses $1,500
MAXIMUM TOTAL CONTRACT$104,500
Section 3. Timeline shall remain unchanged.
Section 4. Full Force and Effect: Except as previously modified herein, all other
provisions of the Agreement shall remain unmodified in full force and effect.
i
i
Amend 1 to A6465 1 30
i
i
IN WITNESS WHEREOF, the parties have executed and entered into this Amendment
as of the date first written above.
ATTEST: CITY OF PALM SPRING
a municipal corporation
By:
City Clerk City Manager
APPROVED AS TO FORM:
City Attorney
CONTRACTOR: Check One: _ Individual Partnership -.4 Corporation
URRUTIA A.I.A AND AS IATES, INC.
u J
Tit
Amend 1 [ 4 o A8 65 2 3
16S Luring Drive
UfYUt1A Palm Springs,CA92262
780.327.8800
760.327.6813 fax
eesi9n@urrutiaanhitects.ram
March 29, 2014
Mr. Allen Smoot
Special Projects Coordination-City Manager's Office
City of Palm Springs
3200 E.Tahquitz Canyon Way
Palm Springs, CA. 92263-2743
RE: Proposal for Professional Design and Engineering Servk es - Palm Springs Police
Department- Basement Men's/Women's Lockers and Restrooms Remodel
Palm Springs, CA.
Dear Mr. Smoot:
Urrutia Architects is pleased to provide the City of Pam Springs with our proposal for
professional architectural and engineering services to include the redesign and
upgrades for the existing Men's and Women's Lockers and Restrooms located in the
Basement.
Scope of Work
The following will summarize our understanding of the scope of work. The City Police
Department is proposing to upgrade and modernize the existing Men's and Women's
Lockers and Restrooms located in the Basement of the Police Department facility.
Based on a preliminary walk thru of the facility and meeting to discuss the requirements
of the PD, the following shall be included in the scope of work:
1. Men's Lockers and Restrooms:
• Refinish existing fixed benches located in Dressing/Lockers area.
• Repaint the existing metal lockers.
• New flooring throughout the locker area.
• New paint on all walls and hard surface Ceilings/soffits.
• Cleanup/Paint existing storage cabinets and concrete flooring located in
"sleep room".
• Where possible, upgrade the restroom areas to meet current ADA
requirements. This will include vanities, sinks, showers, etc.
• Provide new finishes for sink countertops and splashes. Remove existing
recessed towel dispensers (not being used); replace existing plumbing fixtures
with new water efficient fixtures, and new mirrors.
32
i
E
Basement Men's/Women's Lockers and Reslrooms Remodel
Palm Springs Pollce Department
Palm Springs,GA
March 29,2D14
I
• Refinish existing shower with new wall and floor finishes and new plumbing
fixtures.
• Existing sauna will remain as is.
• Review efficiency of exiting lighting and add new fights in shower.
• Add new receptacles that meet current GFCI code requirements at sink area.
2. Women's lockers and Restrooms:
• Refin;sh existing fixed benches located in Dressing/Lockers area.
• Repaint the existing metal lockers.
• New flooring throughout the locker area.
• New point on all walls and hard surface ceilings/soffits.
• Where possible, upgrade the restroom areas to meet current ADA
requirements.This will include vanities,sinks, showers, etc.
• Provide new finishes for sink countertops and splashes. Remove existing
recessed towel dispensers (not being used): replace existing plumbing fixtures
with new wafer efficient fixtures, and new mirrors.
• Refinish existing showers with new wall and floor finishes and new plumbing
fixtures.
• Existing sauna will remain as is.
• Review efficiency of existing lighting and add new lights where necessary.
• Add new receptacles that meet current GFCI code requirements at sink area
for hair dryers, etc.
We are assuming that the project will be subject to review by only the following
agencies/departments:
o City of Palm Springs Police Department
o City of Palm Springs Building Department
o Meet 2013 CBC codes and 2013 Title 24 requirements.
i
Scope of Services
Based on the above Scope of Work, Urrutia Architects wN provide Architectural and
Engineering Services including Design and Construction Documents to include the j
following services:
• Architectural
• Electrical Engineering
• Mechanical (Plumbing) Engineering
i
i
-2 - 33
i
Basement Men's/Women's Lockers and Restrooms Remodel
Palm SpdWs Police Department i
Palm SpdnQs, CA
March n,2014
A. Pre-Destgn/Site Analysls Phase:
a. Urrutta Architects and their consultants shall provide the following services:
i
• Architectural design shall include review of existing construction
documents and record drawings furnished by the City of Palm
Springs. Assumption is that drawings are available for review and
use in preparing existing CADD based drawings. Once a base plan
is prepared of the existing facility, a site visit shall be conducted to
verify existing conditions match the original drawings.
• Electrical and mechanical engineering shall consist of a site visit to
document the existing power sources, electrical panels, and
plumbing fixtures and systems for this area.
B. Schematic Design Phase:
a. Urrutia Architects shall prepare schematic design drawings which will consist
of the following:
• Architectural design shall include a proposed floor plan layout,
finish floor plan, reflected ceiling plan, interior elevations, and finish
material selections. The Architect shall be responsible for the
coordination of all consultants work; provide the City Police
Department with layouts for review and comment; attend all
meetings, including City review meetings; and scheduling of all
consultant's work,
C. Construction Document Phase:
a. For the purpose of this proposal, all construction documents created for
this project shall be a port of a single set of construction drawings for this
project. Phasing the project was not considered in this proposal. Urrutia
Architects and their consultants shall prepare detailed construction
documents based on the final design drawings approved by the City of
Palm Springs and the Police Department, which will, in general, consist
of the following:
i
Title sheet with code analysis and ADA requirements. i
• Partial Site Plan to identify location of work in the overall building.
• Demolition Floor Plans, including temporary construction walls.
• Remodel Floor plans and finish schedule.
i
• Reflected ceiling plans and details. j
I
i
- 3 -
3 4-
i
Basement Men's/Women's Lockers and Restrooms Remodel
Palm Springs Police Department
Palm Springs,CA
March 27,2014
I
• Interior elevations.
• Electrical demolition plan and remodel plan..
I
• Plumbing demolition plan and remodel plan including fixture !
Schedule.
• Floor finish plan. i
i
• Specifications prepared in CSI format.
• Attend user meetings as required.
D. Bidding Phase:
a. Urrutia Architects shall assist the City of Palm Springs in soliciting and
obtaining bids from general contractors for this project as an overall single
project through the public noticing process. During the course of the
bidding process, if requested by the City of Palm Springs, the architect
shall prepare and issue addenda, respond to bidders' RFI's, review bids,
and make final recommendations.
E. Construction Administration Phase:
a. Urrutia Architects shall provide professional services during the course of
construction that shall include the following:
• Provide clarification and interpretive drawings to the
contractor.
. Review and respond to RFI's from the contractor.
• Review submitted changes in construction and costs proposed by
the contractor. Process any Change Orders during the
construction phase.
• Review Applications for Payment from the Contractor and make
recommendations for payments,
i
• Visit the job site biweekly to review the progress of work and
answer any questions the contractor may have. Document the site
visits with photographs and written memos which will be
distributed,
i
• Review and process shop drawings and submittals.
i
• Prepare punch lists during substantial completion and final punch
4 I
35
i
Basement Men's/Women's Loc.CerS and Reftoms Remodel
Palm Springs Police DepwIment
Palm Springs,CA
March 29,2014
lists to close out the project.
• Documentation of all warranties, guarantees, and operation
manuals.
F. Proposed Compensation
To provide the services described in this proposal, the following compensation is
proposed:
A total fixed cost of$23,300.00, plus reimbursable expenses.
A. Pre-Design/Site Analysis Phase:
A fixed sum of$2,000,00, plus reimbursable expenses.
B. Schematic Design Phase:
A fixed sum of$3,700,00, plus reimbursable expenses.
C. Construction Document Phase:
A fixed sum of$12,300.00, plus reimbursable expenses.
D. Bidding Phase:
A fixed sum of$800.00, plus reimbursable expenses.
E. Construction Administration Phase:
A fixed sum of $4,500.00, plus reimbursable expenses.
Reimbursable Expenses.
Reimbursable Expenses are in addition to the Architect's compensation, and include
actual expenditures made by the Architect and the Architect's employees and
Consultants in the interest of the Project for the expenses listed in the following
Subparagraphs:
• Long distance communications;
• Fees paid in securing approvals of authorities having jurisdiction over the Project;
• Reproductions of drawings, specifications and other documents;
• Postage and special handling of documents;
i
We are proposing an estimated budget of$1,500.00 for reimbursable expenses.
I
i
I
- 5-
36 i
I
Basement Men's(Women's Lockers and Reslroonis Remojel
Palm Springs Police Oeparlment
Palm Springs,CA
March 29,2014
Exclusions include the following:
• Geotechnical reports or testing.
• Structural or Mechanical (HVAC) engineering
Assumptions include the following:
• The City of Palm Springs shall provide the Architect with copies of "as built"
drawings of remodel area, including structural, architectural, mechanical, and
electrical data or any other drawings of scope related information relevant to this
project that may assist the Architect in the preparation of their drawings.
• The City of Palm Springs, through the City Procurement Process, will prepare and
provide the City's "boiler plate" specifications and general condition requirements
for bid and construction purposes. The Architect will provide performance
specifications for materials specified.
If our proposal is acceptable, please have the City prepare an agreement for our
services. Should you have any questions, please call me. I look forward to hearing from
you.
Sincerely,
Urrutia Architects
Fran sco J. rutia, AIA/FARA
President
California License # C7467
6 37
:_I'YP sruo WAJ.L
PU7Uf� G;KMrgI�fBlOIY '.
a j
i
LOCKS 9YIP ,
j
!-7
15 19
I
ws
tttttpttt
i
26 14. i
11 �
FIVI
Ck I 0
s
UN
,,� 38
�,�� 12 ZYIQ �.�,..., � ncrnnnc'ce+ui,lm
aim ■
■ Will
■ rC
;9'"Y.T:i■al�'G1���Sj}a"`F/��E�_
X $Y.
ems♦ � am _ T
V N
e'c4l FoaN�p'
CITY COUNCIL STAFF REPORT
DATE: October 15, 2014 CONSENT AGENDA
SUBJECT: POLICE DEPARTMENT REMODEL DESIGN SERVICES AMENDMENT
NO. 2 — REPORT WRITING AND DISPATCH ROOMS
FROM: David H. Ready, City Manager
BY: Special Projects Coordinator
SUMMARY
The proposed action would approve a design services amendment to include the Report
Writing Room, Dispatch Center and other miscellaneous items in the Police Department
remodel project.
RECOMMENDATION:
1, Approve Amendment No. 2 to Agreement No. A6465, with Urrutia A.I.A. and
Associates, Inc., to add architectural and engineering design services for the
remodel of the Report Writing Room, Dispatch Center and other miscellaneous
items to the Police Department remodel project.
2. Authorize the City Manager to execute all necessary documents.
STAFF ANALYSIS:
Local architect Frank Urrutia is under contract to develop plans and specifications for
the remodel of the Police Department Training Center, Records Office, Main Lobby and
Detective Bureau. As that project has moved forward it was determined that additional
remodel work was also needed in the officers report writing room, the dispatch center
and other miscellaneous areas of the building. The architect was asked to provide a
proposal for that work and a copy of that proposal is attached as part of the proposed
amendment. Total cost of this additional assignment comes to $28,550 bringing the
entire project design cost to $133,050,
40
ITEM NO.-.---
City Council Staff Report
October 15, 2014- Page 2
Amendment No.2, Agreement No.A6465
FISCAL IMPACT:
Funds for this additional design work are available in Measure "J" account 260-4500-
59444.
l
Allen F. Smoot, Special Projects Coordinator
David H. Ready, CI ger
Attachments:
1. Amendment/Proposal
i
_ 41
AMENDMENT NO. 2
TO AGREEMENT NO. A6465
ARCHITECTURAL DESIGN SERVICES
THIS SECOND AMENDMENT TO Agreement No A6465 for consulting services, (herein
"Amendment") made and entered into on the _ day of 2014, by and
between the CITY OF PALM SPRINGS (herein "City") and URRUTIA A.I.A. AND
ASSOCIATES, INC. (herein "Consultant') is hereby amended effective as
follows:
RECITALS
WHEREAS, City and Consultant entered into that certain Architectural Design Services
Agreement No. A6465 for the Design Services related to the Police Department
Remodel ("Agreement"), as duly amended from time to time; and
WHEREAS, the parties wish to amend the Agreement to add additional design services
related to consolidation of files, the records break room, dispatch center, new data roam
and sanitary facilities in training center, and for temporary facilities planning for
construction period needs; and
NOW, THEREFORE, for good and sufficient consideration, the parties agree as follows:
Section 1. Scope of Services is hereby amended by adding:
a) Design services for remodel of the Records break area and consolidation of
existing files; and
b) Design services to add a double door beyond the interview rooms; and
c) Design services related to remodel of the Report Writing Room; and
d) Design services related to the remodel of the Dispatch Center; and
e) Design services to develop a new data room in the Training Center; and
f) Design services to and a new sink and plumbing in the Training Center: and
g) Design services related to temporary facilities for construction period
coordination.
All as more specifically described in Proposals dated September 29, 2014 and
Section 2. Exhibit "D" Schedule of Compensation is hereby amended to add a Task 5,
Miscellaneous Projects, as follows:
Tasks from Proposals Cost
Break Roam/Files/Report Writing/Dispatch $12,900
Training Center Data Room/Sink $ 6,000
Temporary Facilities 8,650
Total $27,550
Reimbursable Expenses 1,100
Total Amendment $28,550
42
MAXIMUM TOTAL CONTRACT $133,050
Section 3. Timeline shall remain unchanged.
Section 4. Full Force and Effect: Except as previously modified herein, all other
provisions of the Agreement shall remain unmodified in full force and effect.
IN WITNESS WHEREOF, the parties have executed and entered into the Amendment
as of the date first written above.
ATTEST: CITY OF PALM SPRINGS
A municipal corporation
By:
City Clerk City Manager
APPROVED AS TO FORM:
City Attorney
CONTRACTOR: Check One: _ Individual _Partnership _Corporation
URRUTIA A.I.A. AND ASSOCIATES, INC.
By:
(Signature)
Title:
43
165 Luring Drive
WPM Palm Springs, CA.92262
7603 ?.6e00
/■/■'� g�rA r , (� lj$�, yr�$!.q . 760.3'7.6613 fax
■� 9A C tly' 5 r'e.igi,41WWiearcnil^_uccam
ADDITIONAL WORK AUTHORIZATION
Job No. 1368.00
Date of this authorization is: September 29,2014
In accordance with the written Agreement dated as of 1 1/1912 01 3, between URRUTIA ARCHITECTS and
CITY OF PALM SPRINGS for the following project:
Palm Springs Police Department—Training Center
200 S.Civic Drive
Palm Springs,CA
The Owner hereby authorizes the Architect to:
❑ Proceed with Additional Services
® Proceed with revised Scope of Services
❑ Incur Reimbursable Expenses
Described as follows:
1. Extend the Scope of Work to Include the new Data Room. Includes coordination with IT
consultant; and mechanical and electrical engineering for new dedicated fan coil unit.
2. Extend the Scope of Work to Include new sink cabinet and plumbing. Includes plumbing
engineering.
Compensation shall be based on the following:
A fixed cost of$6,000.00, plus reimbursable expenses.
No work shall commence until this Authorization has been executed and returned. Upon return of fully
executed Authorization,this Authorization shall become a part of the Agreement identified above.
APPROVED BY OWNER APPROVED BY ARCHITECT
City of Palm Springs URRUTIA ARCHITECTS
Date Francisco J. Urrutia, FARA September 29,2014
President
License#C7467
44
165 i.ruing Drive
1P_ Uf f UTIN Peim S7.EKO :A.92282
�u 7 5u. li.8S6U
U6 5 T 0m y e 41is 60 0756 .fax
ADDITIONAL WORK AUTHORIZATION
Job No. 1356.00
Date of this authorization is: September 29,2014
In accordance with the written Agreement dated as of 11/1 91201 3,between URRUTIA ARCHITECTS and
CITY OF PALM SPRINGS for the following project:
Palm Springs Police Department—Records and Lobby
200 S. Civic Drive
Palm Springs,CA
The Owner hereby authorizes the Architect to:
® Proceed with revised Scope of Services
Described as follows:
1. Extend the Scope of Work to include the new Break Room which Is the current file room.
Consolidate all files including existing files in other locations within the building and outside
of the building Into a single file room with high density files storage systems.Includes new
structural design, calculations,and details for reinforcing beam and column connections to
support additional file loads.
2. Extend the Scope of Work to include adding a double door beyond the Interview Rooms.
Rework the storefront system for the last Interview Room.
3. Extend the Scope of work to include the existing Records Room. New space plan,
finishes,electrical/data,and cabinetry for this room.
4. Extend the Scope of work to include the existing Dispatch Room. New space plan,
finishes,electrical/data,and cabinetry to accommodate new consoles.
5. Design and incorporate temporary entrance into existing Jail area to be constructed
with wood framing,siding, lighting,and wall HVAC unit. Add temporary wall and door Into
Interior area.Add to specifications for temporary construction and removal at completion of
work.
Compensation shall be based on the following:
• A fixed cost of$21,550.00,plus reimbursable expenses.
No work shall commence until this Authorization has been executed and returned. Upon return of fully
executed Authorization,this Authorization shall become a part of the Agreement identified above.
APPROVED BY OWNER APPROVED BY ARCHITECT
City of Palm Springs URRUTIA ARCHITECTS
Date Francisco J. Urrutis, FARA September 29,2014
President
License#C7467
45
i
ATTACHMENT 2
46
O�OPLM Sq9
Department of Public Works and Engineering W F
Vicinity Map
r4gsOeH�p
5
J
ANDREASRD
O
U
S
U
E TAHQUITZ CANYON WAY
�! C
d
BARISTO RD —_
ir
-I
W
Legend
� I
® Site �i j
CITY OF PALM SPRINGS
47
ATTACHMENT 3
48
CitySpringsof Palm
Police Department Remodel
PROJECT 100 - TRAINING CENTER
PROJECT 200 - LOBBY & RECORDS
PROJECT 300 - DETECTIVE BUREAU
PROJECT 400 - MEN 'S & WOMEN'S LOCKER ROOMS
CD
-- MEN's & WOMEN's LOCKERS
(BASEMENT)
DETECTIVE
Overall Site Plan FIRING BUREAU
RANGE
LIBRARY
TRAINING CTR.
LOBBY &
RECORDS
CIVIC DRIVE
pRlV
CP
0
wwIrr
1 wl!! *! w
W9 " 99 !
wwww
ii ii
1 " " " ii
IT;
•
• 51
r
I•
1Y=6.1J I, -
P � P
9
I
E� ff
l_._...... • • Cd
0 O G ® B 9 3 O
• •
• •
LL
• /
0 n 52
L/
t
1 I
�:-�w-•C"' � Jam'' � _. __ _
' / :,� a✓�I IMF I r..as� �- � I
pia Io-
•
•
•
• 53
x�
i
_ � I ...:
� � � ,
..� -
i
� � _
__-
���6�
� �_ ,i
'.`% � �
..
— s .� . �
� — ��
. . III
N � ii�il
''� / .� __ ..: 1
__
_�
�, �
�.
^�
_ , .'+�• �
r'` °�
_ I
a
IT I
ilk t i z �
�rmw
'
� N I
- - - - -- - - - -
• 55
*d Ili 11
U ! 7
o -
Q N . •
O
I�
Y
G
•
•
LO
1
1
.• 0 57
00
r�
I
I
�N61M
13
- - - - - - - - - - - - - - m.omx_ — _ _ _ _ _ — _ _ _ _ _ —
U O OO /
r - - - -
-
- - - -- - -
t
Cl
I
•
•
•
1
1
• • �
S.
r) 59
}
� I '
O
4 -J
� I i
6o
ATTACHMENT 4
61
NOTICE OF EXEMPTION
To: ❑ Office of Planning and Research From: City of Palm Springs
1400 Tenth Street, Room 121 3200 E.Tahquitz Canyon Way
Sacramento,CA 95814 Palm Springs, CA 92262
® Clerk of the Board
County of Riverside
P.O. Box 751
Riverside, CA 92502-0751
Project Title: Police Department Remodel City Project No. 15-05
Project Applicant: City of Palm Springs
Project Location(Specific): Palm Springs Police Department is located at 200 S. Civic Dr.
Project Location (City): City of Palm Springs Project Location (County): Riverside
Project Description: The scope of work includes remodeling the existing Police Department Records and Lobby area, Detective
Bureau room, Police Training Center and Men's and Women's Locker rooms. The work shall comprise of replacing the existing floor
surface with new flooring, replace existing plumbing fixtures, redesign existing ceiling lighting, repaint existing walls and HVAC
registers, repaint existing metal lockers, upgrade areas to meet current ADA requirements, installation of furniture, surveillance
cameras,security doors,blinds,ceiling vents,room signage and all other appurtenant work.
Name of Public Agency Approving Project: City of Palm Springs
Name of Person or Agency Carrying Our Project:City of Palm Springs, Public Works&Engineering Department
3200 E.Tahquitz Canyon Way, Palm Springs, CA 92262
Exempt Status:(check one)
❑ Ministerial (Sec. 21080(b)(1); 15268);
❑ Declared Emergency(Sec. 21080(b)(3); 15269(a));
❑ Emergency Project(Sec. 21080(b) (4); 15269(b)(c));
® Categorical Exemption. State type and section number: 15301 Class 1 (a)—Existing Facilities
❑ Statutory Exemptions. Stale code number.
Reasons why project is exempt: Class 1 consists of operation, repair, maintenance, permitting, leasing, licensing, or minor
alteration of existing public or private structures, facilities, mechanical equipment, or topographical features. Interior or exterior
alterations involving such things as interior partitions, plumbing, and electrical conveyances, therefore, the Police Department
Remodel,City Project No. 15-05, is considered categorically exempt from CEQA.
Lead Agency Contact Person: Savat Khamphou Area Code/Telephone/Extension: (760)323-8253x8744
If filed by applicant:
I.Attach certifi d ment of exemption finding.
2.Has a Noll of lion been filed by the public agency approving the project?❑ Yes ❑No
Signature: Date: 0/27/15 Title: Asst. Director of Public Works!
Asst. City Engineer
® Signed by Lead Agency[]Signed by Applicant
Authority cited: Sections 21083 and 21110, Public Resources Code Date received for filing at OPR:
Reference: Sections 21108.21152,and 21152.1,Public Resources Code.
62
ATTACHMENT 5
63
PALM SPRINGS POLICE DEPARTMENT- PRELIMINARY COST ESTIMATE (10.12.15)
Report Locker Detective Training
Site Work Records File Storage Break room Lobby Writing Rooms Bureau Center Totals
Sub Totals $ 25,010.00 $ 12,607.00 $ 34,345.00 $ 16,791.00 $ 260,244.00 $ 26,483,00 $ 181,370.00 $ 85,380.00 $ 303,425.00 $ 945,655.00
Profit and
Overhead 7.0% $ 1,750.70 $ 982.49 $ 2,404.15 $ 1,175.37 $ 19,217.08 $ 1,853,91 $ 12,695.90 $ 5,976.60 $ 21,239.75 $ 66,195.85
Liability
Insurance 1.0% $ 250.10 $ 126.07 $ 343.45 $ 167.91 $ 2,602.44 $ 264.83 $ 1,813.70 $ 853.80 $ 3,034.25 $ 9,456.55
Bonds 3.2% $ 800.32 $ 403.42 $ 1,099.04 $ 537.31 $ 8,327.81 $ 847.46 $ 5,903.84 $ 2,732.16 $ 9,709.60 $ 30,260.96
Total $ 27,811.12 $ 14,018.98 $ 38,191.64 $ 18.671.59 $ 289,391.33 $ 29,449.10 $ 201,683.44 $ 94,942.56 $ 337,408.60 $ 1,051,568.36
Contingency 15.0%1 $ 4,171.67 $ 2,102.85 $ 5,728.75 $ 2,800.74 $ 43,408.70 $ 4,417.36 $ 30,252.52 $ 14,241.38 $ 50,611.29 $ 157,735.25
Construction
Total $ 31,982.79 $ 16.121.83 $ 43,920.39 $ 21,472.33 $ 332,800.03 $ 33,866.46 $ 231,935.96 $ 109,183.94 $ 388,019.89 $ 1,209,303.61
Spacesaver
File Systems $ 81,840.00 $ 81,840.00
Spacesaver
Rotary File
Systems $ 71,940,00 $ 71,940.00
Furniture $ 6,000,00
C $ 6,000.00
Chairs and
Cubicles $ 50,200.00 S 125,500,00 $ 175,700.00
Tables and
Chairs $ 116,000,00 $ 116,000.00
TOTAL
$ 1,660,783.61
� I