HomeMy WebLinkAbout1/13/2016 - STAFF REPORTS - 2.I.Citv Council Staff Report
Date: January 13, 2016 CONSENT CALENDAR
Subject: ACCEPTANCE OF THE TAHQUITZ CANYON WAY LANDSCAPING
PHASE 2, CITY PROJECT NO. 13-33
From: David H. Ready, City Manager
Initiated by: Public Works and Engineering Department
SUMMARY
Formal City Council acceptance of the Tahquitz Canyon Way Landscaping Phase 2,
City Project No. 13-33, is required to document the completion of the public works
improvement, and to allow the City's filing of a Notice of Completion with the Riverside
County Recorder in accordance with Section 9200 of the California Civil Code.
RECOMMENDATION:
1) Accept the public works improvement identified as the Tahquitz Canyon Way
Landscaping Phase 2, City Project No. 13-33, as completed in accordance with the
plans and specifications; and
2) Authorize the City Engineer to execute and file for recordation with the Riverside
County Recorder a Notice of Completion for the Tahquitz Canyon Way Landscaping
Phase 2, City Project No. 13-33.
STAFF ANALYSIS:
On December 17, 2014, the City Council awarded a construction contract to Golden
Valley Construction ("GVC") in the amount of $1,328,315 for the Tahquitz Canyon Way
Landscaping Phase 2, City Project No. 13-33, (the "Project"). The location of the
Project was within Tahquitz Canyon Way from Sunrise Way to El Cielo Road, as shown
in Figure 1, and the Vicinity Map included as Attachment 1.
ITEM NO. 0 L
City Council Staff Report
January 13, 2016 — Page 2
Acceptance of City Project No. 13-33 (Tahquitz Canyon Way Landscaping, Phase 2)
Figure 1 — Project Location
During construction of the Project, certain adjustments were accommodated and the
final cost of the Project was reduced from the original awarded contract amount of
$1,328,315. Contract Change Order No. 1 was prepared and administratively approved
facilitating a reduction (credit) of $56,523.10 reducing the final contract amount to
$1,271,791.90.
As determined by City staff, the Contractor satisfactorily completed the Project on
November 9, 2015. Staff has conducted a final inspection and found the work to be in
compliance with the plans, specifications and standards of the City of Palm Springs.
Staff recommends that the City Council accept the Project, as required by Section 9200
of the California Civil Code, and authorize the City Engineer to file and record a Notice
of Completion within 15 days of the City Council's action. A copy of the Notice of
Completion to be submitted to the County is included as Attachment 2.
ENVIRONMENTAL IMPACT:
Section 21084 of the California Public Resources Code requires Guidelines for
Implementation of the California Environmental Quality Act ("CEQA"). The Guidelines
are required to include a list of classes of projects which have been determined not to
have a significant effect on the environment and which are exempt from the provisions
of CEQA. In response to that mandate, the Secretary for Resources identified classes
of projects that do not have a significant effect on the environment, and are declared to
be categorically exempt from the requirement for the preparation of environmental
documents. In accordance with Section 15301 "Existing Facilities," Class 1 projects
consist of the operation, repair, maintenance, permitting, leasing, licensing, or minor
alteration of existing public structures, facilities, mechanical equipment involving
negligible or no expansion of use beyond that existing at the time of the lead agency's
02
City Council Staff Report
January 13, 2016 — Page 2
Acceptance of City Project No. 13-33 (Tahquitz Canyon Way Landscaping, Phase 2)
determination. Therefore, in accordance with Section 15301(a), staff determined that
the Tahquitz Canyon Way Landscape Phase 2, City Project No. 13-33, was considered
categorically exempt from CEQA.
FISCAL IMPACT
A total of $1,560,000 was previously budgeted by the City Council from the Measure J
Fund (Fund 260) for the Project. The Project budget, and incurred expenditures and
remaining balance, are identified in Table 1:
Table of Project Costs Amount
FY 13/14 Budget Appropriation
$1,030,000
FY 14/15 Budget Appropriation
$530,000
Design Services
($106,158)
Project Administration (through 12/31/15)
($52,334)
Construction Contract
($1,271,792)
Remaining Balance
$129,717
Table 1
The remaining balance of $129,717 will be returned to the Measure J Fund for future use
by other capital projects.
The City is holding retention of $63,589.60 for Golden Valley Construction pending
acceptance of the improvements and filing of the Notice of Completion with the County
Recorder's office. Since the Project involved conversion of existing landscaping
improvements, the Finance Department does not need to add the cost of the Project to
the City's fixed asset system, as no new assets have been created in compliance with
Governmental Accounting Standard Board (GASB) 34 Standards for Financial
Reporting of Infrastructure Assets.
SUBMITTED
V V v WUt \
Marcus L. Fuller, MPA, P.E., P.L.S.
Assistant City Manager/City Engineer
Attachments:
1. Vicinity Map
2. Notice of Completion (NOC)
David H. Ready, EFD.
City Manager
03
ATTACHMENT 1
Ilu
.Off PLM dPP r<
Department of Public Works and Engineering
��..: Vicinity Map
C'piORLLP �_�.�
ti
O
�
ALEJO
RD
z
w
c
. BELDING DR
- }
r
_.
PARK DR
Q
Z
F-
w
z"
j
Z
R
DESERTPALMSDR
O
,U
5
C3
MCMANUSDR:
AMADO RD - - -Z
W
pVIC DR W
PLAIMORAVE
w
�.
.
J >
o
w
UVMORAVE
It
2
'ANDREAS RD
g t
Cz;2—
U
CALLE LILETA
PASEO DE GRACIH
BARISTO RD
G
Ir
W
a �
g
O
U
RAMON RD
Legend
SUNSHINE OR N
®Site
SUNSHINE lAgY
'
TiiERESA DR
Q 500' Radius
CITY OF PALM SPRINGS
id
05
ATTACHMENT 2
06
Recording Requested By:
City of Palm Springs
When Recorded Mail To:
Name James Thompson, City Clerk
Street
Address 3200 E. Tahquitz Canyon Way
City & State Palm Springs, CA 92262
SPACE ABOVE THIS LINE FOR RECORDERS USE
NOTICE OF COMPLETION
(CA Cinl Code §§ 8180-6190, 8100-8118, 9200-9208)
NOTICE IS HEREBY GIVEN THAT:
1. The undersigned is an owner of an interest of estate in the hereinafter described real property, the nature of which interest or estate is.
Fee
(e.g. fee, leasehold, joint tenancy, etc.)
2. The full name and address of the undersigned owner or reputed owner and of all co -owners or reputed co -owners are:
Name Street and No. City State
City of Palm Springs
3200 E Tahquitz Canyon Way Palm Springs CA 92262
3. The name and address of the direct contractor for the work of improvement as a whole is:
Golden Vista Construction, Inc dba Golden Valley Construction, 2000 Executive Drive, Palm Springs, CA 92262
4. This notice is given for (check one):
0 Completion of the work of improvement as a whole.
❑ Completion of a contract for a particular Dortion of the work of improvement (per CA Civ. Code § 8186).
5. If this notice is given only of completion of a contract for a particular portion of the work of improvement (as provided in CA Civ. Code
§ 8186), the name and address of the direct contractor under that contract is:
Not Applicable
6. The name and address of the construction lender, if any, is:
Not applicable
7. On the 9th day of November 2015 , there was completed upon the herein described property a work of improvement as a
whole (or a particular portion of the work of improvement as provided in CA Civ. Code § 8186) a general description of the work provided:
Tahquitz Canyon Way Median Landscaping Improvements consisting of Planting, Lighting, Irrigation, Hardscape, and Decorative Crosswalk Pavers
8. The public work herein referred to is situated in the City of Palm Springs County of Riverside
State of California, and is described as follows:
City Project No 13-33, Tahquitz Canyon Way Landscape Improvements, Phase 2 from Sunrise to El Cielo
9. The street address of said property is:
Tahquitz Canyon Way from Sunrise Way to El Cielo Road
10. If this Notice of Completion is signed by the owner's successor in interest, the name and address of the successor's transferor is:
Not applicable
I certify (or declare) under penalty of perjury under the laws of the State of California that the foregoing is true and correct.
Date: By.
Signature of Owner or Owner's Authorized Agent - Assistant City Manager/City Engineer for City of Palm Springs
Marcus Fuller
t Porter Law Group, Inc 2013
Print Name
Pagel of 2 07
VERIFICATION
I, Marcus Fuller , state, I am the Assistant Citv Manager/City Enqineer ("Owner", "President",
"Authorized Agent", 'Partner", etc.) of the Owner identified in the foregoing Notice of Completion. I have read said Notice of Completion and know the
contents thereof, the same is true of my own knowledge.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct
Executed on (date), at Palm Sorinas (City), CA (State)
Signature of Owner or Owner's Authorized Agent
711
0
0
A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this
certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF
On (date), before
me, Notary Public (name and title of
officer) personally appeared who proved
to me on the basis of satisfactory evidence to be the person(s) whose name(s) islare
subscribed to the within instrument and acknowledged to me that helshelthey executed the
same in hislher/their authorized capacity(ies), and that by hislherltheir signature(s) on the
instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the
instrument.
I certify under PENALTY OF PURJURY under the laws of the State of California that the
foregoing paragraph is true and correct.
Witness my hand and official seal.
Page 2 of 2 Signature