HomeMy WebLinkAbout3/2/2016 - STAFF REPORTS - 5.A. s�*?P�M Sp4 iy V N °vrovs•coe v C�4 1FORN,P City Council Staff Report DATE: March 2, 2016 NEW BUSINESS SUBJECT: APPROVAL OF PLANS, SPECIFICATIONS AND ESTIMATE (PS&E) AND AUTHORIZATION TO BID THE CITY COUNCIL CHAMBER AUDIOVISUAL SYSTEM UPGRADE, CITY PROJECT NO. 15-06 FROM: David H. Ready, City Manager BY: Chief of Staff/City Clerk Public Works & Engineering Department SUMMARY: The Chief of Staff/City Clerk is coordinating with the Public Works & Engineering Department on the design of a complete replacement of the City Council Chamber and Large Conference Room audio/visual systems, including the central control room. Funding for this project is made available from public, educational, and government access ("PEG') fees paid to the City for technology enhancement and upgrade of its public access channels. The construction documents (plans and specifications) have been completed, and in accordance with Section 7.03.040 of the Procurement and Contracting Code the City Council is required to approve and adopt plans, specifications and working details, and authorize the bid request for all public projects in excess of $100,000. Approval of this action will allow staff to proceed with bidding of this capital project, with an estimated cost of$900,000. RECOMMENDATION: 1) Receive a presentation on the various elements of the audio/visual equipment upgrade for the Large Conference Room and City Council Chamber; 2) Approve the aesthetic design of the reconstructed City Council dais; and 3) Approve the plans, specifications and estimate and authorize staff to advertise and solicit bids for the City Council Chamber Audio/Visual System Upgrade, City Project No. 15-06. STAFF ANALYSIS: In March 2014, following a Request for Proposal process, Triton Technologies was selected to design a new audio/visual system for the Police Department Training Center. On the basis of the prior selection of this firm, and its special expertise on the design of audio/visual systems for the City, Triton Technologies was selected to design ITEIV NO. � City Council Staff Report March 2, 2016-- Page 2 Approve CP 15-06 Request for Bids a complete replacement of the existing audio/visual and television broadcast equipment for the City Council Chamber, including the Large Conference Room, and the television studio/production room. On July 2, 2014, the City Council approved Amendment No. 1 to Agreement No. 6503, in the amount of $30,700 to provide the services necessary to design the new audio/visual system for City Hall. Subsequently, Triton Technologies identified the various audio/visual components and architecture of the system, and on February 4, 2015, the City Council received a presentation from staff on the preliminary layout and elements of the system to install within the City Council Chamber. At that time, Council Member Foat requested that the audio/visual system incorporate elements similar to the system used at the Riverside County Board of Supervisors Chamber, where a single monitor is available at the dais and used for broadcasting presentations, watching the live feed, as well as voting. As a result of Council Member Foat's request, staff has coordinated with Triton Technologies to review the audio/visual system in use at the Riverside County Board of Supervisors Chamber, and has determined that the County uses what is called an "AMV system, which is a custom designed and proprietary system. At the Riverside County Chamber, at the dais each voting member has a panel that has 9 buttons with a voting menu and request to speak option, which is an independent voting panel and not incorporated into a touch panel or monitor. At each dais seat there is an individual monitor that only receives the presentation being broadcast from the Chamber, and does not have touch screen or other options available. The County's system provides the Clerk of the Board a touch panel to control the entire system, much in the way that the City Clerk controls the system in the current system used at the Palm Spring City Council Chamber. Staff recommends that the City use a more open platform voting system that has the same capability as the custom/proprietary system in use at the Riverside County Chamber, with an individual monitor and separate voting push button panel at each seat at the dais. However, additional options have been included that allow for Council Members to toggle between the broadcast feed and the uploaded Council agenda and staff reports for the item being presented. The new proposed open platform voting and meeting management system, along with video streaming, will require staff to purchase a new software system to replace the proprietary Granicus system currently being used which has very limited expandability. Given the Class 1 Historic Site designation of City Hall', the final design of the project is subject to review and approval by the Historic Site Preservation Board (HSPB). Staff has retained the architectural services of Jeff Jurasky to support the design effort of modifications to the City Council Chamber to ensure the installation of audio/visual equipment into the City Council Chamber, as well as added to the Council dais, is treated with the appropriate detail and refinement necessary to preserve the architectural integrity of the City Council Chamber. ' On October 2, 1996, the City Council adopted Resolution No. 18907 designating the Q 2 City Hall as a Class 1 Historic Site. City Council Staff Report March 2, 2016-- Page 3 Approve CP 15-06 Request for Bids On January 12, 2016, the Department of Planning Services submitted a Certificate of Approval Request to the HSPB for the proposed audio/visual equipment and dais remodeling scheme in the City Council Chamber. The staff report prepared provided a thorough background of the original architecture constructed in the 1950's, renovations completed in the 1980's and a current view of the council chamber dais illustrating the new audio/visual equipment and potential dais remodeling schemes. Some of the new audio/visual equipment includes ceiling mounted lighting fixtures, ceiling mounted cameras, recessed and ceiling mounted digital television screens, and an equipment rack beside the public podium finished in a credenza style piece of furniture. Additionally, the staff report included three dais remodeling schemes which are shown on the subsequent page with a short explanation / description provided by the interior design. A copy of the January 12, 2016, HSPB staff report is included as Attachment 1. As identified in the HSPB staff report, Jeff Jurasky originally proposed three dais remodeling schemes, however, the HSPB did not believe the options presented preserved the original architectural integrity of the City Council Chamber. Comments from HSPB included requests for a simpler dais remodeling scheme with the addition of the City seal to better represent its original architecture yet allowing incorporation of new audio/visual equipment into the dais with individual monitor screens. Furthermore, the HSPB requested additional information toward the mounting application of the new audio/visual equipment proposed in the Council Chamber. On February 9, 2016, staff presented a revised dais remodeling scheme to the RSPB, with a design that demonstrates the preservation of its original architecture, includes the City seal and continues to support the integration of individual monitors for each dais seat. A copy of the February 9, 2016, HSPB staff report is included as Attachment 2. Figure 1 shows the final Council dais design as presented to and conditionally approved by the HSPB 2. JJ _O NI. h IMYAa O+' 7aaroN Hew wawsrecme Hew Figure 1 2 HSPB requested material and color stain samples to review at their next meeting on 03 March 8, 2016 City Council Staff Report March 2, 2016 --Page 4 Approve CP 15-06 Request for Bids The project includes the following general scope of work: • Reconfigured City Council dais with individual 15" LCD monitor screens which includes a multi-function flush-mount control station with touch screen to retrieve documents, view agenda items, view HD presentation system video, input votes, motions, requests to speak, with microphone control and video selection, including internet access, and with new 15" gooseneck microphones with amplified speaker and volume control • Reconfigured staff seats with individual 15" LCD monitor screens which includes a multi-function flush-mount control station with touch screen to retrieve documents, view agenda items, view HD presentation system video, requests to speak, with new 15" gooseneck microphones with amplified speaker and volume control • Reconfigured podium for public speakers and staff presentations with individual 15" LCD monitor screen which includes a multi-function flush-mount control station with touch screen to retrieve documents, view agenda items, view HD presentation system video, requests to speak, with new 15" gooseneck microphones with amplified speaker and volume control • Installation of two new 60" screen monitors positioned on each side of the Council Chamber (four screens total) to allow better viewing of information being broadcast on television by public attending the meetings in the Council Chamber. • Installation of one new 80" screen monitor to replace the existing overhead projector used to display presentations onto the existing pull-down screen with a new overhead projector digitally transmitting images directly onto the new 80" monitor • Installation of two new 70" screen monitors for the Large Conference Room for presentations • New video camera and speaker systems throughout Council Chamber and Large Conference Room • New lighting systems • New broadcast control room • Ability to add closed-captioned service Schematic plans showing the scope of the audio/visual improvements proposed is included as Attachment 3. The plans and specifications ("contract documents") prepared by Triton Technologies and Jeff Jurasky are being finalized, and with the City Council's final approval will be ready to formally solicit construction bids for the Project. With City Council approval, staff will advertise the project in the Desert Sun, submit the Notice Inviting Bids to plan rooms, and provide the bid documents available free of charge to prospective bidders. A copy of the contract documents for the Project is on file with the Public Works & Engineering Department. The specifications identify the following tentative schedule for the bid process: Notice Inviting Bids to be posted: March 17, 2016 Deadline for receipt of bids: 3:00 PM, April 21, 2016 Contract awarded by City Council: May 4, 2016 04 City Council Staff Report March 2, 2016-- Page 5 Approve CP 15-06 Request for Bids ENVIRONMENTAL IMPACT: Section 21084 of the California Public Resources Code requires Guidelines for Implementation of the California Environmental Quality Act ("CEQA"). The Guidelines are required to include a list of classes of projects which have been determined not to have a significant effect on the environment and which are exempt from the provisions of CEQA. In response to that mandate, the Secretary for Resources identified classes of projects that do not have a significant effect on the environment, and are declared to be categorically exempt from the requirement for the preparation of environmental documents. In accordance with Section 15331 "Historical Resource Restoration/Rehabilitation," Class 31 projects consist of limited maintenance, repair, stabilization, rehabilitation, restoration, preservation, conservation or reconstruction of historical resources, therefore, the City Council Chamber AudioNisual System Upgrade, City Project No. 15-06, is considered categorically exempt from CEQA, and a Notice of Exemption has been prepared and will be filed with the Riverside County Clerk. A copy of the Notice of Exemption is included as Attachment 4. FISCAL IMPACT: Costs for this project are covered by special user fees collected by the City through Time Warner Cable for technology improvements for broadcasting public meetings on the City's public access channels; these fees are identified as "public, educational, and government access" (or `PEG") fees. PEG fees are collected and set aside specifically for improvements to be made associated with broadcasting on the City's public access channels, and cannot be used for other purposes. The City Council budgeted $26,400 in Fiscal Year 2015/2016 from PEG fees into General Fund Account No. 001-1231- 50039 for the project. As of June 30, 2015, the City has received and accumulated a balance of approximately $770,000 in PEG fees for use on the project. The construction estimate for the project is $900,000; and the Project budget and estimated expenditures are identified in Table 1 below. Table 1 Table of Project Costs Amount PEG Fees (Appropriated) $26,354 PEG Fees Fund Balance $771,913 Design $39,450 Pro'ectAdministration Estimated $5,000 Construction Inspection/Admin. (Estimated) $25,000 Construction (Estimated) $900,000) Contingency $90,000 Additional Budget Required $261,183 05 City Council Staff Report March 2, 2016 -- Page 6 Approve CP 15-06 Request for Bids The estimated total cost of the project exceeds currently available PEG fees. Annually, the City receives approximately $100,000 in PEG fees via Time Warner Cable payments. Upon receipt of construction bids and presentation to the City Council of a contract for award, staff will recommend that the City Council appropriate General Fund balance to cover any funding shortfall with repayment as an internal loan to the General Fund from future PEG fees received. Additional costs to purchase a new software system to replace the proprietary Granicus system is estimated at less than $25,000 and will be budgeted separately as part of the City Clerk's annual budget. SUBMITTED: arcus L. Fuller, MPA, P.E., P.L.S. mes Thompson Assistant City Manager/City Engineer Chief of Staff/City Clerk David H. Ready, Esq., City Manager Attachments: 1. January 12, 2016, HSPB staff report 2. February 9, 2016, HSPB staff report 3. Schematic Plans 4. CEQA Notice of Determination Attachment 1 a 07 otoA►M s�*'y a HISTORIC SITE PRESERVATION BOARD STAFF REPORT DATE: January 12, 2016 NEW BUSINESS SUBJECT: A CERTIFICATE OF APPROVAL REQUEST FROM THE CITY OF PALM SPRINGS FOR REMODELING OF PORTIONS OF THE COUNCIL CHAMBER DAIS AT THE PALM SPRINGS CITY HALL, A CLASS 1 HISTORIC SITE LOCATED AT 3200 EAST TAHQUITZ CANYON WAY. (CASE 3.3377 MAA/ HSPB 33-D, ZONE C-U (CIVIC USES). (KL) FROM: Department of Planning Services SUMMARY The City's Public Works Department is overseeing implementation of a Council-initiated renovation of the audio/visual system in the City Council Chambers. An interior design consultant has been retained to assure "...the Council dais is treated with the appropriate detail and refinement necessary to preserve the architectural integrity of the City Council Chambers." The current furnishings and interior decor of the chamber were installed in the 1980's as part of a comprehensive interior remodeling of City Hall. The interior design consultant has developed three design schemes would significantly alter the appearance of the front-panel of the council desk component of the dais. Numerous surface mounted components (lights, cameras, video monitors, etc.) are proposed throughout the council chamber and on the dais. Pursuant to PSMC 8.05.195, alterations to the interior of publicly-owned Class 1 historic sites require a certificate of approval from the HSPB. The Board is to evaluate the three options against the guidelines for granting a certificate of approval and against the United States Secretary of the Interior Standards for the Treatment of Historic Properties. RECOMMENDATION: Provide comments to staff and continue the matter to a date certain of the February 9, 2016 HSPB meeting and direct staff to provide additional interior elevations, photo- simulations, sections and/or scaled details in advance of that meeting as necessary to fully convey the actual integration of the A/V equipment and components into the architecture of the council chamber. 08 Historic Site Preservation Board Staff Report January 12,2016 Case 3.3377 MAA—City Council Dias Remodeling Page 2 of 13 BACKGROUND AND SETTING: The City Council chamber is an integral part of the original City Hall building, designed in a collaborative effort by master architects Albert Frey, John Porter Clark, and Robson Chambers and was constructed between 1952 and 1956.1 The Palm Springs City Hall has been recognized as a historically significant building not only at the local level, but also at the State and national level, having been placed in the National Register of Historic Places by the United States Department of the Interior in 2015. Below are images (credit: Julius Shulman) of the original configuration of the Council chambers shortly after the building was constructed. The dais, which, by definition includes the entire raised platform at the front of the chamber, is comprised of the following basic functional components: (1) the city council desk, (2) the staff desk, (3)A/V components (screens, projectors, computers, etc.), (4) a podium at which the public may address the council. As can be seen in the images below, the original dais also included a small desk immediately in front of the council desk for the recorder/secretary (this function in the current configuration has been subsumed in the staff desk). The original desk-front panels were comprised of vertically-grained clear-finished plywood with what appears to be a fine-grained face veneer run in a vertical orientation. Across the back wall of the dais were acoustical panels, a cork board, and a projection screen. �I Palm Springs City Hall was built in phases, the first between 1952 and 1956, with two large additions at the rear;; one in 1956 designed by Clark, Frey &Chambers and one in 1965 designed by Williams, Clark, and Williams, . In 1972 another smaller addition was constructed, designed by Williams & Williams for the Emergency Operations Center, and in 1984 a substantial remodeling and another large addition designed by Williams, Clark & Williams was added which included the part of the building presently occupied by Development Services. 09 Historic Site Preservation Board Staff Report January 12,2016 Case 3.3377 MAA—City Council Dias Remodeling Page 3 of 13 , r t. 1 $ i 1 t4 - ORIGINAL INTERIOR DESIGN OF COUNCIL CHAMBER-LOOKING SOUTH FROM THE DAIS jR/ry��j�] ry RIIl�� CLOSE-UP VIEW OF ORIGINAL INTERIOR DESIGN OF COUNCIL CHAMBER DAIS to Historic Site Preservation Board Staff Report January 12,2016 Case 3.3377 MAA—City Council Dias Remodeling Page 4 of 13 i 1 . ORIGINAL INTERIOR DESIGN OF COUNCIL CHAMBER- LOOKING NORTH TOWARD THE DAIS The images below portray the current dais as renovated in the 1980's. The 1980's renovation introduced a design aesthetic for the dais furnishings based on a "panelized" look created with a grid of painted wood trim pieces mounted across the desk-front panels. It also introduced a public speaker's podium attached to the edge of the staff desk. Across the back of the dais a series of rolling "presentation boards" integrated into soffits and flanking screen walls with painted vertical wood trim and a motorized projection screen. Behind the east screen wall is a storage I utility closet that may be needed to accommodate some of the AN components. CURRENT VIEW OF COUNCIL CHAMBER DAIS(RENOVATED IN 1984) - 11 Historic Site Preservation Board Staff Report January 12,2016 Case 3.3377 MAA—City Council Dias Remodeling Page 5 of 13 CURRENT CONDITION LOOKING SOUTH FROM THE DAIS r t CURRENT CONDITION LOOKING TOWARD THE DAIS(RENOVATED IN 1984) 12 Historic Site Preservation Board Staff Report January 12,2016 Case 3.3377 MAA—City Council Dias Remodeling Page 6 of 13 CLOSE UP VIEW OF CURRENT DAIS FROM 1984 RENOVATION e •� t n jI CURRENT VIEW OF COUNCIL CHAMBER DAIS EXISTING LOBBY VIDEO MONITOR EXISTING CAMERAS,SPEAKERS,TV MONITORS AND PROJECTION EQUIPMENT WILL BE REMOVED AND REPLACED. 13 Historic Site Preservation Board Staff Report January 12,2016 Case 3.3377 MAA—City Council Dias Remodeling Page 7 of 13 1 � 1 t I k I � { ♦_ ZK I i �`L�ALOID ...TL'Iw se 1 �I J i 1956 ELEVATION DRAWING OF FRONT OF DAIS SfTteil � I � � ConlerenCeRoom r Y �• VOL- ...�y, . .. J_ T - i 3 Council r tr L�'Lj i 1 N �µ( 3 tl. I �•� .��. I 5 I CURRENT FLOOR PLAN 1956 FLOOR PLAN COUNCIL CHAMBER FLOOR PLANS In March of 2014, the City Council hired Triton Technologies to design and install a new audio visual system for the Police Training Center Building on South Civic Drive. In July 2014, the City Council approved an addenda (#1) to expand Triton's scope to include complete replacement of the AN system in the City Council chambers, the Large Conference Room, and the City's Television Studio & Production Center. In February 14 Historic Site Preservation Board Staff Report January 12,2016 Case 3.3377 MAA—City Council Dias Remodeling Page 8 of 13 2015, addenda #2 was approved expanding the technological scope and adding interior design / architectural services to "...support the design effort to ensure the installation of audio/visual equipment into the City Council Chambers, as well as added to the Council dais, is treated with the appropriate detail and refinement necessary to preserve the architectural integrity of the City Council Chambers." At this time, the actual modifications that are necessary to install the new AN components have not been fully identified, but there will be new built-in monitors at all workstations that will necessitate modification of all the dais furnishings and workstations. 3 } l oNlsPMI®.IdEYEW. .At the ceiling, there will be new surface-mounted cameras and ceiling mounted special lighting fixtures necessary to provide proper lighting of the individuals at the dais (see images below). J� .r .j DESIRE D22 TUNGSTEN LED PANASONIC AW-HE130K CEILING SURFACE MOUNTED LIGHT FIXTURE CEILING SURFACE MOUNTED CAMERA The existing two small ceiling-mounted video monitors oriented toward the audience at the ceiling will be replaced with four, 60 inch flat screen ceiling / wall-mounted video 15 Historic Site Preservation Board Staff Report January 12,2016 Case 3.3377 MAA—City Council Dias Remodeling Page 9 of 13 monitorS2. The existing projection screen at the back of the dais will be replaced with 80 inch diagonal flat screen video monitor. LARGE 60INCH FLAT SCREEN VIDEO MONITORS WILL REPLACE THE EXISTING SMALL AUDIENCE-FACING CEILING MOUNTED MONITORS AND THE PROJECTION SCREEN AT THE BACK OF THE DAIS WILL BE REPLACED WITH A RECESSED 80-INCH MONITOR It is assumed wiring, conduit, new digital projection screens cameras, lights, and equipment racks or closets may be part of the new AN system. It is not clear what architectural impact or changes would be necessary to the perimeter walls and ceiling finishes to integrate and accommodate the new AN system. The interior design consultant has developed three schemes which are shown below with a short explanation / description provided by the designer. Option Al-1 "Curvilinear' - Y "Configured on the same footprint as the existing dais, this design features 6" white oak "bands" that attempt to interpret a freeform and fluid approach to the City's business by the various Councils that will be using the dais. The bands are separated by 118" Certain aspects of the subject project are necessary upgrades to address existing deficiencies in compliance with the ADA. 16 Historic Site Preservation Board Staff Report January 12,2016 Case 3.3377 MAA—City Council Dias Remodeling Page 10 of 13 blackened metal sheets that emphasize the individual bands as well as finish the bottom surface of the cantilevered surfaces as they appear. The white oak is to be dyed a complimentary color tone similar to the existing colors within the Chambers." Option A1-2 "Photo Image Palm Sprin s Entry Sign" 1 ✓f M.MV♦-w��1YM "This option also utilizes the same footprint as the existing dais but includes a raised surface counter for staff to utilize at the display boards. The dais face introduces a digital photo image of the Palm Springs entry sign at Tramway that has been printed on white oak and recessed 3"to enable the positioning of a continuous LED perimeter light to frame and illuminate the image. The design was generated as an attempt to give the dais a Palm Springs specific identity instead of being generic. The image is recognizable and memorable. The photo image will be a one color mono-tone (in the compatible coloration of the Chambers) where the balance of the dais will be paint grade to match the existing color palette." Option A1-3 "Colored Panels" f Cfrw.M•> "Although this option sits on the existing footprint of the dais it does project a "battered" 17 Historic Site Preservation Board Staff Report January 12,2016 Case 3.3377 MAA—City Council Dias Remodeling Page 11 of 13 or angled surface along the arm that faces the audience to give this option a more significant, or monumental shape. This option also has a raised counter surface at the display wall for staff to utilize (as in option Al-2). The unique aspect of this option is the use of several %" multicolored acrylic panels that overlap as they fill a 5" recessed surface that is lighted from the perimeter by a continuous LED strip light. The panels are matte finished with polished edges to receive and highlight the panel colors. There is a grid of stainless steel "standoffs" that will be used as mounting hardware for the panels. The design concept here is to emphasize the creativity and diverse composition of the citizenry of Palm Springs while using similar materials to the new City median entry signage. The dais is to be fabricated in paint grade MDF and colored compatibly with the Chambers' palette. The surface behind the panels will be painted white to let the color of the acrylic come through." As with all 3 of the options, the new electronics are to be featured at each one of 7 dais positions, set within an angled surface utilizing plastic laminate as the counter material for durability and cost effectiveness." The interior design consultant has not provided a description on how the three options achieve the stated goal of preserving the architectural integrity of the chamber. RefafednReietiarltr. Ab#dhe'b-Y HSPB,IPlannth 1952 Construction of the first phase of City Hall 1956 Construction of addition to the north of original building. 1965 Construction of a second addition to the north of the original building. 1972 Construction of Emergency Operations Center Addition 1984 Comprehensive remodeling and addition of Development Services annex 1996 City Council designates City Hall as a Class 1 historic site. CC Resolution#18907 2010 South parking lot renovation 2012 City Council clarifies the Class 1 designation of City Hall to include the site (CC Resolution#23016 2013 HSPB approves certificate of approval for installing exterior conduit for connection of a traffic management system. f2014 Partial landscape changes&repaving of parking lots. p}f, Neighborhood organizations were provided the agenda for this meeting pursuant to the noticing requirements outlined in PSZC 94.04. ANALYSIS Certificates of approval applications are evaluated by the HSPB against the guidelines of PSMC 8.05.190 "Factors to be considered upon application". As noted above, the stated goal of adding interior design services to the AN consultant's contract was to: "...support the design effort to ensure the installation of audio/visual equipment into the City Council Chambers, as well as added to the 1�$ Historic Site Preservation Board Staff Report January 12,2016 Case 3.3377 MAA—City Council Dias Remodeling Page 12 of 13 Council dais, is treated with the appropriate detail and refinement necessary to preserve the architectural integrity of the City Council Chambers." In reviewing and acting upon each application, the historic site preservation board shall consider: (1) The historic value and significance, or the architectural value and significance or both, of the structure and its relation to the historic value of the surrounding area; The historic and architectural significance of the Palm Springs City Hall has been well documented as an outstanding example of mid-century modern architecture and the work of master architects Clark, Frey & Chambers. The functional components and arrangement of the Council Chamber dais have remained relatively unchanged since the building's construction. Neither the current furnishings and desk-fronts on the dais nor the three proposed options reflect the original minimalist architectural aesthetic of the council chamber that can be seen in the Shulman photos. While the three options are creative and interesting, it is not clear how they achieve the stated goal of preserving the architectural integrity of the chamber. (2) The relationship of the exterior architectural features of any structure to the rest of the structure itself and to the surrounding area; The subject project does not impact the exterior of the building. The scope is limited to the Council Chamber and dais. (3) The general compatibility of exterior design, arrangement, texture and material which is proposed by the applicant; As noted, the proposed project impacts only one of the key public spaces within City Hall —the City Council chambers. Neither the current condition as renovated in the 80's nor the three schemes for the council desk-front reflect the Clark & Frey's minimalist architectural aesthetic of the chamber. More information is necessary to fully convey the visual impact of the new large LED monitors, surface mounted cameras, lighting and other components. (4) Archaeological or ecological significance of the area. There are no known archaeological or ecological significance to the subject site. CONCLUSION It would be helpful for the projects' consultant to clarify what physical impact integration of the new A/V equipment will have on the architectural integrity of the council chamber. In doing so, it would likely help clarify what modifications are necessary to adapt the 19 Historic Site Preservation Board Staff Report January 12,2016 Case 3.3377 MAA—City Council Dias Remodeling Page 13 of 13 furnishings and architectural treatment and finishes in the chamber to accomplish the AN upgrades. And, although the 1980's remodeling diminished the architectural and historic integrity of the Clark & Frey-designed council chamber, the current project presents an opportunity for the City to begin to restore key components of the chamber in a way that would be more respectful of the original design aesthetic of the space. Staff does not believe the current three design options achieve this goal. ENVIRONMENTAL ASSESSMENT The California Environmental Quality Act (CEQA) allows for a categorical exemption determination to be made in cases where alterations to historic resources are made in accordance with the Secretary of the Interior's Guide for the Treatment of Historic Resources. The original interior aesthetic treatment of the chamber and the furnishings on the dais were materially impaired with the 1980's remodel. The current project could potentially change the aesthetic of the council chamber dais, but would not likely further impair the historic integrity of the space. Ken Lyon, RA, Flinn Fagg, AICP Associate Planner Director of Planning Services Attachments: Vicinity Map Application materials 20 Attachment 2 21 ue4o�,*V Per-av�tw�ea^ o f PLa* vt,i " Sel�v-i,c-�y Wwuora*%A� Date: February 9, 2016 To: Historic Site Preservation Board --~ From: Ken Lyon, RA, Associate Planner J Subject: Case 3.3377 - HSPB 33D — AN Upgrades in the City Council Chamber & Dais Renovation This project, which the HSPB reviewed in January 2016 is one for which the applicant (City) is seeking a certificate of approval to upgrade the AN systems in the Council Chamber and large conference room. The stated goal of the project is: ... to assure "...the Council dais is treated with the appropriate detail and refinement necessary to preserve the architectural integrity of the City Council Chambers." At its January 2016 meeting, the Board reviewed the above project and voted to continue it to the February meeting with direction to the applicant (City) to provide a design scheme for the council dais that is more reflective of the original Frey-designed furnishings and interior and to: "...direct staff to provide additional interior elevations, photo-simulations, sections and/or scaled details in advance of(the next) meeting as necessary to fully convey the actual integration of the AN equipment and components into the architecture of the council chamber. Incorporate the City seal in the design of the dais." The Board suggested the designer should attempt to incorporate the minimalist aesthetic and simplicity of form and material detailing evident in the photos of the original dais and Council Chamber. ORIGINAL INTERIOR DESIGN OF COUNCIL CHAMBER—(Photo credit: Julius Shulman) 22 The City's design consultant has produced a fourth scheme in an effort to respond and incorporate the HSPB's recommendations. The fourth scheme is attached herein with a description below provided by the designer: Council Dais design Al — 4 Concept Description: Responding to the direction from the HSPB, this design takes into account the concepts of Albert Frey when he originally designed the Council Chambers. The streamlined wood skinned forms delineate the dais as per Frey's design. A "curb" is added to the top of the desk to hide the paper work and desktop mess that is so noticeable from a TV camera view that was not a concern back in the 1960's, and now the addition of the angled technology unit which is intended to simply wrap over the top of the dais stations and provide a name plate (static or digital) location on the 18" drop apron facing the audience. The re-introduction of the City's official seal is positioned on the audience- facing surface next to the Mayor's position at the dais. Materials are wood veneers in two different finishes. Dais Option A1-4 J, / •r 9EGTION NEN/ _. a�V1�W The design proposes a desk for the Council members that is similar in material, color tones and detailing as that seen in the original photos. Planning staff recommends the Board grant a certificate of approval only for the reconstruction of the Council desk &furnishings as shown at this time. No additional information has been provided showing how the other A/V components are to be integrated into the Council Chamber. Planning Staff recommends these details be provided to the HSPB in March in order to make a fully informed decision on the appropriateness of the integration of the new A/V system in the Council Chamber. Attachment: Vicinity Map January 2016 Staff report excerpt. 23 Attachment 3 24 ippLLM p �,�►� ,,. k* Go �r V to C',q`IFORN,p P m ri n s itCounci a December 17th1 2015 Final Drawing & Document Review TRITON 32234 Paseo Adelanto • L • San Juan Capistrano, CA. 92675 �J 949-388-3919 9' cG CO &C EMLOGTIONS COae COLNCa OISPIAy LOCATIONS cL CO k CEILNO LOCATIONS OSY DALSEaAPMENT LOTiLTCNS i p✓, noo, POONM E00 PMExr LOG11CN5 STAFF EOUIpMENT LO TIONSLMATJMS 5Wd EOW%IENTI NTEO FA INO AOOIENCE ON FRONT OF SOFFIT WALL S C O a M CON ftOE3 NOT E OEPN:TACTUALSNAPE LENS O MPKTS CAME"CIRECTM C Z Or) oNl �R d� •• MASTMFACE�SET r ^ ! • 'AIIl WATe FONSL TAE L • y MhIOTE PL GW STAWN(FOR f _ Ml POATASLE STATIONS) �� •• PRESET m PSl STAT m 3 ISI • rt L� DEEREEN p V f m luxcSTEN • NOTE ALL lI1GTP CAL Fn(TIriE3 NWNT AT M NFM CE4wO NElONT v � A - A =` i, N a O 0 � pNy /L ad � � V m a `s a d >i { 77 P Triton TechnologySolutions ^n'e"'L0""O"°PR°�°0Y TMOE SECRET NOTICE:This paper,el nfornaEal died ed wNExurem MIUM pnnw C—W o.r PTa•w1 Fw os+w An Lw+ g 7223APefeo AdeIaNle SuiNE1 aE.mweoe•- neu MAA`E. and pe aNmmahP.m ena aewlo.o neuron pr llerewm en d.A1111MHN d 3 015 PALM SPRINGS CITY COUNCIL FLOOR PLAN Z70- 1021115 ProPrIalaTRITON ° Tol(943 mfarMry e use TNINeTepMp�°'T"ae°bMpnd'pebeumd° Ne FP COUNCIL � Toe f9e%]559919 a'°Iv noed rITLW raprwauM unwttyaMW we woWd �r P,a„N, COUNCIL CHAMBER FwKAw9ovlo eT rw.E APaaw as Marty Wlar unaWn¢ad party.Sutlr unxAadxed we wwYd T E 0 H N 0 L 0 0 Y wNw.Trlt° Tachrwk gy.N be a wolalrm of McNeal law, L ROSE °'a FN PSCC Floc!PITIR dwg anNl I s I cool DS01 tt Ill,/ G OS02 1,tr 1�/fC D503 CCO4 OSO4 Dsos } STF3 J � ` STF2 i h m t ' O a 1 L a i N j m I i tQ^n i OS07 - ? 1 STF1 { 1 POA�3 ASST LSTN ANT A MIC RX Swo7 Sw09 FED swol C� F-- — ED SHORE REWew10ARD.W�IIOYLDn WVtEKAABER6ENE] De', cir�e dY: Mt�q rv, Dy Tb A—L. 0 Tnwn TacMobOy Sdutbn$ TRADE SEGFET NOTICE:Tln papa,a0 illamadon dlecbesd ]227s Feaeo Aalanw,Suit Et •BvaweD.. RevxweD wrt. and un mans elwwn Bne aexnpeet nereen ahereWM aA O.ALU4PM b S 2015 PALM SPRINGS CITY COUNCIL FLOOR PLAN Rw Da.. 10/ltn5 TRITON San Juan Gpebrw,CA92575 pn pne YY ID Tnlan Technology.These pux and spetl a au TBI:191E{DB9]919 am lar Me We Use d Tnwn TedtnoloSy,and may not a used er nRmw COUNCIL CHAMBER — DAIS AREA Dmary we. �'�/ T 1: O H N O L O Q V ande TrMnTe N e1 ®N nnu.e o`a`re by any lsoon of(Want etl pasty.Such anaWwrimd uae WwW CH DAIS /11TEA adWY. aDvblslgn Dl ladeniiew. P. POSE D.erw Pscc Root Ptan.dw0 S. I al i 1cc h F RM WAP R ] Lccx I Mut xxa.wawpro �� LCCk LARGE CONFERENCE ROOM CEILING LOLARCGE ATIONCOS LCWM NFERENCE ROOM WALL LOCATIONS LCRp LARGE CONFERENCE ROOM RACK LOCATIONS LCFN LARGE CONFERENCE ROOM FLOOR LOCATIONS CAMERA ICON DOES NOT DEPICT ACTUAL «w] SHAPE. LENS DEPICTS CAMERA DIRECTION SPEAKER LOCATIONS WITH ALL SPEAKERS ON BRACKETS FROM CEILING AV ABST ANT B MIC 0IO2 INTEGRATOR RESPONSIBLE FOR SECURE , MOUNTING LC LC 4 erw enlle xs"1 i c� t m o C7 r lCxt g Gm s LARGE CONFERENCE ROOM "R n, a m �I lCwt � lCG 12' Tnlon Technology SohjWns SECRET NOTICE The peps,Ml inblmation dietloead `^ro x�sen sce¢e o G...x o.r n.o..a ry o.s*rr n..L. a ]22]1 Paseo Adelenb,Sulb Et Ammosr nenawsowls and ow mesar ahovm and tlewibeahwpn«haraMN ary O.g2yµN 6 5 2015 PALM SPRINGS CITY COUNCR. FWOR PLAN 9..0.. 1021115 TRITON San Juan Capee>no CA 92675 pmp a«y b TMn Ter obgy These pbns m spodfi ohs _ Tel,1919)]eb]919 ere Mf be sob usa d Tataa Te .bw.and.y W bs used a„P wq.s lyCONIF T H C M N O L O O Y www,TnbnTeNnd N nxaL/.w9a1Ea8Y- Iuxl/.nne1E1)wn¢ ROOM by«ryp9grurelllh« Wperry suchYMYlh«Ileausexnwd FP CONE RM 2 V oPi w a,ddetbn of federal law 8. NOSE 7'n4-PSCC Floor PI.d.V am. I a I ,or,-MSi \ STF3 STF7 STF2 } STF6 !— — PS1 Am�IRS ELF STF5 I i_ STF1 POM3 ASST SWU ANT A 3W01�STF4 ED, - � ® PDM1 E SHURE tSENHEIS�ERMXWAPT -a PDM2 MOUNT DEVICES O CD02 SOFFIT FACING AUI 36 . 0 Theo Tenlaeology Solutions asv¢eTp sxpwma.Tnev TRADE SECRET NOTICE:This papal,an W.nh.boo d.Lo wRe xurecn sEa'Ea' d.er Daps— o'.ow i> pp a.. �� 0 322 Paiep Adelanb,Suds ElP weoar ee+e xp wm. and me maser cbmn and deathbed hereon or hem Wnam O. AL"N 6/3/2015 PALM SPRINGS CITY COUNCIL FLOOR PUN n..oua 10RI/15 TRITON San Juan Capevono CA 92W5 pm"W,W TM Terhnohpgy.Theee plane and epedLalmm Tel(919)]A61919 an In ma sdp usaa TnNn ieanaody,ana may na be ueed T„m awaw COUNCIL CHAMBER — STAFF AREA p�cae f/�9 T G C M N O L 0 0 Y 0.'WW.TnIpnTlphne N MlMpYfp a. IpY YnOI[a M.E byany What MalnhAKadpeln'.SYNVnaNIKKlSedus woA �+v CH STf AREA b0Y be a xWahon a ladenal am. IL ROSE TelY PSCC floor Plan.d" 5Me 1 r I CONTROL ROOM CTRL RM WAP I CR00 CRC1 c I ^ CRC7 i@� /1 AMX .....- NXA-WAP1000 (�l CR07 ICR## CONTROL ROOM CONSOLE LOCATIONS CRO6 RK## 45RU RACK LOCATIONS c I CEILING LOCATIONS CRO5 m x n o. n m 'm^ CROt CR62 CR03 CR04 a RK01 RK02 � 1 a Triton TechnokVy Solutions aeviaw[°rw°useaw e. TRADE SECRET NOTICE.-This Paper,all NfomW Gsdosao wwE wuse�•s'.nn Deer nw.eos rm..ery 32234 Pwm AENeMa,Suite El eaviawsaar Me awsP o,c agMemowr si am aesrnoee Manson of harewlN em 0. sJs/mts PAW SPRINGS CITY COUNCIL FLOOR PLAN TRITON San Juan Capa4ane.CAM75 par- fy b Than Te Andopy Thine pane eM epetlau cna a-�.. ,0 2,y,5 iel(949t]aa]919 are la pa ado use d Trion Tedwo4y."may, Mal be useC w naNp� CONTROL ROOM tea• T E C H N O 4 O O Y nwwTrgwrTadno19 awaaaneawaear fwuunmvmd-c Py any aUxe dwrtreCParty Sa unaupabaP use amid FP CTL RM 30 Ma a„dawn draoarat iew. R. AOSE a..•. PSCC Floor Plan dwp b 1 d I CONTROL ROOM KVMPC Y) Y EDIT PC CR01 � JIJ ° CR02 I cma � .. t 0 v v v � ��I o ��� O°°OO�O°00 • ` § CAM CTRL m m °o�o 00 0 00 41111111 LIGHT CTRLlug �, PROD SWR oggo'O °°oee` e PROD MIXER CR03 n N VQ7 a Y m L s CR05 CR04 RK02 RK01 Tnton Techrwl Rch aw.ewe.Ec er p p wwE RIaaER SEae:e oi.n... c.es o.u: n o agy SOlulions TRADE SECRET N°nGE.TNf a ar,oA nlomawn dedoaed npin°r' CRY of Palm Springs °'°'°` City Cawdl Chamber Update n"""'� 32274 Pelee Ad01ea4.Sae E7 REvawEoar REVEMOMtt and flue meter ehT:fi and desefhad hereon or he rewih eR & Rep B/S/15 o.ou. 12/13115 TRITON Sen hen GPtuano CA 92675 u.c.Iww swoedaery to Tnen Techocbpy Those Plena and gwdlhatmne Control Room �] T.l9a9)Me 19 ere b 9r sae use or Tdwn Tadmdoyy.and my not he used ER aRaa ea Plan VIeW 31 n1NL YiRO+E00r lNµ M1aVFD eeIE �Cy any alter auuTonaed parry Such unauthen2ad use v ukf CRE01 wwx TdWn7achnokgYd eeevidetian er federal law_ a. Alkwn a•alaa:PSCC CTRLRM Rack Elevenons RKE°1.dwy sr.. 1 42 Attachment 4 32 NOTICE OF EXEMPTION To: ❑ Office of Planning and Research From: City of Palm Springs 1400 Tenth Street, Room 121 3200 E Tahquitz Canyon Way Sacramento,CA 95814 Palm Springs, CA 92262 ® Clerk of the Board County of Riverside P.O. Box 751 Riverside,CA 92502-0751 Project Title: Council Chamber AudtoMsual Upgrade,City Project No. 15-D6 Project Applicant: City of Palm Springs Project Location(Specific): Palm Springs City Hall located at 3200 E.Tahquitz Canyon Way Project Location (City): City of Palm Springs Project Location(County): Riverside Project Description: The scope of work Indudes upgrading the existing City Hall Council Chamber Room Lar Conference j P p P9 n9 n9 lY 9e Room and Control Room. The work shall comprise of installing new audiolvisual equipment including Individual voting monitors for City Council and staff dais,renovated dais,ceiling mounted lighting fixtures,ceiling mounted cameras,recessed and ceiling mounted televisions screens,microphones,equipment racks,conductors and cabling and all other appurtenant work. Name of Public Agency Approving Project: City of Palm Springs Name of Person or Agency Carrying Our Project, City of Palm Springs, Public Works 8 Engineering Department 3200 E. Tahquitz Canyon Way, Palm Springs, CA 92262 Exempt Status: (check one) ❑ Ministerial(Sec.21080(b)(1); 15268); ❑ Declared Emergency(Sec.21080(b)(3); 15269(a)); ❑ Emergency Project(Sec. 21080(b) (4); 15269(b)(c)); ® Categorical Exemption. Stale type and section number. 15331 Historical Resource RestorationlRehabilitafion (Class 31);for the maintenance and repair on historical resources ❑ Statutory Exemptions. State code number: Reasons why project is exempt: Class 31 consists of projects limited to maintenance, repair,stabilization, rehabilitation, restoration, preservation, conservation or reconstruction of historical resources in a manner consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating,Restoring,and Reconstructing Historic Buildings(1995),Weeks and Grimmer('the Standards').Therefore,the Council Chamber Audio/Visual Upgrade, City Project No. 15-06, is considered categorically exempt from CEGA Lead Agency Contact Person: Marcus Fuller Area Code7relephone/Extension: (760)322-838D If filed by applicant: 1.Attach certified document of exemption finding. 2..Has/aA�N�ottiicce of Exemption been filed by the public agency approving the project? ❑Yes ❑No Signaturz/, y w'r.t (A/1oc Date: 2111/16 Title: Asst. City Manaaer)CityEnaineer ®Signed by Lead Agency[]Signed by Applicant Authority cited: Sections 21083 and 21110, Public Resources Code Date received for filing at OPR: Reference: Sections 21108,21152,and 21152.1, Public Resources Code. 33 RECEIVED CITY OF PALM 5PRING= STATE OF CALIFORNIA-THE RESOURCES AGENCY T811 SEP 2' AM 8' 24 DEPARTMENT OF FISH AN D GAME ENVIRONMENTAL FILING FEE CASH RECEIPT jAiJESTHOHPSON CITY CLERK Receipt#: 16-254471 State Clearinghouse# (if applicable): Lead Agency: CITY OF PALM SPRINGS Date: 08/04/2016 CountyAgencyofFiling: RIVERSIDE Dxxa Ac- E-201600845 Project Title: COUNCIL CHAMBER AUDIOVISUAL UPGRADE, CITY PROJECT NO 15-06 Project Applicant Name: CITY OF PALM SPRINGS Phwnefimder: (760)322-8380 Project ApplicantAddress: 3200 E. TAHQUITZ CANYON WAY, PALM SPRINGS, CA 92262 Project Applicant LOCAL PUBLIC AGENCY CHECKAPPLICABLE FEES: ❑Environmental Impact Report ❑Negative Declaration []Application Fee WaterDtversion(State WaterResourcesControl Board Only) ❑Project Subject to Certified RegulatoryPrograms ®CountyAcnimustrationFee $50.00 ❑Project that is exempt from fees(DFG No Effect Determination (Form Attached)) ®Project that is--emptfromfees(Notice ofExemprion) Total Recelved $50.00 Signature and title ofperson receiving payment: Deputy Notes: ACR 533(Est.12/2013) NOTICE OF EXEMPTION To: ❑ Office of Planning and Research From: City of Palm Springs 1400 Tenth Street, Room 121 3200 E. Tahquitz Canyon Way Sacramento, CA 95814 Palm Snrinns r.A r199a9 F I L E D / P O S T E D ® Clerk of the Board County of Riverside County of Riverside Peter Aldana P.O. Box 751 Assessor-County Clerk-Recorder Riverside, CA 92502-0751 E-201600845 08/04/2016 10:17 All Fee: $ .00 Audio/Visual 1 ofStp 1 S 2016 Project Title: Council Chamber Audio sual Upgrade, City Proiect No. 15-06 r Rem�v,elIldI : BY: Deputy Project Applicant: City of Palm Springs 'III YA'Y FIX ' 'I II Project Location (Specific): Palm Springs City Hall located at 3200 E. Tahquitz Canyon AA'WY ay Project Location (City): City of Palm Springs Project Location (County): Riverside Project Description: The scope of work includes upgrading the existing City Hall Council Chamber Room, Large Conference Room and Control Room. The work shall comprise of installing new audio/visual equipment including individual voting monitors for City Council and staff dais, renovated dais, ceiling mounted lighting fixtures, ceiling mounted cameras, recessed and ceiling mounted televisions screens, microphones,equipment racks,conductors and cabling and all other appurtenant work. Name of Public Agency Approving Project: City of Palm Springs Name of Person or Agency Carrying Our Project: City of Palm Springs, Public Works&Engineering Department 3200 E. Tahquitz Canyon Way, Palm Springs, CA 92262 Exempt Status: (check one) ❑ Ministerial (Sec. 21080(b) (1). 15268); ❑ Declared Emergency (Sec. 21080(b) (3), 15269(a)), ❑ Emergency Project (Sec. 21080(b) (4). 15269 (b)(c)); ® Categorical Exemption. State type and section number: 15331 Historical Resource Restoration/Rehabilitation (Class 31); for the maintenance and repair on historical resources ❑ Statutory Exemptions. State code number: Reasons why project is exempt: Class 31 consists of projects limited to maintenance, repair, stabilization, rehabilitation, restoration, preservation, conservation or reconstruction of historical resources in a manner consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings(1995),Weeks and Grimmer('the Standards"). Therefore, the Council Chamber AudioNisual Upgrade, City Project No. 15-06, is considered categorically exempt from CEQA Lead Agency Contact Person: Marcus Fuller Area Code/Telephone/Extension: (760) 322-8380 If filed by applicant: 1.Attach certified document of exemption finding. 2.Haas��a Notice of Exemption been filed by the public agency approving the project? [:1 Yes El No SignaturA v 4 wM� ^ Date: 2/11/16 Title: Asst. City Manager/City Engineer ® Signed by Lead Agency ❑Signed by Applicant Authority cited: Sections 21083 and 21110, Public Resources Code Date received for filing at OPR: Reference: Sections 21108, 21152, and 21152.1, Public Resources Code.