C'441FOIL CITY COUNCIL STAFF REPORT
DATE: March 16, 2016 CONSENT AGENDA
SUBJECT: REPORT OF COOLING TOWER REPAIRS AT THE PALM SPRINGS
INTERNATIONAL AIRPORT PURSUANT TO PALM SPRINGS
MUNICIPAL CODE SECTION 7.04.040.
FROM: David H. Ready, City Manager
BY: Department of Aviation
SUMMARY
Pursuant to section 7.04.040 (3) of the Municipal Code, on March 1, 2016, the City
Manager exercised his authority to approve the emergency repair of one of the cooling
towers at the Palm Springs International Airport in the amount of $44,994 by Desert Air
Conditioning, Inc., pursuant to its proposal dated February 4, 2016, to preserve the
public's health, safety, and welfare. Section 7.04.040 (4) requires that a written report of
the circumstances for emergency purchases in excess of $25,000 be made to the
Council at the next regularly scheduled meeting after the emergency procurement is
made.
RECOMMENDATION:
Receive and File.
STAFF ANALYSIS:
The Palm Springs International Airport is provided with heating and cooling through the
City's Municipal Co-Generation Plant, as well as two existing cooling towers located at
the Airport. Collectively, these systems satisfy the heating and cooling demand of the
Airport. One cooling tower is approximately 20 years old, has exceeded its anticipated
life span, and has failed. Staff has researched required repairs, and recommended an
emergency repair on the basis of the 4 — 6 week lead time from the manufacturer for the
unit, additional transit time, plus an additional 1 — 2 weeks for the separation, removal
and replacement unit to be installed. Initiating the emergency repairs allows staff to
ensure the replacement of the cooling tower is completed prior to the summer heat
demand imposed on the system.
ITEnn NO.
City Council Staff Report
March 16, 2016-- Page 2
Emergency Repair of Airport Cooling Tower
Staff obtained three quotes for the required cooling tower repairs, as follows:
• Desert Air Conditioning; Palm Springs, CA $44,994
• HTL Mechanical; La Quinta, CA $64,628
• Russell Air Conditioning; Desert Hot Springs, CA $82,000
Copies of these proposals are included as Attachment 1. Staff reviewed and
recommended to the City Manager that he authorize issuance of a Purchase Order in
the amount of $44,994 to Desert Air Conditioning on the basis of the urgent need to
initiate the repairs given the long-lead time to obtain the parts and supplies, and
complete the work.
ENVIRONMENTAL IMPACT:
Section 21084 of the California Public Resources Code requires Guidelines for
Implementation of the California Environmental Quality Act ("CEQA"). The Guidelines
are required to include a list of classes of projects which have been determined not to
have a significant effect on the environment and which are exempt from the provisions
of CEQA. In response to that mandate, the Secretary for Resources identified classes
of projects that do not have a significant effect on the environment, and are declared to
be categorically exempt from the requirement for the preparation of environmental
documents. In accordance with Section 15301 "Existing Facilities," Class 1 projects
consist of the operation, repair, maintenance, permitting, leasing, licensing, or minor
alteration of existing public structures, facilities, mechanical equipment or topographical
features involving negligible or no expansion of use beyond that existing at the time of
the lead agency's determination. Therefore, in accordance with Section 15301(c), staff
determined that repair of the Airport cooling tower was considered categorically exempt
from CEQA.
FISCAL IMPACT:
Funds for this emergency repair are available from the Airport Fund in account 416-
6501-56173.
/"UA>1
Tom Nolan, Dirb6or of Aviation Marcus Fuller, Assistant City Manager
David H. Ready, City Ma
Attachments:
1. Repair quotes
02
0
ESERT °
caxn�oxmr4,�c
SOHy the CSMfid aNAq Mwekm
590 WILLMLMS RD•PALM SPRINGS.CA 92264
(760)323-M•FAX(760)323. M
www.desertaxcondi6o ft=mm
LICENSE NO.276586
February 4,2016
City of Palm Springs
Attn:BUD
RE: Palm Springs International Airport
3400 East Tahquitz Canyon
Palm Springs, CA 92262
PROPOSED INSTALLATION OF UPER SECTION OF COOLING TOWER
Work to include:
• Disconnect piping for upper section
• Remove bolts and separate gasket between upper and lower section
• Remove upper section with use of a crane
• Install new upper casting section which consists of spray assembly and fill
(epoxy coated)with use of a crane
• Replace a total of 12 eliminators(epoxy coated)
• Connect piping
• Start up and check operation
Installed price$44,994.00
If we were to replace the eliminators with the PVC style the price would be$41,668.00.
Lead time is 4-6 weeks plus transit time.
The system will be down for 2 days while work is being done.
Customer acceptance Date
03
Q KT.L A&3chtatical
ups
Hecaecoo.He•re�ss�e•aezrurarana� 760.4494712
oIftiodm6aftmhoo.com
Proposal
PropomW 1215
Date:2t29116
City of Patin Spy
Attn: Dam Ridorour
Repb mmcat of Top Section of RAC Codes Tower
1) Pon permit
2) Dim mble tap pert of taws r,piping moftrs eraue iR and laud array.
3) Cratm lilt now top of tower on to ezbft beb m part of BAC Tower.
4) Afe="A idb ad piping.
5) IastaB ad part and daUicaL
6) Perform Awg4p and comm
7) Two yeah warranty on labor and faetary sty on parb-
S) ii proposal is accepted wig sol mit aonhact
Total Cast: $ 642627.52
H.T.L.IMeciwaic i•46M Cameo rams Dr,La Quiets,CA 9220.760-449.4712 04
Russell Air Conditioning Inc.
P.O. Box 1351 February 29,2016
Desert Hot Springs,CA 92240
(760)363-2032 Phone
(760)363-3312 Fax
russel lairconQyahoo.com
LicenseN 960094
City Of Palm Springs
Craig L. Gladders, C.P.M.
Procurement and Contracting Manager
Email
Russell Air Conditioning Inc. is pleased to submit for your approval the following quote to install
a new top section for BAC tower located at the Palm Springs International Air Port
SCOPE OF SERVICES
• Remove old top section of BAC tower
• Install anew top section for BAC tower
• Startup and check operation
Total price to complete services.........................................................................$ 82,000.00
The above quote includes all applicable taxes,materials,shipping and labor. Scheduling is
immediate upon receipt of your authorization to proceed. Should upon performance of the above,
it be noted that any additional labor or materials be required to complete services above and
beyond the scope, you will be notified prior to commencement of services. This proposal is firm
for acceptance within thirty(30) days. if I may be of further assistance,please feel free to contact
me at any time.
Sincerely, Accepted
-raid -esm
Paul R. Soto Date