Loading...
HomeMy WebLinkAbout9/21/2016 - STAFF REPORTS - 1.H. ALM SA4 .y V N C�4OtEfO q� 01 City Council Staff Report DATE: September 21, 2016 CONSENT CALENDAR SUBJECT: AUTHORIZATION OF PAYMENT TO SOUTHERN CALIFORNIA EDISON IN THE AMOUNT OF $69,579.93 FOR UTILITY UPGRADES AT THE WASTEWATER TREATMENT PLANT ASSOCIATED WITH THE SOLAR PHOTOVOLTAIC SYSTEM FROM: David H. Ready, City Manager BY: Public Works and Engineering Department SUMMARY This action will authorize payment to Southern California Edison ("SCE") in the amount of $69,579.93 to upgrade the existing SCE transformer serving the City's Wastewater Treatment Plant ("WWTP"). RECOMMENDATION: Authorize payment to Southern California Edison in the amount of $69,579.93 to upgrade the existing SCE transformer serving the City's Wastewater Treatment Plant. BACKGROUND: On October 7, 2015, the City Council adopted Resolution 23905 authorizing the City Manager to enter into certain infrastructure financing agreements and associated contracts with SolarCity Corporation for the design and construction of a 1,110.42 kW solar PV system capable of initially producing a total of 2,442,616 kWh, which offsets 88% of the typical annual electric load at the WWTP of 2,773,670 kWh. The layout for the WWTP Solar PV System is an array of ground-mount solar PV modules as shown in Figure 1: ITEM NO. City Council Staff Report September 21, 2016 -- Page 2 Authorize SCE Payment—CP15-03 t xN A 4 �t /P.4,r I� � C �• � `` .:.. �., '� y is i b _ o 4 W A Figure 1 WWTP Solar PV System Agreements were subsequently executed with SolarCity Corporation, and final design has been completed. As a part of the final design, coordination with SCE is required to receive approval for an interconnection for the solar power generated by the system. In its review of the solar interconnection, SCE has reviewed its existing utility infrastructure, and determined that the existing 500 Wa electrical transformer will need to upgraded to a larger 1000 Wa transformer so that the transformer size accommodates the solar system size of 1,110 M 02 City Council Staff Report September 21, 2016-- Page 3 Authorize SCE Payment—CP15-03 SCE has submitted a request for payment via Invoice #252904 in the amount of $69,579.93 for costs associated to upgrade the existing transformer and related SCE facilities. These utility upgrades were not a part of the scope of work being provided by SolarCity Corporation. A copy of SCE's Invoice #252904 is included as Attachment 1. ENVIRONMENTAL IMPACT: Construction of the WWTP Solar PV System is considered a "Project" as defined by California Environmental Quality Act ("CEQA"). Pursuant to Section 15378(a) of Title 14 of the California Code of Regulations, (the "CEQA Guidelines"), a "Project" means the whole of an action, which has a potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment, and that is (1) an activity directly undertaken by any public agency including but not limited to public works construction and related activities, clearing or grading of land, improvements to existing public structures, etc. Section 21084 of the California Public Resources Code requires Guidelines for Implementation of CEQA. The Guidelines are required to include a list of classes of projects which have been determined not to have a significant effect on the environment and which are exempt from the provisions of CEQA. In response to that mandate, the Secretary for Resources identified classes of projects that do not have a significant effect on the environment, and are declared to be categorically exempt from the requirement for the preparation of environmental documents. The WWTP Solar PV System is proposed to be installed on 5 acres of currently vacant land surrounding by urban uses located within the City's Wastewater Treatment Plant, consistent with the applicable general plan designation and all applicable general plan policies, applicable zoning designation and regulations, on a project site that has no value as habitat for endangered, rare, or threatened species, and would not result in any significant effects relating to traffic, noise, air quality or water quality. Pursuant to California Public Resources Code 21084, and Section 15332 of the CEQA Guidelines, the WWTP Solar PV System is considered an "In-Fill Development Project," defined as a Class 32 Categorical Exemption, and construction of the WWTP Solar PV System is considered Categorically Exempt from CEQA. On October 7, 2015, the City Council adopted Resolution No. 23905 approving and ordering the filing of a CEQA Notice of Exemption for the WWTP Solar PV System. FISCAL IMPACT: All costs associated with the WWTP Solar PV System are budgeted from the Wastewater Fund (Fund 420); sufficient funding is available in Account No. 420-6800- 57040 (Solar PV System). 03 City Council Staff Report September 21, 2016-- Page 4 Authorize SCE Payment—CP15-03 SUBMITTED: Marcus L. Fuller, KIPA, P.E., P-1= David H. Ready, Es ., h.D Assistant City Manager/City Engineer City Manager Attachments: 1) SCE Invoice 04 ATTACHMENT 1 05 JMTJ SOUTNFBN CALIFORNIA Document ft �"ri'r:��3'_ EDIS(�Ns nvo eq 4 1../ lmvice Term: 90 Days Am ED750N INTERNATIONAL'Company Customer Name: PALM 5PRINOS.CITY('JP' FuO:em Callisnia Ldu,m Company Customer Email: M sRCUS FI,I(I FP a,PALMSPRINGSCA-GOV Invoice Date: Qx 3011016 PO BOX_>743 ._Contact 6r..firaRac Bunon PAt,Nl SPRINGS CA 9^_9n3 2743 Telephone: f766)-302-4]86 Install-BillingOption: District Address: 36100 CA DP OR,11.CANYON DRIVE(:At I[EDRAL m .,,::� '_ �s W' !_ .. ! z'='u � it .�_.�_ _ _�- .i�:. an�� I it IF(II II lii, — rvoce egnesL um c 2134576 Proect Itescripitroto lUtls 5,7437599fSQtIlI-8PM!'2.fS'RE[_CK"Cf t1C'[1 flhK;yAT Project Location: 417s MISQUHF. PALM SPRINGS CA 92�04.._.__,. --design A: 833758 Design lescriplion: 4375 MESQUITE PMP_,PS+AEMOVERL.OADFD I RANSFORMER AND CABLE Product q: 1159268-RULOCATL FACILCIILS LARQR: this amount represmns the total S{E labor required to complete the,rork rcV to cons,case;,ins la'aor amount will connst of d6d18.92 c nxinwiton Labor r and ury ald:nmmt kRmr required for com m;pi u the s,ork-equcsi T u consi -non labor amount will typical b consist of installation and s rsice labor required ter the cork request.The addil4onal labor laMitntw ill nq:catly consi t at labor rot inspection,cobleand egtdppment make-up,dead ending,tm[fic control,gwund"nrg,supersision,and switching All applicable lati related orcthein s for items such as the desimt,engineering,and project managnnar are also included in the nsal SCE labor amount. Ndrtu1At 1 T us amount 1cpn,aUu1 t n:told I SCE rumored required to comp etc Ina ,iq, ' a nl, a moss cases.Mrs materiu I amount wl 1 consist 52911182.98 t construction material and an additional material required tar completing the%ork ryuest the ensweom maleriat will rvp'wlly consist of iroal lalitin and u.rvrce material such as Iran tormcrs,cable,conductor,poles,meters.riser, o,itches,tu>:n5 equipment,handn les,and cross-anus. Alt applicable malcdaI related overheads in also included in the total SCE nor eriat amuust. OTHER: This amount represents the total SCH other casts required to compkae the work rcqu>t [it most.cases this,Ibe,am"m`will consiq of $26,895.05 70 additional requremenis needed far compltling the work rLiqu,ot.'This other amoanr i-piaalI,[onmo,of cents such as Aarl d Famltoes one Iim charges,contractor vvork,rights check,and Ixmdts, t. ... '� —�' ,Ft: :'.3:E�.ilii3 "wC' '.:.t:: -` '' .,_.. -- — . __. 1. ;NEDITS: n amount represents t e a+c., cr6 ns rega," [o WiliOct.e wor request. n meat:taut ,.ns ctemt a roc x:..eon,ss[(it, _E0.00 Sal,age(iedil Depreciation Cr<dt JVA Credit Overhead P,rluievlent Credit — .«.ry.;w1 ' TOTAL .. , 1I: W;}i Tei.Y: .on. pp xeaot vmrs.cx lac yv l t}msa ne, mount} . 'IaxRate P2.li'.W-b Tax Amoral 50.00 2 11('C on Net Ci e,ni or,([ass Non Tatiable Amo irl Tas Base(Taxable Amount) 535 563.03 7axRate 11bo% ii 3 ._ Tao Amount $7393.87 ...3ItIri3.,1JIII (I _ ,�.,. Ii:F�iv,_'rvF R`iFrfi.C41�i) rtNI hlllli�F -,..._�"'..+ :: .::m DEPOSITS: �— Prelimmary Design&Engineering Advance gp pp Preci,ws Paymsnl gp hp COMME}'1 S: :ndaddo, nv.coppies of sour invoice Please return onru ps rr fhc invoce wtih}roar payment l"J AcecwrsR airaMcin lha encluib r mm-riccs ,ed p n ietope.or a other copy of the ino mfl it to,our ira sub. All pri.:cs t r a}wilicable Pot a periml of 9f1 days from this Aate and are srbJ t to changC thcr r0er. VII p-•meals mast be del( t et by mail,an a(lemate postal method,or one aPour elecl'on c payment rgnls rs.14aicm payincuts art no longer accepted o my to 1 location,9nduding Accounts end return "°lease complete oll ord.,ais applications,man with this oud realm layout acts )lannit B cc oil theto I vmd mum.aidr ssul ut eeinpe. "Ifs erect IigN work order is uav,wiated with the prgiea,contracts�or that projc t still be• nda d. 'i' S 569 93j_ ® SOUTHERN CALIFORNIA Document% E D I S O N' Invoice# '52904 Invoice I coon 96 Days An EVISON ENTERNATIONAL a Ccap y CuslomerName: PMAT SPRINGS,Cl I N;OF Southern Ca"louca Ediaon Comtany Customer .mad: ti1\RCIISYLI[FRrr,M AisPR lNGSC'.4.GOV Invoice ate: 0x30i2016 P013OX2743 SCE Contact; Ktisrini Rae Burton PALM SPRINGS CA 91_2fi3 2?13 Telephone: pGt)_902-t2g6 Install-Billing Option: Di,trlct Address: 361G0 CA`1BEOR.AL CANYO`J DRIVE.C.4TBEDRAL CONINIENTS CON'IIVCED! `Easement documents will L.mailed directly to you from our Right of W a% department,Please complete and return them as soon is possible, as we will not be able to proceed with the project without clearance •Call the Edison company at 1-800-655-4555 to make application for electrical service, "An Edison Inspector must approve all underground systems.Please call your designated inspector 43 hours prior to construction to schedule an inspection. "Final electrical inspection from the local governmental building and safety department must be received before we can energize your ADDITIONAL PAYYIENI INSIRCCIIONS, If paying by check, please follow instructions on payment stub Instructions for wire or AC'.H payments: JP Morgan Chase Bank New York.NY ABA#:021000021-Aoctp: 3 23-1944 34 SCE Taxpayer ID No.95-1240335 SCE COntaC`t: Krishna Rae Burton Document 0: 7590050322 Failure to proper:',identify your document number and SCE contact two d0m,the application of fund,and initiation of pour protect Special Instructions for overnight delivery methods: Southern California Edison Attn:Accounts Receivable 8631 Rush Street G-5 i Rosemead,CA 91770 I Please detach and return payment stub with payment Payment Please pay total amount now due: $69,579.93 Stub Invoice is 2529{u Ihank you for paving promptly Document it: 7590050322 Make check payable to Southern Cali fornia Edison PALM SPRINGS,CITY OF ATTN:Accounts Receivable PO Box 8t10 PO BOX 2743 Rosemead,CA 9 1 711-00 1 PALM SPRINGS CA 92263 2743