DATE: December 7, 2016 CONSENT CALENDAR
SUBJECT: APPROVAL OF PLANS, SPECIFICATIONS AND ESTIMATE (PS&E)
AND AUTHORIZATION TO BID THE ADA CURB RAMPS PROJECT,
CITY PROJECT NO. 16-09.
FROM: David H. Ready, City Manager
BY: Engineering Services Department
SUMMARY
The construction documents (plans and specifications) have been completed, and in
accordance with Section 7.03.040 of the Procurement and Contracting Code the City
Council is required to approve and adopt plans, specifications and working details, and
authorize the bid request for all public projects in excess of $100,000. Approval of this
action will allow staff to proceed with bidding of this capital project, with an estimated
construction cost of$102,000.
RECOMMENDATION:
Approve the plans, specifications and estimate and authorize staff to advertise and
solicit bids for the ADA Curb Ramp project, City Project No. 16-09.
STAFF ANALYSIS:
The proposed ADA curb ramp work includes, but is not limited to, the reconstruction of
existing curb ramps, upgrade nonconforming curb ramps, and all other appurtenant
work at the locations listed in the attached ADA Curb Ramps Lists (Attachment 1).
Engineering Services Department field selected the locations identified in the Vicinity
Map, representing an estimated construction cost of $102,000 that includes ramp
reconstruction and modifications. Project locations are limited to Ramon Road including
reconstruction of 43 existing curb ramps, and modification of 4 existing curb ramps as
shown on the Vicinity Map included as Attachment 2.
With City Council's approval, staff will advertise the project for bids in the Desert Sun,
submit the Notice Inviting Bids to plan rooms, and provide the bid documents available
free of charge to prospective bidders. Copies of the construction drawings and contract
/ ITEM NO.
V
City Council Staff Report
December 7, 2016-- Page 2
Authorization to Bid CP.16-09
specifications for the Project are on file with the Engineering Services Department. The
following tentative schedule has been identified for the bid process:
Notice Inviting Bids issued and posted: December 17, 2016
Deadline for receipt of bids: 3:00 PM, January 24, 2017
Contract awarded by City Council: March 8, 2017
ENVIRONMENTAL IMPACT:
Section 21084 of the California Public Resources Code requires Guidelines for
Implementation of the California Environmental Quality Act ("CEQA"). The Guidelines
are required to include a list of classes of projects which have been determined not to
have a significant effect on the environment and which are exempt from the provisions
of CEQA. In response to that mandate, the Secretary for Resources identified classes
of projects that do not have a significant effect on the environment, and are declared to
be categorically exempt from the requirement for the preparation of environmental
documents. In accordance with Section 15301 "Existing Facilities," Class 1 projects
consist of the operation, repair, maintenance, permitting, leasing, licensing, or minor
alteration of existing public structures, facilities, mechanical equipment involving
negligible or no expansion of use beyond that existing at the time of the lead agency's
determination. Therefore, in accordance with Section 15301(a), staff determined that
the ADA Curb Ramps Project, City Project No. 16-09, is considered categorically
exempt from CEQA and a Notice of Exemption was prepared and will be filed with the
Riverside County Clerk.
FISCAL IMPACT:
Sufficient funds are available in the Special Gas Tax Fund (Fund 133), account number
133-4298-50251. The estimated total cost of the project is $117,000 and Table 1
summarizes the estimated expenditures.
Table of Project Costs Amount
Project Administration Estimated $8,000
Construction Inspection (Estimated) $7,000
Construction Cost Estimated $102,000
Total Cost $117,000
Table 1
02
City Council Staff Report
December 7, 2016-- Page 3
Authorization to Bid CP.16-09
SUBMITTED:
Marcus L. Fuller, MPA, P.E., P.L.S. David H. Ready, Esq
Assistant City Manager/City Engineer City Manager
Attachments:
1. Curb Ramp Lists
2. Vicinity Map
Q�
ATTACHMENT 1
04
ADA Ramps on Ramon Road from Belardo Road to Sunrise Way.
homer Ram Loction-:Street Intersection Type of Ramp Construclion Trunca I Aomas Only
S/E Ramon& Belardo A-Std. 212
N/E Ramon& Belardo B-Std.213
NAN Ramon& North Palm Cyn. B-Std.213
N/E Ramon& North Palm Cyn. _ _ A-Std.212
SNV Ramon& North Palm Cyn. A-Std.212
S/E Ramon& North Palm Cyn. A-Std. 212
SNV Ramon&Calle Ajo B-Std.213 _
SNV _ Ramon&Calle Encilia A-Std.212
S/E Ramon&Calle Encilia B-Std.213
SAN Ramon&Abronia B-Std.213
SNV Ramon& Palo Fierro C-Std.214
S/E Ramon& Palo Fierro C-Std. 214
S/E Ramon&Camino Real C-Std. 214
SNV Ramon&Grenfall A-Std.212 _
S/E Ramon&Grenfall B-Std. 213
S/W Entrance to Ramona Villas C-Std.214
S/E Entrance to Ramona Villas A-Std. 212
S/W Ramon&Thornhill B-Std.213
S/E Ramon&Thornhill B-Std.213
SNV Ramon Entrance to Trailer Park-1441 Ramon C-Std.214
S/E Ramon Entrance to Trailer Park-1441 Ramon C-Std. 214
SNV Ramon Entrance to Sunrise Plaza _ C-Std.214
S/E Ramon Entrance to Sunrise Plaza C-Std.214
SUBTOTAL 1 Tiles: 35 SF
O
:11
ADA Ramps on Ramon Road from El Cielo Road to Williams Road
Comer Ramp Location-Street Intersection Type of Ramp Construction Tr, Domes Only
NM Ramon& Entrance to El Cielo Center A-Std.212 _
N/E Ramon& Entrance to El Cielo Center A-Std. 212
SAN Ramon& Desert Wew B-Std.213
S/E Ramon& Desert Wew B-Std. 213
SAN Ramon& Highland B-Std.213
S/E Ramon& Highland B-Std. 213
SAN Ramon& Desert Way B-Std.213
S/E I Ramon& Desert Way B-Std. 213
SAN Ramon&Mountain View B-Std.213 _
S/E Ramon&Mountain View B-Std. 213
SAN Ramon& El Placer B-Std.213
S/E Ramon& El Placer A-Std.212
SAW Ramon& Paseo Dorotea _ _ B-Std.213
S/E Ramon& Paseo Dorotea A-Std.212
SAW Ramon&Calle Santa Cruz A-Std. 212
S/E I Ramon&Calls Santa Cruz B-Std. 213
SAN Ramon&Vella Rd. B-Std. 213
S/E Ramon&Vella Rd. A-Std. 212
NAN Ramon& Kirk Douglas A-Std.212_
N/E Ramon& Kirk Douglas A-Std. 212
SAW Ramon&Oleander Rd. B-Std.213
S/E Ramon&Oleander Rd. B-Std. 213
SAN Ramon&Williams Rd. B-Std.213
S/E Ramon&Williams Rd. B-Std. 213
SUBTOTAL 2 Tiles: 24 SF
S
ATTACHMENT 2
07
0 ¢ 0 pF PALA4 So
ALEJO ROAD 0 3 0
W W w w
» = z Of
Of u Iti Z
¢ CITY HALL
a G AMADO ROAD N W
0 0 00 CONVENTION (..)
z CENTER 10
z z m 0 P\rSPRl
¢ ¢ w w INTERNATIONAL AIRPORT C' AT
U U ut J TAHQUITZ CANYON WAY 0 ` q� 1 FORN�P
J AAAA
J Q W ¢Z ¢ ENTER TENNIS
NOT TO SCALE
zBARISTO ROAD
PALM SPRINGS¢ LIBRARY HIGH SCHOOL KIRK DOUGLAS
U
RAMON COURTHOUSE ROAD RAMON ROAD �
00 0
O0 < a Q o a o N N x H ¢ a rc > 3 W a < ry o d o
Q aU o w O rc H LL x u a p J3 0 5 0 3 5 Q o rc m H O
J Cl z 5 K Z d j d W p
0] U U U O O S < K p a 0 a W N K a K d O < < O < ¢ ¢
¢ w a O O
o z ti J - i W- f W - i a D w
�z 3 o a z_ w O z a a a y" w
SVNNY DUNES ROAD N Of V o z o O U J
w �
MESQUITE AVE, w M1 SQUITE AVE. 0
Of
z DEMUTH U
O PARK PUBLIC
z TENNIS COURTS
U
SONORA ROAD
O
rc
PALM SPRINGS
a � 'OLD' GOLF
ui o COURSE
u EAST PALM CANYON DRIVE PALM SPRINGS
GOLF CLUB HOUSE
Jm
VICINITY MAP egsT 111 �c
CITY OF PALM SPRINGS, CALIFORNIA aq(M C,4NyoN
ADA CURB RAMPS, CITY PROJECT NO. 16-09
111
❑ CURB RAMP RECONSTRUCTION
Q O CURB RAMP MODIFICATION (INSTALLATION OF TRUNCATED DOMES)
G4
The Desert Sun
750 N Gene Autry Trail Certificate of Publication
Palm Springs, CA 92262
760-778-4578/Fax 760-778-4731
State Of California ss: CITY fi pE E'N Ej
County of Riverside SpIr
�IN(,_-
2#17 JAN-4 PM 7: 59
Advertiser: CITY OF PALM SPRINGSILEGALS JA MES TrH iFSOp_,
PO BOX2743 CITY CLERK
PALM SPRINGS CA 92263
Order# 0001803579
NO 1918: CITY OF PALM SPRINGS NOTICE INVITING BIDS
ADA CURB RAMPS CITY PROJECT NO.16-09
N-1 NOTICE IS HEREBY GIVEN that sealed bids for the ADA CURB RAMPS,City
Project No. 16-09,will be received by the Office of the Procurement and Con-
trotting Manager of the City of Palm Springs,-California,.until 3:00 P.M.on Jan-
am over the age of 18 years old,a citizen of nary 24, 2017 at which time they will be opened and read aloud. The Engi-
neer's estimate range is 590,0004110,000. g'
the United States and not a party to, or have N-2 DESCRIPTION OF THE WORK:The Work comprises reconstruction of existing
curb ramps and upgrade nonconforming curb ramps at the locations listed in
interest in this matter. I hereby certify that the the Appendix.
The work shall be diligently prosecuted to completion before the expiration of:
attached advertisement appeared in said 25 working days
( type set in newspaper t smaller than N-3 AWARD OF CONTRACT:
pa no sma an n (a)The City reserves the right after opening bids to reject any or all bids,to
poriel) n eachand d entire issue of said waive any informality(non-responsiveness) in a bid,or to make award to the
lowest responsive, responsible bidder, and reject all other bids, as it may best
newspaper and not In any supplement thereof serve the interest of the City.If there are multiple and/or alternative Bid Sched-
ules,Bidders are required to bid on all Bid Schedules.:
on the following dates,t0 wit: (b)As a condition of award, the successful bidder will be required to submit
payment and performance bonds and Insurance.
(c)As a condition of award or after April 1,2015,the contractor and any sub-
Newspaper:The Desert Sun contractor listed on the bid must be registered with the Department of Industri-
al Relations pursuantto Section 1725.5 of the California Labor Code.
N-40I13 SECURITY:.each bid shall be accompanied by a certified or cashier's
'check or Bondln the amount of 10 percent of the total bid price payable to
12/17/2016 12/24/2016 the City of Palm Springs,
N-5 BIDS TO REMAIN OPEN:The Bidder shall guarantee the Total Bid Price for a
period of 120 calendar days from the date of bid opening.
N-5 CONTRACTOR'S LICENSE CLASSIFICATION:The Contractor shall possess a val-
id Class A or CB Contractor license at the time of submitting bids.
N-7 CALIFORNIA WAGE RATE REQUIREMENTS:The Contractor shall pay the gen-
eral prevailing rate of per diem wages as determined by the Director of the De-
I acknowledge that I am a principal clerk Of the - partment of Industrial Relations of the State of California for the locality where
the work is to be performed. All contractors and subcontractors must furnish
printer of The Desert Sun, printed and electronic certified payroll records directly to the Labor Commissioner (via the
Division oftabor Standards Enforcement)as further described in Article 5 of the
published weekly in the City of Palm Springs, Construction Contract(Mutual Obligations).
A copy of said wage rates is available on-line at:
County of Riverside, State of California.The www.dir.ca.govidisr/DPreWageDeterminatior.htm
The Contractor and any subcontractors shall pay not less than said specified
Desert Sun was adjudicated a Newspaper of rates and shall post a copy of said wage-rates and other notices prescribed by
regulation at the project site.
general circulation on March 24, 1988 by the N-B RETAINAGE FROM PAYMENTS: The Contractor may elect to receive 100 per-
cent ofdue under the Contract Documents from time to time,with-
Superior Court of the County of Riverside, out retention of any portion of the payment by the City,by depositing securi-
ties of equivalent value with the City in accordance'with the provisions of Sec-
StateOfCallfornlaCaseN0. 191236. tion 22300 of the Publics Contract Code. -
N-9 OBTAINING OR INSPECTING CONTRACT DOCUMENTS:
(a)Contract Documents may be inspected without charge at the City of Palm
Springs.Engineering Services Department, 3200 East Tahquitz Canyon Way,
Palm Springs,CA 92262.
(b)A digital copy of said Contract Documents is available without:charge on-
line at:Activated web link:httpsd/www.dropbox.com/sh/esvl7gdisl000b/AAAo
1 NTeCs3s7XDrVTbrsogVa?dl=0
declare under penalty of perjury that the Web address: https:l/www.dropbox.coagsh/ewl7gdis1006ab/AAAoINTeCs3s7XD
rVTbrsogVa?dl=O
foregoing IS true and correct. Executed On (c) Registration as a Bidder: If you are interested in submitting a bid,Bidders
shall contact the Engineering Services Department by e-mail atbidinfoDpalmsp
this 24th day Of DECEMBER, 2016 In Palm ringsca.gov,or by phone at(760)323-8253,to officially register as a Bidder for
this prolect with your company name,address,phone,fax,contact person and
Springs, CallfOrAIEV._' a-mail address.Bldders'am encouraged to register to ensure receipt of any Ad-
/ denda issued by the C!ty
,i (d)This Notice Inviting$ids,the Plan Holders List,and other related.information
for th s-ca.gect can m found online at the cures webpage at http:!/www.palm
springgs-ca.goy/government/departmentslprocurement-contracting
(e)All questions about the meaning or Intent of the Bid Documents are to be
directed to the City Engineer. Questions shall be submitted in writing to:City
of Palm Springs Engineering Services Department,by fax to(760)322-8325, or
------ by e-mail to bidinfo®palmspringsca,gov. Questions must be submitted in writ-
ing at least 5 working days prior to bid opening. Questions submitted within 5
working days of bid opening will not be accepted.
N-10 LOCAL BUSINESS PROMOTION-In accordance with the provisions of Palm
Springs Ordinance No.1756,and Section 7.09.030 of the Palm Springs Municipal.
'\ Code, "Local Business Preference Program';subsection(5)"Local Preference m
Public Works Contracts(Sub-ContraRmgg)",the prime contractor shall use good
` DeClarfint faith efforts to sub-contract the'supply of materials and equipment to.total
businessenterprises.and to sub- ntract services to businesses whose work force
N-11 resides
ADp Ewithin
SSAND MARKING Coachella
OFValley.OF BIDS:The envelope enclosing the Bid shall be
sealed and addressed to the City of Palm Springs, and shall be delivered or
mailed to the Procurement-and Contracting Division,City of Palm Springs,3200
East Tahquitz Canyon Way, Palm Springs, CA 92262. The envelope shall be
plainly marked in the upper left hand corner with the name and address of the
Bidder and shall bear the words"Bid For"followed by the title of the Project
and the dote and hour of opening Bids.The certified or cashier's check or Bid
Bond shall be enclosed in the same envelope with the.Bid,
_By Marcus L.Fuller,PE,.PIES _ Date92/12l2016
Assistant City Manager/City Engineer -