Loading...
HomeMy WebLinkAbout4/19/2017 - STAFF REPORTS - 1.H. PALMSa iy u m ♦ R 4a ovnto`0� " c4`'F°"`'�P CITY COUNCIL STAFF REPORT DATE: April 19, 2017 CONSENT AGENDA SUBJECT: AIRPORT TAXIWAY J PAVEMENT REHABILITATION AND ELECTRICAL SYSTEMS REPLACEMENT PROJECTS BID SOLICITATION APPROVAL AND FAA GRANT FUNDING ACCEPTANCE FROM: David H. Ready, City Manager BY: AIRPORT SUMMARY This action would approve the Plans and Specifications for the Palm Springs International Airport's Taxiway J Pavement Rehabilitation and Electrical Systems Projects, and approve acceptance of the FAA Grant to fund the projects. RECOMMENDATION: 1. Approve the plans and specifications for the Palm Springs International Airport Taxiway J Pavement Rehabilitation and Electrical Systems Replacement Projects. 2. Authorize the acceptance of FAA Grant AIP No. 55 in an amount of up to $2,500,000 for the construction of both projects and the associated construction management professional services. 3. Authorize the City Manager to advertise and solicit bids. STAFF ANALYSIS: An FAA Grant No. 54 was previously approved by City Council on August 3, 2016, for the purpose of designing two airfield systems rehabilitation projects for Palm Springs International Airport. The design is now completed and the projects are ready to proceed with the bid phase. These projects address two separate PSP Airport airfield components as follows: ITFM NO. City Council Staff Report April 19, 2017— Page 2 Airport Taxiway J Pavement Rehabilitation and Electrical Systems Replacement Projects Bid Solicitation Approval and FAA Grant Funding Acceptance Airfield Electrical Systems Project Rehabilitation of the airfield ground navigation aids, including directional signage used by all aircraft when taxiing to and from the runways. 222,000 lineal feet of existing airfield electrical conductors to all taxiway and runway lights, signs and navaids, with the exception of Runway 13R-31 L that was reconstructed in 2016, will replace old system components. The airport's electrical vault will have key components, including all existing constant current regulators, replaced with new state-of-the-art equipment capable of self-diagnosis. Electrical transformers on all existing LED Taxiway fixtures, 851 in total, along with 130 existing incandescent lights in directional signage will be replaced; the airport's secondary runway will be upgraded with new medium intensity LED light fixtures as will the associated approach navigational aids of Runway End Indicator Lights (REILS) and Precision Approach Path Indicators (PAPIS). The project is allotted 120 calendar days for completion and will be closely coordinated to ensure the airport remains open, safe and functional for all types of aircraft operations. PALM SPRINGS INTERNATIONAL AIRPORT AIRFIELD ELECTRICAL AND TAXIWAY J REHABILITATION TAXJWAYJ05 .. i k ' _ \'Ep'AIXPER➢H.ECIPICALP'IRE VIiH4LIlA0iARD MNS - iA](ryAT1YA\'El@V{9p,A9p.ITATION ,,, f ■ AIRFlELDELECTRICAL4"AVLT 4TGPAD65 , 02 City Council Staff Report April 19, 2017— Page 2 Airport Taxiway J Pavement Rehabilitation and Electrical Systems Replacement Projects Bid Solicitation Approval and FAA Grant Funding Acceptance Airfield Taxiway J Project This project is a rehabilitation of the airfield asphalt pavement on Taxiway J between Taxiway C and Runway 13L. The existing asphalt will be removed and reconstructed with new FAA approved materials constructed in accordance with the Standards for Construction of Airfield Pavement. The project's duration is scheduled for 30 calendar days. FISCAL IMPACT: The Taxiway J project's estimated cost prior to bid is $214,430, and the Airfield Electrical is $2,027,356. Both projects are eligible for and will be funded by Federal Aviation Administration Airport Improvement Grant No. 55. The City's Airport Fund will be responsible for providing the ten percent matching share of the grant at about $250,000 taken from budgeted Account No. 416-6401-56186. Although the FAA grant has not been received as of the date of this Staff Report, these projects have been approved and fiscally programmed by the FAA, and are anticipated in June. Council approval for acceptance of the grant is requested ahead of that schedule to facilitate the project's construction. Thomas No an Executive Director, Airport j David H. Ready City Manager Attachments: Invitation for Bids 03 CITY OF PALM SPRINGS, CALIFORNIA NOTICE INVITING BIDS FOR TAXIWAY W REHABILITATION PROJECT PALM SPRINGS INTERNATIONAL AIRPORT FAA AIRPORT IMPROVEMENT PROJECT NO. 3-06-0181-055-2016 INVITATION FOR BIDS (IFB) 17-xx NOTICE IS HEREBY GIVEN that sealed bids will be received at the Office of the Procurement and Contracting Manager of the City of Palm Springs, California, 3200 East Tahquitz Canyon Way, Palm Springs, California 92262 until,. local time on at which time they will be opened and read aloud. Bids must be submitted in sealed envelopes marked on the outside:'TAXIWAY `J' REHABILITATION PROJECT". DELIVERY OF BIDS - NOTIFICATION OF PARKING LOT CONSTRUCTION AT CITY HALL- Contractors are hereby notified that there will be construction in progress at the Palm Springs City Hall parking lot on the day that Bids are due. Contractors shall take this into account in the delivery of their bids, as neither the City nor the parking lot contractor shall be liable or responsible for the late delivery of a bid due to the construction in progress at City Hall. It is the responsibility of the contractor to see that any bid that is hand delivered, sent through the mail, or by any other delivery method, shall have sufficient time to be received by the Office of Procurement & Contracting by the due date and time. Late bids will not be accepted and shall be returned unopened. LOCATION OF WORK - The Work to be performed hereunder is located at the Palm Springs International Airport, 3400 E.Tahquitz Canyon Way, Palm Springs, Califomia. DESCRIPTION OF THE WORK: The Project consists of the Removal and Reconstruction of approximately 12,000 sf of failed Asphalt Pavement within the limits of Taxiway J. Construction will consist of full depth removal of existing Asphalt Pavements, re-compaction of existing base materials and construction of new Asphalt Cement Pavement. Project includes repainting runway and taxiway markings. The Project will require temporary closures to Runway 13L— 31 R and Taxiway J and Taxiway E. No electrical work is anticipated. The Engineer's Estimate falls within a range of$200,000 to $250,000 The City has not yet received FAA grant funding. However, a pre-application has been made and there is sufficient Airport Improvement Program entitlement funding allocated for this project, but the FAA will not issue final grant offer without final bid price amount. OBTAINING OR INSPECTING CONTRACT DOCUMENTS - A complete set of Contract Documents dated March 17. 2017 may be obtained on, or after at Planit Reprographics, 77738 Flora Road, Palm Desert, California 92211, phone (760) 345-2500, fax (760) 345-2599 for a non- refundable deposit of $400.00 for each hardcopy set or $200.00 for each CD. Shipping costs are extra. Checks to be made payable to Planit Reprographics. A copy of the Planholder's list may be obtained by contacting Planit Reprographics directly. Contact person: Eric Birch Email: planwell@planitreprographics.com Bidder must supply all information required by the complete bid documents and specifications. PROJECT ADVERTISEMENT-The project was advertised for bid PRE-BID CONFERENCE AND VISIT TO WORK SITE -All interested bidders are encouraged to attend a Pre- Bid Conference and examine the site to become familiar with the site conditions. The NON-MANDATORY Pre Bid Conference will be held at. local time,on at the Palm Springs International Airport, 3400 E. Tahquitz Canyon Way, Palm Springs, California, in the 2""Floor Conference Room. A tour of the site will occur for interested bidders, immediately following the conclusion of the Pre Bid Conference. For safety and security reasons, bidders are limited to 2 representatives on the site tour. COMPLETION OF WORK-Time is of the essence. All field work must be completed within 30 consecutive calendar days after commencement date stated in the Notice to Proceed. 04 AWARD OF CONTRACT - The contract will be awarded to the lowest responsible bidder. The City reserves the right, after opening, to reject any and all bids, or to waive any minor informality in a bid. The award of the contract is subject to the approval of the Federal Aviation Administration. As a condition of award, the successful bidder will be required to submit bonds and insurance, prior to the execution of the contract by the City. Failure to meet this requirement shall constitute abandonment of the Bid by the Bidder and forfeiture of the Bid Bond. If this occurs the contract will then be awarded to the next lowest bidder. BID SECURITY - Each bid shall be accompanied by either cash, certified cashiers check or Bid Bond in the amount of ten (10) percent of the total bid price (all schedules, as applicable), payable to the City of Palm Springs, as a guarantee that the Bidder, if its Bid is accepted, will promptly obtain the required Bonds and Insurance and will prepare the required submittal document and execute the Agreement. BIDS TO REMAIN OPEN-The Bidder shall guarantee the Total Bid Price for a period of ninety(90)calendar days from the date of Bid Opening. CONTRACTOR'S LICENSE CLASSIFICATION-In accordance with the provisions of California Public Contract Code Section 3300, the City has determined that the Contractor shall possess a valid Class A Contractor License at the time the Contract is awarded. Failure to possess the specified license shall render the bid as non-responsive and shall act as a bar to award of the Contract to any bidder not possessing said license at the time of award. The Contractor must be licensed to do business in the City of Palm Springs in accordance with the provisions of Chapter 9, Division 3, of the Business and Professions Code, and will be required to obtain a City Construction Permit No Fee from the Building Department and/or the Public Works Inspection Supervisor, City Hall, Palm Springs, California. STATEMENT OF QUALIFICATIONS - Each proposal must be accompanied by a statement of the bidders qualifications to perform the work contemplated. The Statement of Qualifications shall be prepared on the form attached hereto. CONTRACTORS REGISTRATION REQUIREMENTS - As a condition of award or after April 1, 2015, the contractor and any subcontractor listed on the bid must be registered with the Department of Industrial Relations pursuant to Section 1725.5 of the California Labor Code." WAGE RATE REQUIREMENTS- (a) State - In accordance with the provisions of California Labor Code Section 1770, 1773, 1773.1,1773.6 and 1773.7, as amended, the Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with the standards set forth in Section 1773 for the locality in which the Work is to be performed. A copy of said wage rates is on file at the Department of Building and Safety, City Hall, Palm Springs, California. It shall be mandatory upon the Contractor to whom the Work is awarded and upon any subcontractor under the Contractor to pay not less than said specified rates to all workers employed by them in the execution of the Work, and shall post a copy of said wage rates at the project site. (b) Federa!- The general prevailing rate of wages, as determined by the Secretary of Labor are included hereinafter as part of the Contract Documents; provided, that if there is any difference between the State or Federal wage rate for any given craft or mechanic needed to execute the work, it shall be mandatory upon the Contractor and any subcontractor to pay the higher of the two rates. All labor on the project shall be paid no less than the minimum wage rates established by the U.S. Secretary of Labor. TRADE RESTRICTIONS-All solicitations, contracts and subcontracts resulting from projects funded under the Airport Improvement Program (AIP) must contain the foreign trade restriction required by 49 CFR Part 30, Denial of Public Works Contracts to Suppliers of Goods and Services of Countries That Deny Procurement Market Access to U. S. Contractors. The Aviation Safety and Capacity Expansion Act of 1990 provides that preference be given to steel and manufactured products produced in the United States when funds are expended pursuant to a grant issued under the Airport Improvement Program. 05 EQUAL EMPLOYMENT OPPORTUNITY AND AFFIRMATIVE ACTION REQUIREMENTS — Each bidder must complete, sign and furnish, prior to award of the contract, the 'Bidders Statement on Previous Contracts Subject to EEO Clause", a "Certification of Nonsegregated Facilities", and the "Assurance of Disadvantaged Business Enterprise Participation" as contained in the Bid Proposal. These items must be submitted with his or her bid. A Contractor having 50 or more employees and his or her subcontractors having 50 or more employees and who may be awarded a contract of$50,000 or more will be required to maintain an affirmative action program, the standards for which are contained in these specifications. The proposed contract is under and subject to Executive Order 11246, as amended, of September 24, 1965, and to the Equal Employment Opportunity(EEO) and Federal Labor Provisions. The EEO requirements, labor provisions, and wage rates are included in the specifications and bid documents and are available for inspection at the Department of Building and Safety, City Hall, Palm Springs, California. To be eligible for award, each bidder must comply with the affirmative action requirements which are contained in the specifications. Disadvantaged Business Enterprises (DBEs) as defined in 49 CFR Part 26 shall have the maximum opportunity to participate in the performance of contracts under this agreement. Consequently, the DBE requirements of 49 CFR Part 26 apply to this agreement. Women will be afforded equal opportunity in all areas of employment. However, the employment of women shall not diminish the standards of requirement for the employment of minorities. RETAINAGE FROM PAYMENT - The Contractor may elect to receive 100 percent payments due under the Contract Documents from time to time, without retention of any portion of the payment by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code. Such securities, if deposited by the Contractor, shall be valued by the City, whose decision on valuation of the securities shall be final. Securities eligible for investment under this provision shall be limited to those listed in Section 6430 of the Government Code or bank or savings and loan certificates of deposit. ADDRESS AND MARKING OF BIDS -The envelope enclosing the Bid shall be sealed and addressed to the City of Palm Springs, and shall be delivered or mailed to Craig L. Gladders, C.P.M., Procurement and Contracting Manager, at 3200 East Tahquitz Canyon Way, Palm Springs, CA 92262. The envelope shall be plainly marked in the upper left hand corner with the name and address of the Bidder and shall bear the words 'TAXIWAY J REHABILITATION PROJECT" for the 'PALM SPRINGS INTERNATIONAL AIRPORT', followed by the date and hour of opening Bids. The certified or cashier's check or Bid Bond shall be enclosed in the same envelope with the Bid. PROJECT ADMINISTRATION - All communications relative to this Work shall be directed to Mr. Curt Ingraham, P.E., Parsons Brinckerhoff, 451 E. Vanderbilt Way, Suite 200, San Bernardino, CA 92408, phone (909) 888-1106, fax (909) 889-1884, (e-mail) Ingraham@pbworld.com All questions relating to interpretation of the Contract Documents or products must be submitted in writing, ten days prior to bid opening, and any responses will be in the form of written addenda to the Documents. BY ORDER OF THE CITY OF PALM SPRINGS,CA DATE: March 28,2017 By: Craig L. Gladders, C.P.M Procurement and Contracting Manager 06 CITY OF PALM SPRINGS, CALIFORNIA NOTICE INVITING BIDS FOR AIRFIELD LIGHTING PROJECT PALM SPRINGS INTERNATIONAL AIRPORT FAA AIRPORT IMPROVEMENT PROJECT NO. 3-06-0181-055-2016 INVITATION FOR BIDS (IFB) 17-xx NOTICE IS HEREBY GIVEN that sealed bids will be received at the Office of the Procurement and Contracting Manager of the City of Palm Springs, California, 3200 East Tahquitz Canyon Way, Palm Springs, California 92262 until, local time on at which time they will be opened and read aloud. Bids must be submitted in sealed envelopes marked on the outside:"AIRFIELD LIGHTING PROJECT". DELIVERY OF BIDS -NOTIFICATION OF PARKING LOT CONSTRUCTION AT CITY HALL- Contractors are hereby notified that there will be construction in progress at the Palm Springs City Hall parking lot on the day that Bids are due. Contractors shall take this into account in the delivery of their bids, as neither the City nor the parking lot contractor shall be liable or responsible for the late delivery of a bid due to the construction in progress at City Hall. It is the responsibility of the contractor to see that any bid that is hand delivered, sent through the mail, or by any other delivery method, shall have sufficient time to be received by the Office of Procurement & Contracting by the due date and time. Late bids will not be accepted and shall be returned unopened. LOCATION OF WORK - The Work to be performed hereunder is located at the Palm Springs International Airport, 3400 E. Tahquitz Canyon Way, Palm Springs, California. DESCRIPTION OF THE WORK: The Project consists of replacing approximately 222,000 lineal feet of existing airfield electrical conductors to taxiway and runway lights, signs and navaids. The Project includes replacement of Constant Current Regulators, replacement of transformers on existing LED taxiway fixtures, and replacement of existing incandescent Mandatory, Directional and Informational signs with LED signs. The GA Runway will be upgraded with Medium Intensity LED Runway Lights, new LED Runway End Indicator Lights and new LED Precision Approach Path Indicators. The Project will require temporary closures to runways and taxiways. The Engineer's Estimate falls within a range of$1.9 to $2.2 million. The City has not yet received FAA grant funding. However, a pre-application has been made and there is sufficient Airport Improvement Program entitlement funding allocated for this project, but the FAA will not issue final grant offer without final bid price amount. OBTAINING OR INSPECTING CONTRACT DOCUMENTS - A complete set of Contract Documents dated March 17, 2017 may be obtained on, or after at Planit Reprographics, 77738 Flora Road, Palm Desert, California 92211, phone (760) 345-2500, fax (760) 345-2599 for a non-refundable deposit of$400.00 for each hardcopy set or $200.00 for each CD. Shipping costs are extra. Checks to be made payable to Planit Reprographics. A copy of the Planholder's list may be obtained by contacting Planit Reprographics directly. Contact person: Eric Birch Email: planwell@planitreprographics.com Bidder must supply all information required by the complete bid documents and specifications. PROJECT ADVERTISEMENT-The project was advertised for bid PRE-BID CONFERENCE AND VISIT TO WORK SITE -All interested bidders are encouraged to attend a Pre- Bid Conference and examine the site to become familiar with the site conditions. The NON-MANDATORY Pre Bid Conference will be held at local time,on at the Palm Springs International Airport, 3400 E. Tahquitz Canyon Way, Palm Springs, California, in the 2" Floor Conference Room. A tour of the site will occur for interested bidders, immediately following the conclusion of the Pre Bid Conference. For safety and security reasons, bidders are limited to 2 representatives on the site tour. COMPLETION OF WORK - Time is of the essence. All field work must be completed within 150 n7 consecutive calendar days after commencement date stated in the Notice to Proceed. AWARD OF CONTRACT - The contract will be awarded to the lowest responsible bidder. The lowest responsible bidder for the purposes of award shall be the bidder offering the lowest aggregate price for the Base Bid plus Alternate No. 1, No. 2 and No. 3. However, the City reserves the right to delete any and all line items from any, all or none of the Bid Alternates from the actual contract award based upon the availability of funding. The deletion of any and all of the line items from the Bid Alternates shall in no way affect the determination of the lowest responsible bidder, which shall be determined by the inclusion of all of the line items. The City reserves the right, after opening, to reject any and all bids, or to waive any minor informality in a bid. The award of the contract is subject to the approval of the Federal Aviation Administration. As a condition of award, the successful bidder will be required to submit bonds and insurance, prior to the execution of the contract by the City. Failure to meet this requirement shall constitute abandonment of the Bid by the Bidder and forfeiture of the Bid Bond. If this occurs the contract will then be awarded to the next lowest bidder. BID SECURITY - Each bid shall be accompanied by either cash, certified cashiers check or Bid Bond in the amount of ten (10) percent of the total bid price (all schedules, as applicable), payable to the City of Palm Springs, as a guarantee that the Bidder, if its Bid is accepted, will promptly obtain the required Bonds and Insurance and will prepare the required submittal document and execute the Agreement. BIDS TO REMAIN OPEN-The Bidder shall guarantee the Total Bid Price for a period of ninety(90)calendar days from the date of Bid Opening. CONTRACTOR'S LICENSE CLASSIFICATION - In accordance with the provisions of Califomia Public Contract Code Section 3300, the City has determined that the Contractor shall possess a valid Class A Contractor License at the time the Contract is awarded. Failure to possess the specified license shall render the bid as non-responsive and shall act as a bar to award of the Contract to any bidder not possessing said license at the time of award. The Contractor must be licensed to do business in the City of Palm Springs in accordance with the provisions of Chapter 9, Division 3, of the Business and Professions Code, and will be required to obtain a City Construction Permit No Fee from the Building Department and/or the Public Works Inspection Supervisor, City Hall, Palm Springs, California. STATEMENT OF QUALIFICATIONS - Each proposal must be accompanied by a statement of the bidder's qualifications to perform the work contemplated. The Statement of Qualifications shall be prepared on the form attached hereto. CONTRACTORS REGISTRATION REQUIREMENTS - As a condition of award or after April 1, 2015, the contractor and any subcontractor listed on the bid must be registered with the Department of Industrial Relations pursuant to Section 1725.5 of the Califomia Labor Code." WAGE RATE REQUIREMENTS- (a) State - In accordance with the provisions of Califomia Labor Code Section 1770, 1773, 1773.1.1773.6 and 1773.7, as amended, the Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with the standards set forth in Section 1773 for the locality in which the Work is to be performed. A copy of said wage rates is on file at the Department of Building and Safety, City Hall, Palm Springs, California. It shall be mandatory upon the Contractor to whom the Work is awarded and upon any subcontractor under the Contractor to pay not less than said specified rates to all workers employed by them in the execution of the Work, and shall post a copy of said wage rates at the project site. (b) Federal-The general prevailing rate of wages, as determined by the Secretary of Labor are included hereinafter as part of the Contract Documents; provided,that if there is any difference between the State or Federal wage rate for any given craft or mechanic needed to execute the work, it shall be mandatory upon the Contractor and any subcontractor to pay the higher of the two rates. All labor on the project shall be paid no less than the minimum wage rates established by the U.S. Secretary of 08 Labor. TRADE RESTRICTIONS-All solicitations, contracts and subcontracts resulting from projects funded under the Airport Improvement Program (AIP) must contain the foreign trade restriction required by 49 CFR Part 30, Denial of Public Works Contracts to Suppliers of Goods and Services of Countries That Deny Procurement Market Access to U. S. Contractors. The Aviation Safety and Capacity Expansion Act of 1990 provides that preference be given to steel and manufactured products produced in the United States when funds are expended pursuant to a grant issued under the Airport Improvement Program. EQUAL EMPLOYMENT OPPORTUNITY AND AFFIRMATIVE ACTION REQUIREMENTS — Each bidder must complete, sign and furnish, prior to award of the contract, the 'Bidders Statement on Previous Contracts Subject to EEO Clause", a "Certification of Nonsegregated Facilities", and the "Assurance of Disadvantaged Business Enterprise Participation" as contained in the Bid Proposal. These items must be submitted with his or her bid. III A Contractor having 50 or more employees and his or her subcontractors having 50 or more employees and who may be awarded a contract of$50,000 or more will be required to maintain an affirmative action program, the standards for which are contained in these specifications. The proposed contract is under and subject to Executive Order 11246, as amended, of September 24, 1965, and to the Equal Employment Opportunity(EEO) and Federal Labor Provisions. The EEO requirements, labor provisions, and wage rates are included in the specifications and bid documents and are available for inspection at the Department of Building and Safety, City Hall, Palm Springs, California. To be eligible for award, each bidder must comply with the affirmative action requirements which are contained in the specifications. Disadvantaged Business Enterprises (DBEs) as defined in 49 CFR Part 26 shall have the maximum opportunity to participate in the performance of contracts under this agreement. Consequently. the DBE p 9 requirements of 49 CFR Part 26 apply to this agreement. Women will be afforded equal opportunity in all areas of employment. However, the employment of women shall not diminish the standards of requirement for the employment of minorities. RETAINAGE FROM PAYMENT - The Contractor may elect to receive 100 percent payments due under the Contract Documents from time to time, without retention of any portion of the payment by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code. Such securities, if deposited by the Contractor, shall be valued by the City, whose decision on valuation of the securities shall be final. Securities eligible for investment under this provision shall be limited to those listed in Section 6430 of the Government Code or bank or savings and loan certificates of deposit. ADDRESS AND MARKING OF BIDS - The envelope enclosing the Bid shall be sealed and addressed to the City of Palm Springs, and shall be delivered or mailed to Craig L. Gladders, C.P.M., Procurement and Contracting Manager, at 3200 East Tahquitz Canyon Way, Palm Springs, CA 92262. The envelope shall be plainly marked in the upper left hand corner with the name and address of the Bidder and shall bear the words "AIRFIELD LIGHTING PROJECT' for the "PALM SPRINGS INTERNATIONAL AIRPORT', followed by the date and hour of opening Bids. The certified or cashier's check or Bid Bond shall be enclosed in the same envelope with the Bid. PROJECT ADMINISTRATION - All communications relative to this Work shall be directed to Mr. Curt Ingraham, P.E., Parsons Brinckerhoff, 451 E. Vanderbilt Way, Suite 200, San Bernardino, CA 92408, phone (909) 888-1106, fax (909) 889-1884, (e-mail) Ingraham@pbworld.com All questions relating to interpretation of the Contract Documents or products must be submitted in writing, ten days prior to bid opening, and any responses will be in the form of written addenda to the Documents. 09 BY ORDER OF THE CITY OF PALM SPRINGS,CA DATE: By: Craig L. Gladders, C.P.M Procurement and Contracting Manager 10 NO 0874: CITY OF PALM SPRINGS,CALIFORNIA NOTICE INVITING BIDS FOR TAXIWAY'J'REHABILITATION PROJECT The Desert Sun PALM SPRINGS INTERNATIONAL AIRPORT 750 N Gene AutryTrail Certificate of I FAA AIRPORT IMPROVEMENT PROJECT NO.3-06-0181-055-2017 GC tY'�� INVITATION FOR BIDS(IFS)17-06 Palm Springs, CA 92262 R ECEi 7u SP R IN U: NOTICE IS HEREBY GIVEN that sealed bids will be received at the Office of the 760-778-4578/Fax 760-76WbF P AIM Procurement and Contracting Manager'of the City of Palm Springs,California, 3200 East Tahquitz Canyon Way,Palm Springs,California 92262 until,3:00 .m., local time on Wednesday,July 19,2017 at which time they will be openedpp and read aloud. Bids must he submitted in sealed envelopes marked on the outside: �Q�q State Of California ss: `, -3 p� $s 'TAXIWAY'J'REHABILITATION PROJECT". p 1 ,fUL DELIVERY OF BIDS-NOTIFICATION OF PARKING LOT CONSTRUCTION AT CITY Countyof Riverside HALL- Contractors are hereby notified that there will be construction in prog- F THE CIl'Y CLEF st s ess at the Palm Springs City Hall parking lot on the day that Bids are due. Con- tractors tractors shall take this into account in the delivery of their bids,as neither the OFFICE City nor the parking lot contractor shall be liable or responsible for the late de- livery of a bid due to the construction in progress at City Hall. It is the responsi- bility of the contractor to see that any bid that is hand delivered,sent through CITY OF PALM SPRINGS/LEGALS the mail,or by any other delivery method,shall have sufficient time to be re- Advertiser: ceived by the Office of Procurement&Contracting by the due date and time. PO BOX 2743 Late bidswill not be accepted and shall be returned unopened. LOCATION OF WORK-The Work to be performed hereunder is located at the PALM SPRINGS CA 92263 Palm Springs International Airport,3400 E.Tahquitz Canyon Way,Palm Springs, _.California. DESCRIPTION OF THE WORK:The Pro1'ect consists of the Removal and Recon- struction of approximately 12,000 sf of failed Asphalt Pavement within the lim- Order# 0002214081 its of Taxiway). Construction will consist of full depth removal of existing As- phalt Pavements, re-compaction of existing base materials and construction of new Asphalt Cement Pavement. Project includes repainting runway and taxiway markings. The Project will require temporary closures to Runway 13L- 31 R and Taxiway J and Taxiway E.No electrical work is anticipated. The Engineer's Estimate falls within a range of$200,000.to.$250,000 The City has not yet received FAA grant funding.. However,.a pre-application has been made and there is sufficient Airport Improvement Program entitle- ment funding allocated for this project, but the FAA will,not issue final grant offer without flnal.bid price amount I am over the age of 18 years old, a citizen of OBTAINING OR INSPECTING CONTRACT DOCUMENTS-A complete set of Con- tract Documents dated March 17,2017 may be obtained free of charge on,or the United States and not a party to,or have after Thursday,June 15,2017 from Planit Reprographlu by download at www. planitplanroom.cosntpublicjobs. A copy of the Pllanholder's list may be ob- interest in this matter. I hereby certify that the taine directly from Planit Reprographics, 77738 Flora Road, Palm Desert, CA 92211,phone(760)345-2500. Any costs for hard copies or mailing of the Con- attached advertisement appeared in said tract Documents is non-refundable. Bidder must supply all information required by the complete bid documents newspaper(set in type not smaller than non and specifications. oriel)in each and entire issue of said PROJECT ADVERTISEMENT-The project was advertised for bid on June 17,2017 p and June 24,2017. an newspaper and not in supplement thereof PRE-BID CONFERENCE AND VISIT TO WORK SITE-All Interested bidders are en- couraged to attend a Pre-Bid Conference and examine the site to become famil- on the followingdates t0 wit: iar with the site conditions.The NON-MANDATORY Pre Bid Conference will be , from 9:00 a.m.-11:00 a.m,local time,on Tuesday,June 27,2017 at the Palm Springs International Airport, 3400 E. Tahquitz Canyon Way, Palm Springs, Newspaper:The Desert Sun California, in the 2nd Floor Conference Room. A tour of the site will occur for interested bidders,immediately following the conclusion of the Pre Bid Confer- ence. For safety and security reasons, bidders are limited to 2 representatives on the site tour. 6/17/2017 6/24/2017 COMPLETION OF WORK-Time is of the essence.All field work must-becomplet- ed within 30 consecutive calendar days after commencement date stated In the Notice to Proceed. _ AWARD OF CONTRACT-The contract will be awarded to the lowest responsible bidder. The City reserves the right,after opening,to re)'ect any and all bids,or to waive any minor informality in a bid.The award of the contract is subject to the approval of the Federal Aviation Administration. I acknowledge that I am a principal clerk of the As a condition of award,the successful bidder will be required to submit bonds and Insurance, prior to the execution of the contract by the City. Failure to printer of The Desert Sun, printed and meet this requirement,shall constitute abandonment of the Bid by the Bidder and forfeiture of the Bid Bond. H this occurs the contract will then be awarded published weekly in the City of Palm Springs, to the next lowest bidder. TITLE VI NOTICE-The City of Palm Springs,in accordance with the provisions of County of Riverside, State of California. The Title VI of the Civil Rights Act of 1964(78 Stat.252,42 U.S.C.5§2000d to 2000d- 4)and the Regulations, hereby notifies all bidders that it will affirmatively en- Desert Sun was adjudicated a Newspaper of sure that any contract entered into Pursuant to this advertisement, disadvan- taged business enterprises will be afforded full and fair opportunity to submit general circulation on March 24, 1988 by the bids In response to this invitation and will not be discriminated against on the grounds of race,color,or national origin in consideration for an award. Superior Court of the County of Riverside, BID SECURITY-Each bid shall be accompanied by either cash,certified cashier's check or Bid Bond in the amount of ten(10)percent of the total bid price(all State Of California Case NO. 191236, schedules, as applicable), payable to the City of Palm Springs, as a guarantee that the Bidder, if its Bid is accepted, will promptly obtain the required Bonds and Insurance and will prepare the required submittal document and execute the Agreement BIDS TO REMAIN OPEN-The Bidder shall guarantee the Total Bid Price for a pe-. fod of ninety(90)calendar days from the date of Bid Opening. CONTRACTOR'S LICENSE CLASSIFICATION-In accordance with the provisions of California Public Contract Code Section 3300,the City has determined that the I declare under penalty of perjury that the Contractor shall possess a valid Class A Contractor License at the time the Con- tract is awarded. Failure to possess the specified license shall render the bid as foregoing Is true and correct. Executed on non-responsive and shall act as a bar to award of the Contract to any bidder not possessing said license at the.time of award. this 24th day Of DUNE, 2017 In Palm The contractor must be licensed to do business in the City of Palm Springs in ac- cordance with the provisions.of Chapter 9,Division 3,of the Business and Pro- fessions Code,and will be required to obtain a City Construction Permit No Fee Springs, C�,allfof from the Building Department and/or the Public Works Inspection Supervisor, City Hall,Palm Springs,California. STATEMENT OF QUALIFICATIONS-Each proposal must be accompanied by a statement of the bidder'squalifications to perform the work contemplated. The Statement of Qualifications shall be prepared on the form attached hereto. CONTRACTORS REGISTRATION REQUIREMENTS-As a condition of award or af- ter April 1,2015,the contractor and any subcontractor listed on the bid must be registered with the Department of Industrial Relations pursuant to Section 1725.5 of the California Labor Code." WAGE RATE REQUIREMENTS- (a) State-In accordance with the provisions of California Labor Code Section 1770. 1773, 1773.1,1773.6 and 1773.7,as amended,the Director of,the Depart- mentof Industrial Relations has determined the general prevailing rate of per tr diem wages in accordance with the standards set forth in Section 1773 for the I locality in which the Workis to be pperformed. A copy of said wage rates is on Declarantfile at the Department of Building and Safety, City Hall, Palm Springs, California. It shall-be mandatory upon the Contractor to whom the Work is awarded and upon any subcontractor under the Contractor to pay not less'than said specified rates to all workers employed by them in the.execution of the Work,and shall post a copy of said wage rates at the project site. (b) Federal-The general prevailing rate of wages,'as determined by the Secre- tary of Labor are included hereinafter as part of the Contract Documents; pro- vided,that if there is any difference between the State or Federal wage rate for any given craft or mechanic needed to execute the work,it shall be mandatory uppon the Contractor and any subcontractor to pay the higher of the two rates. All labor on the project shall be paid no less than the minimum wage rates es- tablished by the U.S.Secretary of Labor. BUY AMERICA-The Aviation Safety and Capaclty Expansion Act of 1990 pro- vides that preference be g!van to steel and manufactured products.produced In the United States when funds are expended pursuant to agrant issued under the Airport Improvement Program. EQUAL EMPLOYMENT OPPORTUNITY AND AFFIRMATIVE ACTION REQUIRE- MENTS-Each bidder must complete, sign and furnish, prior to award of the contract,the'Bidders Statement on Previous Contracts Subject to EEO Clause', a'Certification of Norsegregated Facilities';and the 'Assurance of Disadvan- taged Business Enterprise Participation"as contained in the Bid Proposal. These --items must be submitted with his or her bid. A Contractor having 50 or more employees and his or her subcontractors having 50 or more employees and who may be awarded a contract of$50,000 or more will be required to maintain an affirmative action program, the Standards,for which are contained in these specifications. The proposed contract is under and subject to.Executive Order 11246, as amended, of September 24, 1965, and to the Equal Employment opportunity (EEO)and Federal Labor Provisions. The EEO requirements, labor provisions, and wage rates.are included in the specifications and bid documents and are available for inspection at the Depart-. ment of Building and Safety,Ci%Hall,Palm Springs,California. To.be eligible for award,each idder.must comply with the affirmative action requirements which are contained in the specifications. Disadvantaged Business Enterprises (DEES) as defined in 49 CFR Part 26 shall have the maximum opportunity to participate in the performance of contracts under this agreement. Consequently, the DBE requirements of 49 CFR Part26 apply to this agreement. Women will be afforded equal opportunity in all areas of employment.Howev- er,the.employment of women shall not diminish the standards of requirement for the employment of minorities. RETAINAGE.FROM PAYMENT The Contractor may elect to receive100 percent payments due under the Contract.Documents from time to time,without reten- tion of any portion of the payment by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code. Such securities,if deposited by the Contrac- tor,shall be valued by the City,whose decision on valuation of the securities shall be final. Securities eligible for investment under this provision shall be limited to those listed in Section 6430 of the Government Code or bank or sav- ings and loan certificates of deposit. - A66IEESi AA6lvIA1fQIN'�i OF BIGfCThe envelope enclosing the Bid shall be sealed and addressed to the City of Palm,Springs, and shall be delivered or mailed to Craig L.Gladders, C.P.M.;Procurement and Contracting Marager,at 3200 East Tahquitz Canyon Way,Palm Springs,CA 92262. The envelope"shall be plainly marked in the upper le hand corner with the name and address of the Bidder and shall bear the words "TAXIWAY J REHABILITATION PROJECT" for the'PALM SPRINGS INTERNATIONAL AIRPORT',followed by the date and hour of opening Bids. The certified or cashier's check or Bid Bond shall be enclosed in the same envelope with the Bid. iPROJECT ADMINISTRATION-All communications relative to this Work shall be directed to Mr.Curt Inggraham;P.E.,WSP USA,451 E.Vanderbilt Way,Suite 200, San Bernardino,CA 92408,phone(909)888-1106,Wirral)curt.ingraham@asp. cum. AIl.questions relating.to interpretation of the Contract Documents or products must be submitted in writing,.ten days prior to bid opening,and any responses will be in the form of written addenda to the Documents. BY ORDER OF THE CITY OF PALM SPRINGS,CA DATE:June 15,2017 By:Craig L.Gladdens,C.P.M Procurement and ContractiVi%Manger Published:6117,6124J2017 T• The Desert Sun NO 0875: CITY OF PALM SPRINGS,CALIFORNIA Certificate of PU NOTICE INVITING BIDS FOR AIRFIELD LIGHTING PROJECT 750 N Gene Autry Trail `• rr' -� PALM SPRINGS INTERNATIONAL AIRPORT Palm Springs, CA 92262 ��G4 � FAA AIRPORT IMPROVEMENT PROJECT NO.3-06-0181-055-2017 �.�``s,,,1 S r�{I t; INVITATION FOR BIDS(IFS)17-07 760-778-4578/Fax 760-778-4731,�Y Y C1 r 11 NOTICE IS HEREBY GIVEN that sealed bids will be received at the Office of the n: r'] Procurement and Contracting Manager of the City of Palm Springs, California; 20i1 1UL t� J 3200 East Tahquitz Canyon Way,Palm Springs,California 92262 until 4:00 .m., State Of California SS: local time on Wednesday,July 19,2017 at which time they will be openedpand r read aloud. Bids must be submitted in sealed envelopes marked on the outside: County of Riverside ryy {,r CLE1aN AIRFIELD LIGHTING PROJECT". ' � 41 ��1 DELIVERY OF BIDS-NOTIFICATION OF PARKING LOT CONSTRUCTION AT CITY r 1 �" HALL- Contractors are hereby notified that there will be construction in prog- ram at the Palm Springs City Hall parking lot on the day that Bids are due. Con- tractors shall take this into account in the delivery of their bids,as neither the City nor the parking lot contractor,shall be liable or responsible for the late de- CITY OF PALM SPRINGSILEGALS livery of a bid due to the construction In progress at City Hall. It is the responsk Advertiser: bility of the contractor to see that any bid that is hand delivered,sent through PO BOX 2743 the mail,or by any other delivery method,shall have sufficient time to be re- ceived by the.Office of Procurement &Contracting by the due date and time. PALM SPRINGS CA 92263 Late bids will not be accepted and shall be returned unopened. LOCATION OF WORK-The Work to be performed hereunder is located at the Palm Springs International Airport 3400 E.Tahquitz Canyon Way,Palm Springs, California. Order# 0002214087 DESCRIPTION OF THE WORK: The Project consists of replacing approximately 222,000 lineal feet of existing airfield electrical conductors to taxiway and run- way lights,signs and navaids.The Project includes repplacement of Constant Cur- rent Regulators, replacement of transformers om existing LED taxiway fixtures, and replacement of existing Incandescent Mandatory, Directional and Informa- tional signs with LED signs. The GA Runway will be upgraded with Medium In- tensity LED Runway Lights,new LED Runway End Indicator Lights and new LED Precision Approach Path Indicators, The Project will require temporary closures to runways and taxiways. The Engineer's Estimate falls within a range of$1.9 to$2.2 million. I am over the age Of 18 years Old, a citizen Of The City has not yet-recelved-FAA.grant-funding.-However, a pre-application has been made and there is sufficient Airport Improvement Program entitle- the United States and not a party to, or have ment funding allocated for this project, but the FAA will not issue final grant offer without final bid price amount. Interest In this matter. I hereby certify that the OBTAINING OR INSPECTING CONTRACT DOCUMENTS-A complete set of Con- tract Documents dated March 17,2017 may be.obtained free of charge on,or attached advertisement appeared in said after Thursday,June 15,2017 from'Planit Reprograpphics b v yy download at w w. planitplanroom.com/publicjob m s. A copy of the Planholder's list may be ob- newspaper(set in type not smaller than non taed directly from Planit Reprographics, 77738 Flora Road, Palm Desert, CA 92211, phone(760)345-2500. Any costs for hard copies or mailing of the Con- pariel)in each and entire issue of said tract Documents is non-refundable. and not in an supplement thereof Bidder must supply all information required by the complete bid documents newspaper Y PP and specifications. on the following dates,t0 wit: PROJECT ADVERTISEMENT -The project was advertised for bid June 17,2017 and June 24,2017 PRE-BID CONFERENCE AND VISIT TO WORK SITE-All interested bidders are en- NEWS a The Desert Sun couraged to attend a Pre-Bid Conference and examine the site to become famil- P Per: iar with the site conditions.The NON-MANDATORY Pre Bid Conference will be from 2:00 p.m.-4:00 p.m,local time,on Tuesday,June 27,2017 at the Palm Springs International Airport, 3400 E. Tahquitz Canyon Way, Palm Springs, 6/17/2017 6/24/2017 California,in the 2nd Floor Conference Room. A tour of the site will occur for interested bidders,immediately following the conclusion of the Pre Bid Confer- ence..For safety and security reasons, bidders are limited to 2.representatives on the site tour. COMPLETION OF WORK-Time is of the essence.All field work must be complet- ed within 150 consecutive calendar days after commencement date stated in the Notice to Proceed. acknowledge that I am a principal clerk of the AWARD OF CONTRACT-The contract will be awarded to the lowest res onsible bidder. The lowest responsible bidder for the purposes of award shall be the printer of The Desert Sun, printed and bidder offering the lowest aggregate price for the Base Bid plus Alternate No. 1,No.2 and No.3. However,the City reserves the right to delete any and all published weekly in the City of Palm Springs, line items from any;al)-or-none of the:Bid-Alternates-from the actual contract award based upon the availability of funding.'The deletion of any and all of County of Riverside, State of California.The the line items from the Bid Alternates shall in no way affect the determination of the lowest responsible bidder,which shall be determined by the inclusion of Desert Sun was adjudicated a Newspaper of all of the line items. The City reserves the right, after opening,to reject any and all bids,or to waive any minor informality in a bid.The award,of the con- general circulation on March 24, 1988 by the tract Is subject to the ap roval of the federal Aviation Administration. As a condition of awalthe successful bidder will be required to submit bonds Superior Court of the County of Riverside, and Insurance, prior to the execution of the contract by the City. Failure to meet this.requirement shall constitute abandonment of the Bid by the Bidder State Of California Case No. 191236. and forfeiture of the Bid Bond. If this occurs the contract will then be awarded, to the next lowest bidder. TITLE VI NOTICE-The City of Palm Springs,in accordance with the provisions of Title VI of the Civil Rights Act of 1964(78 Stat 252,42 U.S.C.55 20Nd to 2000d- 4)and the Regulations, hereby notifies all bidders that it will affirmatively en- - sure that any contract entered into pursuant to this advertisement, disadvan- taged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be..disaiminated against on the declare under penalty of perjury that the ggrounds of race,color,or national origin inconsideration for an award. BID SECURITY-Each bid shall be accompanied by either cash,certified cashier's foregoing IS true and correct. Executed on check or Bid Bond in the amount of ten(10)percent of the total bid price(all schedules, as applicable), Payable to the City of Palm Springs, as a guarantee that the Bidder, if its Bid is accepted,will promptly obtain the required Bonds this 24th day Of JUNE, 2017 In Palm and Insurance and will prepare the required submittal document and execute Callfor a. the Agreement. Springs, BIDS TO REMAIN OPEN-'The Bidder shall guarantee the Total Bid Price fora pe- riod of ninety(90)calendar days from the date of Bid Opening. CONTRACTOR'S LICENSE CLASSIFICATION--In accordance with the provisions of California Public Contract Code Section 3300,the City has determined that the Contractor shall.possess a valid Class A Contractor License at the time the Con- tract is awarded. Failure to possess the specified license shall render the bid as non-responsive and shall act as a bar to award of the Contract to any bidder not possessing said license at the time of award. The Contractor must be licensed to do business in the City of Palm Springs in ac- cordance with the provisions of Chapter 9,Division 3, lithe Business and Pro- fessions Code,and will be required to obtain a City Construction Permit No Fee from.the Building Department and/or the Public Works Inspection Supervisor, City Hall,Palm Springs,California. STATEMENT OF QUALIFICATIONS -Each proposal must be accompanied by a statement of the bidder's qualifications to perform the.work contemplated. Declarant The Statement of Qualifications shall be prepared on the form attached hereto. CONTRACTORS REGISTRATION REQUIREMENTS As a condition of award or af- ter April 1,2015,the contractor and any subcontractor listed on the bid must be registered with the Department of Industrial Relations pursuant to Section 1725.5 of the California Labor Code." WAGE RATE REQUIREMENTS- l (a). State-In accordance with the provisions of California Labor Code Section il 1770,1773,1773.1,1773.6 and 1773.7,as amended,the Director of the Depart- ment of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with the standards set forth in Section 1773 for the locality in which the work is to be Performed. A copy of said wage rates is on file at the Department of Building and:Safety, City Hall, Palm Springs, California. It shall be mandatory upon the Contractor to whom the Work is awarded and upon any subcontractor under the Contractor to pay not less than said specified rates to all workers employed by them in the execution of the Work,and shall post a copyof said wage rates at the fir o1'ect site. (b) Federal-The general prevailing rate of wages,as determined by the Secre- tary of Labor are Included hereinafter as part of the Contract Documents; pro- vided,that if there is any difference between the State or Federal wage rate for any given craft or mechanic needed to execute the work,it shall be mandatory SFon the Contractor and any subcontractor to pay the higher of the two rates. All labor on the project shall be paid no less than the minimum wage rates es- tablished by the U.S.Secretary of Labor. BUY AMERICA-The Aviation Safety and Capacity Expansion Act of 1990 pro- vides that preference be ggiven to steel and manufactured products produced in the United States when funds'are expended pursuant to a grant issued under the Airport Improvement Program. EQUAL EMPLOYMENT OPPORTUNITY AND AFFIRMATIVE ACTION REQUIRE- MENTS-Each bidder must complete, sign and furnish, prior to award of the contract,the'Bidders Statement on Previous Contracts Subject to EEO Clause', a 'Certification of Nonsegregated Facilities',and the 'Assurance of Disadvan- taged Business Enterprise Participation'as contained in the Bid Proposal.,These items must be submitted with his or her bid. , A Contractor having 50 or more employees and his or her subcontractors having 50 or more employees and who may be awarded a contract of$50,000 or more will be required to maintain an affirmative'action program,the standards for which are contained in these specifications. The proposed contract is under and subject to Executive Order 11246, as amended, of September 24, 1965, and to the Equal Employment Opportunity (EEO)and Federal Labor Provisions. The EEO requirements. labor provisions, and wage rates':are included in the specifications and bid documents and are available for inspection at the Depart- ment of Building and Safety,City Hall,Palm Springs,California. To be eligible for award,each bidder must comply with the affirmative.action requirements which are contained in the specifications. Disadvantaged Business Enterprises (DBEs) as defined in 49 CFR Part 26 shall have the maximum opportunity to participate in the performance of contracts under this agreement..Consequently, the DBE requirements of 49 CFR Part 26 apply to this agreement. Women will be afforded equal opportunity in all areas of employment.Howev- er,the employment of women shall not diminish the standards of requirement for the employment of minorities. RETAINAGE FROIP-PA YMINY-The Contractor may elect to receive 100 percent payments due under the contract Documents from time to time,without reten- tion of any portion of the payment by the City; by depositing securities of I equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code. Such securities,if deposited by the Contrac- tor;shall be valued by the City,whose decision on valuation of the securities shall be final. Securities eligible for investment under this provision shall be limited to those listed in Section 6430 of the Government Code or bank or saw ings and loan certificates of deposit. ADDRESS AND MARKING OF BIDS-The envelope enclosing the Bid shall be sealed and addressed to the City of Palm Springs, and shall be delivered or mailed to Craig L.Gladders,C.P.M.,Procurement and Contracting Manager,at 3200 East Tahquitz Canyon Way,Palm Springs,CA 92262. The envelope shall be plainly marked in the upper left hand comer with the name and address of the Bidder and shall bear the words"AIRFIELD LIGHTING PROJECT"for the'PALM SPRINGS INTERNATIONAL AIRPORT',followed by the date and hour of opening Bids. The certified or cashier's check or Bid Bond shall be enclosed In the same envelope with the Bid. PROJECT ADMINISTRATION -All communications relative to this Work shall be directed to Mr.Curt Ingraham,P.E.,WSP USA,451 E.Vanderbilt Way,Suite 200, San Bernardino,CA 92408,phone(909).888-1106,(e-mail)curt.inaraham®wsp. com. All questions relating to interpretation of the Contract Documents or products must be submitted in writing,ten days prior to bid opening,and any responses will be in the form of written addenda to the Documents. BY ORDER OF THE CITY OF PALM SPRINGS,CA DATE: June 15,2017 By:Craig L.Gladders,.C.P.M Procurernt and Contracting Manager Plished:6117,W24I2017. I