Cq<fFORN�P+ CITY COUNCIL STAFF REPORT
DATE: May 17, 2017 NEW BUSINESS
SUBJECT: PRELIMINARY OVERVIEW OF THE DEPARMENT OF AVIATION
FISCAL YEAR 2017-2018 BUDGET
FROM: David H. Ready, City Manager
BY: Airport
SUMMARY
Staff is presenting to City Council a preliminary Fiscal Year 2017-2018 Airport Budget.
Included are estimates for revenues and expenditures which include a recommendation
for four new Police Officers to increase security, and increases to various revenue
sources required to balance the budget.
RECOMMENDATION:
1. Discussion of the Draft 2017-18 Airport Budget; direct the City Council Finance/
Budget Subcommittee, and City Staff as appropriate.
STAFF ANALYSIS:
The Airport projects an operating surplus of $372,060 at the end of the current fiscal
year ending June 30, 2017, and a reserve cash balance of$3,843,430.
The FY 2017-2018 proposed budget projects revenues of approximately $21,309,100
and expenditures of $21,287,000, resulting in an operating surplus of $21,100. The
projected reserve cash balance is expected to be $3,495,812 (see Attachment A).
The Airport Commission and Commission Finance Sub-Committee have been reviewing
the proposed Budget over that past month and will formally vote on the final budget at
the Airport Commission Meeting on May 17th — staff will report the outcome of their vote
during the City Council Meeting.
FY 2017 — 2018 Overview
The information in this report represents the best estimates by Staff of both the Airport
and Department of Finance and Treasury for revenues and expenditures based upon a
ITEM NO. 5.�'
Proposed
BudgetTERNATIOI04
2017-2018
May97. 2017
• ''fir "_- `.
. 40aw7 .
}
INTERNATIONAL AIRPORT
Airport Summary of Operations
FY 2016-17 FY 2016-17 FY 2017-18
Category Budget Projected Proposed Budget
Beginning Reserve Fund Balance $ 4,474,227 $ 4,607,870 $ 3,843,430
Fund 415 General Airport Enterprise Funds
Revenues $ 20,420,220 $ 20,012,950 $ 21,309,134
Expenditures $ (20,082,281) $ (19,640,890) $ (21,287,252)
Operating Surplus I(Deficit) $ 337,939 $ 372,060 $ 21,882
Non-Operating Items:
Interfund transfer to General Fund $ (287,500) $ (287,500) $ (287,500)
Interfund transfer to Cap Prj Fund 416-Match $ (421,795) $ (264,000) $ (872,000)
Interfund transfer to Cap Prj Fund 416-CP $ (1,395,000) $ (755,000) $ (710,000)
Reduce Airline Incentive Funds $ 170,000
Reimbursement local AIP Grant matching funds
$4.5 Million over 3 years
AIP-New PFC Project Funds- (1st of three years) $ 1,500,000
Projected Reserve Fund Balance $ 2,707,871 $ 3,843,430 $ 3,495,812
* The Proposed Budget includes:
>The cost of 4 Police Officers $740,000
>Other payroll and benefit increases $330,000
>Revenues from rental car lease space increase of 35% $ 345,000
> Increasing the daily public parking rate from $14 to$17 $ 425,000
> Increasing airline leased rates $ 300,000
Page 1
MATI ��RPORt �
aniaN�noru� uaaoar
Airport Summary of Operations
FY 2016-17 FY 2016-17 FY 2017-18
Category Budget Projected Preliminary
Project Ending Balance $2,707,871 $ 3,843,430 $ 3,495,812
Capital Projects Fund 416
Revenues AIP Grants $ 4,140,000 $ 2,640,000 $ 8,720,000
Local Special Capital Projects $ (1,395,000) $ (755,000) $ (1,035,000)
Interfund transfer from Fund 415-Match $ 421,795 $ 264,000 $ 872,000
Interfund transfer from Fund 415-CP $ 1,395,000 $ 755,000 $ 1,035,000
EndingCash $ 2,707,871 $ 3,843,430 $ 3,495,812
Fund 405 CFC(Customer Facility Charge-Rental
Beginning Cash $ 13,843,486 $ 13,850,000 $ 15,820,250
Revenues $ 1,975,000 $ 1,970,250 $ 2,100,000
Expenditures $ (2,500,000) $ - $ (6,500,000)
Ending Cash $ 13,318,486 1 $ 15,820,250 $ 11,420,250
Fund 410 PFC(Passenger Facility Charge)
Beginning Cash $ 1,865,131 $ 1,817,031 $ 1,840,131
Revenues $ 3,940,000 $ 3,988,100 $ 3,940,000
Expenditures $ (3,640,000) $ (3,965,000) $ (3,640,000)
Reimburse Prior Year Matching Funds $ (1,500,000)
Ending Cash $ 2,165,131 $ 1,840,131 $ 640,131
Page 2
Airport Capital Outlay Budget not Funded by Grants
FY 2017-18
SPECIAL CAPITAL PROJECTS 416-6501
CAPITAL BUDGET 2017.18
Department 6601
56000 Emergency Capital Programs $ 200,000
56xxx Aircraft Passenger Loading bridge parts and equipment(8 units) $ 220,000
56xxx AVI -Auto Vehicle Identification $ 200,000
56xxx Carpet Replacement $ 90,000
TOTAL SPECIAL CAPITAL PROJECTS $710,000
City of Palm Springs - FY 2017-18 Page 3
Airport Capital Outlay Budget
FY 2017-2018
Airport Development
FEDERAL GRANTS
CAPITAL- Local Grant Match BUDGET 2017-18
Department 6401
56xxx AIP 56 Terminal and Airfield Improvements 395,000
56xxx AIP 57 Terminal Capacity Improvements 477,000
TOTAL CAPITAL 872,000
CAPITAL- FAA Grant Funding
Department 6601 BUDGET 2017-18
56xxx AIP 56 Terminal and Airfield Improvements 3,950,000
56xxx AIP 57 Terminal Capacity Improvements 4,770,000
TOTAL AIP GRANT-CAPITAL 8,720,000
Federal Grant Totals 9,592,000
City of Palm Springs - FY 2017-18 Page 4
General Airport Revenue
FY 2016-17 FY 2016-17 FY 2017-18
Category Budget Projection Preliminary %Change
Fund 415 General Airport
Scheduled Landing Fees 1,606,910 1,633,966 1,635,250 1.8%
Land Rental 1,245,500 1,176,900 1,185,000 -4.9%
Advertising 402,000 399,960 433,000 7.7%
Leased Parking 3,150,000 3,165,000 3,590,000 14.0%
Airline Leased Space& Hold Roon 2,273,200 2,181,400 2,275,000 0.1%
On-Airport Rental Car 6,436,000 6,160,100 6,736,000 4.7%
Term Non-Air Comm Rent 1,236,000 1,295,020 1,240,000 0.3%
TSA LEO Grant 116,800 116,800 116,800 0.0%
Concessions 495,000 546,125 520,000 5.1%
Customs Fees 269,300 244,010 269.300 0.0%
All Other General Rev. 3,189,510 3,093,679 3,308,784 3.7%
TOTAL AIRPORT REVENUE 415 20,420,220 20,012,950 21,309,134 4.4%
Airport Revenue
Fund 415 Scheduled
Landing Fees
8%
Land Rental
6%
All Other
General Rev.
Term Non-Air 16%
Comm In
6% Leased Parking
Concessi 17%
3%
Advertising-
TSA LEO Gra
2%
Airline Leased
Space
11
Rental Car
31%
City of Palm Springs - FY 2017-18 Page 5
General Airport Appropriations
FY 2016-17 FY 2016-17 FY 2017-2018
Category Budget Projection Preliminary % Change
Fund 415 - Airport Operations
AirportAdmin. 3,619,193 3,505,120 3,613,659 -0.2%
Airport Security 1,508,050 1,498,760 2,300,824 52.6%
Airside Ops 817,204 800,435 869,956 6.5%
Air Rescue-Fire 2,986,766 2,854,880 3,045,867 2.0%
Landside Ops 1,507,816 1,462,940 1,463.767 -2.9%
Grounds Main. 510,728 505,185 498,730 -2.3%
Terminal Bldg Ops 5,300,505 5,218,870 5,626,574 4.3%
Control Ctr. Ops 3,616,238 3,584,620 3,749,383 3.7%
Customs 215,781 210,080 218,492 1.3%
TOTAL $20,082,281 $19,640,890 $21,287,252 6.0%
Airport Departments Customs
by Percentage 1%
I nfo.Tech. 1%
Control Ctr. Ops
18% Airport Security
7%
Terminal Bldg Airside Ops
Ops 4%
27%
Grounds Maint. Landside Ops
2% 7%
16-17 Budget Projection 17-18 Preliminary
Fund 416 -Airport Capital Projects
Federal Grant Match 421,795 420,200 872,000 106.74%
Special Cap. Projects 1,395,000 855,000 1.035,000 -25.81%
TOTAL $ 1,816,795 $ 1,275,200 $ 1,907,000 4.97%
City of Palm Springs - FY 2017-18 Page 6
Restricted Airport Funds
FY 2016-17 FY 2017-18 Preliminary Budget
Category Budget Preliminary Budget % Change
Fund 405 - Customer Facility Charge
Revenue
Prior Year Carryover 13,843,486 15,820,250 14.28%
CFC 1,925,000 2,100,000 9.09%
Total Revenue 15,768,486 17,920,250 13.65%
Appropriations
Rental Car Improvement Design 2,500,000
Rental Car Design and Enabling Projects 6,500,000
Total Appropriations 2,500,000 6,500,000 160.00%
Surplus/(Deficit) $13,268 486 $11 420 250
FY 2016-17 FY 2017-18
Category Bud et Prelimina Bud et % Change
Fund 410 - Passenger Facility Charge
Revenue
Carryover from prior year 1,431,715 1,817,031 26.91%
Interest Income 7,500 7,500 0.00%
Interest Income Fiscal Agent 40,000 40,000 0.00%
Passenger Facility Charge 3,940,600 3,915,600 -0.63%
Total Revenue 5,419,815 5,780,131 6.65%
Appropriations
Series 1998 PFC Debt Service 1,790,506 1,800,000 0.53%
Series 2006 Debt Service 1,080,278 1,095,000 1.36%
Series 2008 Debt Service 732,000 745,000 1,78%
Total Appropriations 3,602,784 3,640,000 1.03%
Reimburse Prior Year Marching Funds 1,500,000
Surplus I(Deficit) $0 640,131
City of Palm Springs - FY 2017-18 Page 7
City Council Staff Report
May 17, 2017-- Page 2
Department of Aviation Fiscal Year 2017-2018 Budget Preliminary Overview
'carry-over' budget, including personnel-related cost adjustments (e.g., CalPERS
retirement, health care, etc.), four new Police Officer positions, and nominal increases in
supplies, utilities, and materials and supplies. The budget also includes increases in
revenues from lease rates for car rental space, daily rates for public parking, and
adjusting the airline lease rates. The resulting budget is essentially balanced, with a
small surplus of$21,882 in the Airport's Fund 415.
Fund 415 — General Airport Enterprise Fund
Expenditures
The largest increase to expenditures is related to personnel costs ($330,000) and the
addition of four new Police Officer positions ($740,000), these include increases to
employee compensation and benefits as a result of the negotiated salary agreements
approved in FY 2014-15. Additionally, employee pension costs paid to CalPERS will
increase next fiscal year (as discussed in the Staff Report of April 19, 2017, regarding
the City's Preliminary FY 2017-18 Budget). Other contractually-driven cost increases
which are included in the budget relate to health care costs, retiree health care costs,
and workers' compensation.
The Chief of Police recommends adding the additional officer positions to increase
security at the Airport - increasing law enforcement coverage at the Airport to a
minimum of two officers on each shift, 24 hours per day, and seven days a week.
Also, beginning in FY 2018-19, CalPERS retirement costs will begin increasing more
significantly as new investment earnings assumptions, known as 'the discount rate' (or
PERS anticipated 20-year average rate of return on investments), are being
implemented system wide resulting in several years of much higher required employer
contributions. The following illustrates CalPERS projections for the Airport, which
indicate annual required contributions will almost, double over a seven-year period:
16-17 17-18 18-19 19-20 20-21 21-22 22-23
Total PERS Costs
BEFORE Change
Discount Rate @ 7.5% $2.1 $2.3 $2.6 $2.9 $3.1 $3.3 $3.5
Total PERS Costs
AFTER Change $2.1 $2.3 $2.6 $3.0 $3.5 $3.8 $4.1
New Discount Rate 7.375% 7.25% 7.0% 7.0% 7.0%
02
City Council Staff Report
May 17, 2017-- Page 3
Department of Aviation Fiscal Year 2017-2018 Budget Preliminary Overview
Revenues
In order to produce a balanced budget, rate increases to several revenue sources are
proposed to cover the additional expenses, as shown in the following table:
Re�enue'Source N. _ '�: Pro ose'sIncrease `Am6urti
Rental Car Lease Space Increase of 35% $345,000
Daily Automobile Public Parking Rate Increase from $14/da to $17/da $425000
Airline Lease Rate Increase 10% $300:000
In calendar year 2016, eight car rental companies collectively paid the Airport
$5,823,324, based primarily from 10% of the gross revenue generated from rental
transactions. In addition, they collectively paid the Airport $845,500 for space they
leased. The proposed 35% increase will apply only to the space the car rental
company's lease. The increase will be effective July 2017.
The current daily rate for public parking at the Airport is $14/day, which went into effect
September 1, 2016. The proposed increase of $3, to a new daily rate of $17, will
become effective on July 1 , 2017. The new proposed rate is comparable to rates at
other Southern California airports, including Ontario International Airport (ONT), which
increased some of its parking rates effective May 2017. ONT will charge $24/day in two
small parking lots immediately in front of both of its terminals, and $18/day in the two
larger lots also immediately in front of the terminals.
The 10% increase to the airline lease rate was necessary to cover the remaining
balance following the increase to the car rentals lease spaces and parking rates. These
new rates are anticipated to go into effect January 1, 2018, consistent with the
provisions in the current Airline Use and Lease Agreements.
Non-Operating Items
The proposed budget identifies three inter-fund transfers totaling $1,869,500. These
transfers are required to cover a financial obligation to the City's General Fund, pay for
capital projects, and to pay the Airport's matching portion for FAA grant-funded projects.
Capital Projects
There are three capital projects programmed for FY 2017-18 and an emergency reserve
for a total of $710,000: maintenance and/or replacement of passenger boarding bridges,
installed in 1999; needed replacement of the Automatic Vehicle Identification system
(AVI), which tracks all permitted commercial ground transportation vehicles (e.g., taxis,
limousines) and is the primary tool used by airport staff to charge and collect revenue;
and replacement of carpet in and around the baggage claim area. The $200,000
identified as 'Emergency Capital Programs' provides capital funds for unforeseen
projects and repairs that occur throughout the fiscal year.
03
City Council Staff Report
May 17, 2017-- Page 4
Department of Aviation Fiscal Year 2017-2018 Budget Preliminary Overview
Fund 405 — Customer Facility Charge (CFC) — Rental Car
The Airport projects $2,100,000 in revenues and $6,500,000 in expenditures.
Expenditures will be used to initiate the planning and design for a new car rental facility,
and will likely include costs associated with enabling projects required prior to actual
demolition and construction of the new facility. The fund balance is projected to be
$11.4 million at the end of FY 2017-18.
Fund 410 PFC — Passenger Facility Charge
The Airport projects $3,940,000 in revenues and $3,640,000 in expenditures.
Expenditures will be used to service the current bond debt. Additionally, there will be a
$1,500,000 transfer to Fund 415 to reimburse the General Airport Enterprise Fund for
previous FAA grant funded projects.
Fund 416 —Airport Capital Projects
The Airport anticipates receiving $8,720,000 in AIP Grant funds and two transfers from
Fund 415 (as identified above) in the amount of $1,582,000. The Airport also plans to
spend $710,000 for capital improves as described above.
Thomas olan David H. Ready, E D.
Executive Director, Airport City Manager
04
ATTACHMENT A
I o,tvt �Vf-iI
INTERNATIONAL AIRPORT
Airport Summary of Operations
FY 2016-17 FY 2016-17 FY 2017-18
Category Budget Projected Proposed Budget
Beginning Reserve Fund Balance $ 4,474,227 $ 4,607,870 $ 3,843,430
Fund 415 General Airport Enterprise Funds
Revenues $ 20,420,220 $ 20,012,950 $ 21,309,134
Expenditures $ (20,082,281) $ (19,640,890) $ (21,287,252)
Operating Surplus/ (Deficit) $ 337,939 $ 372,060 $ 21,882
Non-Operating Items:
Interfund transfer to General Fund $ (287,500) $ (287,500) $ (287,500)
Interfund transfer to Cap Prj Fund 416-Match $ (421,795) $ (264,000) $ (872,000)
Interfund transferto Cap Prj Fund 416-CP $ (1,395,000) $ (755,000) $ (710,000)
Reduce Airline Incentive Funds $ 170,000
Reimbursement local AIP Grant matching funds
$4.5 Million over 3 years
AIP-New PFC Project Funds - (1st of three years) $ 1,500,000
Projected Reserve Fund Balance $ 2,707,871 $ 3,843,430 $ 3,495,812
* The Proposed Budget includes:
>The cost of 4 Police Officers $740,000
>Other payroll and benefit increases $330,000
>Revenues from rental car lease space increase of 35% $ 345,000
>Increasing the daily public parking rate from $14 to $17 $ 425,000
> Increasing airline leased rates $ 300,000
it 5
IMiOlUTONLL MOOT
Airport Summary of Operations
FY 2016-17 FY 2016-17 FY 2017-18
Category Budget Projected Preliminary
Project Ending Balance $2,707,871 $ 3,843,430 $ 3,496,812
Capital Projects Fund 416
Revenues AIP Grants $ 4,140,000 $ 2,640,000 $ 8,720,000
Local Special Capital Projects $ (1,395,000) $ (755.000) $ (1,035,000)
Interfund transfer from Fund 415-Mate $ 421,795 $ 264,000 $ 872,000
Interfund transfer from Fund 415-CP $ 1,395,000 1 $ 755,0001 $ 1,035,000
Ending Cash $ 2,707,871 1 $ 3,843,430 $ 3,496,812
Fund 405 CFC (Customer Facility Charge -Rent
Beginning Cash $ 13,843,486 $ 13,850,000 $ 15,820,260
Revenues $ 1,975,000 $ 1,970,250 $ 2,100,000
Expenditures $ (2,500,000) $ - $ (6,500,000)
Ending Cash $ 13,318,486 i $ 15,820,250 $ 11,420,250
Fund 410 PFC (Passenger Facility Charge)
Beginning Cash $ 1,865,131 $ 1,817,031 $ 1,840,131
Revenues $ 3,940,000 $ 3,988,100 $ 3,940,000
Expenditures $ (3,640,000) $ (3,965,000) $ (3,640,000)
Reimburse Prior Year Matching Funds $ (1,500,000)
Ending Cash $2,165,131 1 $ 1,840,131 $ 640,131
U6
Airport Capital Outlay Budget not Funded by Grant
FY 2017-18
SPECIAL CAPITAL PROJECTS 416-6501
CAPITAL BUDGEr 2017-18
Department 6501
56000 Emergency Capital Programs $ 200,000
56xxx Aircraft Passenger Loading bridge parts and equipment(8 units) $ 220,000
56xxx AVI -Auto Vehicle Identification $ 200,000
56xxx Carpet Replacement $ 90,000
TOTAL SPECIAL CAPITAL PROJECTS $710,000