Loading...
HomeMy WebLinkAbout6/7/2017 - STAFF REPORTS - 1.P. pALM So iy V N FOIL City Council Staff Report DATE: June 7, 2017 CONSENT CALENDAR SUBJECT: APPROVE AMENDMENTS TO COACHELLA VALLEY ASSOCIATION OF GOVERNMENTS (CVAG) REIMBURSEMENT AGREEMENTS FOR INCREASED FUNDING COMMITMENTS AND ESTABLISH TIME TRIGGERS ASSOCIATED WITH VARIOUS PHASES OF CITY PROJECTS FROM: David H. Ready, City Manager BY: Engineering Services Department SUMMARY Approval of Amendments associated with Reimbursement Agreements between the City of Palm Springs and Coachella Valley Association of Governments (CVAG), allows for an increase in funding to the Preliminary Engineering (PE) phase, includes funding commitments for the remaining phases (Right of Way and Construction) and establishes associated time triggers necessary to facilitate completion of associated city projects. RECOMMENDATION: 1) Approve Amendment No. 1 to Agreement No. 6530 , a Reimbursement Agreement with the Coachella Valley Association of Governments, increasing funding to the Preliminary Engineering (PE) phase, includes funding commitments for the remaining phases (Right of Way and Construction) and establish associated time triggers for the South Palm Canyon Drive Bridge Replacement over Tahquitz Creek, City Project No. 12-02, federal-aid Project No. BRLS 5282(042); 2) Approve Amendment No. 1 to Agreement No. 6531 , a Reimbursement Agreement with the Coachella Valley Association of Governments, increasing funding to the Preliminary Engineering (PE) phase, includes funding commitments for the remaining phases (Right of Way and Construction) and establish associated time triggers for the East Palm Canyon Drive Bridge Rehabilitation over Palm Canyon Wash, City Project No. 12-04, federal-aid Project No. BRLS 5282(041); 3) Authorize the City Manager to execute all necessary documents. ITEM NO. a- 'P- City Council Staff Report June 7, 2017 - Page 2 Approve Amendments to CVAG Reimbursement Agreements, CP 12-02 and CP 12-04 STAFF ANALYSIS: The Engineering Services Department has pursued and obtained federal funding from the state of California Department of Transportation ("Caltrans") through its Highway Bridge Program (HBP) to design and construct bridges within the City of Palm Springs that are also included in the adopted CVAG Transportation Project Prioritization Study ("TPPS"). As a result that success, Caltrans committed to funding 88.53% of the entire eligible project cost, leaving the local match and project costs not funded by the HBP program to be split between CVAG and the City of Palm Springs at a 75%/25% ratio. Caltrans typically programs the entire project costs for all phases, committing funds for the entire project into the HBP program. Likewise, the City is requesting that CVAG do the same for its local share match with two amendments to the reimbursement agreements to coincide with Caltrans' HBP program as identified below: On March 17, 2017 staff sent a letter to CVAG requesting Amendment No. 1 to Reimbursement Agreement A6530 with the City, to increase costs for the PE phase, to include funding commitments for the remaining phases (Right of Way and Construction) and to establish associated time triggers for the South Palm Canyon Bridge Replacement Project over Tahquitz Creek. On April 24, 2017 the CVAG Executive Committee approved Amendment No. 1 to the CVAG Reimbursement Agreement for the project as summarized in the Table 1 from CVAG's staff report and included as Attachment 1. South Palm Canyon Bridge Replacement over Tahquitz Creek City Project No. 12-02, federal-aid Project No. BRLS 5282(042) Funding/Schedule Summary (Amendment No. 1 to Agreement No. 6530) Year Phase HBP Funding Local Funding Totals 2013/2014 Prelim. En in. PE $ 1,117.248 $ 144,752 $ 1,262,000 2019/2020 Right of Way RW $ 743,652 $ 96,348 $ 840,000 2021/2022 Construction CON $ 6,257,300 $ 810,700 $ 7,068,000 Totals $ 8,118,200 $1,051,800 $ 9,170,000 Table 1 CVAG Share: 75% of$1,061,800 = $788,850 The increased project funding request from the City was approved by Caltrans for the following reasons. a. Enhance traffic control for the project by providing for temporary and permanent traffic signal improvements to reduce anticipated congestion during construction; b. Provide additional funding for architectural treatment as recommended by the Palm Springs Public Arts Commission; 02 City Council Staff Report June 7, 2017 - Page 3 Approve Amendments to CVAG Reimbursement Agreements, CP 12-02 and CP 12-04 c. Provide increased construction costs to widen the bridge to accommodate wider shoulders and lane widths for bicycles; and d. Provide for additional funds to lengthen the bridge to achieve channel width dimensions as required by the Riverside County Flood Control. On March 17, 2017 staff sent a letter to CVAG requesting Amendment No. 1 to Reimbursement Agreement A6531 with the City, to increase costs for the PE phase, to include funding commitments for the remaining phases (Right of Way and Construction) and to establish associated time triggers for the East Palm Canyon Bridge Widening over Palm Canyon Wash. On April 24, 2017 the CVAG Executive Committee approved Amendment No. 1 to the CVAG Reimbursement Agreement for the project as summarized in the Table 2 from CVAG's staff report and included as Attachment 2. It was requested by the City that CVAG fund costs not funded by the HBP program. East Palm Canyon Bridge Widening over Palm Canyon Wash City Project No. 12-04, federal-aid Project No. BRLS 5282 (041) Funding/Schedule Summary (Amendment No. 1 to Agreement No. A6531) Year Phase HBP Funds Local Match Non-HBP Total 2013/14 Prelim E PE $1,149,119 $148,881 $45,000 $1,343,000 2019/20 Right-of-Way $442,650 $57,350 $95,000 $595,000 2021122 Construction $6,431,350 $833,250 $300,000 $7,564,600 Total $8,023,119 $1,039,481 $440,000 $9,502,600 Table 2 CVAG Share: 75% of ($1,039,481 + $440,000) = $1,109,611 As the project developed, the Engineering Services Department expanded the Project scope to include retrofitting the existing pedestrian/bicycle bridge, continue sidewalks easterly on the south side of the bridge, and improve an existing undeveloped Sunline bus stop that currently pulls onto a soft graveled shoulder, all of which are elements of CVAG's Active Transportation Plan (ATP). These improvements were not funded by the HBP program but are eligible for CVAG's regional funding. FISCAL IMPACT: The federal Highway Bridge Program (HBP) grant pays 88.53% of all eligible costs, leaving the 11.47% match and all other non-HBP funded costs to be funded locally. In accordance with CVAG policy, 75% of those costs not funded by HBP are to be funded with Regional Measure A funds. The City will fund the remaining 25% with local Measure A funds. 03 City Council Staff Report June 7, 2017 - Page 4 Approve Amendments to CVAG Reimbursement Agreements, CP 12-02 and CP 12-04 SUBMITTED Marcus L. Fuller, MPA, P.E., P.L.S. David H. Ready, Assistant City Manager City Manager ;n Thomas Ga cia, P.E. City Engineer Attachment: 1. CVAG Staff Report — South Palm Canyon Bridge 2. CVAG Staff Report — East Palm Canyon Bridge 3. Amendments 04 Attachment 1 015 IT.ELIR. E Coachella Valley Association of Governments Executive Committee I R April 24,201vi Staff Report Subject: Consider Amendment No. 1 to the Reimbursement Agreement with the City of Palm Springs to provide regional funding through all phases of the South Palm Canyon Drive Bridge Replacement Project Over Tahquitz Creek Contact: Eric Cowie, Transportation Program Manager (ecowle(o cvag.oro) Recommendation: Approve Amendment No. 1 to the Reimbursement Agreement with the City of Palm Springs providing a not-to-exceed total amount of $788,850 as 75% of local eligible costs to fund all phases of the South Palm Canyon Drive Bridge Replacement Project Over Tahquitz Creek. Transportation Committee: CONCURS (Meeting of April 31) Technical Advisory Committee): CONCURS (Meeting of April 10t') Background: In January of 2014, The Executive Committee approved a Reimbursement Agreement in the amount of $76,476 with the City of Palm Springs to provide 75% of the local share of costs for environmental approval and final design (Preliminary Engineering)for the South Palm Canyon Drive Bridge Replacement Project over Tahquitz Creek. The City of Palm Springs had successfully obtained Federal Highway Bridge Program (HBP) funding to cover 88.53% of the costs for the environmental and design phases of the project. CVAG's 75% portion of the local share was capped at $76,476. As the Project developed, the scope expanded to include additional elements necessary to meet current design standards. The additional scope and costs were approved by Caltrans. The CVAG regional share of the match necessary to complete the Preliminary Engineering phase will increase from $76,476 to $108,564, an increase of$32,088. Having now obtained Federal HBP funding to cover 88.53% of the costs for Right-of-Way and Construction, the City of Palm Springs is now requesting that CVAG provide regional funds for 75% of the local match for the Right-of-Way and Construction phases of the Project. The total CVAG share of this Project would increase to $788,850, including the previously obligated $76,476 as indicated in the table below: Funding Schedule Summary Year Phase HBP Funds Local Match Total 2013/14 Prelim En PE $1,117,248 $144,752 $1,262,000 2019/20 Right-of-Way $743,652 $96,348 $840,000 2021/22 Construction $6,257,300 $810,700 $7,068,000 Total $8,118,200 $1,051,800 $9,170,000 CVAG: 75% of$1,051,800 = $788,850 0�� Fiscal Impact: Regional Transportation Funds are available to cover CVAG's share of$788,850 within the identified schedule. Contract Finalization: Minor changes/revisions may be made for clarification purposes by CVAG's Executive Director and Legal Counsel prior to execution. Attachments: City of Palm Springs Request Letter 07 AMENDMENT NUMBER ONE TO THE REIMBURSEMENT AGREEMENT BY AND BETWEEN THE CITY OF PALM SPRINGS AND CVAG SOUTH PALM CANYON DRIVE BRIDGE REPLACEMENT PROJECT OVER TAHQUITZ CREEK THIS AMENDMENT NUMBER ONE, effective this 241 day of April, 2017, by and between the City of Palm Springs (lead Agency) and the Coachella Valley Association of Governments, a California joint powers agency, (CVAG), and is made with reference to the following background and circumstances: In January, 2014, the Executive Committee agreed to provide funding assistance to complete environmental approval and final design (Preliminary Engineering)for the South Palm Canyon Drive Bridge Replacement Project over Tahquitz Creek. At the time, the staff report identified the opportunity to take advantage of highly leveraged federal Highway Bridge Development (HBP) funding. The HBP grant provided 88.53% of the project costs for the Preliminary Engineering Phase. The City of Palm Springs is now requesting a commitment from CVAG to provide funding for additional phases of the Vista Chino Drive Bridge Project, including construction. This Amendment Number One shall: 1) Establish that the Highway Bridge Program proceeds acquired by the City of Palm Springs will fund the Major Portion of Costs for the South Palm Canyon Drive Bridge Project, and; 2) Provide CVAG Regional Funds for 76% of the Unfunded Local Portion of Qualified Project Costs, as described, and Not-to-Exceed $788,860, and; 3) Provide that any"Additional Qualified Funds"which the City of Palm Springs should acquire for this Project be First Applied "Off the Top" to reduce remaining Total Project Costs, and; 4) Extending the "Time Triggers" for Right-of-Way and Construction to coincide with the revised schedule, as described, and; 6) Provide that CVAG does not agree to advance the Proposed Schedule for the Construction Phase of the Project, and may delay funds for the proposed construction Phase of the Project should CVAG's Cash Flow require such an action at that time, and; 6) Authorize the Executive Director, in consultation with CVAG General Counsel, to resolve any Minor Inconsistencies in approving this Amendment Number One. All other provisions in the existing Reimbursement Agreement for the South Palm Canyon Drive Bridge Replacement Project shall remain in full force and effect. (Funding Schedule Summary on following page) 08 Revised Funding Schedule Summary Year Phase HBP Funding Local Funding Totals 2013/2014 Prelim. En in. PE $ 1,117,248 $ 144,752 $ 1,262,000 2019/2020 Right of Way RW $ 743,652 $ 96,348 $ 840,000 2021/2022 Construction CON $ 6,257,300 $ 810,700 $ 7,068,000 Totals $ 8,118,200 $1,051,800 $ 9,170,000 CVAG Share: 75% of$1,051,800 = Total Not-to-Exceed $788,850 Time Trigger for Completion of Right-of-Way June 31, 2020 Time Trigger for Beginning Construction June 31, 2022 (Signatures on following page) os COACHELLA VALLEY ASSOCIATION of GOVERNMENTS The parties hereto have caused this Amendment Number Two to be executed by their duly authorized representatives on the above-referenced date. ATTEST: AGENCY: CITY OF PALM SPRINGS By: By: City Manager Mayor CVAG By: By: Tom Kirk Dana Reed Executive Director CVAG Chair 10 City of Palm Springs a Engineering Services Department 3200 East TahQuitz Canyon Way• Palm Springs,California 92262 Tel:(7601323-8253• Fax:(760)322-8360-Web:www.palmspringsca.gov C�t1FORN�P March 17, 2017 Martin Magana Director of Transportation Coachella Valley Association of Governments (CVAG) 73-710 Fred Waring Drive, Suite 200 Palm Desert, CA 92260 Re: Request for Amendment No. 1 to the Reimbursement Agreement (A6530) with CVAG to Increase the Regional Funding Share for the Preliminary Engineering Phase and to Establish Funding Commitments with Associated Time Triggers for the remaining phases of the South Palm Canyon Drive Bridge Replacement, City Project No. 12-02, Federal Project No. BRLS 5282 (042) ("the Project") Dear Mr. Magana: The City of Palm Springs (City) requests an Amendment to the current AGENCY REIMBURSEMENT AGREEMENT BY AND BETWEEN CVAG AND THE CITY OF PALM SPRINGS, Agreement No. A6530, to increase the regional funding share for the Preliminary Engineering (PE) phase and to include funding commitments with associated time triggers for the remaining phases of the Project. The City's current agreement includes a funding commitment from CVAG only for the PE phase. Since execution of the agreement, the City has programmed additional funds through the Highway Bridge Program (HBP), a federal program administered by the California Department of Transportation (Caltrans). The HBP will fund 88.53% of the project costs, whereas, the City is responsible for the remaining 11.47% local match. Because the Project is located on a CVAG regional arterial and is listed on the Transportation Project Prioritization Study (TPPS), it is eligible for regional funding from CVAG. Therefore, the City is requesting that CVAG fund 75% of the local match coinciding with the HBP funding commitments as shown on the following Funding Schedule Summary. Funding Schedule Summart Year Phase I HBP Funds Local Match Total 2013/2014 Prelim. Engineering PE $1.117,248 $144,752 $1 252,000 1 2019/2020 Right of Way RNV $743 652 $96,348 $840,000 i 2021/2022 Construction CON $6,257,300 $810,700 $7,068,000 Total 1 $8.118 200 $1,051 800 $9,170,000 11 MR. MARTIN MAGANA March 17, 2017 Page 2 The City of Palm Springs applied for Highway Bridge Program (HBP) funds to replace the South Palm Canyon Bridge over the Tahquitz Creek Channel. In 2012, $889,000 was programmed for the PE phase of the project. The PE phase, as defined by Caltrans, includes the environmental approval and final design phases. They are also known as the Project Approval and Environmental Document (PA&ED) phase and the Plans, Specifications and Estimates (PS&E) phase, respectively. The reimbursement agreement between CVAG and the City was for the regional share of the local match for the PE phase. At the time, the cost of the PE phase was $889,000. The HBP Program funded $787,032 (88.53%) and the City was responsible for the remaining $101,968 (11,47%) local match. Per the agreement, CVAG's regional share of the Project cost was 75% of the local match or $76,476. As the project developed, the scope expanded adding enhanced architectural treatments, traffic signal upgrades, and other roadway improvements that were not initially identified, but were necessary to meet current design standards. The additional scope and increased costs were approved by Caltrans and is reflected in the Funding Schedule Summary table used to calculate the increased reimbursement ratio for the various phases. The PE phase was increased to an estimated cost of$1,262,000 with the local match of $144,752 (11.47%). CVAG's regional share of the local match would be $108,564 (75%). The RAN phase is estimated at$840,000 of which $96,348 (11.47%) is the required City local match. CVAG's regional share of the local match would be $72,261 (75%). The CON phase of the Project is estimated at $7,068,000 of which $810,700 is the required City local match. CVAG's share of the local match would be $608,025 (75%). The City is requesting from CVAG, as part of Amendment No. 1, a funding commitment of 75% of the local match for all phases of the Project in the amount of $788,860 under its policy of funding eligible projects to member jurisdictions. If you have any questions or need additional information please contact me at (760) 323-8253 ext. 8744 or .a e-mail at Savat.Khamohouaoalmsorinasca.00v. Sincerel , avat mp ou, A.E. Senior Civil Engineer Attachments: 1. HBP Backup list 2. Improvement Plan I cam. 2014/15-2019120 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: Riverside Responsible Agency HBP-ID Project Description Palm Springs 3974 BRIDGE NO.56C0408.S PALM CANYON DR.OVER TAHQUITZ CREEK CHANNEL,0.4 MI.S10 RAMON ROAD. Replace 4lane bridge with new 4 lane bridge. Phase Summary: Prior 14115 15116 1&17 17118 1619 19120 Beyond Total Project#: PE 8891000 1 373,000 1,262.00(1 5282 042 RAN 80,00DI I B40,000 CON 1 7.068,0001 7,068,000 Total 889,000 1 373,0001 1 1 940,OODI 7,066,000 9,170.W0 Fund Source Summary: Prior 141`15 15116 16117 17/18 IM19 1W20 Beyond Total red 787,032 330,217 743,652 6,257,300 8,118.201 Local Match 101.968 42,783 K348 810,700 1,051.799 Bond LSSRP Local AC Total 889.000 373.000 840,000 7.068,000 9,170,000 PE Summary: Prim 14115 15116 16117 17118 18119 19120 Beyond Total Fed S 787.032 330,217 1.117,249 Local Match 101,968 42,783 144.751 LSSRP Bond Local AC Total 889.000 373.000 1,262,000 RAN Summary: Prior 14115 15116 16117 17118 18119 19120 Beyond Total Fed S 743.652 741652 Local Match 98,348 96,348 LSSRP Bond Local AC Total 840,000 840.000 CON Summary: Prior 14115 15116 16117 17118 - 18119 1W20 Beyond Total Fed S 6,257,300 6.257,300 Local Match 810,700 810,700 LSSRP Bond Local AC Total 7.068.000 7.068.000 W Caltrans, Division of Local Assistance 10/2612016, 10:10 AM Det2 FL4 SmlTxt bif Page 10 M+6i:Ynr1 fYNWY:N.WL 11 4 L-7 9._ qa i vAs `f /w rfFr s•v �t.wl lJI!^fw,w dae I w.w wwe d� Y+ L.E. ssp +. uQ,-� c ar 1d: h n�" ��^- iw.r wawar /ill is 1 y Gnat !; a �^- .i""err Z w100i NMI fe Li Le p Enii PA Q ermxawniarf.wx --1 _ Q cars:wc.yvn+W+Luofcvwa � ....__�YCY .r.v Lau«rYurw:wwxwriwrK r.P�Yf a vin mfrxorwrwcxa+mfrrw..q.rLwc Q' H:avfmuCr,ccm.Y'iYermvauX '.,I � ., a L lV'F ...... + ssrwe 'a i f.MwuworuLrcrconrae.rowmwoxc. Q ea�:aii wneu wiarw•oxla+v • r I � Je'_C �,v-n � I i vnnwn. ern O ttingrW[1SM TREE WELL DETAIL r ff c MMYPr6Y1w44WM.rfGW. � � � 4 4 wf•uM�waa�ry w[ g Iff[ PRELIMINARY- p NOT FOR CONSTRUCTM O LWI..MOaW iY• Q y ..w � .. _ rfrf+mMwu"""" '•+.,,,A TYPICAL SECTIONjig; _ MLVw{ "M,, nn +o.amx�r��� u.� . • �� flit 0( PALM $PNING CA,IE N'A veSr R ��3J 91aS�n 'IRR'1+®w6�Ctlb0 p- �t�— 9UM Wr CITY Wt PALM WRING 6CMMw WU O+wQ W a4n tYMOV(YEN�w Mrp PFRRiIE Z ID�W r _ i a num _ ..ct _ ...--`...• WltNY4Y . � � / I .... S1Y�rfxYlr Y,LYt Wruaexnl uo YxPi Rlwox.u.W J AlC.xl.r v., - /r!r.u.c..,s� /' � �u' nwm anW.Iwyrm ync.�tvuav f r'ba axwt, msnw. TA ITZ CREEK CHANNEL 0 ' '•. ' rj.. • ,.._.,. TYPICAL SECTION LOOKING EAST•NO SCALE —{—PALM CANY OR W.� r a t tj Y in.Yn� ti F i wwcyav� ---� a ��'4 rautum.o / r- wT.wma wc.cwx.. tmrywt TAHOUTTZ AT Cl-LANNEL 7 TYPICAL SECTION AT BRIDGE•NO SOLE � wauiWerw - i t 1 � �. � � I a�'avr�macrtm`ar m.cu,mrca }} ..vte.n � nwWemawran,utruroM ! .I tw.na o..wD,tcno.Ycmrr IA CEO PRELIMINARY•NOT FOR CONSTRUCTION R[AW{ bag RN r�'rY"'^�"'�"� oa i. ' °.$ "' ' x'�:5.:.•.x CITY OF PALM SPRINGS, CALIF• NIA wk=— �aR'T�— c nw ���� muM eW,r aura uc eN¢tot.,muf oa uxaln am cwt 2 e i ELCxCnK IVFMV.tI ORIWN( .ryn f,WapR[M[n d.rvNCt WMCXa[xn yr[ F-y L Attachment 2 tg ITEM 7D �l Coaclhella Valley Association of Cw*ernments Executive Committee : r Apri[24,2017 Staff Report Subject: Consider Amendment No. 1 to the Reimbursement Agreement with the City of Palm Springs to provide regional funding through all phases of the East Palm Canyon Drive Bridge Rehabilitation Project Over Palm Canyon Wash Contact: Eric Cowie, Transportation Program Manager(ecowle(dcvag.org) Recommendation: Approve Amendment No. 1 to the Reimbursement Agreement with the City of Palm Springs providing a not-to-exceed total of$1,109,611 as 75% of local eligible costs to fund all phases through Construction for the East Palm Canyon Drive Bridge Rehabilitation Project Over Palm Canyon Wash. Transportation Committee: CONCURS (Meeting of April 3rd) Technical Advisory Committee (TACT: CONCURS (Meeting of April 10t') Background: In January of 2014, The Executive Committee approved a Reimbursement Agreement with the City of Palm Springs to provide 75% of the local share of costs for environmental approval and final design (Preliminary Engineering) for the East Palm Canyon Drive Bridge Rehabilitation Project Over the Palm Canyon Wash. The City of Palm Springs had successfully obtained Federal Highway Bridge Program (HBP)funding to cover 88.53% of the costs for the environmental and design phases of the project. CVAG's 75% portion of the local share was capped at $76,563. The Preliminary Engineering phase was increased to an estimated cost of$1,298,000, with a 11.47% local match of$148,881. The CVAG regional share of the match necessary to complete the Preliminary Engineering phase will increase from $76,563 to $111,661, an increase of$35,098. Having now obtained Federal HBP funding to cover 88.53% of the costs for Right-of-Way and Construction, the City of Palm Springs is now requesting that CVAG provide regional funds for 75% of the local match for those phases of the Project. HBP Non-participating costs total $440,000. The City requests that CVAG provide 75% of these costs as well. The total CVAG share of this Project would increase to $1,109,611, including the previously obligated $76,563 as indicated in the table below: Funding Schedule Sum mar Year Phase HBP Funds I Local Match I Non-HBP Total 2013/14 Prelim En PE $1,149,119 $148,881 $45,000 $1,343,000 2019/20 Right-of-Way $442,650 $57,350 $95,000 $595,000 2021/22 Construction $6,431,350 $833,250 $300,000 $7,564,600 Total $8,023,119 $1,039,481 $440,000 $9,502,600 17 CVAG: 75% of($1,039,481 + $440,000) = $1,109,611 Fiscal Impact: Regional Transportation Funds are available to cover CVAG's share of $1,109,611 within the identified schedule. Contract Finalization: Minor changes/revisions may be made for clarification purposes by CVAG's Executive Director and Legal Counsel prior to execution. Attachments: City of Palm Springs Request Letter 19 AMENDMENT NUMBER ONE TO THE REIMBURSEMENT AGREEMENT BY AND BETWEEN THE CITY OF PALM SPRINGS AND CVAG EAST PALM CANYON DRIVE BRIDGE REHABILITATION PROJECT OVER PALM CANYON WASH THIS AMENDMENT NUMBER ONE, effective this 241 day of April, 2017, by and between the City of Palm Springs (lead Agency) and the Coachella Valley Association of Governments, a California joint powers agency, (CVAG), and is made with reference to the following background and circumstances: In January, 2014, the Executive Committee agreed to provide funding assistance to complete environmental approval and final design (Preliminary Engineering) for the East Palm Canyon Drive Bridge Rehabilitation Project over Palm Canyon Wash. At the time, the staff report identified the opportunity to take advantage of highly leveraged federal Highway Bridge Development (HBP) funding. The HBP grant provided 88.53% of the project costs for the Preliminary Engineering Phase. The City of Palm Springs is now requesting a commitment from CVAG to provide funding for additional phases of the East Palm Canyon Drive Bridge Rehabilitation Project, including construction. This Amendment Number One shall: 1) Establish that the Highway Bridge Program proceeds acquired by the City of Palm Springs will fund the Major Portion of Costs for the East Palm Canyon Drive Bridge Project, and; 2) Provide CVAG Regional Funds for 76% of the Unfunded Local Portion of Qualified Project Costs, as well as 75% of Project costs not eligible for HBP funding, as described, and Not-to-Exceed $1,109,611, and; 3) Provide that any"Additional Qualified Funds"which the City of Palm Springs should acquire for this Project be First Applied "Off the Top" to reduce remaining Total Project Costs, and; 4) Extending the "Time Triggers" for Right-of-Way and Construction to coincide with the revised schedule, as described, and; 5) Provide that CVAG does not agree to advance the Proposed Schedule for the Construction Phase of the Project, and may delay funds for the proposed construction Phase of the Project should CVAG's Cash Flow require such an action at that time, and; 6) Authorize the Executive Director, in consultation with CVAG General Counsel, to resolve any Minor Inconsistencies in approving this Amendment Number One. 19 All other provisions in the existing Reimbursement Agreement for the East Palm Canyon Drive Bridge Project shall remain in full force and effect. Revised Funding Schedule Summary Year Phase HBP Local Non-HBP Totals Funding Funding 2013/2014 Prelim. En in. (PE) $ 1,149,119 $ 148,881 $ 45,000 $ 1,343,000 2019/2020 Right of Way RW $ 442,650 $ 57,350 $ 95,000 $ 595,000 2021/2022 Construction CON $ 6,431,350 $ 833,250 $300,000 $ 7,564,600 Totals $ 8,023,119 $1,039,481 $440,000 $ 9,502,600 CVAG Share: 75% of($1,039,481 + $440,000) = Total Not-to-Exceed $1,109,611 Time Trigger for Completion of Right-of-Way June 31, 2020 Time Trigger for Beginning Construction June 31, 2022 (Signatures on following page) 20 COACHELLA VALLEY ASSOCIATION of GOVERNMENTS The parties hereto have caused this Amendment Number Two to be executed by their duly authorized representatives on the above-referenced date. ATTEST: AGENCY: CITY OF PALM SPRINGS By: By: City Manager Mayor CVAG By: By: Tom Kirk Dana Reed Executive Director CVAG Chair 21 -�PALM SA City of Palm Springs a" Engineering Services Department 3200 East Tahquitz Canyon Way•Palm Springs,California 92262 Tel:(760)323-8253• Fax:(760)322.8360•Web:www.palmspringsca.gov Cq4/FORN�P March 21, 2017 Martin Magana Director of Transportation Coachella Valley Association of Governments (CVAG) 73-710 Fred Waring Drive, Suite 200 Palm Desert, CA 92260 Re: Request for Amendment No. 1 to the Reimbursement Agreement (A6631) with CVAG to Increase the Regional Funding Share for the Preliminary Engineering Phase and to Establish Funding Commitments with Associated Time Triggers for the remaining phases of the East Palm Canyon Drive Bridge Widening, City Project No. 12-04, Federal Project No. BRLS 6282 (041) ("the Project") Dear Mr. Magana: The City of Palm Springs (City) requests an Amendment to the current AGENCY REIMBURSEMENT AGREEMENT BY AND BETWEEN CVAG AND THE CITY OF PALM SPRINGS, Agreement No. A6531, to increase the regional funding share for the Preliminary Engineering (PE) phase and to include funding commitments with associated time triggers for the remaining phases of the Project. The City's current agreement includes a funding commitment from CVAG only for the PE phase. Since execution of the agreement, the City has programmed additional funds through the Highway Bridge Program (HBP), a federal program administered by the California Department of Transportation (Caltrans). The HBP will fund 88.53% of the project costs, whereas, the City is responsible for the remaining 11.47% local match. Because the Project is located on a CVAG regional arterial and is listed in the Transportation Project Prioritization Study (TPPS), it is eligible for regional funding from CVAG. Therefore, the City is requesting that CVAG fund 75% of the local match coinciding with the HBP funding commitments as shown on the attached HBP Backup List. Ancillary infrastructure necessary to complete the project include retrofitting the existing pedestrian/bicycle bridge, continuing sidewalks easterly on the south side of the bridge, and improving an existing Sunline undeveloped bus stop that currently pulls onto a soft graveled shoulder. These transitional infrastructure components are beyond the HBP eligible funding limits and not eligible for HBP funding. Therefore, the City is requesting 75% CVAG regional funding for these additional Non-HBP Project costs provided on the attached Dokken Cost Estimate. 22 MR. MARTIN MAGANA March 21, 2017 Page 2 HBP costs, the local match, and Non-HBP costs in the respective Project phases are shown in the Funding Schedule Summary below: Funding Schedule Summary Year Phase HBP Funds Local Match Non-HBP Total 2013/2014 Prelim. Enaineering (PE) $1,149,119 $148,881 $45,000 $1 343,000 2019/2020 Right of Way RNV $442,650 $57,350 $95,000 $595 000 2021/2022 Construction CON $6,431,350 $833,250 $300,000 $7,564,600 Total $B 023 119 $1,039,481 $440,000 $9,502,650 The City of Palm Springs applied for Highway Bridge Program (HBP) funds to rehabilitate East Palm Canyon Bridge over the Palm Canyon Wash. In 2013, $890,000 was programmed for the PE phase of the project. The PE phase, as defined by Caltrans, includes the environmental approval and final design phases. The project phases are also known as the Project Approval and Environmental Document (PA&ED) phase and the Plans, Specifications and Estimates (PS&E) phase, respectively. The agreement between CVAG and the City of Palm Springs included a reimbursement agreement for the regional share of the local match of the Preliminary Engineering phase. At the time, the cost of the PE phase was $890,000. The HBP Program funded $787,917 (88.53%) and the City was responsible for the remaining $102,083 (11.47%) local match. Per the agreement, CVAG's regional share of the Project cost was 75% of the local match or $76,562. Overall costs for the project have been updated and approved by Caltrans per the HBP List attached. The Local Match and the Nan-HBP portions of the project are reflected in the Funding Schedule Summary table upon which CVAG's re-imbursible portion is calculated. The Preliminary Engineering phase was increased to an estimated cost of $1,298,000 with the local match of $148,881 (11.47%). CVAG's regional share of the local match has been increased to $111,661 (75%). The Right of Way phase is estimated at $500,000 of which $57,350 (11.47%) is the local match. CVAG's regional share of the local match would be $43,012 (75%). The Construction phase of the Project is estimated at $7,264,600 of which $833,250 is the local match. CVAG's share of the local match would be $624,937 (75%). As part of Amendment No. 1, the City is requesting a funding commitment for all phases of the Project that is eligible for HBP funding in the amount of $779,611, and for Non- HBP eligible funding in the amount of $330,000, for a total amount of $1,109,611 which represents 75% of CVAG's regional share. L.� MR. MARTIN MAGANA March 21, 2017 Page 3 If you have any questions or need additional information please contact me at (760) 323-8253 ext. 8744 or via e-mail at Savat.Khamphou(a palmsorinosca.gov. Sincerely, / Savat Khamphou, P.E. Senior Civil Engineer Attachments: 1. HBP Backup List 2. Dokken Cost Estimate 3. Eligibility Map 24 2014116-2019/20 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP. District: 08 County: Riverside Responsible Agency HBP4D Project Description Pape Springs 3979 BRIDGE NO.56C0409,E PALM CANYON DROVER PALM CANYON WASH.0.5 MI.E/O FARREL DRIVE. Bridge rehabildalion project. Widen eslsli g 4 lane bridge to add shoulders and sidewalk(no added capacity). Phase Summary: Pdor 14115 16/16 1 16117 1 17118 1 ta/19 I 19t20 I Beyond Total Project#: PE 890400 1 405,0001 1 1 1 1 1,296,000 5282041 RM 500,0001 1 500,000 CON I 7,264,600 1 7264,600 Total 890.000 1 408,0001 1 500,0001 7,264,6001 9,062,600 Fund Source Summary: Nor IW115 15116 16117 17118 18119 19120 Beyond Total Fed$ 787.917 361,202 442,650 6.431.350 8,023,120 Local Match 102.083 46.798 57,350 833.250 1.039,480 LSSRP Bond Local AC Total $90,000 408,000 500,000 7,264,600 9,962,600 PE Summary: Pdor 14115 15116 16117 17/18 18119 19/20 Beyond Total Fed$ 787,917 361,202 1.149,119 Local Match 102,093 46,7W 148,881 LSSRP Bond Local AC Total 890.000 408.000 1,298,000 RlW Summary: Prior 14115 15115 16117 17116 18119 19r20 Beyond Total Fed$ 442.650 442,650 Local Match 57.350 57,350 LSSRP Bond Local AC Total 500,000 500,000 CON Summary: Pdor 14115 15116 16117 17118 18119 19120 Beyond Total Fed$ 6,431,350 6,431,350 Local Match 833.250 833.250 LSSRP Bond Local AC Total 7,264,690 7.264,600 fV [Jt Caltrans, Division of Local Assistance 10/26/2016. 10:10 AM Det2 FL4 SmlTxt brf Page 11 RMDOKKEN ENGINEERING MEMORANDUM Company: City of Palm Springs Attention: Savat Khamphou From: Matthew W. Salveson, PE, PhD Subject: East Palm Can on Drive Project—Estimated Project Costs Date: March 16, 2017 BACKGROUND The East Palm Canyon Drive bridge rehabilitation project is currently progressing through the final stages of the environmental documentation process under both CEQA and NEPA. Final design has also commenced. The project will include components that are federally participating under the Highway Bridge Program(HBP) and components that are not eligible for federal dollars. This memorandum summarizes the overall project costs based on our current estimate of construction costs, right of way impacts, environmental mitigation and I or avoidance costs, and engineering costs. Costs are COST ESTIMATES Federally Participating Costs Project Element Estimated Cost Right of Way —TCE's and potential utility relocations $200,000 Right of Way—Environmental Mitigations $300,000 Construction — Bridge and Roadway Improvements (Includes 25% $7,264,600 Contingencies) Preliminary Engineering—Consultant& Local ALency Staff $1,298,000 Total: $9,062,600 110 Blue Ravine Road, Suite 200 • Folsom, CA 95630 • Tele: 916 858-0642 • Fax: 916 858-0643 Page 1 26 R§ DOKKEN T: NGI NEE RING Non-Federally Partiei atin Costs Proiect Element Estimated Cost Construction—PedestrianBridge Rehabilitation $150,000 Construction—A roach Sidewalks, Curb and Gutter, Bus Pullout $150,000 Preliminary Engineering.(Consultant and Local Agenc Staft) $45,000 Right of Way (Temporary Construction Easement, Utility Relocations, $95,000 Fee Takes) _ Total(Less Local Agency Preliminary Engineering): $440,000 110 Blue Ravine Road, Suite 200 • Folsom,CA 95630 • Tele: 916 858-0642 • Fax: 916 858-0643 Page 2 27 RAq� PROW AC DIKE 1 REHABILITATE PEDESTRIAN DPIOOE � JJJ 1 '.„.- r „+TCE I/ 6RtYE1TAY�/•� ROW% `^"?`•' r•� _j TI ETw N LEGEND: PROPOSED BRIDOE •`a9'••,,• �l IIUL[{a NON - PARTICIPATING ELf MEMTS — vim / PROPOSED IMPROVEMENTS % `?` 171. E%15TlNG CONDITIONS ARABY TRAIL PARKING LOT SCALE:1"-1 • i IJDOKKENI EJISTPALMCANYON DRNE Ic PROJECT OVERVIEWEXHINT SHEET70F3 7V � 00 ................. SIDEWALK '+ j + - - - .......... ---------.._.._.._ 7 a E PALM CANYON ORWE �- Y� .......... ICE T FCE ROW xr j •• Ft - j ICI U\IL DIES '\ 1JEILL BOW TO BE RELOCATED RETAINING WALL � BUS PU.LOhi-� �1 SIDEWALK LEGEND: ® NON - PARTICIPATING ELEMENTS PROPOSED IMPROVEMENTS EXISTING CONDITIONS r SCALE:1'"OD' ®DOKKbN EAST PALM CANYON DRIVE PROJECT OVERVIEW SHEET ZOF3 r ................ EEHIBIT i ED Attachment 3 30 COAC14 ELLA VALLEY AssociaiONOF GOVERNMENTS D- a�a� CVAG April 26, 2017 �Q Q�'(�e f�1WJN06 Kathie Hart X City of Palm prings 3200 Eas ahquitZ Canyon Way Palm Sp ngs, CA 92262 Re: Amendment Number One — East Palm Canyon Drive Bridge Rehabilitation Project over Palm Canyon Wash & Amendment Number One — South Palm Canyon Drive Bridge Replacement Project over Tahquitz Creek Enclosed please find two originals of each Amendment between the Coachella Valley Association of Governments (CVAG) and The City of Palm Springs. Please sign all contracts, then return them to me at: Coachella Valley Association of Governments 73-710 Fred Waring Drive, Suite 200 Palm Desert, CA 92260. If you have any questions, or need further information regarding this agreement, please contact the acquisition manager, Eric Cowie. Sincere V MAY 0 8 2017 Cynthi Rhoton Accounting Assistant BY: Enclosures CITY OF BLYTHE CITY OF CATHEDRAL CITY CITY OF COACHELLA-CITY OF DESERT RIOT SPRINGS-CITY OF INDIAN WELLS 31 CITY OF INDIO-CITY OF LA QUINTA-CITY OF PALM DESERT-CITY OF PALM SPRINGS•CITY OF RANCHO MIRAGE-COUNTY OF RIVERSIDE AGUA CALIENTE BAND OF CAHUILLA INDIANS•CABAZON BAND OF MISSION INDIANS AMENDMENT NUMBER ONE TO THE REIMBURSEMENT AGREEMENT BY AND BETWEEN THE CITY OF PALM SPRINGS AND CVAG EAST PALM CANYON DRIVE BRIDGE REHABILITATION PROJECT OVER PALM CANYON WASH THIS AMENDMENT NUMBER ONE, effective this 24th day of April, 2017, by and between the City of Palm Springs (lead Agency) and the Coachella Valley Association of Governments, a California joint powers agency, (CVAG), and is made with reference to the following background and circumstances: In January, 2014, the Executive Committee agreed to provide funding assistance to complete environmental approval and final design (Preliminary Engineering) for the East Palm Canyon Drive Bridge Rehabilitation Project over Palm Canyon Wash. At the time, the staff report identified the opportunity to take advantage of highly leveraged federal Highway Bridge Program (HBP) funding. The HBP grant provided 88.53% of the project costs for the Preliminary Engineering Phase. The City of Palm Springs is now requesting a commitment from CVAG to provide funding for additional phases of the East Palm Canyon Drive Bridge Rehabilitation Project, including construction. This Amendment Number One shall: 1) Establish that the Highway Bridge Program proceeds acquired by the City of Palm Springs will fund the Major Portion of Costs for the East Palm Canyon Drive Bridge Project, and; 2) Provide CVAG Regional Funds for 75% of the Unfunded Local Portion of Qualified Project Costs, as well as 75% of Project costs not eligible for HBP funding, as described, and Not-to-Exceed $1,109,611, and; 3) Provide that any "Additional Qualified Funds" which the City of Palm Springs should acquire for this Project be First Applied "Off the Top" to reduce remaining Total Project Costs, and; 4) Extending the "Time Triggers" for Right-of-Way and Construction to coincide with the revised schedule, as described, and; 5) Provide that CVAG does not agree to advance the Proposed Schedule for the Construction Phase of the Project, and may delay funds for the proposed construction Phase of the Project should CVAG's Cash Flow require such an action at that time, and; 6) Authorize the Executive Director, in consultation with CVAG General Counsel, to resolve any Minor Inconsistencies in approving this Amendment Number One. 32 All other provisions in the existing Reimbursement Agreement for the East Palm Canyon Drive Bridge Project shall remain in full force and effect. Revised Funding Schedule Summary Year Phase HBP Local Non-HBP Totals Funding Funding 2013/2014 Prelim. En in. PE $ 1,149,119 $ 148,881 $ 45,000 $ 1,343,000 2019/2020 Right of Way RW $ 442,650 $ 57,350 $ 95,000 $ 595,000 2021/2022 Construction CON $ 6,431,350 $ 833,250 $300,000 $ 7,564,600 Totals $ 8,023,119 $1,039,481 $440,000 $ 9,502,600 CVAG Share: 75% of($1,039,481 + $440,000) = Total Not-to-Exceed $1,109,611 Time Trigger for Completion of Right-of-Way June 31, 2020 Time Trigger for Beginning Construction June 31, 2022 (Signatures on following page) 33 COACHELLA VALLEY ASSOCIATION of GOVERNMENTS The parties hereto have caused this Amendment Number One to be executed by their duly authorized representatives on the above-referenced date. ATTEST: AGENCY: CITY OF PALM SPRINGS By: By: City Manager Mayor CVAG By: By: Tom Kirk Dana Reed Executive Director CVAG Chair 34 AMENDMENT NUMBER ONE TO THE REIMBURSEMENT AGREEMENT BY AND BETWEEN THE CITY OF PALM SPRINGS AND CVAG SOUTH PALM CANYON DRIVE BRIDGE REPLACEMENT PROJECT OVER TAHQUITZ CREEK THIS AMENDMENT NUMBER ONE, effective this 241h day of April, 2017, by and between the City of Palm Springs (lead Agency) and the Coachella Valley Association of Governments, a California joint powers agency, (CVAG), and is made with reference to the following background and circumstances: In January, 2014, the Executive Committee agreed to provide funding assistance to complete environmental approval and final design (Preliminary Engineering) for the South Palm Canyon Drive Bridge Replacement Project over Tahquitz Creek. At the time, the staff report identified the opportunity to take advantage of highly leveraged federal Highway Bridge Program (HBP) funding. The HBP grant provided 88.53% of the project costs for the Preliminary Engineering Phase. The City of Palm Springs is now requesting a commitment from CVAG to provide funding for additional phases of the South Palm Canyon Drive Bridge Replacement Project, including construction. This Amendment Number One shall: 1) Establish that the Highway Bridge Program proceeds acquired by the City of Palm Springs will fund the Major Portion of Costs for the South Palm Canyon Drive Bridge Project, and; 2) Provide CVAG Regional Funds for 75% of the Unfunded Local Portion of Qualified Project Costs, as described, and Not-to-Exceed $788,850, and; 3) Provide that any "Additional Qualified Funds" which the City of Palm Springs should acquire for this Project be First Applied "Off the Top" to reduce remaining Total Project Costs, and; 4) Extending the "Time Triggers" for Right-of-Way and Construction to coincide with the revised schedule, as described, and; 5) Provide that CVAG does not agree to advance the Proposed Schedule for the Construction Phase of the Project, and may delay funds for the proposed construction Phase of the Project should CVAG's Cash Flow require such an action at that time, and; 6) Authorize the Executive Director, in consultation with CVAG General Counsel, to resolve any Minor Inconsistencies in approving this Amendment Number One. All other provisions in the existing Reimbursement Agreement for the South Palm Canyon Drive Bridge Replacement Project shall remain in full force and effect. 35 (Funding Schedule Summary on following page) Revised Funding Schedule Summary Year Phase HBP Funding Local Funding Totals 2013/2014 Prelim. En in. PE $ 1,117,248 $ 144,752 $ 1,262,000 2019/2020 Right of Way RW $ 743,652 $ 96,348 $ 840,000 2021/2022 Construction CON $ 6,257,300 $ 810,700 $ 7,068,000 Totals $ 8,118,200 $1,051,800 $ 9,170,000 CVAG Share: 75% of$1,051,800 = Total Not-to-Exceed $788,850 Time Trigger for Completion of Right-of-Way June 31, 2020 Time Trigger for Beginning Construction June 31, 2022 (Signatures on following page) 36 COACHELLA VALLEY ASSOCIATION of GOVERNMENTS The parties hereto have caused this Amendment Number One to be executed by their duly authorized representatives on the above-referenced date. ATTEST: AGENCY: CITY OF PALM SPRINGS By: By: City Manager Mayor CVAG By: By: Tom Kirk Dana Reed Executive Director CVAG Chair 3?