HomeMy WebLinkAbout9/6/2017 - STAFF REPORTS - 1.J. �OF P A LM SA4 iy � c u m ■ T'p,011Q cq��FORN�P City Council Staff Report Date: September 6, 2017 CONSENT CALENDAR Subject: ACCEPTANCE OF THE DEMUTH PARK ADA ACCESS IMPROVEMENTS, CITY PROJECT NO. 15-15 From: David H. Ready, City Manager Initiated by: Engineering Services Department SUMMARY Formal City Council acceptance of the Demuth Park ADA Access Improvements, City Project No. 15-15, is required to document the completion of the public works improvement, and to allow the City's filing of a Notice of Completion with the Riverside County Recorder in accordance with Section 9200 of the California Civil Code. RECOMMENDATION: 1) Accept the public works improvement identified as the Demuth Park ADA Access Improvements, City Project No. 15-15, as completed in accordance with the plans and specifications; and 2) Authorize the City Engineer to execute and file for recordation with the Riverside County Recorder a Notice of Completion for the Demuth Park ADA Access Improvements, City Project No. 15-15. STAFF ANALYSIS: On February 1, 2017, the City Council awarded a construction contract to Tri-Star Contracting II, Inc., in the amount of $521,098.30 for the Demuth Park ADA Access Improvements, City Project No. 15-15, (Project). The scope of work included the construction of accessible paths using Portland Cement and parking areas to access the various park facilities. The project also constructed concrete sidewalks in areas where portions of sidewalk is absent along Mesquite Ave frontage. Existing parking stalls were upgraded to meet current American with Disabilities Act (ADA) guidelines and parking stalls were relocated to provide an easier and more direct route to park amenities. An aerial map of the site is identified on the subsequent page. ITEM NO. �- City Council Staff Report September 6, 2017—Page 2 Acceptance of City Project No. 15-15 IIi�RlO ��, `ter a�ltfccEA01r 1�A.. [iF ■ ♦.�wK !•�/7iamb@9:4 lie Ayr nA O Fe • f iiZ"R -�� tlilt IR1 M M A<4A1 IA1� Figure 1 Throughout construction of the Project two contract change orders were approved as follows: • Construction Contract Change Order 1 (CCO1) in the amount of $29,091.30 was approved by City Council on February 1, 2017, to construct Portland cement concrete walkways in lieu of decomposed granite walkways. Decomposed granite walkways were the original design intent, however, staff anticipated the decomposed granite material to degrade and require more maintenance thus recommended constructing Portland cement concrete walkways. • Construction Contract Change Order 2 (CCO2) in the amount of $12,761.73 was approved by the City Manager as a final balancing change order to adjust contract bid item quantities and compensate the Contractor for paying prevailing wages for delivery of ready mix concrete in accordance with new California Assembly Bill 219. The final cost of the Project was increased by $41,853.04 from the original awarded contract amount of$521,098.30 for a final contract amount of$562,951.33. As determined by City staff, the Contractor satisfactorily completed the Project on June 16, 2017. Staff recommends that the City Council accept the Project as required by Section 9200 of the California Civil Code, and authorize the City Engineer to file and record a Notice of Completion within 15 days of the City Council's action. A copy of the Notice of Completion to be submitted to the County is included as Attachment 1. ENVIRONMENTAL IMPACT: Section 21084 of the California Public Resources Code requires Guidelines for Implementation of the California Environmental Quality Act ("CEQA"). The Guidelines are required to include a list of classes of projects which have been determined not to have a significant effect on the environment and which are exempt from the provisions of CEQA. In response to that mandate, the Secretary for Resources identified classes 02 City Council Staff Report September 6, 2017—Page 2 Acceptance of City Project No. 15-15 I � i® t ' • W111 81 v r.t .� ■�t�u�• ■. titer ry tt � ',lC'"fis t ff77[ .t �F$-r r-. ai e ... •'.�-: l�ti!•ifip ^HF]�!�'> '� t . ct .III IfIt,.• .cjCi'Rtr a• . a � iAC iILI, .t�tF7:�, r���71•t r% . 1' O 1! a � • 7 'o "��.di���``a.�j� r ►fit Y Y.S �It"'a t 4'i T. ' i aali �� Ic 7- W 'irate rtwn s. _ W WOO- ;I 1 !• ;r !.. 4e+C'. sMr Y► �f , G't81ii tti0 t t�1.All RONNE= Figure 1 Throughout construction of the Project two contract change orders were approved as follows: • Construction Contract Change Order 1 (CCO1) in the amount of $29,091 .30 was approved by City Council on February 1, 2017, to construct Portland cement concrete walkways in lieu of decomposed granite walkways. Decomposed granite walkways were the original design intent, however, staff anticipated the decomposed granite material to degrade and require more maintenance thus recommended constructing Portland cement concrete walkways. • Construction Contract Change Order 2 (CCO2) in the amount of $12,761.73 was approved by the City Manager as a final balancing change order to adjust contract bid item quantities and compensate the Contractor for paying prevailing wages for delivery of ready mix concrete in accordance with new California Assembly Bill 219. The final cost of the Project was increased by $41,853.04 from the original awarded contract amount of$521,098.30 for a final contract amount of $562,951.33. As determined by City staff, the Contractor satisfactorily completed the Project on June 16, 2017. Staff recommends that the City Council accept the Project as required by Section 9200 of the California Civil Code, and authorize the City Engineer to file and record a Notice of Completion within 15 days of the City Council's action. A copy of the Notice of Completion to be submitted to the County is included as Attachment 1. ENVIRONMENTAL IMPACT: Section 21084 of the California Public Resources Code requires Guidelines for Implementation of the California Environmental Quality Act ("CEQA"). The Guidelines are required to include a list of classes of projects which have been determined not to have a significant effect on the environment and which are exempt from the provisions of CEQA. In response to that mandate, the Secretary for Resources identified classes 02 City Council Staff Report September 6, 2017— Page 2 Acceptance of City Project No. 15-15 of projects that do not have a significant effect on the environment, and are declared to be categorically exempt from the requirement for the preparation of environmental documents. In accordance with Section 15301 "Existing Facilities," Class 1 projects consist of pedestrian trails involving a minor alteration of existing public or private structures or facilities; therefore, the Demuth Park ADA Access Improvements, City Project. No. 15-15, is considered categorically exempt from CEQA, and a Notice of Exemption has been prepared and filed with the Riverside County Clerk. FISCAL IMPACT: In the 2014/15 and 2015/16 fiscal years a total amount of $43,110 was budgeted thru the General Fund — Park Maintenance Department, Account 001-2451-43240 for design services. In the 2016/17 fiscal year budget, a budget of$500,000 was appropriated into the Measure J Capital Project Fund, Account 260-4500-59488 for construction. Further, an additional budget of $125,000 was appropriated into the Capital Projects Fund, Account 261-1395-54988 to cover construction shortfall and budget for construction contingencies. A total budget of$668,110 has been budgeted for the Project. Table 1 below is a summary of the total costs incurred for the Project. FY 14115 FY 15/16 FY 16117 FY 17/18 Phase Expenditure Expenditure Expenditure Expenditure Final Cost Administration $5,273.45 $2,941.18 $8,214.63 Design $7,475.00 $28,742.50 $6,835.00 $43,052.50 Inspection $10,667.50 $10,667.50 Construction Contract $379,846.54 $141,251.76 $521,098.30 Contract Change Orders $29,091.30 $12,761.73 $43,853.03 Total Cost $7,475.00 $28,742.50 $431,713.79 $156,954.67 $626,885.96 Table 1 The Project was funded through the following sources as shown in Table 2: Fund Name Account Actual General Fund 001-2451-43240 $43,110.00 Measure J Fund 260-4500-59488 $500,000.00 Capital Projects 261-1395-59488 $125,000.00 Total Expenditures for Project $626,885.96 Project Budget $668,110.00 Remaining Balance $41,224.04 Table 2 03 City Council Staff Report September 6, 2017— Page 2 Acceptance of City Project No. 15-15 The City is holding retention of $28,147.56 for Tri-Star Contracting II, Inc., pending acceptance of the improvements and filing of the Notice of Completion with the County Recorder's office. The Finance Department will add the cost of this project to the City's fixed asset system to include the creation of these assets in compliance with Governmental Accounting Standard Board (GASB) 34 Standards for Financial Reporting of Infrastructure Assets. SUBMITTED Marcus L. Fuller, MPA, P.E., P.L.S. Thomas Garcia, P.E. Assistant City Manager City Engineer David H. Ready, Esq., P . City Manager Attachments: 1. Notice of Completion 04 Attachment 1 05 Recording Requested By: City of Palm Springs When Recorded Mall To: Name Kathleen D.Hart,Interim City Clerk Street Address 3200 E.Tahquitz Canyon Way City& Palm Springs,CA 92262 State SPACE ABOVE THIS LINE FOR RECORDERS USE NOTICE OF COMPLETION (CA Civil Code§§8180-8190,8100-6118,9200-9208) NOTICE IS HEREBY GIVEN THAT: 1. The undersigned is an owner of an interest of estate in the hereinafter described real property,the nature of which interest or estate is: fee (e.g.fee,leasehold,joint tenancy,etc.) 2. The full name and address of the undersigned owner or reputed owner and of all co-owners or reputed co-owners are: Name Street and No. City State City of Palm Springs 3200 E.Tahquitz Canyon Way Palm Springs CA 3. The name and address of the direct contractor for the work of improvement as a whole is: Tri Star Contracting II Inc.15-501 Little Morongo Road,Desert Hot Springs,CA 92240 4. This notice is given for(check one): 0 Completion of the work of improvement as a whole. ❑ Completion of a contract for a particular portion of the work of improvement(per CA Civ.Code §8186). 5. If this notice is given only of completion of a contract for a particular portion of the work of improvement(as provided in CA Civ.Code § 8186),the name and address of the direct contractor under that contract is: Not Applicable. 6. The name and address of the construction lender, if any,is: Not Applicable. 7. On the 16th day of June 20 ,there was completed upon the herein described property a work of improvement as a whole(or a particular portion of the work of improvement as provided in CA Civ.Code§8186)a general description of the work provided: City Project 15-15,Demuth Park ADA Access Improvements 8. The real property herein referred to is situated in the City of Palm Springs County of Riverside State of California,and is described as follows: APN's: 680-120-031;680-020-043;680-020-051;680-020-052;680-020-053 9. The street address of said property is: 4365 Mesquite Avenue,Palm Springs CA 92264 10. If this Notice of Completion is signed by the owners successor in interest,the name and address of the successor's transferor is: Not applicable I certify(or declare)under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Date: By: Signature of Owner or Owner's Authorized Agent-City Engineer for City of Palm Springs Thomas Garcia, City Engineer 0 Porter Law Group,Inc.2013 Print Name,and Title Page 1 of 2 C►6 VERIFICATION 1, Thomas Garcia state: I am the City Engineer _("Owner',"President", "Authorized Agent","Partner",etc.)of the Owner identified in the foregoing Notice of Completion. I have read said Notice of Completion and know the contents thereof;the same is true of my own knowledge. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed on (date),at Palm Springs (City), CA (State). Signature of Owner or Owner's Authorized Agent Thomas Garcia,City Engineer A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached,and not the truthfulness,accuracy,or validity of that document. STATE OF CALIFORNIA COUNTY OF On (date), before me, Notary Public (name and title of officer) personally appeared who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s),or the entity upon behalf of which the person(s)acted,executed the instrument. I certify under PENALTY OF PURJURY under the laws of the State of California that the foregoing paragraph is true and correct. Witness my hand and official seal. Page 2 of 2 Signature 07