Loading...
HomeMy WebLinkAbout9/6/2017 - STAFF REPORTS - 5.B. F`M SA4 iZ h C U N a : y-0 .+ f�a0[u' CQ41FORO CITY COUNCIL STAFF REPORT DATE: September 6, 2017 New Business SUBJECT: A REQUEST FOR COUNCILMEMBER REVIEW OF AN ACTION BY THE PLANNING COMMISSION TO APPROVE A MAJOR ARCHITECTURAL APPLICATION BY GLENWOOD MANAGEMENT GROUP, LLC, TO CONSTRUCT A SEVENTEEN-UNIT APARTMENT COMPLEX ON AN UNDEVELOPED 1.13-ACRE PARCEL LOCATED AT 2150 NORTH ZANJERO ROAD, ZONE R-2 (CASE 3.3989-MAJ). FROM: David H. Ready, City Manager BY: Planning Services Department SUMMARY This is a request for review of action taken by the Planning Commission on July 26, 2017, to approve a major architectural application for the construction of a seventeen- unit apartment project, located at 2150 North Zanjero Road. Section 94.04.00 (E)(2)(c) of the Zoning Code authorizes the Planning Commission to approve major architectural applications; a Councilmember has initiated a review of the decision on this application pursuant to Palm Springs Zoning Code (PSZC) Section 94.10.00. RECOMMENDATION: 1. Open the hearing and receive testimony for the major architectural approval. 2. Adopt Resolution No. "A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS, CALIFORNIA, APPROVING A MAJOR ARCHITECTURAL APPLICATION BY GLENWOOD MANAGEMENT GROUP, LLC, TO ALLOW THE CONSTRUCTION OF A SEVENTEEN-UNIT APARTMENT COMPLEX ON AN UNDEVELOPED 1.13-ACRE PARCEL LOCATED AT 2150 NORTH ZANJERO ROAD." R E'M NQ, r PALM S. O� 4� .• y A O V 1/ 1b s �fOfl1E0\a CITY COUNCIL STAFF REPORT DATE: September 6, 2017 New Business SUBJECT: A REQUEST FOR COUNCILMEMBER REVIEW OF AN ACTION BY THE PLANNING COMMISSION TO APPROVE A MAJOR ARCHITECTURAL APPLICATION BY GLENWOOD MANAGEMENT GROUP, LLC, TO CONSTRUCT A SEVENTEEN-UNIT APARTMENT COMPLEX ON AN UNDEVELOPED 1.13-ACRE PARCEL LOCATED AT 2150 NORTH ZANJERO ROAD, ZONE R-2 (CASE 3.3989-MAJ). FROM: David H. Ready, City Manager BY: Planning Services Department SUMMARY This is a request for review of action taken by the Planning Commission on July 26, 2017, to approve a major architectural application for the construction of a seventeen- unit apartment project, located at 2150 North Zanjero Road. Section 94.04.00 (E)(2)(c) of the Zoning Code authorizes the Planning Commission to approve major architectural applications; a Councilmember has initiated a review of the decision on this application pursuant to Palm Springs Zoning Code (PSZC) Section 94.10.00. RECOMMENDATION: 1. Open the hearing and receive testimony for the major architectural approval. 2. Adopt Resolution No. "A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS, CALIFORNIA, APPROVING A MAJOR ARCHITECTURAL APPLICATION BY GLENWOOD MANAGEMENT GROUP, LLC, TO ALLOW THE CONSTRUCTION OF A SEVENTEEN-UNIT APARTMENT COMPLEX ON AN UNDEVELOPED 1.13-ACRE PARCEL LOCATED AT 2150 NORTH ZANJERO ROAD." S MTFM NO, r i �OQ F A L M S,6 A � V N •� 1ro e� » C fb9ATff 4t/F00% CITY COUNCIL STAFF REPORT DATE: September 6, 2017 New Business SUBJECT: A REQUEST FOR COUNCILMEMBER REVIEW OF AN ACTION BY THE PLANNING COMMISSION TO APPROVE A MAJOR ARCHITECTURAL APPLICATION BY GLENWOOD MANAGEMENT GROUP, LLC, TO CONSTRUCT A SEVENTEEN-UNIT APARTMENT COMPLEX ON AN UNDEVELOPED 1.13-ACRE PARCEL LOCATED AT 2150 NORTH ZANJERO ROAD, ZONE R-2 (CASE 3.3989-MAJ). FROM: David H. Ready, City Manager BY: Planning Services Department SUMMARY This is a request for review of action taken by the Planning Commission on July 26, 2017, to approve a major architectural application for the construction of a seventeen- unit apartment project, located at 2150 North Zanjero Road. Section 94.04.00 (E)(2)(c) of the Zoning Code authorizes the Planning Commission to approve major architectural applications; a Councilmember has initiated a review of the decision on this application pursuant to Palm Springs Zoning Code (PSZC) Section 94.10.00. RECOMMENDATION: 1. Open the hearing and receive testimony for the major architectural approval. 2. Adopt Resolution No. "A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS, CALIFORNIA, APPROVING A MAJOR ARCHITECTURAL APPLICATION BY GLENWOOD MANAGEMENT GROUP, LLC, TO ALLOW THE CONSTRUCTION OF A SEVENTEEN-UNIT APARTMENT COMPLEX ON AN UNDEVELOPED 1.13-ACRE PARCEL LOCATED AT 2150 NORTH ZANJERO ROAD." r City Council Staff Report Page 2 of 3 Case 3.3989-MAJ September 6,2017 PRIOR ACTIONS: Related Rebe`t tit ci `"dtions The Architectural Advisory Committee (AAC) reviewed the proposed 01/17/17 apartment development and voted to continue the project, with direction to revise certain aspects of the site plan. The AAC reviewed the revised plans that addressed all of the Committee's 07/17/17 comments, and voted unanimously to recommended approval to the Planning Commission. 07/26/17 he Planning Commission considered and approved the project with conditions. BACKGROUND: On July 26, 2017, the Planning Commission reviewed the proposed major architectural application for the development of a seventeen-unit apartment complex at 2150 North Zanjero Road. The site, which is currently undeveloped, is surrounded by a nursing home to the north, undeveloped parcels to the south and northwest, an assisted living facility to the southwest, and existing residential uses to the east. The parcel is 1.13- acres in size and is located on the west side of North Indian Canyon Drive. The subject property is one of the few remaining undeveloped parcels on North Indian Canyon Drive, and is landlocked on three sides. Additional analysis of the site is provided in the analysis section of the attached Planning Commission staff report dated July 26, 2017, which is included as Attachment #4. The Planning Commission considered and approved the project by a vote of 6-0-1 (Commissioner Middleton, abstained), finding that it met the required development standards and was in conformance to the Architectural Review criteria. ANALYSIS: Proposals for major architectural applications do not typically require Council action. Pursuant to PSZC Section 94.04.00(E), Planning Commission Approvals, Major Architectural applications for uses that are permitted by right-of-zone are subject to review and approval by the Planning Commission after a review by the AAC. This item is being brought to the Council at the request of Councilmember Mills pursuant to the provision of Section 94.10.00 of the Zoning Code, which states that any member of the City Council may initiate a review of any decision of the Planning Commission that would not otherwise come before the City Council. The process for this review is further described in Section 2.06.030 of the Municipal Code. Pursuant to the procedures identified in Palm Springs Municipal Code Section 2.060.030(d), the City Council is to set aside the action of the Planning Commission and conduct a review of the case de novo. Staff recommends that the Council consider the analysis prepared for the proposed project as detailed in the staff report provided to the Planning Commission on July 26th. Upon reviewing the information and concluding a 02 City Council Staff Report Page 3 of 3 Case 3.3989-MAJ September 6,2017 review of the application, staff seeks direction on the specific revisions desirable to the City Council for the amendments to this project. Such revisions will be included in the draft resolution attached to this report. ENVIRONMENTAL DETERMINATION: The proposed project has been evaluated for compliance with the California Environmental Quality Act (CEQA) and has determined that the project is categorically exempt from the requirements of CEQA pursuant to Section 15332 (In-Fill Development Projects) of the CEQA Guidelines. Staff has recommended an adoption of a Categorical Exemption since proposed project meets the following criteria: 1. The project is consistent with the applicable general plan designation and applicable zoning designation; 2. The project is located within the City limits on a site of no more than five acres substantially surrounded by urban uses; 3. The project is not located on sites that have value as habitat for endangered, rare or threatened species; 4. The project will not result in any significant impacts relating to traffic, noise, air quality, or water quality; and 5. The project can be adequately served by all required utilities and public services. A Notice of Exemption will be prepared and filed with the Riverside County Clerk upon a final approval of the proposal by the City Council. Z'� Flinn Fagg, AICP Marcus L. Fuller, MPA, PE, PLS Director of Planning Services Assistant City Manager/City Engineer David H. Ready, Esq., . . City Manager Attachments: 1. 500' Vicinity Map 2. Draft City Council Resolution 3. Draft Conditions of Approval 4. Planning Commission Staff Report (07/26/17) 5. Planning Commission Minutes (07/26/17) 6. Approved Plans (dated July 2017) 03 ATTACHMENT No. 1 04 Ut ��Lp �+ N a 1 N Department of Planning Services "' E o;��. Vicinity Map S R,C I PD 1 GLEN CIR N ROCHELLE RD R2 RIC R2 —CI-1 T, GLEN CIR 5 N VWOL'IVERA - YcZ. A R2 `;Ct Rz g C1 R2 0 V Z C, sy ` Wm a R2 c z VIA'ESCU ELA RGA6 R3 Legend c, ®Site R3 [3500 R Site Radius Zoning —Parcels CITY OF PALM SPRINGS CASE NO: 3.3989 MAJ APPLICANT: Glenwood Management Group, LLC ADDRESS: 2150 North Zanjero Road 65 ATTACHMENT No. 2 06 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS, CALIFORNIA, APPROVING CASE NO. 3.3989-MAJ; A MAJOR ARCHITECTURAL APPLICATION APPROVAL FOR THE CONSTRUCTION OF THREE A SEVENTEEN-UNIT APARTMENT COMPLEX ON A 49,405- SQUARE FOOT UNDEVELOPED PARCEL LOCATED AT 2150 NORTH ZANJERO ROAD, ZONE R-2, SECTION 3. THE CITY COUNCIL FINDS AND DETERMINES AS FOLLOWS: A. Glenwood Management Group, ("Applicant') has filed an application with the City pursuant to Section 94.04.00 of the Zoning Ordinance for the construction of a new seventeen-unit apartment complex on an undeveloped parcel located 2150 North Zanjero Road, Zone R-2, Section 3. B. On July 17, 2017, the Architectural Advisory Committee voted unanimously, to recommend approval of the project to the Planning Commission as submitted. C. On July 26, 2017, a public meeting on the application to consider Case 3.3989 MAJ was held by the Planning Commission in accordance with applicable law. D. On September 6, 2017, a public meeting on the proposed major architectural application was held by City Council in accordance with applicable law. The City Council has carefully reviewed and considered all of the evidence presented in connection with the meeting on the proposed major architectural approval, including but not limited to the staff report and all written and oral testimony presented. E. The proposed project is considered a "project' pursuant to the terms of the California Environmental Quality Act ("CEQA"), and has been determined to be categorically exempt pursuant to Section 15332 (In-Fill Development Projects) of the CEQA Guidelines. Furthermore, the project meets the following CEQA criteria: 1 . The project is consistent with the applicable general plan designation and applicable zoning designation; 2. The project is located within the City limits on a site of no more than five acres substantially surrounded by urban uses; 3. The project is not located on sites that have value as habitat for endangered, rare or threatened species; 4. The project will not result in any significant impacts relating to traffic, noise, air quality, or water quality; and 5. The project can be adequately served by all required utilities and public services. F. Pursuant to Section 66412.3 of the Subdivision Map Act, the City Council has considered the effect of the proposed project on the housing needs of the region, 07 City Council Resolution No. September 6,2017 Case 3.3989 MAJ—1250 N.Zanjero Road Page 2 of 4 and has balanced these needs against the public service needs of residents and available fiscal and environmental resources. G. The City Council has carefully reviewed and considered all of the evidence presented in connection with the Project, including but not limited to the staff report, and all written and oral testimony presented and finds that the Project complies with the requirements of Section 94.04.00 of the City's Zoning Code. The City Council makes the following findings based on specific evidence as described after each finding: 1. Site layout, orientation, location of structures and relationship to one another and to open spaces and topography. Definition of pedestrian and vehicular areas; i.e., sidewalks as distinct from parking areas; The proposed development is on an undeveloped flat lot with access from a local street with adequate off-street parking. The site layout, orientation and locations of structures allow adequate open space and well-defined pedestrian and vehicular areas. Existing sidewalks are provided along North Indian Canyon Drive and along North Zanjero Road leading into the development. Proposed sidewalks along North Zanjero Road will be distinct from planned parking areas. The view corridors of the site and its surroundings will not be impacted by the apartment building; proposed height is twenty (20) feet; the R-2 zone allows a maximum height of twenty-four (24) feet. 2. Harmonious relationship with existing and proposed adjoining developments and in the context of the immediate neighborhood community, avoiding both excessive variety and monotonous repetition, but allowing similarity of style, if warranted; The proposed apartment complex will be developed in an area that is surrounded by mostly undeveloped parcels. There is an existing nursing home to the north, undeveloped parcels to the south and northwest, an assisted living facility to the southwest and existing multi-family residential uses to the east. The proposed complex will be harmonious with existing land uses in the immediate vicinity. The design of the proposed apartment complex will fit the immediate neighborhood/community relative to the style and future use. 3. Maximum height, area, setbacks and overall mass, as well as parts of any structure (buildings, walls, screens towers or signs) and effective concealment of all mechanical equipment; The proposed development conforms to required development standards of the zoning designation such as setbacks, height limits, minimum and maximum coverage limits. The maximum height, overall mass are all in keeping with the R-2 development standards. The project is not seeking any relief for development standards of the designated zone. Mechanical equipment will be placed on grade and is well screened. 4. Building design, materials and colors to be sympathetic with desert surroundings; AND 08 City Council Resolution No. September 6,2017 Case 3.3989 MAJ—1250 N.Zanjero Road Page 3 of 4 5. Harmony of materials, colors and composition of those elements of a structure, including overhangs, roofs, and substructures which are visible simultaneously, AND 6. Consistency of composition and treatment, As proposed, the building design will complement existing development in the area; proposed materials and colors are sympathetic with desert surrounding. The size of apartment buildings, proposed materials, colors and other elements of the new structures are consistent with the architectural styles prevalent in the City. There is consistency in the composition and treatment of the new buildings with a simple architectural style. 7. Location and type of planting, with regard for desert climate conditions. Preservation of specimen and landmark trees upon a site, with proper irrigation to insure maintenance of all plant materials,- The project proposes mostly drought-tolerant plant species deemed appropriate to the desert environment. As designed, landscaped areas will include use of shade trees and decomposed granite and hardscape along the frontage, side yards and courtyard area. The proposed landscape plan includes a mix of different species of drought tolerant shrubs, decomposed granite and groundcovers used along the property frontage, patio and recreation areas. THE CITY COUNCIL OF THE CITY OF PALM SPRINGS RESOLVES: SECTION 1. That the findings and determinations reflected above are true and correct, and are incorporated by this reference herein as the cause and foundation for the action taken by and through this resolution. SECTION 2. CEQA. The proposed project is considered a "project' pursuant to the terms of the California Environmental Quality Act ("CEQA"), and has been determined to be categorically exempt pursuant to Section 15332 (In-Fill Development Projects) of the CEQA Guidelines. SECTION 3. The City Council hereby approves the proposed major architectural approval allow the development of a seventeen-unit apartment complex located at 2150 North Zanjero Road, and such approvals shall be valid for two years, unless otherwise extended in a manner authorized under applicable provisions of the Palm Springs Municipal Code. ADOPTED THIS 6th day of September 2017. 09 City Council Resolution No. September 6,2017 Case 3.3989 MAJ—1250 N.Zanjero Road Page 4 of 4 David H. Ready, Ph.D., City Manager ATTEST: Kathleen D. Hart, Interim City Clark 10 ATTACHMENT No. 3 RESOLUTION NO. Exhibit A Case 3.3989-MAJ Glenwood Management Group 17-Unit Apartment Complex 2150 North Zanjero Road September 6, 2017 CONDITIONS OF APPROVAL Before final acceptance of the project, all conditions listed below shall be completed to the satisfaction of the City Engineer, the Director of Planning Services, the Director of Building and Safety, the Chief of Police, the Fire Chief or their designee, depending on which department recommended the condition. Any agreements, easements or covenants required to be entered into shall be in a form approved by the City Attorney. ADMINISTRATIVE: ADM 1. Project Description. This approval is for the project described per Case 3.3989-MAJ; except as modified with the approved the conditions below; ADM 2. Reference Documents. The site shall be developed and maintained in accordance with the approved plans, date stamped July 26, 2017, including site plans, architectural elevations, exterior materials and colors, landscaping, and grading on file in the Planning Division except as modified by the approved Mitigation Measures and conditions below. ADM 3. Conform to all Codes and Regulations. The project shall conform to the conditions contained herein, all applicable regulations of the Palm Springs Zoning Ordinance, Municipal Code, and any other City County, State and Federal Codes, ordinances, resolutions and laws that may apply. ADM 4. Minor Deviations. The Director of Planning or designee may approve minor deviations to the project description and approved plans in accordance with the provisions of the Palm Springs Zoning Code. ADM 5. Indemnification. The owner shall defend, indemnify, and hold harmless the City of Palm Springs, its agents, officers, and employees from any claim, action, or proceeding against the City of Palm Springs or its agents, officers or employees to attach, set aside, void or annul, an approval of the City of Palm Springs, its legislative body, advisory agencies, or administrative officers concerning Case 3.3989-MAJ. The City of Palm Springs will promptly notify the applicant of any such claim, action, or proceeding against the City Conditions of Approval September 6,2017 Case No.3.3989-MAJ Page 2 of 17 of Palm Springs and the applicant will either undertake defense of the matter and pay the City's associated legal costs or will advance funds to pay for defense of the matter by the City Attorney. If the City of Palm Springs fails to promptly notify the applicant of any such claim, action or proceeding or fails to cooperate fully in the defense, the applicant shall not, thereafter, be responsible to defend, indemnify, or hold harmless the City of Palm Springs. Notwithstanding the foregoing, the City retains the right to settle or abandon the matter without the applicant's consent but should it do so, the City shall waive the indemnification herein, except, the City's decision to settle or abandon a matter following an adverse judgment or failure to appeal, shall not cause a waiver of the indemnification rights herein. ADM 6. Maintenance and Repair. The property owner(s) and successors and assignees in interest shall maintain and repair the improvements including and without limitation all structures, sidewalks, parking areas, landscape, irrigation, lighting, signs, walls, and fences between the curb and property line, including sidewalk or bikeway easement areas that extend onto private property, in a first class condition, free from waste and debris, and in accordance with all applicable law, rules, ordinances and regulations of all federal, state, and local bodies and agencies having jurisdiction at the property owner's sole expense. This condition shall be included in the recorded covenant agreement for the property if required by the City. ADM 7. Time Limit on Approval. Approval of the Architectural Application (MAJ) shall be valid for a period of two (2) years from the effective date of the approval. Extensions of time may be granted by the Planning Commission upon demonstration of good cause. ADM 8. Right to Appeal. Decisions of an administrative officer or agency of the City of Palm Springs may be appealed in accordance with Municipal Code Chapter 2.05.00. Permits will not be issued until the appeal period has concluded. ADM 9. Public Art Fees. This project shall be subject to Chapters 2.24 and 3.37 of the Municipal Code regarding public art. The project shall either provide public art or payment of an in lieu fee. In the case of the in-lieu fee, the fee shall be based upon the total building permit valuation as calculated pursuant to the valuation table in the Uniform Building Code, the fee being 1/2% for commercial projects or 1/4% for residential projects with first $100,000 of total building permit valuation for individual single-family units exempt. Should the public art be located on the project site, said location shall be reviewed and approved by the Director of Planning and Zoning and the Public Arts Commission, and the property owner shall enter into a recorded agreement to maintain the art work and protect the public rights of access and viewing. ADM 10. Park Development Fees. The developer shall dedicate land or pay a fee in lieu of a dedication, at the option of the City. The in-lieu fee shall be computed �. 3 Conditions of Approval September 6,2017 Case No.3.3989-MAJ Page 3 of 17 pursuant to Ordinance No. 1632, Section IV, by multiplying the area of park to be dedicated by the fair market value of the land being developed plus the cost to acquire and improve the property plus the fair share contribution, less any credit given by the City, as may be reasonably determined by the City based upon the formula contained in Ordinance No. 1632. In accordance with the Ordinance, the following areas or features shall not be eligible for private park credit: golf courses, yards, court areas, setbacks, development edges, slopes in hillside areas (unless the area includes a public trail) landscaped development entries, meandering streams, land held as open space for wildlife habitat, flood retention facilities and circulation improvements such as bicycle, hiking and equestrian trails (unless such systems are directly linked to the City's community-wide system and shown on the City's master plan). ENVIRONMENTAL ASSESSMENT: ENV 1. Coachella Valley Multiple-Species Habitat Conservation Plan (CVMSHCP) Local Development Mitigation Fee (LDMF) required. All projects within the City of Palm Springs, not within the Agua Caliente Band of Cahuilla Indians reservation are subject to payment of the CVMSHCP LDMF prior to the issuance of certificate of occupancy. ENV 2. Notice of Exemption. The project is exempt from the California Environmental Quality Act (CEQA); therefore, an administrative fee of$50 shall be submitted by the applicant in the form of a money order or a cashier's check payable to the Riverside County Clerk within two business days of the Commission's final action on the project. This fee shall be submitted by the City to the County Clerk with the Notice of Exemption. Action on this application shall not be considered final until such fee is paid (projects that are Categorically Exempt from CEQA). PLANNING DEPARTMENT: PLN 1. Outdoor Lighting Conformance. Exterior lighting plans, including a photometric site plan showing the project's conformance with Section 93.21.00 Outdoor Lighting Standards of the Palm Springs Zoning ordinance, shall be submitted for approval by the Department of Planning prior to issuance of a building permit. Manufacturer's cut sheets of all exterior lighting on the building and in the landscaping shall be included. If lights are proposed to be mounted on buildings, down-lights shall be utilized. No lighting of hillsides is permitted. PLN 2. Water Efficient Landscaping Conformance. The project is subject to the Water Efficient Landscape Ordinance (Chapter 8.60.00) of the Palm Springs Municipal Code and all other water efficient landscape ordinances. The applicant shall submit a landscape and irrigation plan to the Director of Planning for review and approval prior to the issuance of a building permit. Landscape plans shall be wet stamped and approved by the Riverside , 4 t Conditions of Approval September 6,2017 Case No.3.3989-MAJ Page 4 of 17 County Agricultural Commissioner's Office prior to submittal. Prior to submittal to the City, landscape plans shall also be certified by the local water agency that they are in conformance with the water agency's and the State's Water Efficient Landscape Ordinances. PLN 3. Screen Roof-mounted Equipment. All roof mounted mechanical equipment shall be screened per the requirements of Section 93.03.00 of the Zoning Ordinance. PLN 4. Surface Mounted Downspouts Prohibited. No exterior downspouts shall be permitted on any facade on the proposed building(s) that are visible from adjacent streets or residential and commercial areas. PLN 5. Pre-wiring for Installation of Photo-voltaic systems. If the project does not include photo-voltaic system(s) for electrical production, "pre-wiring" and appropriate configuration of electrical panels and conduit must be provided to accommodate the future installation of such equipment on rooftops of structures within the proposed development. PLN 6. Trash Bins Stash bins shall be placed behind screened location at all times with the exception of garbage collection days. ENGINEERING DEPARTMENT: The Engineering Division recommends that if this application is approved, such approval is subject to the following conditions being completed in compliance with City standards and ordinances. All Grading Plans, Improvement Plans, Required Studies and Documents listed below, must be submitted to Engineering Services Department for review and approval. STREETS ENG 1 . The Engineering Services Department recommends deferral of off-site improvement items (identified as "Deferred') at this time due to lack of full improvements in the immediate area. The owner shall execute a street improvement covenant agreeing to construct all required street improvements upon the request of the City of Palm Springs City Engineer at such time as deemed necessary. The covenant shall be executed and notarized by the property owner(s) prior to approval of the Grading Plan or issuance of grading or building permits. A current title report; or a copy of a current tax bill and a copy of a vesting grant deed shall be provided to verify current property ownership. A covenant preparation fee in effect at the time that the covenant is submitted shall be paid by the applicant prior to issuance of any grading or building permits. i � Conditions of Approval September 6,2017 Case No.3.3989-MAJ Page 5 of 17 ENG 2. Any improvements within the public right-of-way require a City of Palm Springs Encroachment Permit. All improvements are subject to inspection and a 24 to 48 hour inspection notification is required. ENG 3. Submit street improvement plans prepared by a registered California civil engineer to the Engineering Services Department. The plan(s) shall be approved by the City Engineer prior to issuance of any building permits. NORTH INDIAN CANYON DRIVE ENG 4. Remove the existing curb located 32 feet west of centerline and replace with an 8 inch curb and gutter located 38 feet west of centerline along the entire frontage in accordance with City of Palm Springs Standard Drawing No. 200. "Deferred' ENG 5. Construct an 8 feet wide sidewalk behind the future curb along the entire frontage in accordance with City of Palm Springs Standard Drawing No. 210. "Deferred' ENG 6. Construct an 8 feet wide sidewalk behind the curb along the entire frontage in accordance with City of Palm Springs Standard Drawing No. 210. ENG 7. Construct a 14-feet wide raised, landscaped median island as specified by the City Engineer across the entire frontage. Landscaping and irrigation plans for the median shall be submitted to the City Engineer for review and approval, in conjunction with the associated street improvement plans. "Deferred' ENG 8. Submit landscaping and irrigation system improvement plans for review and approval by the City Engineer and Director of Parks and Recreation. The irrigation system shall be separately metered from the parkway landscaping to be maintained by the applicant, for future use by the City upon acceptance of the median landscaping by the City. The plans shall be approved in conjunction with the street improvement plans for the median and prior to issuance of a building permit, unless otherwise allowed by the City Engineer. "Deferred' ENG 9. All median landscaping shall be guaranteed for a period of one year from the date of acceptance by the City Engineer. Any landscaping that fails during the one year landscape maintenance period shall be replaced with similar plant material to the satisfaction of the City Engineer, and shall be subject to a subsequent one year landscape maintenance period. "Deferred' � s Conditions of Approval September 6,2017 Case No.3.3989-MAJ Page 6 of 17 ENG 10. Construct pavement with a minimum pavement section of 5 inches asphalt concrete pavement over 4 inches crushed miscellaneous base with a minimum subgrade of 24 inches at 95% relative compaction, or equal, from edge of proposed gutter to clean sawcut edge of pavement along the entire frontage in accordance with City of Palm Springs Standard Drawing No. 110. (Additional pavement removal and replacement may be required upon review of existing pavement cross-sections, and to ensure grade breaks of the pavement cross-section do not occur within a travel lane.) If an alternative pavement section is proposed, the proposed pavement section shall be designed by a California registered Geotechnical Engineer using "R" values from the project site and submitted to the City Engineer for approval. "Deferred' ENG 11. All broken or off grade street improvements along the project frontage shall be repaired or replaced. ZANJERO ROAD ENG 12. Contact Desert Water Agency at (760) 323-4971 to determine impacts to any existing Whitewater Mutual Water Company water lines and other facilities that may be located within the existing 30 feet wide strip parcel adjacent to Zanjero Road (APN# 504-270-014). Applicant to acquire an easement for street purposes from Via Escuela and extending north along the frontage of project. Make appropriate arrangements to protect in place or relocate any facilities that are impacted by the development. A letter of approval for relocated or adjusted facilities and an executed Grant of Easement from Desert Water Agency shall be submitted to the Engineering Services Department prior to approval of the Grading Plan. ENG 13. Construct a 6 inch curb and gutter, 18 feet east of centerline from the intersection of Via Escuela and along the entire frontage, with a 25 feet radius curb return, spandrel and cross gutter at the northeast corner of the intersection of Via Escuela and Zanjero Road in accordance with City of Palm Springs Standard Drawing No. 200 and 206. ENG 14. Construct an 8 feet wide sidewalk behind the curb along the entire frontage in accordance with City of Palm Springs Standard Drawing No. 210. ENG 15. Construct two 24 feet wide driveway approaches in accordance with City of Palm Springs Standard Drawing No. 205. ENG 16. Construct a Type A curb ramp meeting current California State Accessibility standards at the northeast corner of the intersection of Via Escuela and Zanjero Road and in accordance with City of Palm Springs Standard Drawing No. 212. i7 Conditions of Approval September 6,2017 Case No.3.3989-MAJ Page 7 of 17 ENG 17. Construct pavement with a minimum pavement section of 2 '/z inches asphalt concrete pavement over 4 inches crushed miscellaneous base with a minimum subgrade of 24 inches at 95% relative compaction, or equal, from edge of proposed gutter to 6 feet west of centerline from the intersection of Via Escuela and Zanjero Road along the entire frontage in accordance with City of Palm Springs Standard Drawing No. 110. (Additional pavement removal and replacement may be required upon review of existing pavement cross-sections, and to ensure grade breaks of the pavement cross-section do not occur within a travel lane.) If an alternative pavement section is proposed, the proposed pavement section shall be designed by a California registered Geotechnical Engineer using "R" values from the project site and submitted to the City Engineer for approval. ENG 18. An application for an Encroachment Agreement shall be submitted to the Engineering Services Department to allow installation of landscaping and appurtenances within the public right-of-way across the frontage of APN#504-270-016. The application for the Encroachment Agreement shall be approved prior to issuance of a certificate of occupancy. ENG 19. All broken or off grade street improvements along the project frontage shall be repaired or replaced. ON-SITE ENG. 20. The minimum pavement section for all on-site pavement drive aisles, parking spaces shall be 2-1/2 inches asphalt concrete pavement over 4 inches crushed miscellaneous base with a minimum subgrade of 24 inches at 95% relative compaction, or equal. If an alternative pavement section is proposed, the proposed pavement section shall be designed by a California registered Geotechnical Engineer using "R" values from the project site and submitted to the City Engineer for approval. ENG. 21. An accessible pedestrian path of travel shall be provided throughout the development, as may be required by applicable state and federal laws. An accessible path of travel shall be constructed of Portland cement concrete, unless alternative materials meeting state and federal accessibility standards is approved by the City Engineer. SANITARY SEWER ENG. 22. All sanitary facilities shall be connected to the public sewer system. New laterals shall not be connected at manholes. i8 Conditions of Approval September 6,2017 Case No.3.3989-MAJ Page 8 of 17 GRADING ENG. 23. Submit a Precise Grading Plan prepared by a California registered Civil engineer to the Engineering Services Department for review and approval. The Precise Grading Plan shall be approved by the City Engineer prior to issuance of grading permit. a. A Fugitive Dust Control Plan shall be prepared by the applicant and/or its grading contractor and submitted to the Engineering Services Department for review and approval. The applicant and/or its grading contractor shall be required to comply with Chapter 8.50 of the City of Palm Springs Municipal Code, and shall be required to utilize one or more "Coachella Valley Best Available Control Measures" as identified in the Coachella Valley Fugitive Dust Control Handbook for each fugitive dust source such that the applicable performance standards are met. The applicant's or its contractor's Fugitive Dust Control Plan shall be prepared by staff that has completed the South Coast Air Quality Management District (AQMD) Coachella Valley Fugitive Dust Control Class. The applicant and/or its grading contractor shall provide the Engineering Services Department with current and valid Certificate(s) of Completion from AQMD for staff that has completed the required training. For information on attending a Fugitive Dust Control Class and information on the Coachella Valley Fugitive Dust Control Handbook and related "PM10" Dust Control issues, please contact AQMD at (909) 396-3752, or at http://www.AQMD.gov. A Fugitive Dust Control Plan, in conformance with the Coachella Valley Fugitive Dust Control Handbook, shall be submitted to and approved by the Engineering Services Department prior to approval of the Grading plan. b. The first submittal of the Grading Plan shall include the following information: a copy of final approved conformed copy of Conditions of Approval; a copy of a final approved conformed copy of the Site Plan; a copy of current Title Report; a copy of Soils Report; and a copy of the associated Hydrology Study/Report; a copy of the project-specific Final Water Quality Management Plan. ENG. 24. Prior to approval of a Grading Plan (or issuance of a Grading Permit), the applicant shall obtain written approval to proceed with construction from I the Agua Callente Band of Cahullla Indians, Tribal Historic Preservation Officer or Tribal Archaeologist ( a copy of the written approval must be provided to the City) . The applicant shall contact the Tribal Historic Preservation Officer or the Tribal Archaeologist at ACBCI- THPO(a�aguacaliente.net to determine their requirements, if any, associated with grading or other construction. The applicant is advised to contact the Tribal Historic Preservation Officer or Tribal Archaeologist as early as possible. If required, it is the responsibility of the applicant to � 9 Conditions of Approval September 6,2017 Case No.3.3989-MAJ Page 9 of 17 coordinate scheduling of Tribal monitors during grading or other construction, and to arrange payment of any required fees associated with Tribal monitoring. ENG. 25 In accordance with an approved PM-10 Dust Control Plan, temporary dust control perimeter fencing shall be installed. Fencing shall have screening that is tan in color; green screening will not be allowed. Temporary dust control perimeter fencing shall be installed after issuance of Grading Permit, and immediately prior to commencement of grading operations. ENG. 26. Temporary dust control perimeter fence screening shall be appropriately maintained, as required by the City Engineer. Cuts (vents) made into the perimeter fence screening shall not be allowed. Perimeter fencing shall be adequately anchored into the ground to resist wind loading. ENG. 27. Within 10 days of ceasing all construction activity and when construction activities are not scheduled to occur for at least 30 days, the disturbed areas on-site shall be permanently stabilized, in accordance with Palm Springs Municipal Code Section 8.50.022. Following stabilization of all disturbed areas, perimeter fencing shall be removed, as required by the City Engineer. ENG. 28. A Notice of Intent (NOI) to comply with the California General Construction Stormwater Permit (Water Quality Order 2009-0009-DWQ as modified September 2, 2009) is required for the proposed development via the California Regional Water Quality Control Board online SMARTS system. A copy of the executed letter issuing a Waste Discharge Identification (WDID) number shall be provided to the City Engineer prior to issuance of a grading or building permit. ENG. 29. In accordance with City of Palm Springs Municipal Code, Section 8.50.022 (h), the applicant shall post with the City a cash bond of two thousand dollars ($2,000.00) per disturbed acre (if there is disturbance of 5,000 square feet or more) at the time of issuance of grading permit for mitigation measures for erosion/blowsand relating to this property and development. ENG. 30. A Geotechnical/Soils Report prepared by a California registered Geotechnical Engineer shall be required for and incorporated as an integral part of the grading plan for the proposed development. A copy of the Geotechnical/Soils Report shall be submitted to the Engineering Services Department with the first submittal of a grading plan (if required) or prior to issuance of any permit. ENG. 31. The applicant shall provide pad (or finish floor) elevation certifications for all building (or structure) pads in conformance with the approved grading 20 Conditions of Approval September 6,2017 Case No.3.3989-MAJ Page 10 of 17 plan (if required), to the Engineering Services Department prior to construction of any building (or structure) foundation. ENG. 32. In cooperation with the Riverside County Agricultural Commissioner and the California Department of Food and Agriculture Red Imported Fire Ant Project, applicants for grading permits involving a grading plan and involving the export of soil will be required to present a clearance document from a Department of Food and Agriculture representative in the form of an approved "Notification of Intent To Move Soil From or Within Quarantined Areas of Orange, Riverside, and Los Angeles Counties" (RIFA Form CA-1) prior to approval of the Grading Plan (if required). The California Department of Food and Agriculture office is located at 73-710 Fred Waring Drive, Palm Desert (Phone: 760-776- 8208). WATER QUALITY MANAGEMENT PLAN ENG. 33. A Final Project-Specific Water Quality Management Plan (WQMP) shall be submitted to and approved by the City Engineer prior to issuance of a grading or building permit. The WQMP shall address the implementation of operational Best Management Practices (BMP's) necessary to accommodate nuisance water and storm water runoff from within the underground parking garage and the on-site private drive aisles. Direct release of nuisance water to adjacent public streets is prohibited. Construction of operational BMP's shall be incorporated into the Precise Grading and Paving Plan. ENG. 34. Prior to issuance of any grading or building permits, the property owner shall record a "Covenant and Agreement" with the County-Clerk Recorder or other instrument on a standardized form to inform future property owners of the requirement to implement the approved Final Project- Specific Water Quality Management Plan (WQMP). Other alternative instruments for requiring implementation of the approved Final Project- Specific WQMP include: requiring the implementation of the Final Project- Specific WQMP in Home Owners Association or Property Owner Association Covenants, Conditions, and Restrictions (CC&Rs); formation of Landscape, Lighting and Maintenance Districts, Assessment Districts or Community Service Areas responsible for implementing the Final Project- Specific WQMP; or equivalent. Alternative instruments must be approved by the City Engineer prior to issuance of any grading or building permits. DRAINAGE ENG. 35. All stormwater runoff passing through the site shall be accepted and conveyed across the property in a manner acceptable to the City Engineer. For all stormwater runoff falling on the site, on-site retention or 21 Conditions of Approval September 6,2017 Case No.3.3989-MAJ Pagel 1 of 17 other facilities approved by the City Engineer shall be required to contain the increased stormwater runoff generated by the development of the property. Provide a hydrology study to determine the volume of increased stormwater runoff due to development of the site, and to determine required stormwater runoff mitigation measures for the proposed development. Final retention basin sizing and other stormwater runoff mitigation measures shall be determined upon review and approval of the hydrology study by the City Engineer and may require redesign or changes to site configuration or layout consistent with the findings of the final hydrology study. No more than 40-50% of the street frontage parkway/setback areas should be designed as retention basins. On-site open space, in conjunction with dry wells and other subsurface solutions should be considered as alternatives to using landscaped parkways for on-site retention. ENG. 36. The project is subject to flood control and drainage implementation fees. The acreage drainage fee at the present time is $ 6511.00 per acre in accordance with Resolution No. 15189. Fees shall be paid prior to issuance of a building permit. GENERAL ENG. 37. Any utility trenches or other excavations within existing asphalt concrete pavement of off-site streets required by the proposed development shall be backfilled and repaired in accordance with City of Palm Springs Standard Drawing No. 115. The developer shall be responsible for removing, grinding, paving and/or overlaying existing asphalt concrete pavement of off-site streets as required by and at the discretion of the City Engineer, including additional pavement repairs to pavement repairs made by utility companies for utilities installed for the benefit of the proposed development (i.e. Desert Water Agency, Southern California Edison, Southern California Gas Company, Time Warner, Verizon, Mission Springs Water District, etc.). Multiple excavations, trenches, and other street cuts within existing asphalt concrete pavement of off-site streets required by the proposed development may require complete grinding and asphalt concrete overlay of the affected off-site streets, at the discretion of the City Engineer. The pavement condition of the existing off-site streets shall be returned to a condition equal to or better than existed prior to construction of the proposed development. ENG. 38. Any utility trenches or other excavations within existing asphalt concrete pavement of off-site streets required by the proposed development shall be backfilled and repaired in accordance with City of Palm Springs Standard Drawing No. 115. ENG. 39. All proposed utility lines shall be installed underground. 22 Conditions of Approval September 6,2017 Case No.3.3989-MAJ Page 12 of 17 ENG. 40. In accordance with Chapter 8.04.401 of the City of Palm Springs Municipal Code, all existing and proposed electrical lines of thirty-five thousand volts or less and overhead service drop conductors, and all gas, telephone, television cable service, and similar service wires or lines, which are on- site, abutting, and/or transecting, shall be installed underground unless specific restrictions are shown in General Orders 95 and 128 of the California Public Utilities Commission, and service requirements published by the utilities. The existing overhead utilities across the west property line, meet the requirement to be installed underground. Utility undergrounding shall extend to the nearest off-site power pole; no new power poles shall be installed unless otherwise approved by the City Engineer. A letter from the owners of the affected utilities shall be submitted to the Engineering Services Department prior to approval of a grading plan, informing the City that they have been notified of the City's utility undergrounding requirement and their intent to commence design of utility undergrounding plans. When available, the utility undergrounding plan shall be submitted to the Engineering Services Department identifying all above ground facilities in the area of the project to be undergrounded. Undergrounding of existing overhead utility lines shall be completed prior to issuance of a certificate of occupancy. ENG. 41. The applicant is advised that deferral of utility undergrounding requires specific approval by the Planning Commission and City Council. If utility undergrounding is deferred in accordance with specific direction by the Planning Commission and/or City Council, the record property owner(s) shall enter into a covenant agreeing to underground all of the existing overhead utilities required by the Municipal Code in the future upon request of the City of Palm Springs City Engineer at such time as deemed necessary. The covenant shall be executed and notarized by the property owner(s) and submitted to the City Engineer prior to issuance of a building permit. A current title report; or a copy of a current tax bill and a copy of a vesting grant deed shall be provided to verify current property ownership. A covenant preparation fee in effect at the time that the covenant is submitted shall be paid by the developer prior to issuance of any grading or building permits. ENG. 42. All existing utilities shall be shown on the improvement plans if required for the project. The existing and proposed service laterals shall be shown from the main line to the property line. ENG. 43. Upon approval of any improvement plan (if required) by the City Engineer, the improvement plan shall be provided to the City in digital format, consisting of a DWG (AutoCAD 2004 drawing file), DXF (AutoCAD ASCII drawing exchange file), and PDF (Adobe Acrobat 6.0 or greater) formats. 23 Conditions of Approval September 6, 2017 Case No.3.3989-MAJ Page 13 of 17 Variation of the type and format of the digital data to be submitted to the City may be authorized, upon prior approval by the City Engineer. ENG. 44. The original improvement plans prepared for the proposed development and approved by the City Engineer (if required) shall be documented with record drawing "as-built' information and returned to the Engineering Services Department prior to issuance of a final certificate of occupancy. Any modifications or changes to approved improvement plans shall be submitted to the City Engineer for approval prior to construction. ENG. 45. Nothing shall be constructed or planted in the corner cut-off area of any driveway which does or will exceed the height required to maintain an appropriate sight distance per City of Palm Springs Zoning Code Section 93.02.00, D. ENG. 46. All proposed trees within the public right-of-way and within 10 feet of the public sidewalk and/or curb shall have City approved deep root barriers installed in accordance with City of Palm Springs Standard Drawing No. 904. ENG. 47. This property is subject to the Coachella Valley Multiple Species Habitat Conservation Plan Local Development Mitigation Fee (CVMSHCP-LDMF). The LDMF shall be paid prior to issuance of Building Permit. TRAFFIC ENG. 48 All damaged, destroyed, or modified pavement legends, traffic control devices, signing, striping, and street lights, associated with the proposed development shall be replaced as required by the City Engineer prior to issuance of a Certificate of Occupancy. ENG. 49. Construction signing, lighting and barricading shall be provided during all phases of construction as required by City Standards or as directed by the City Engineer. As a minimum, all construction signing, lighting and barricading shall be in accordance with Part 6 'Temporary Traffic Control' of the California Manual on Uniform Traffic Control Devices (CAMUTCD), dated November 7, 2014, or subsequent editions in force at the time of construction. ENG. 50. This property is subject to the Transportation Uniform Mitigation Fee which shall be paid prior to issuance of building permit. 24 Conditions of Approval September 6,2017 Case No.3.3989-MAJ Page 14 of 17 FIRE DEPARTMENT: FID 1 These conditions are subject to final plan check and review. Initial Fire Department conditions have been determined from the plans received July 13, 2017. These Fire Department conditions may not provide all requirements. Owner/developer is responsible for all applicable state and locally adopted fire codes. Detailed plans are still required for review. FID 2 Fire Department Conditions are based on the 2016 California Fire Code as adopted by City of Palm Springs, Palm Springs Municipal Code, PSFD Appendix "O" Development Requirements and latest adopted NFPA Standards. Three (3) complete sets of plans for private fire service mains, fire alarm, or fire sprinkler systems must be submitted at time of the building plan submittal. No deferred submittals accepted. FID 3 PLANS AND PERMITS Complete plans for private fire service mains or fire sprinkler systems should be submitted for approval well in advance of installation. Plan reviews can take up to 20 working days. Submit a minimum of three (3) sets of drawings for review. Upon approval, the Fire Prevention Bureau will retain one set. Plans shall be submitted to: City of Palm Springs Building and Safety Department 3200 E. Tahquitz Canyon Way Palm Springs, CA 92262 Counter Hours: 8:00 AM — 6:00 PM, Monday— Thursday A deposit for Plan Check and Inspection Fees is required at the time of Plan Submittal. Inspection fees are charged at the fully burdened hourly rate of the fire inspector. These fees are established by Resolution of the Palm Springs City Council. Complete listings and manufacturer's technical data sheets for all system materials shall be included with plan submittals. All system materials shall be UL listed or FM approved for fire protection service and approved by the Fire Prevention Bureau prior to installation. Plans shall include all necessary engineering features, including all hydraulic reference nodes, pipe lengths and pipe diameters as required by the appropriate codes and standards. Plans and supporting data, (calculations 25 Conditions of Approval September 6,2017 Case No.3.3989-MAJ Page 15 of 17 and manufacturers technical data sheets) including fire flow data, shall be submitted with each plan submittal. Complete and accurate legends for all symbols and abbreviations shall be provided on the plans. FID 4 Conditions of Approval — "Conditions of Approval" received from the Palm Springs Planning Department must be submitted with each plan set. Failure to submit will result in a delay of plan approval. FID 5 Fire Apparatus Access Roads (CFC 503.1.1): Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. Dimensions (CFC 503.2.1): Fire apparatus access roads shall have an unobstructed width of not less than 24 feet except for approved security gates in accordance with Section 503.6 and an unobstructed vertical clearance of not less than 13 feet 6 inches. Surface (CFC 503.2.3): Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus (73,000 lbs. GVW) and shall be surfaced so as to provide all-weather driving capabilities. • Fire Lanes — signage and/or curb markings required Project Note: Project is not compliant with the above 150' Rule". An interior standpipe system may be used as an alternate means of protection. Contact the fire department for details. FID 6 Required access (CFC 504.1): Exterior doors and openings required by this code or the California Building Code shall be maintained readily accessible for emergency access by the fire department. An approved access walkway leading from fire apparatus access roads to exterior openings shall be provided when required by the fire code official. Project Note: Approved access required to reach all grade level exterior walls. FID 7 Turning radius (CFC 503.2.4): Fire access road turns and corners shall be designed with a minimum inner radius of 25 feet and an outer radius of 43 feet. Radius must be concentric. FID 8 Traffic Calming Devices (CFC 503.4.1): Traffic calming devices shall be prohibited unless approved by the fire code official. 26 Conditions of Approval September 6,2017 Case No.3.3989-MAJ Page 16 of 17 FID 9 Key Box Required (CFC 506.1): Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be flush mount type and shall contain keys to gain necessary access as required by the fire code official. FID 10 Operational Fire Hydrant(s) (CFC 507.1, 507.5 & C105.1): An approved water supply capable of supplying the required fire flow for fire protection shall be provided. • Maximum distance from any point on street frontage to a public hydrant — 250 feet • Operational fire hydrant(s) shall be installed within 250 feet of all combustible construction and shall be serviceable prior to and during construction FID 11 NFPA 13R Fire Sprinklers Required: An automatic fire sprinkler system is required. Only a C-16 licensed fire sprinkler contractor shall perform system design and installation. System to be designed and installed in accordance with NFPA standard 13R, 2013 Edition, as modified by local ordinance. • Shall comply with Palm Springs Fire Code Appendix "O" FID 12 Fire Extinguisher Requirements (CFC 906): Provide one 2-A:10-B:C portable fire extinguisher for every 75 feet of floor or grade travel distance for normal hazards. Show proposed extinguisher locations on the plans. Extinguishers shall be mounted in a visible, accessible location 3 to 5 feet above floor level. Preferred location is in the path of exit travel or near an exit door. FID 13 Residential Smoke and Carbon Monoxide Alarms Installation (CFC 907.2.11.2/3/4; CRC R314 & R315; and California Health & Safety Code 17926): Provide and install Residential Smoke and Carbon Monoxide Alarms. Alarms shall receive their primary power from the building wiring, and shall be equipped with a battery backup. In new construction, alterations, repairs and additions, smoke and carbon monoxide alarms shall be interconnected. The operation of any smoke alarm will cause all smoke alarms within the dwelling to sound. The operation of any carbon monoxide alarm will cause all carbon monoxide alarms within the dwelling to sound. FID 14 Hazardous Materials (CFC 5004.1): Storage of hazardous materials in amounts exceeding the maximum allowable quantity per control area as set forth in Section 5003.1 shall be in accordance with Sections 5001, 5003 and 5004. Storage of hazardous materials in amounts not exceeding the maximum allowable quantity per control area as set forth in Section 5003.1 shall be in accordance with Sections 5001 and 5003. Retail and wholesale storage and display of nonflammable solid and nonflammable and 27 Conditions of Approval September 6,2017 Case No.3.3989-MAJ Page 17 of 17 noncombustible liquid hazardous materials in Group M occupancies and Group S storage shall be in accordance with Section 5003.11. • Pool Chemicals — dedicated, compliant storage cabinets, rooms, or areas required • Liquid Petroleum Gas (LPG) — dedicated, compliant storage cabinets, rooms, or areas required Project Note: Show compliant chemical storage room on plans END OF CONDITIONS 28 ATTACHMENT No. 4 29 i �gALM sD9 iy O V N R s ca •S °q40FORN Planning Commission Staff Report DATE: July 26, 2017 New Business SUBJECT: A REQUEST BY GLENWOOD MANAGEMENT GROUP, LLC, FOR A MAJOR ARCHITECTURAL APPROVAL TO CONSTRUCT A SEVENTEEN-UNIT APARTMENT COMPLEX ON A 1.13-ACRE UNDEVELOPED PARCEL LOCATED AT 2150 NORTH ZANJERO ROAD, ZONE R-2 (CASE 3.3989-MAJ) (ER). FROM: Department of Planning Services SUMMARY The Planning Commission to consider a major architectural application approval for the construction of seventeen (17) apartment units in three (3) separate two-story buildings. The proposal includes required parking spaces, recreation areas and associated landscaping. RECOMMENDATION: Adopt a categorical exemption; approve the proposed project as recommended by the Architectural Advisory Committee (AAC) subject to the attached conditions of approval. PRIOR ACTIONS: On January 17, 2017, the AAC reviewed the proposed project to construct a 16-unit apartment complex on an undeveloped parcel located at 2155 North Indian Canyon Drive. After receiving the staff and applicant's presentations, Committee members discussed the details of the proposal relative to the overall project. The AAC voted to continue the item and recommended that the applicant work on the following issues: • Configuration of rear parking area and common area. • Spacing of parallel parking spaces. (Tree is in grate and level with pavement.) • Public amenities are adjacent to Indian Canyon Drive; wall will buffer traffic noise. • Exterior details of buildings. (control joint lines in stucco) • Space planning studies would be adequate for pool/bbq amenity areas. • Prefers to see more division between units in the common area. • Increase trees to 36" box size. • Reconfigure amenities - pool, patio and parking. On July 17, 2017, revised plans addressing all the AAC comments were presented to the Committee and with a unanimous vote recommended approval to the Planning Commission as submitted. 30 Planning Commission Staff Report July 26,2017--Page 2 Case 3.3989 MAJ—2150 N.Zanjero Road BACKGROUND: Related Relevant City Actions by Planning, Fire, Buildin etc... None Most Recent Ownership 05.17.16 Glenwood Management Group, LLC Nei hborhood Notification 07.20.17 Neighborhood Organizations notified. Field Check 07.13.17 Staff visited site to observe existing conditions Notification Not Required Site Area Net Area 1.13 Acres 49,405-s uare feet Existing General Plan Existing Land Use Existing Zoning 'Designations Designations Site Medium Density R-2 Limited Multiple-Family Residential Undeveloped Residential North Medium Density R-2 Limited Multiple-Family Residential Nursing Home Residential South Medium Density R-2 Limited Multiple-Family Residential Undeveloped Residential East Mixed Use / Multi Use R-2 Limited Multiple-Family Condominium Units Residential West Medium Density Assisted living facility Commercial / Limited Residential / Undeveloped Multiple-Family Residential BACKGROUND AND SETTING: The site which is currently undeveloped is surrounded by a nursing home to the north, undeveloped parcels to the south and northwest, an assisted living facility to the southwest and existing residential uses to the east. The parcel is 1.13-acres in size and located on the west side of North Indian Canyon Drive. The lot which is flat and slopes gently to the east does not appear to have been previously disturbed; however, there is debris and low-growing vegetation across the parcel. The subject property is one of the remaining undeveloped parcels landlocked on three sides. Additional analysis of the site is provided in the analysis section of this memo. 31 Planning Commission Staff Report July 26,2017--Page 3 Case 3.3989 MAJ—2150 N.Zanjero Road PM A OWN j 4 i J I 14 y r .. t r _ ` _,f Subject Site: 2150 N. Zanjero Road Project Description: The proposed project is a 17-unit, two-story rental apartment complex to be constructed in three separate buildings on a 1.13-acre parcel. The project will include twenty-three (23) carports, nine (9) surface parking spaces, associated landscaping, and a swimming pool. Fifteen (15) of the units will have two bedrooms, two bathrooms, a kitchen and a den. Two of the units will have three bedrooms, three and one-half bathrooms and a kitchen. All the units will have enclosed backyards and patios. Proposed common amenities will include a pool, and a trellis/patio with seating area. The applicant has proposed to install solar panels on the building roof tops. The main access into the complex will be from Zanjero Road. ANALYSIS: Table 2 R-2 Proposed Project Compliance Lot Area 20,000-s . ft. 49,405 s uare feet Yes Lot Width 130 feet 169.7 feet Yes Lot Depth 150 feet 301 feet Yes Front Yard 25 feet 81 feet Yes Side Yard 10 feet 17 feet Yes Rear Yard 30 feet 30 feet Yes Density 15 du/acre Gen. Plan 17 Units / 1.13 acres Yes No. of units Allowed 1.13 acres x 15 du = 16.95 17 Units Yes Building Height 24 feet 20 feet 2 Stories Maximum 2 Stories Yes Bldg. Coverage 50% lot coverage 29.5% lot coverage Yes Bldg. Separation 15 feet. 25 feet Yes Parking Reg. 28 32 Space Provided Yes Landscaping Nospecific requirements Landscape plan provided Yes 32 Planning Commission Staff Report July 26,2017—Page 3 Case 3.3989 MAJ—2150 N.Zanjero Road 1111r. �� . M now t ._J L V I if dt Jr �V Subject Site: 2150 N. Zanjero Road Project Description: The proposed project is a 17-unit, two-story rental apartment complex to be constructed in three separate buildings on a 1.13-acre parcel. The project will include twenty-three (23) carports, nine (9) surface parking spaces, associated landscaping, and a swimming pool. Fifteen (15) of the units will have two bedrooms, two bathrooms, a kitchen and a den. Two of the units will have three bedrooms, three and one-half bathrooms and a kitchen. All the units will have enclosed backyards and patios. Proposed common amenities will include a pool, and a trellis/patio with seating area. The applicant has proposed to install solar panels on the building roof tops. The main access into the complex will be from Zanjero Road. ANALYSIS: Table 2 R-2 Proposed Project Compliance Lot Area 20,000-s . ft. 49,405 square feet Yes Lot Width 130 feet 169.7 feet Yes Lot Depth 150 feet 301 feet Yes Front Yard 25 feet 81 feet Yes Side Yard 10 feet 17 feet Yes Rear Yard 30 feet 30 feet Yes Density 15 du/acre Gen. Plan 17 Units / 1.13 acres Yes No. of units Allowed 1.13 acres x 15 du = 16.95 17 Units Yes Building Height 24 feet 20 feet 2 Stories Maximum 2 Stories Yes Bldg. Coverage 50% lot coverage 29.5% lot coverage Yes Bldg. Separation 15 feet. 25 feet Yes Parking Reg. 28 32 Spa es Provided Yes Landscaping Nos ecific requirements Landscape plan provided Yes 32 Planning Commission Staff Report July 26,2017--Page 4 Case 3,3989 MAJ—2150 N.Zanjero Road Project Design: The undeveloped site is a rectangular parcel with frontages along North Zanjero Road which is currently an unpaved road and North Indian Canyon Drive. The site slopes downward from west to east. The apartment units will be contained in three detached structures with recreation area in the center. The architectural design of the buildings has a modern/contemporary style. The three separate two-story buildings are depicted as Units N (North Building), Unit S (South Building) and Unit E (East Building); there are a total of seventeen (17) units. Units N and S will each contain five (5) apartment units; Unit E will contain seven (7) two-bedroom units. The North Building is 8,390 square feet in size; the South Building is 8,390 square feet, while the East Building is 9,328 square feet in size. The community amenities are located at the center of the complex. The recreation/amenities will include a swimming pool, a spa, trellis with seating area and shaded areas for various activities. A combination of six-foot tall stucco wall and six-foot high iron picket fence will separate the parking area and the recreation area. A three and one-half foot tall entry gate leads into the main complex from the parking area. The main entrance into the development will be from Zanjero Road. Two driveways leading into the development and parking spaces are off Zanjero Road. The parking spaces will have open carport roof structures along with an electric vehicle (EV) charging station. The trash enclosure is located in front of the parking area and is proposed to be screened with a six-foot tall masonry wall and landscaping to adequately shield the structure. The maximum height of each of the buildings is twenty feet (20'); the maximum height permitted in the R-2 zoning designation is twenty-four feet (24'). All other development standards of the proposed buildings are consistent with the R-2 standards in terms of density, front, rear and side yard setbacks, dwelling size and lot coverage. Proposed building exterior walls will include a three-coat cement plaster stucco smooth coat "Santa Barbara" finish with milky quartz color. Proposed window materials will include double insulated glass with coating. Parking Requirement.- Pursuant to Section 93.06.00(D)(29)(c) of the Zoning Code, parking requirements for the proposed apartment project is as follows: • Two-bedroom units require 1.5 spaces, • Three or more bedrooms require .75 spaces per bedroom. The project contains fifteen (15) two-bedroom units and two (2) three-bedroom units therefore requiring twenty-eight (28) parking spaces. The applicant is proposing thirty- two (32) parking spaces inclusive of two ADA-compliant handicap parking spaces, meeting the parking requirement. Landscape Plan: A conceptual landscape plan for the apartment project was submitted as part of the major architectural review. As designed, proposed landscaped areas will include use of shade trees and decomposed granite and hardscape along the frontage on Zanjero Road, northerly and southerly side yards, courtyard area, patio areas and rear yard areas along North Indian Canyon Drive. The streetscape along North Indian Canyon 33 Planning Commission Staff Report July 26,2017—Page 5 Case 3.3989 MAJ—2150 N.Zanjero Road Drive will include the use of Hybrid Fan Palm trees, Mediterranean Fan palm trees, different selections of shrubs, 2" depth compacted 3/8" minus Mohave gold decomposed granites, 4"-6" diameter Cobble rock and T-4' diameter Desert select Boulders. The rest of the plant selections for the project include the following: a mix of different species of drought tolerant shrubs, Citrus trees (Lemon and Lime), Chamaerops Humilis, Hybrid fan palms, Green Carpet, Boxwood beauty, Sweet memory, Indigo bush, Desert Spoon, Ficus to be used for hedges, Lynn's legacy Texas Ranger, Regal mist, Yellow bells, Bougainvillea and Yellow bells. The AAC recommended that the applicant increase the sizes of proposed trees from 24" to 36" and shrubs from 1 gallon to 5 gallons and provide shade trees along the North Indian Canyon Drive frontage. AAC Review: On January 17, 2017, the Architectural Advisory Committee (AAC), reviewed the project and voted to continue the project with comments and recommendations to the applicant. On July 17, 2017, a revised item addressing the AAC's concerns was brought back to the AAC for review. At this hearing, the Committee expressed its appreciation to the applicants for incorporating all their recommendations to the revised plans. The Committee then recommended approval to the Planning Commission with conditions. The conditions are as follows: 1. Add pedestrian entry/gates into the complex from North Indian Canyon frontage. 2. Add shade trees along the sidewalk on North Indian Canyon Drive. 3. Increase proposed Citrus trees sizes from 24" box to 36" box. 4. Proposed trees on North Indian Canyon to be moved outside fence further into the yard areas. 5. Proposed Fan Palm tree sizes on North Indian Canyon to be 24" or 36" box, 6. Replace proposed hedges of Ficus with different plants. The applicant concurred with these conditions and informed the AAC that all the recommended conditions will be incorporated into the project. REQUIRED FINDINGS: There are no specific required findings for architectural approval which do not require environmental assessments. This project's conformance to the architectural guidelines of the Zoning Ordinance is analyzed below. Architectural Review.- Specific aspects of design shall be examined to determine whether the proposed development will provide desirable environment for its occupants as well as being compatible with the character of adjacent and surrounding developments, and whether aesthetically it is of good composition, materials, textures and colors. Conformance is evaluated based on consideration of the following: 9. Site layout, orientation, location of structures and relationship to one another and to open spaces and topography. Definition of pedestrian and vehicular areas; i.e., sidewalks as distinct from parking areas; 34 I Planning Commission Staff Report July 26,2017--Page 6 Case 3.3989 MAJ—2150 N.Zanjero Road The proposed development is on an undeveloped flat lot with access from a local street with adequate off-street parking. The site layout, orientation and locations of structures allow adequate open space and well-defined pedestrian and vehicular areas. Existing sidewalks are provided along North Indian Canyon Drive and along North Zanjero Road leading into the development. Proposed sidewalks along North Zanjero Road will be distinct from planned parking areas. The view corridors of the site and its surroundings will not be impacted by the apartment building; proposed height is twenty (20) feet; the R-2 zone allows a maximum height of twenty-four (24) feet. 2. Harmonious relationship with existing and proposed adjoining developments and in the context of the immediate neighborhood community, avoiding both excessive variety and monotonous repetition, but allowing similarity of style, if warranted; The proposed apartment complex will be developed in an area that is surrounded by mostly undeveloped parcels. There is an existing nursing home to the north, undeveloped parcels to the south and northwest, an assisted living facility to the southwest and existing multi-family residential uses to the east. The proposed complex will be harmonious with existing land uses in the immediate vicinity. The design of the proposed apartment complex will fit the immediate neighborhood/community relative to the style and future use. 3. Maximum height, area, setbacks and overall mass, as well as parts of any structure (buildings, walls, screens towers or signs) and effective concealment of all mechanical equipment; The proposed development conforms to required development standards of the zoning designation such as setbacks, height limits, minimum and maximum coverage limits. The maximum height, overall mass are all in keeping with the R-2 development standards. The project is not seeking any relief for development standards of the designated zone. Mechanical equipment will be placed on grade and is well screened. 4. Building design, materials and colors to be sympathetic with desert surroundings; AND 5. Harmony of materials, colors and composition of those elements of a structure, including overhangs, roofs, and substructures which are visible simultaneously, AND 6. Consistency of composition and treatment, As proposed, the building design will complement existing development in the area; proposed materials and colors are sympathetic with desert surrounding. The size of apartment buildings, proposed materials, colors and other elements of the new structures are consistent with the architectural styles prevalent in the City. There is consistency in the composition and treatment of the new buildings with a simple architectural style. 7. Location and type of planting, with regard for desert climate conditions. Preservation of specimen and landmark trees upon a site, with proper irrigation to insure maintenance of all plant materials; 35 Planning Commission Staff Report July 26,2017--Page 7 Case 3.3989 MAJ—2150 N.Zanjero Road The project proposes mostly drought-tolerant plant species deemed appropriate to the desert environment. As designed, landscaped areas will include use of shade trees and decomposed granite and hardscape along the frontage, side yards and courtyard area. The proposed landscape plan includes a mix of different species of drought tolerant shrubs, decomposed granite and groundcovers used along the property frontage, patio and recreation areas. ENVIRONMENTAL DETERMINATION: The proposed project has been evaluated for compliance with the California Environmental Quality Act (CEQA) and has determined that the project is categorically exempt from the requirements of CEQA pursuant to Section 15332 (In-Fill Development Projects) of the CEQA Guidelines. Staff has recommended an adoption of a Categorical Exemption since proposed project meets the following criteria: 1 . The project is consistent with the applicable general plan designation and applicable zoning designation; 2. The project is located within the City limits on a site of no more than five acres substantially surrounded by urban uses; 3. The project is not located on sites that have value as habitat for endangered, rare or threatened species; 4. The project will not result in any significant impacts relating to traffic, noise, air quality, or water quality; and 5. The project can be adequately served by all required utilities and public services. Accordingly, upon approval of this item, a Notice of Exemption will be prepared and filed with the Riverside County Clerk. NOTIFICATION: This project is not a public hearing item; however, the nearby Neighborhood Organization was notified of this hearing. CONCLUSION: Overall, the proposed project is consistent with and in conformance with the architectural guidelines for development in the City. And as proposed, the project conforms to the development standards for the R-2 zone and is a by-right project. The proposed apartment project has a simple rhythmic design. The area has remained undeveloped for a very long time and would be an appropriate location for the proposed housing development which the City needs. Staff recommends approval of the proposed project as submitted subject to the attached conditions of approval. Edward Robertson Flinn Fagg, AICP, Directo Principal City Planner Department of Planning Services 36 ATTACHMENT No. 5 37 EXCERPT OF MINUTES At the Planning Commission meeting of the City of Palm Springs, held July 26, 2017, the Planning Commission took the following action: 3C. GLENWOOD MANAGEMENT GROUP, LLC, FOR A MAJOR ARCHITECTURAL APPROVAL TO CONSTRUCT A SEVENTEEN-UNIT APARTMENT COMPLEX ON A 1.08-ACRE UNDEVELOPED PARCEL LOCATED AT 2150 NORTH ZANJERO ROAD (CASE 3.3989-MAJ). (ER) Commissioner Middleton left the dais at 3:20 pm. Principal Planner Robertson provided an overview on the proposed 17-unit apartment complex as outlined in the staff report. FENTON BOOTH, Glenwood Management Group, manager, said in the last five years they have built many new rental complexes and as developers they looked at North Palm Springs and how it's developing. He said they have had a lot of success with the affordable market rental housing in Chicago and think this parcel can succeed. Vice-Chair Calerdine commended the developer for bringing forth this much needed multi-family rental project. Chair Weremiuk asked what the rent projection is and verified if solar is included in the project. (2 bedroom, 2 bath townhouse— will be slightly under $2000 per month and solar will be included on the center carport only.) ACTION: Approved subject to: • Installation of solar panels over the center carport. MOTION: Vice-Chair Calerdine, seconded by Commissioner Hudson, and carried on a 6-0-1 roll call vote. Commissioner Middleton returned to the dais at 3:40 pm. I, TERRI HINTZ, Planning Administrative Coordinator forthe City of Palm Springs, hereby certify that the above action was taken by Planning Commission of the City of Palm Springs on the 26t" day of July, 2017, by the following vote: AYES: Donenfeld, Hirschbein, Hudson, Lowe, Vice Chair Calerdine, Chair Weremiuk 38 Planning Commission Minutes-Excerpt City of Palm Springs July 26,2017 NOES: None ABSENT: None ABSTAIN: Middleton 2 Terri Hintz Planning Administrative Coordinator 2 39 ATTACHMENT No. 6 40 ,1 I y 1�4 i ,n �e _ nw , ZN "D4 ?,L,;:W+wi;.•rc¢a ,�,iJ'- � qv: r f> - ,.a �`"2:J, _ x L , , r y, WVQFPAUXftMQMVMARAWNGDEPARTMWpnoswrrawraaauowa►R r»a ► AWTECTURAL ADVISORY COMMITTEE PLANNING COMMON APPROVAL. RECOMMENDATION FORAPPROV ,Z(A, &.,3. 2 _ Der ONO .— ftm ft BOOTH HANSEN VIEW FROM INDIAN CANYON z1ssN. wolaNUaNlEE23201 4 , PARKING ZONING ANALYSIS PARKING(REO'D) TOTAL COUNT: ADDRESS 2150 N.ZANJERO RD.PALM SPRINGS,CALIFORNIA 92262 1..75 PKNG 12 BED I BED IN B ZONING DISTRICT R-2 BOOTH HANSEN 1 PPKNG/UNIS $BED EST 1 PKNG l4 UNITS FOR GUESTS GROSS SITE AREA 49.405 SF(PER SURVEY).LOT DIMENSIONS=16W-7"X 301' HA DICAP(.75 ACES 7 UNITS/4)=32 PKNG SPOTS (WESTERN EDGE NON PERPENDICULAR) HANDICAP:2 SPACES FOR 2650 SPACES COMPACTSPACES ALLOWED:40%OF TOTAL PARKING SPACES SETBACKS FRONT: 25'4r(LOT FACING LOCALICOLLECTOR ST.) (R-3 ZONE PROVISIONS SHALL SIDE: 17-e"(NORTH)S 170(SOUTH) PARKING(ACTUAL) TOTAL NUM OF PARKING SPACES:32 APPLY-SEE ARCH PLANS) REAR: 39-V(LOT BACKING ON MAJOR THOROUGHFARE) 23 STANDARD SPACES 7 COMPACT SPACES(22%) Architecture Inlenors Plarming 2 HANDICAP SPACES W/5'WIDE WALKWAY 333 South Des Plaines Street MAX M OF RESIDENTIAL UNITS 17(49,405SF/3,000SF(MAX DENSITY)) Chicago,Illinois 60661 75%OF PARKING SPOTS SHADED BY CARPORT STRUCT. MAX BUILDING HEIGHT 24'(ACTUAL HT.:2d-0"12 STORIES) PERMITTED PROJECTIONS FRONT: 4*0 SIDE/REAR(REO'D): 4"FOR EVERY 12"OF THE REQ'D SIDE I REAR YARD SIDE/REAR(ACTUAL):4'-0"PROJECTION(TRELLISES) PROJECT GENERAL NOTES ACTUAL GROSS BLDG.AREA NORTH GILDING:8,390 SF SOUTH BUILDING:9,390 SF 1.NORTH BUILDING IS SAME AS SOUTH EAST BUILDING:II SF BUILDING BUT MIRRORED NORTH/ TOTAL AREA:26.108 SF SOUTH. SITE PLAN LEGEND N.51JM CALIFORNIA NURSING AND REHAB CENTER t N a -a ye.a — E. BBr a g-a 61 mow YWROREa IINR Bt'-a 9-P 1i-1' IBIGIN iM-a IP-B/Q• BF-a x0•-P �,. m BMITVAINtINGEPKtis ( NORTHB SOUIH FABT WDG PFMSEIH.LK ACCESSIBLE UNITS 18-tr e 3t-a IC-a le-a R-a p-a Gr1EpTNB�s rro' UNIT 51 UNITE, '� 21P esanorMmuw,l®xnrect:rw. . e 1®mlaualED vArasar Iw. —_ un�rn. vreovERTr erwsrtmxvEa UNIT N1 UNIT E7 ^" __— eSRm�RYlM1E0 peovi, 1W.eA1EMOPRNATE — y1P varum REFER TO G003 FOR ACCESSIBILITY II _ I ruro rum rum rup rAam a CODE REQUIREMENTS N4905EB i —. -� ntwmE Li r i -r. �----�'U "— YurawieR ( vAx®RovnrrwovEx xrNm cuvroraooEslvucTulE '. I ( Ir uRr 1 .45 II L: MEa TMD LA x 4D b as-a wMl�x� � 1 IMWEhm 8fA1pN 1pfW YBW ME MIN WIW RRr Iiw SRm WRPoKJ,iH1Yn. EAIEwI:R R31L[iw.PkTA@]IIIMfsAi R,sf II �MDIIEMJNG Rrlltt 1 I b � E ? it®1 2m2 2m 2B®x m IWI 2B ®e Y BIIG.bdrums Wvula_ IFN'EGfl4V1C , w v I. �L r WIN 3 a I I\. ®B r R I 0 z e7 II � ° b �r vow i h:,l.l rwAl z GI I 1 b �6 k Ie3BTOWBM E IL�, R I V -- Y t S = Q 2 CORRECTIONS 07.19.17 M , — 2® TNm Z 1 ARCHITECTURAL 06.28.17 �� �SdEbAIDPIANNG ADVISORY COMMITTEE . r J_ 6 -- _-I—J� 2 x N1 OEBfIiIIOX MlE o ` ` 0 ,. 6 tLLi Ll.C'OV61LL � � �._.. � 3® rA9D �� y ^t 45 I \ LN - unr cc 1 _ 2e® rAEo b EWMrYrE b O `5 I BIYR 4 V J*!{ U I I ( n Y1AD ® V 3 i I ( P°�P0P01NAVLL° " Irrw uwa YRp uww %W2 NRC 1 $Z PROJECT NUMBER 1605 r,MPUT ROO�siPJL-114E irEEl TTPE3 i19E3 Trvex Tv1E3t II--I A90D eB® xB® 2m 2E® x® 3® I WERE -I ._ ll-- J _ wmw«m _ 2150 N. ZANJERO RD. PERRI 61-a 5- OPFRTY YNE " PALM SPRINGS, FI I n9 ITPARKINGSPA£S L CAUFORNIA 92262 c � I EmensovrovearnA ExreaTaoEsasrAmEVBn 8 TEo arauoum xn GTY EXISTING SURFACE OF PALM SPHINDS.CAUFORNIA PLANNING D�AH1M6fi m PARKING LOT ARCHITECTURAL ADVISORY COMIMTTEE SITE PLAN l RECOMMENDATION POR APPROY i�SITE PLAN Daiel.rl•h O A00 i 0 4 B 2 F(� (� BOOTH HANSEN I I 1E 0- Architecture Interiors Pwning YM� 333 South Des Planes Street Chk ago,Illinois 60661 R D. �. PROJECT GENERAL NOTES R 1.NORTH BUILDING IS SAME AS SOUTH BUILDING BUT MIRRORED NORTH/ i SOUTH R.D. SITE PLAN LEGEND �— — N BLDr;_— uEry III � �?.I B � N i MIRRORED UNIT R.D. ROOFING GENERAL NOTES 1.NOT ALL REQUIRED ROOF BLOCKING IS INDICATED ON THE CONTRACT ® DOCUMENTS. ROOF SYSTEM MANUFACTURER REQUIRED WOOD BLOCKING SHALL BE PROVIDED TO MEET THEIR SYSTEM SPECIFIC REQUIREMENTS UNLESS NOTED OTHERWISE. R.D x IMIM r � R.D. 1N-P V-P 1R-P tE-P I-. 19-o' If.P I' 1 - EUTueuaxwc 1 ARCHITECTURAL 0628.17 MTYEIBIMIEAIYJF 1W Ro "UDI ADVISORY COMMITTEE C I.r£T�YERED C N9Julplro Ip Cf50Flg1 wTE MTI➢fFmM TUNTO KHEV£ATEN' ��IRIIN VC MR RR`7 TW n.TN' urns b oR.D. R.D. R.D. R.D. R.D. C / 1 R.D. O nroo rum j PROJECT NUMBER 1805 g' I uEt v - � U ` 2150 N. ZANJERO RD. PALM SPRINGS, SOUTH BUILDING-ROOF PLAN EAST BUILDING-ROOF PLAN CALIFORNIA 92262 _p D12 a _ O 012 " E 0 ROOF PLANS A101 �R t . D� 3 A IMG 1 J 1 O A 7 1 AN°ERiFIGLpNGPA1p �'i Y Y IgGR IW 96tE8 CR EG '. BOOTH HANSEN ROOF lacANTEa:Aam u u _ _ _ _ c c c c c ._ u a ROOF m sxaaw _ i� za-0"� pPFno wn cwma., 2a-0"�1 BSTRUCT. k FOND STRLICT. ENROL 6" srmmww AeffEelrw mNrwamNrs.m 16' T I I SECOND FLR n FlR_t� 1a 8" IaeNrteive�sPL ArclnlecWre Interiors Planning aNNANIG�AQOftlP v • • 333 Salta DBS Flames Street 0�d6 k O ❑ OChicago,Illinois 60661 I I FlRST FUR /� RST FLR r, 0 I � 0q S.BLDG-EAST ELEVATION S.BLDG-NORTH ELEVATION l 1 PROJECT GENERAL NOTES 11'r-V-v ^rL� 1.NORTH BUILDING IS SAME AS SOUT- °I z BUILDING BUT MIRRORED NORTH I SOUTH. Onw A9oo D 7 A� OD O Awl ( d ) ! Z 1 SITE PLAN LEGEND - 101®iES pi B] � N BLna 4TPxiD YiI GIMRLP.IL _ I IPGIIIIF.A✓® ROOF ms><s.Uuro c'211 5a7. s=oaa".Ipmiillg nEsar[wo . I - _21Ra8O Oa S/STR� u nm BfSTRC $BL CG SECOND R MIRROREDUNIT ONDaF� - N u BUILDING ENCLOSURE GENERAL NOTES 1 CONTINUITY OF THERMAL AIR,AND VAPORRRIERS IN BUILDING FIRST FLR I k , H H[p I L n § FIRST FLR ENCLOSURE SYSTEMS SHALL BE EXTERIOR - 00. MAINTAINED AT ALL TRANSITIONS S.BLDG WEST ELEVATION S.BLDG-SOUTH ELEVATION ` BETWEEN DIFFERENT MATERIALS 4 _ - - - - -- 2. ANY BUILDING EXTERIOR ENCLOSURE 1I'- �I' n 2'1.I1� 1� -V-17 oI2 P7�1� LATERAL LOADING,INCLUDING UPLIFT, THAT IS NOT SPECIFICALLY DESCRIBED ON THE CONTRACT DOCUMENTS SHALL BE BASED ON THE REQUIREMENTS OF LATEST EDITION OF ASCE 7 CHAPTER 6. 3.ALL EXTERIOR JOINTS,SEAMS,AND O A PENETRATIONS TOTHE APE,ORWEATLL BE SEALED WITH CAULK,TAPE,OR WEATHER STRIPPING. ANoalseuG.ioNGlw 4.PROVIDE(2)CONTINUOUS LINES OF ROOF mow lmSonEsprEp c a c u c c w c w a u ROOF SEALANT AT WINDOWS AND DOORS. STQN M1LLLAR216r 201 BSTRUCT. wcamaa+asm wQ k BSTI QT. S.HANDRAILS AND GUARDS SHALL BE DESIGNED TO RESIST A CONCENTRATED 18' 1g-8 LOAD OF 200LBS IN ACCORDANCE WITH Iry�� SECTION 4.6.1 OF ASCE7(CBC 160Z8.1.1) SECOND FLR sn.wrnaw SECOND FLR 1a� lacwnnEPE°ALUM. � 1a-g'•V sxarauNo a1PIip1L � roTANFxoMBmtr k � k b \` oxa*U w+oow ti 1 ARCHITECTURAL O62B.17 ADVISORY COMMITTEE FIRST FLR S FlRST F_ LR n V NG °EStlYPInN M E f y E.BLDG-NORTH ELEVATION n E.BLDG-WEST ELEVATION U � OB I _ t1 - - ROOF /� PROJECT NUMBER 1605 V u u u :� c a u :v a �1 s zo•-a• ` so'-o• SiSTRUCT. 857RUC7. 1 -� ti R8L-S- r CON OFL� cot! r V V 2150 N. ZANJERO RD. PALM SPRINGS, ::Jull I IUF T11 N! CALIFORNIA 92262 FIRST FLR FIRST FLR S ` r� a �e1 E.BLDG-SOUTH ELEVATION E.BLDG-EAST ELEVATION 8 U 11r=Vg °U 2'y~ a � vqv °G2�� EXTERIOR ELEVATIONS A200 44 BOOTH HANSEN Architecture Interiors Kenning 333 South Des Plaines Street Chicago,Illinois 60661 '�I � NORIN9MDIC � �EpS+SU6DNG ff'ttN0 �IIIHNOEY �� 1 BISTRUCT. SECOND FLR z � I unrn arts _. m iWEf iYfEt +�, 38® I FIRST FLR BUILDING SECTION 2 i 118"=1,-0" 0 r z a e 7 ARCHITECTURAL 0628.17 ADVISORY COMMITTEE no otsarlvl DIrE 5� F � $WIN&LLDnD FAST WILD No ROOF OJ PRECT NUMBER 1505 J 'tQ� w BISTRUCT. -`� L 18, g doxrsrn 10'-VICOND FLR n T_ 2150 N. ZANJERO RD. m tN ®i ®a ®a ®� j PALM SPRINGS, a 5 FIRST F R s CALIFORNIA 92262 n E BUILDING SECTION 1 � BUILDING SECTIONS g 012 1 2 A300 2 BOOTH HANSEN ArchilKture Interiors Planning 333 South Des Planes Stree, Chicago,IIhno,s 60661 PROJECT GENERAL NOTES 1.NORTH BUILDING IS SAME AS SOUTH BUILDING BUT MIRRORED NORTH I SOUTH. SITE PLAN LEGEND R BLDG— I ® N L e_BIDG. _ MKRGnEDUNIT UNIT S7 7 B UNIT 31 3r-P Y-I 1'-101¢ 7_1' tt-4w S C r-r -NV! r Ir tt-r,¢ S'V r-C L_\LLX g \ I trs b DEN \ / 1-202 Isa BON --_ v 1-102 \r/ `\ r 8 mil°: O G, tr.r .v \ // `\ 'Bad \4 3-o- e•-o- ralri ® . 'l BATH-203 MCIENI3IAW AT/FF I BATHz " \ Ia'. ti 16 I 1 ARCHITECTURAL 06.21117 >w - --1---; IQ Al ADVISORY COMMITTEE % rrioacc wv 5 IO;O --- /1 rp osswmB ors 1 r� I I 01 \ b c a 4 _ b b b y b M61 9 -_1 N v BATN 4 BAT,. - b o ar A 1.204 00 \ / F \ / \ / I PROJECT Nl11.9 F:-F 16C5 \ / I 9 b 19 `\\ // b BDRM 1 BDRM4 " ' O KI7CHENlLMNG 1-105 / \ ,-205 ROOM 2150 N. ZANJERO RD. PALM SPRINGS, CALIFORNIA92262 / \ b F r ® BT W ENLARGED TYPE 1 UNIT PLANS \ (S BLDG) 1¢ r g / s'-3 a.r .31¢ t-o- _ r.u¢ 6'.41¢ 6.r rat¢ li r-tW R0. Ro * RD RA. S BLDG-UNIT TYPE 1 SECOND FLOOR PLAN OIW S BLDG-UNIT TYPE 1 FIRST FLOOR PLAN O A4 O 0 1 2 . e 0 1 2 4 a BOOTH HANSEN Architecture Interiors Planning 333 Soulh Des Planes Street Chicago.Illinois 5W1 PROJECT GENERAL NOTES 1.NORTH BUILDING IS SAME AS SOUTH BUILDING BUT MIRRORED NORTH I SOUTH. SITE PLAN LEGEND N BL➢G u ml N L _ s.e�oc. — 9 MIRRORED UNIT UNIT S4 UNIT S5 O UNIT 134 UNIT 35 I 2 91? IT' / I:'-21R' 7 91? 5 0' 19-2w ITT 2'-91T 7-R T-P 7.217I 7-910 J 0' 7-T J 0' 7'-21? 1IT RO RO.- - /((�^\ RO RO RD. R0. — - 19 P DEN O2-102 i b 2-202 2-203 = - ENTRY, LAUNDRY 2-101 E2lp 03 J CL PWDR RM. 2-206 406- O O 2-104 IN a O a+ BATH 2 i --- 1 ARCHITECTURAL =pe.28.17 ADVISORY COMMITTEE 2-204 b xD oEsarllax W1E - 1 41 HALL BATH o w+ - D.v b 2 209 7 2-205 PROJECT NUMBER 1605 0 CL BDRM1 1! KITCHEN LIV ING VING 2150 N. ZANJERO RD. ROOM o azoe 2-210 2-10e I PALM SPRINGS, ® CALIFORNIA 92262 ENLARGED TYPE 2 UNIT PLANS - - - - - -� - - - - - -- - iD) (SBLDG)z.91rr so• m-21rz• r-9t¢ s-p 1o21a utt J91? YV 7-9 t? t-9t? 5-0' 7-S T0' Y-91?` R0 R0 -- R0. R0. R0. R0. 14 S BLDG-UNIT TYPE 2 SECOND FLOOR PLAN S BLDG-UNIT TYPE 2 FIRST FLOOR PLAN 47 0 1 2 4 8 BOOTH HANSEN Architecture Interiors Planning 333 South Des Plaines Street CNcago,Illinois 6OBB1 PROJECT GENERAL NOTES 1-NORTH BUILDING IS SAME AS SOUTH BUILDING BUT MIRRORED NORTH I SOUTH. SITE PUN LEGEND ry BIDG 44 m L AL N _ MRRDREDVW 2 1O 2 1 b V \/ UNIT E6 h N b - I o h ` I \ 1 ARC RA HITECTUL 0628.17 ADVISORY COMMITTEE UNIT E6 1- 08 �Aoe L 0 0 a S r a 4 UNIT E7 — \ v PROJECT NUMBER 1605 3 yALL _ 3P[_ o, UNIT E7 �� 4205 4202 v \ O 03 u w 'a qI 20fi to-i \ ga PWD RIM LAUNDRY s N R m 4-104 4-ID3 2150 N. ZANJERO RD. KITCHEN lUTANG c� ROOM 3� N' DEN PALM SPRINGS, R 0 a-nt +^' 4-10z CALIFORNIA 92262 h BDRM 1 BABATH 2 BDRM 2 h42104- 4204 4-203 c 0 N P o f,p ENLARGED TYPE 3&4 UNIT s e 4 O PLANS(E BLDG) N 8 AEF 2l.e IR T-P t'-f IL-T Ak i P -6 G-UNIT TYPE 3 8 4 SECOND FLOOR PLAN �� E BLDG•UNIT TYPE 3 8 4 FIRST FLOOR PLANRD ��—�O A4062 'I+-� a + z a e 114�_�'� o l z a a — BOOTH HANSEN Ok �--- _ r Architecture Interiors Planning 333$OUIh Des Poaloe9 Street p - Chicago.Illinois 6W1 I r y rf� •�1 4 Ili• ' � vi k M I�. ' � $+ t i I l � I v BUILDING EXTERIOR WALLS DOOR SYSTEM WINDOW SYSTEM GLASS MATERIAL: 3-COAT CEMENT PLASTER STUCCO MATERIAL: ANDERSEN 100 SERIES MATERIAL:ANDERSEN 100 SERIES HIGH PERFORMANCE DOUBLE INSULATED SMOOTH COAT"SANTA BARBARA" FINISH FIBREX GLIDING PATIO DOOR FIBREX FIXED&CASEMENT WINDOWS GLASS UNITS WITH LOW-E COATING COLOR:OMEGA STUCCO COLORTEK 432 COLOR:TERRATONE COLOR:TERRATONE MILKY QUARTZ ARCHITECTUfiAL 28 77 ADVISORY COMMITTEE ra. o[sawiax Dlm f N C F ,7. - PROJECT NUMBER - 2150 N. ZANJERO RD. U PALM SPRINGS, a ROOF EXTERIOR PAVING EXPOSED STEEL CALIFORNIA 92262 MATERIAL: FULLY ADHERED 1-PLY PVC FLAT ROOF MATERIAL: EXPOSED AGGREGATE CONCRETE FINISH MATERIAL:ARCHITECTURAL COLOR:WHITE AND/OR LIGHT GRAY(AS PICTURED) COLOR: LIGHT GRAY EXPOSED STEEL E COLOR: 3-COAT TNEMEC PAINT, COLOR&MATERIALS $ COLOR TO MATCH WHITE STUCCO h S 2 A800 1, tj m BOOTH HANSEN Architecture Interiors Planning 333 South Des Plaines Sweet - Chicago,Illinois 60661 R\- t t-� 7 III`{q,!'1 p �?.•4' '1■ �. ^.n ..f.1� � I ' 1 PERSPECTIVE VIEW FROM INDIAN CANYON DR. U Y 1 ARCHITECTURAL 0528.17 �. _. ADVISORY COMMITTEE rp slsaa m oeh N F'HO.IFCI M1UMfiP 16C5 Q a c F 1 bf � s 2150 N. ZANJERO RD. PALM SPRINGS, e CALIFORNIA 92262 n m E PERSPECTIVE VIEW FROM ZANJERO RD. PERSPECTIVE VIEWS 8 S A900 581.13 1T 58439 582,63 ___ - 58184 __ 581.36 _ __ 580.53 -. - C 5B4.78 �. UNDSCAPE AREA FG -- L 9 - F FL 578.0 h P�4.28 Ln 57e0 Q5% 10% EP _ _- 57A�13,F3836 583J1 4 _ _ 4-0�� F 5 p 5 V W E 5 . . 1771 81/ _ I ` SBZ16 S i0 582 35- FL 581.5 ID 20 40 50 80I I Sep,2I I TC58444 II I I TP 58394 L& Lu SCALE:t'•2D 1 y W ,\ .]A= - . 58A401I� �I ��� . X5B0.08 FF=5 9.97 PE=579.3 5 9,21 C 582.17 24 583Q 1 -0 I _ FL 501 B7 B1.T , L� TcB 4PRIVE AISLE li ..:D7e MMEt�R. 8 I .�. FgF I TC 5RI 3 PNOz 3 �_ ox,� I m G I .. RET 1 T B41 91 TI H �� TC 582]OI h � 'O i RxauRGue RD. sJ o I I 4 JD ` 00 - [7- Fs PROJECT SITE g VN I O BA91N F D FG S797 -FG 5B0.0' FG 530.0 FGS 5 L.L� Ili iC6g I _ FG 13. °n` $� \ „ I LANDSCAPE AREA. /I I - EC177D AREA _ x� - �9 PROP ts' PIoe58,0„ uN::sca=L AREA uc to W $ FG 11 FS 58T25 VICINITYMAPNTS $ g m I dRM1 �`, yI sn - N vA09 F II I / - FG5etB 578 13 - .. q ° ,�\4•w ° iD wv seem ws sWJ _ v I j p ¢ INy.571.00 \\N,d m' FG a I -'m LPTC58Te2 ��- I. U1 I FL 581.32 J 50` 2258171 C91 �A� 577 FSW25 INV 5/a00 580,49LEC3END 58305 QFSgj aINV 5773F/ Sl9 ANDSCAPE AREA 578.08 PROP.12'ADS PIPE \ - INV.571.SO TIN 5]5 BSL INDICATES BUILDING SETBACK LINE I� - --- - - a RnW COVC INDICATES CONCRETE I I 1 'T. ELEC INDICATES ELECTRKAL 12a 3552. -0D2' INV 5740p/ �� �583I7 583.17 U\ INV.57200 GB x! L cG 5B13 FG 5799 FG 99E a FG 578A FG S/B FG 5793 iN INDICATES EWE HYDRANT I GB IRA. INDICATES IRNWTION I c MH INDICATES MANHOLE I • I I I y NVA INMATES Nqi-KNKULIR ACCESS :p 5502W TCS 82 E2 p'K _ TP58212 R INDICATES PROPERTY LINE I I (5B3I7 Y1 TC 582,t y I \ TC%773 TC 5933fi FL 50181 J FOR INDICATES POINT q BCINMNG l TP 58323 TP 562 AJ n - PP INDICATES POWER POLL ,{ 1; i 0 - FF=579.97 SDNH INDICATES STORM DRAIN MANHOLE 914 INMATES SEARCHED FOUNDNOIHINc PE=579.3 , - I W -� _ 579.09 578.19 SNH INpUTE55EWE0.MANHCIE I I I 3m1L J TTB INDICATES TRAFFIC SCNLL NX I (n FG 4 Q 519014' AN INDICATESWATER METER I1 I I 1.92 y0�. N , 1 . WV INpC>TES WATER v4vE INN MpUTESHPE I�I RE I - e-e- INDICATESWRWGHT IRON FENCE TC INDICATES TOR $ I I TP 5�835� TC 33 20°b -qF- INMATES OVERHEAD P'MER LINE FL INMATES FLCR I } �JO Z155� I FL$WiW TOW INDKATES TOP OO ALL `� JVJ`JJ \/ C / INDKATESCONCRETE IT INOICATESTOPOFF NC II EWE OF INDKATESFROPERNTSASS O TP NpCAifSTW qp ILA ENT I III I , y \ � -/ I` INDICATES FaONY0 A5MALT PAVEMENT HP INMATES HIGH POYI O II _ _1. �0 F '-..__ I F , _ 5 9.83 F5=579.83 FG INMATES RNISHEp BADE - D - - INDKATfSfASFMENTSASSHOWN FS INMATES FINISH FACE (.. 6 _ _ ` _ _ 1 /� LP INDICATES LdY Pg1�T `'J�i v GS QI GS\ � N1 Vl `JJY.7D 1 / HPFL 57e.a V� « x h I x ^ / r INDlcarfs PROPOSED cuRa4 cuTTFx I x 1 PP GS I" INDICATES p15TINC CURB 6GUTTER TB INDICATES OF AC RM (�'S 11 'm b A siy -- - "' 65 ---- 5 9 INDICATES PROPOSED WRIER CURB PL INMATES PROPERTY E I I h F� --- --- -- 1D 75 _ 4 LANDSCAPE AREA 580.49 F FGVELO \ - \ LAN�APEp A v \,W S7a.0 ✓ I /FG 57B0 '" EARTHWORK ESTIMATE � _ _ REM CUT"FRI.(CY) �, O ruw 275 128 9'-0" /��GG�v 9'-0" 9'-0" 9�0" 9.0„ 9.0" 6•_0" SHRINKAGE (15%) (ae) 0 I X581'30 `-PAL BuBBIDENCE (0,15) (lee) D GS 81 OVERExCAVATTON (3.1n C21W x,�Gq1.n RETENTION CHAMBERS 376 .` �I x`h 7PARKING SPACES T29� RE GS GS x Ly _M x L� 1TITAL 1'm 1� LOTARBA: 46,BPL S,F,.1aACRBS I n1, I ! GS ! GS I.PpiT IOW g8TT1RBEDA 45,9p23.F. ILIX MJt�3 CONIELTED PP FB HWRS BEFORE YW PG NO. BY eY u4L S7JNf£AfERI -800-227-2600 DATE DA E APPROVED GATE BBICH MAW" ELEV. PREPAREDUNDERTNEDIRECT9V%RV5JQNOF. DE9IGNBY: REAEw£DBY: BY: RLENO MEET No. CITY OF PALM SPRINGS,CALIFORNIA 1.CSP 3-20A 572.774' DAc. c�n�LIRI.R.NacgNRBNy RCE.SOOST DRAVv1U EEY PRELIMINARY GRADING PLAN 1 SBRONSE019CATINEMOC.LFRENE I� CAC. ,10FNM.BRUDIN MARCUS FULLER APN 504-270-019 NO. 'w E�auuw,Ar Irol,w cwraN.Vo '-" - '^ I � C D BY: R C.E.NO. DATE R. ND DATE 2155 NORTH INDIAN CANYON DRIVE 5.1 1CAC 41M 1 IN PORTION OF N V2 OF SE 114 OF SECTION 3,US.114E,S.B.M. g28NEE1E _DIGS.B 8 C WIDTH BLDG.A DFBT#J FRONT SETBACK D NG ETAINI WALL 18.0.. _F.n.. he N ;576,44 PROPOSED 12" BROOKS 13OX sx a_. ` 5 y F s7ep 519 FcseDD U FIG D EMERGENCY OVERFLOW —— —= - 577, W E s7s.e7 576.32 PO STE o�` ' • I iP W LL 577.99 97 W L5780 FL 5]B I IF F=5 9.97 y FGSD7 w 'E=579.3 IAN 41 b 5 9.21 ,. ,g d `O7B. I D, 6. 575.96 5146.71 575.65 LEGEND GS88 I z BA INDICATES BUILEING SETBACK LINE fG 58C0 FG SL00 _ FG 6 m _ I CC INDICATES CIX CRIETE LE CTMICA KO I O EMC INDICATES f Rf HYDRANT r 1 RE ING V A L \J� IM. INDIUTESIRRILATION W ;I I -— I / MH NDICATES MANHOLE PROP 12'ADS PIPE56,o„ _ Lu y. 7 NVA INDICATESNON-VOLICULARACCE55 I ,DSCAPE AREA LIP 81.6 ` PtINDCATES PROPERTY UNE _.-_--FS5812.. v = -.. -. G5708 _ W FF=579.67 POE, INDICATES PONT OF BEGINMNG w PE-579.0 F ti PP INDICATES RANTER NIE 7 U SCMH IN DI T ES STORM DRMN MANHOLE V.SM07 '� 1��bpp U 914 INDIGM MAERCHEDFOUNONCTHING wFAIRINDIUCATES SEWER MANHOLE ? a 7 TSB INpITES TRAFFIC SIGNAL BOX M o L AM INDICATES WATER METER FB SB1.25 WV INDCATES WATER VALVE INV INDICATES PPE INVERT ':$78AB IF- INDICATES WROUGHT IRON FBRCf TIC INDICATES TOP Of CURB PROP.1]'%,FOS PIPE LNOBCAPE MEA 2A% FG STR.4 —GRIP— INDICATES OVERHEAD PJKB LINE FL INDICATES ONF G TOPF INDCATESCONCRETE ROW INDI TPS TOP OF W4L TF INDICATES TCP OF FOOTING INDICATES EDGE OF PAVEMENT PC r 4 _ - ( FS INDICATES FINISHED SURFACE I ---- INOKATES FASENENTS AS SHOWN FGS 9 FG5796 FG 579 INDKATE5FROPERTYUNE TP INDICATES TOP OF PAVEMENT INDICATES PNOPO5ED ASPHALT PAVEMENT HP INDIUTESHIGHPpNT I e NOICATES MOWYED TIM d GHTTER LP LNDIUTES LOWPOINT INDICAME)USTINCCUM&CUTTER IT INDICATES TOP OF AC BERM 6 INDICATES PROPOSED BARRIER CURB PL INDICATES PROPERTY LINE F=5 9.97 : ' EARTHWORK ESTIMATE 3E= 79.3 5 - 75,aB ITEM CUT ICI') FILL(CY) s7B:9 5]6.77 RAW zF5 Im FG 571 IF ,l76�0 l`1A-0l 1tK suesoeNLE (0,151 nae) D NZ �4z x`� CAIEREACAVATION (3.R) (216) -- I AC RETENTIONCWaMBERs 375 G SlB.O TOTAU. iM t2W LOT ARENA a5,302 SF 1 61 PIECES WPM JIM DISTURBED MEA 45.302 S.F.1.04 ACRES 1 5 ^.cIs 1� 3,9�} LD _F_-579.93 9.93 1 FS=57993 _-. xs K1 .Gg -GS. x N s B s7c.br `�hgl 7 OD 5I.54 GS .-. \J .1 _. GS W 576 �N x aQ �, N56� R�1 W1 PAF.tFLLMt. HPR 9Se —��K - - _ - 579\ F 9 37BFTM D 5 f� OA �DI D AC` HA� g i RAL UD GUe RD. 57 s7a.a9 PROJECT SITE g VIA UE A 75.33) D W ^11 _ ��Y1 REraNING wAu� � P M CORRECTED APPROVED N HORS eEfOPiE YW DIG E g NO. BY B � DayyrlQbR zD,s CALL VICINITY MAPNTs Sanborn A/E. lac, ICEAP'%iX'.RO-gRwa&,mr w raebL. Raarwa —800-227-2600 WTE DA E APPROVED CUIM BENCHMARK ELEV. PREPARED LINGER THE DIRECT SUPERVI3ICN OF. 91GN BY-. RENEWED BY'. AR4ROVEp EN'. FIIF ND BNEET N0 CSP 320A 5M.Tl4' LAD CITY OF PALM SPRINGS, CALIFORNIA ElGwtiatnaa a Cn"m' RICES By PRELIMINARY GRADING PLAN 2 S BFIDQE DISL ATTHEMO.C.OFTIENE ^'.'m`^�IWO v,'�°.'�..., �� C.AC. ,pHN M.BRUgN MARCLFE FULLER APN 5D4-27D-019 ND. CURB IIETLRaR AT INDNI GIIYONANp °""""'�""^' H Y'. R.C.E INC,. DATE R.CE ND. DATE 2155 NORTH INDIAN CANYON DRIVE ry �^EacLEIA �� KAC. 41105 5212t IN PORTION OF N In OF SE 1/4 OF SFCION 3,T4S,R4E,S.B.M. OF 2 SHEETS 104'-0" 19'6117 36'-0" 39-0" (9)9'X1T PARKING SPACES NORTH B SOUTH BLDGS EAST BLDG REAR SETBACK r 0] 25'A" ___ 3Z-(r 18'•0" 181-91 ,, 18'-0" 18'-0" W J- FRONT SETBACK 6'PERFORATED CORRUGATED �, -.6'SOLID CORRUGATED 2'X2'CONCRETE __POOL W 12' MTL FENCE.TYP. TL FENCE, P. ' PAVERS @ YARDS,TYP EQUIPMENT PROPERTY LINE U_ N 8Y sIF —_ — \ _ ,,"�" � Y 61t -'D CI CP�U,N- �, � � .. � i� TC � • t2 Z Ir `1 - ,' i •. .y __ _. .� .J 8' TC uj LU A i - F / T V / �. 1• LU r I ' �r a L W W MAILBOXES PAVED ROADWAY WI OPEN DU ,• TYP.GATE ST BUILDING'' II, U Q I LU CARPORT ROOF STRUCTURE - r 7 UNITS J.' INTO PRIVATE �.. � � �' � � U I. .a_ _._. HACK YARD UNIT N ED a W `CI .,.., Q w Z I �. I T LCON( w 8, NORTH BUIDLIN 6 UNITS i DU TRELLIS,TYP- D d 2-1 DRIVE AISLE _ 'I 8' UNR N1 UNIT N2 UNIT N3 UNIT N4 UNIT N5 UNIT E2 I, `il 4 ~__-- O pF f PARKING: — Q TYPE 1 TYPE 2 TYPE 2 TYPE 2 TYPE 2 TYPE 3 J 9FACFEE 3 BED 2 BED 2 BED 2 BED 2 BED 6'TALL SOLID 2 BED SUMMARY _ CORRUGATED s BELOW r ti FENCE,TYP.BETWEEN BR - . , #.. ; E3K. UNITS AT EAST TC '.. = .;3 L„�`'vs'.. / ;'.,aJ7. r•, -�. ', i `;,..s`* 4.� c�.�.' t A BLDG.BACKYARDS _ 1 9 1 T. _�-CAR CHARGING .'` J 't« '�4� STATION -��' 12' 12' 12' 12 12' 12' UNIT ES A _ _ r TRASH AND ,v _ F C III{111II'llf„ „,. 2 6ED ,j RECYCLING a ENCLOSURE ,I N ENTRY GAI L; -.. DU g Z d PINTO ^ 4w _. I I : 4 UNIT N PEMASONRY b PC- WALL OTHERS T13 2BED TRELLIS _- < Q Q NEWSIDEWALK 12 C UW Wz x i LLcl I aO _ • 0J UUNIT ES PE 3 TYPED Z In rD U Z ¢ a Ls' " SCORED CONC. 5'TALL IRON PICKET I w 0 D_ (n SIDEWALK FENCE UNIT E6 I .. Z Q r -* CI AT POOL DECK PERIMETER TYPE 3 Z l B'TALL STUCCO 2 BED Q WALL I a Lo �J Lo o a cor} SOUTH BUIDUNG EXISTING SIDEWALK 5 UNITS N o PAVED ROADWAY Wi UNIT S1 UNIT S2 UNIT S3 UNIT S4 UNIT 55 H, UTINPEE4 ORBRORT ROOF TYPE 1 TYPE 2 TYPE 2 TYPE 2 TYPE 2 2 BED Y I i STRUCTURE 3 BED 2 BED 2 BED 2 BED - 2 BED x CL r U DESERTMOOERN � • i VI\ 1 m w 0 msA D 1 T k= a TC DESIGN Cl A� •�..*o A A I ♦ 1 �. w f w DW-JOHNSTON o Cl i I TC ,. TC a o CONSTRUCTIONINC. awY1 ..{iC.. :J q�. n V: '" •eow�"'"iw�• 63 D" _- _ 5'-D' ERTY UNE 4 TALL IRON PICKET FENCE Wl GATE. REmSION (7)9'X17'PARKING SPACES - 10-10-1 PLANTING LEGEND WATER PLANT it- 1 PLANTING SZE SCIENTIFIC NAME COMMON NAME ® 6 SGAL TECOMA STANS YELLOW BELLS MODERATE .50 - -17 4 36"-BOX TIPUANA TIPU TIPU TREE MODERATE .50 10 BK 5-GALESPW/WIRE BOUGAINVILLEA'BARBARA KMST BOUGAINVILLES MODERATE SO - 4- 7 _ 7 36'-BOX TR. CITRUS TREE(LEMON AND LIME) SR&HI fLIA VALLEY MODERATE .50 .• iF•28 Cl 5-13AL ESP W/WIRE CDA�LLMWDRA INAEOUILATERA PINK POWER PUFF MODERATE 50 5 241'iAL MULTI TR. CHAMAEROPS HUMILIS MEDITERRANEAN MODERATE .50 17 DU 5-GAL ESP Wl WIRE TECOb1A 5'SWNSET MEMORY' YELEET LOW BELLS MODERATE .50 MODERATE .50 SGU! SCALE 1•-10' FAN PALM 21 TC SG4L ESP W/WIRE EC TT m - 27 8'.12 HT.SKINNED WASHINGTONIA HYBRID HYBRID FAN PALM MODERATE .50 V6"CIA COBBLE ROCK Iv m iy �y Important Notice- Undergeund Service Alert 79 1-GAL CARISSA G.'GREEN CARPET GREEN CARPET MODERATE .50 T-4'DIA DESERT SELECT BOULDERS BY SOUTHWEST BOULDERS AND STONE 5rm'�1�beprav+cw"".n rmuea"e. 2'DEPTH COMPACTED 3/8"MINUS MOHAVE GOLD DECOMPOSED GRANITE a cgN.I b.:ruw.N.ro+o-auat+on. 21 5-GAL CARISSA'BOXWWOD BEAUTY' BOXWOOD BEAUTY MODERATE .50 BY SOUTHWEST BOULDERS AND STONE SCALEV-lT 'M1mlbFmnb'Mb�tl fw pi L�uN • OPTIONAL 4"6•DIA.HICKORY CREEK FRACTURED GRANITE TO BE RECESSED. u"umlwro.du4.v"."S.Ia uln 31 5115-W MIX CORDIA PARVIFOLIA LITTLE LEAF CORDIA LOW .20 FINISHED GRADE TO BE AS THE ADJACENT SIDEWALK rau mFE++aoPal-LNwa,.n.q M. OR DURANTA REPENS OR SWEET MEMORY MODERATE .50 Oebe r°"a 17 5-GAL DALEA GREGGII INDIGOSUSH LOW .20 PLANTING NOTES MASTER OR PORTULACARIA AFRA OR DWARF JADE PLANT MODERATE 50 L 1 .0 n.a�.m.bemm+.mwsnq++b.rssmmrw mmw,a 14 5115-GALMIX DASYLIRION WHEELERI DESERT SPOON LOW .20 i. PLANTING AREAS TO RECENEA7 MIN.LAYER OF 318'MOHAVE GOLD CRUSHED ROCK W+•a:m+"^'1^.�:+I•aro+Im'nT•"91n'uW+I++Y'w PRUNUSCAIGHT ANA BY SOUTHWEST ESBOULDERS INDICATED STONE PLANTING PLAN ,„a ,HN, ,"„,tia„+ynwm•.•:.w�+m n""Lleb 46 5-GAL Column CAROLINA LAUREL MODERATE .60 BEUCOPN TIGHT 2. PLANT QUANTITIES INDICATED IN THE PLANT UST ARE FOR CONTRACTOR'SI CONVENIENCE "O" `^"oI""""°�`•'�°'m'•"brM'''F"1b4idnq n0ini°'+°"p1p 18 $-GAL LEUCOPHYLLUM'LYNNS LEGACY LYNN'S LEGACY LOW .20 ONLY. E AND INSTALL TO VERIFY PLANT QUANTITIES PER PLAN PRIOR TO BID.CONTRACTOR TO e.yn o,d..urn.,:r.wn"r+d+I wl.:r"rya.nm.mu„wbI PROVIDE AND INSTALL ALL PLANTS INDICATED PER PLAN. P,e,,.ea,ronml.omp®+vld•r..Vn".u.w+da•+odwr 22 SGAL LEUCOPHYLLUM'SILVER CLOUD' TEXASRANGER LOW .20 3. ALL TREES WITHIN FIVE FEET OF PAVING SHALL BE INSTALLED WITH APPROVED DEEP ROOT YIYNw+ .. ..,.. u.,u,r.mrn."..""...,.— ___.. ...__ -------- _- BARRIER. 301'-0" PROPERTY LENGTH 104'-0" 19'-61l2" 36'-0" 30'-0" (9)VX17'PARKING SPACES NORTH&SOUTH BLDGS EAST BLDG REAR SETBACK } CD 25". 3Y-D" 18'-0" 18'-0" 18'-0" 18'-0" N LLI FRONT SETBACK 6'PERFO TED CORRUGATED 16'SOLID ORRUGATED 2'X2'CONCRETE POOL PROPERTY LINE U 12' MTL FENCE TYP. PAVERS YARDS,TYP. EQUIPMENT $K•. BK•. $K. - - __ - •TC .CI - .-CI 1Lu L Z . _ C7 LU N —_� --_ _— V O BK �� W w ------ -----M AILBOXES'( PAVED ROADWAY W/OPEN ! DU TYP.GATE EAST UNITS IN U Q Q U o N INTO PRIVATE j BACKYARD UNIT a LLJ w i ORT�BUIDLIN TYPE 4 D CLA2BED ICI o aI,J,J Z 26'-0" B' 5 TRELLIS.TYP. U ❑ Q II 12 DRIVEAISLE ,�- 8' p 'I • PARKING: TMPE; UNIT N2 UNIT N3 UNIT N4 UNIT N6 E UNIT E2 SBACFEE TYPE 2 TYPE 2 TYPE 2 TYPE 2 TYPE 3 SUMMARY - 3 BED 2BED 2BED 2BED 2 BED 4 6'TALL SOLID a 2 BED i CAR CHARGING U BfC _- -, CORRUGATED BETWEEN a ,�. 6006 000 YARDS " TQ FENCE,TYP. bl �� BLDG.BACK STATION - ® 12 12^ I 12 12 ( 12' 12 UNIT E3 TYPE 3 O 2BED • ' __. . - • • .•., _j.,•. I` TRASH AND " F -.. --- —z- rW- _ . _x6#+^ RECYCLING ,i -- -- ENCLOSURE 0- ENTRY GAT 1 1-DUI g i ZO TALL 0 MASONRYTO q an b ® POOL BY �'= UNIT E4 _ a z 1 � l U' WALL w p� Mom' OTHERS SPq TYPE 3 a TRELLIS ` 2BED f 1 NEW SIDEWALK 12' • C w w Z • . •: �\ ap_ UNITES g O U "� - •� - m 12' 12+ 12' �''. 12'o 2' 12 TYPE 3 2BED d CL 11 SCORED Cl SIDEWALK FENCE 6 TALL IRON PI9KET i UNIT EB 8i Q Q '' bU N - WALL AT POOL DECK PERIMETER TYPE 3 Q � Q 12 _. 6'TALL STUCCO - J a 2 BED C Lo --Irr • a. �� - Nw1_1uD J, I OUTHBUIDLIN - I EXISTING SIDEWALK SUNITS I e N o PAVED ROADWAY W/ r UNIT 31 UNIT S2 UNIT S3 UNIT 84 UNIT S5 UNIT Eq OARRORT ROOF TYPE 1 TYPE 2 TYPE 2 TYPE 2 TYPE 2 � .OI•.. STRUCTURE 3 BED 2 BED 2BED 2BED 2 BED 2BED , U DESERTMODERN � ., � —_ -._—. .-- • - __— W < LANDSCAPE DESIGN xC tro r0. 7c. � _, •�I _ 1. 1 �LgJ , — __ _ 2 w D.W.JOHNSTON - CI- •• -* C`-.` __ • . .TC •_ _�C- _ 1 a O CONSTRUCTION INC. 51 ROPEATY LINE 4'TALL IRON PICKET 8'X1T PARKING SPACES "- FENCE W/GATE. REVISION _ (7) 10-10-18 PLANTING LEGEND WATER PANT 1-26-1 PLANTING SIZE SCIENTIFIC NAME COMMON NAME ® 6 SGAL TECOMA STANS YELLOW BELLS MODERATE .50 06-20-17 4 7e'-BOX TIPUANA TIPU TNp'pU TREE MODERATE .50 WSK SGAL ESP WI WIRE BOUGAOJVILLEA'BARBARA KARST BOUGAINVILLES MODERATE .50 07-24-17 7 36'-BOX MULTI TR. CITRUS TREE(LEMON AND LIME) �ap•aWN VALLEY MODERATE .50 �26 Cl 5-GAL ESP WI WIRE CALLIANDRA INAEQUILATERA PINK POWER PUFF MODERATE .50 5 MEDITERRANEAN MODERATE SO 170U 5-GAL ESP WI WIRE DURANTA'SWEET MEMORY' SWEET MEMORY MODERATE .50 SCAE. SGALE1"=10' 24GAL MULTI TR. CHAMAERDPS HUMILIS 21TC 5-GAL ESP WI WIRE TECOMA STANS YELLOW BELLS MODERATE .50 FAN PALM ``�� 27 V.12'HT.SKINNED WASHINGTONIA HYBRID HYBRID FAN PALM MODERATE SO �� 4'-F DIA COBBLE ROCK m iy m w Important Notice-Underground Service Alert 79 IGAL CARISSA G.'GREEN CARPET GREEN CARPET MODERATE .50 �C�'J 3'4'DIA.DESERT SELECT BOULDERS BY SOUTHWEST BOULDERS AND STONE sedwT,gi&nurde.G—mmiaaemy:ee 2"DEPTH COMPACTED 3I8'MINUS MOHAVE GOLD DECOMPOSED GRANITE ao 21 5-GAL CRISSA'SOXWWOD BEAUTY BOXWOOD BEAUTY MODERATE .50 BY SOUTHWEST BOULDERS AND STONE SCALE 1�lv Nl F,Gg OPTIONAL 4'-6'DIA.HICKORY CREEK FRACTURED GRANITE TO BE RECESSED. uana*+oo.aumer.ilaTmiyums"w wen 31 5115-GALMIX CORDIA PARVIFOLIA LITTLE LEAF CORDIA LOW .20 FINISHED GRADE TO BE AS THE ADJACENT SIDEWALK Ta.mcEd aemmluoow."agmP OR DURANTA REPENS OR SWEET MEMORY MODERATE .50 SHEET °4o"ygi ro- O 17 5-GAL DALEA GREGGII INDIGO BUSH LOW .za PLANTING NOTES MASTER r smnm mmaumyme:sam.mrmm..m pmmapx�mmnnvumm OR PORTULACARIA AFRA OR DWARF JADE PLANT MODERATE .50 �_� "O w.nm�wm,mWmwr.mo:eeneum.weam mnpem mpmaeuy ra 14 TVI5GALM0( DASYLIRION WHEELERI DESERT SPOON LOW .20 1. PLANTING AREAS TO RECEIVE A 2-MIN.LAYER OF 318'MOHAVE GOLD CRUSHED ROCK ioewmnnenauegnemaWmwmuomWmePdnawaweWeydWemu« PRUHT'NTIOLINIANA BV SOUTHWEST BOULDERS AND STONE PLANTING PLAN smmeomYaw tltrtamimimiNWxmMemoMm"WmiM's4�mx'miWem 46 5-GAL Column CAROLINA LAUREL MODERATE .50 BEUCOPN TIGHT 2. PLANT CONTRACTOR INDICTED IN THE PLANT LIST ARE FOR CONTRACTOR'S CONVENIENCE mnnn..URran.am m1tlR�0"t°d olk n.Wwd Woee+raro 16 5-GAL LEUCOPHYLLUM'LYNNS LEGACY' LYNN'S LEGACY LOW .20 ONLY.CONTRANSTALL VERIFY PLANTINDICATED PIESPERPLAN PRIOR TO BID.CONTRACTOR TO A aepnpdeasbanamrskm ear ene Wlwry.isla WepeG.mwnrevom.b ma PROVIDE AND INSTALL ALL PlAMSINDICATED PER PLAN. �� "`. mib v.axm ft Hopi maou+a leWMveigM1emMede T.*— eeay" 22 5-GAL LEUCOPHYLLUM'SILVER CLOUD' TEXAS RANGER LOW .20 3. ALL TREES WITHIN FIVE FEET OF PAVING SHALL BE INSTALLED WITH APPROVED DEEP ROOT BARRIER 73 iGAL MUHLENBERGIA CAPILARIS REGAL MIST MODERATE ,50 .11ti K. fly•r � . �� t . ,� i i �� � � - � � � ` � o •' d h + a . s s e - 44 •.. 4Y ♦ � ♦ It�! R"^AF g k ' T _ '�"� , t'i .[��'r+^"Ri"• �'t'�. .y"' �� ��+Y �.� e� .�. cif' - / �s �{- ' ... Y • s tom, -x�. ,. '' 'r'" ti�71+,�: A1w1:� }- '�.t, � - �{•� ..6 • f',• *7K '�, mo LLA • ..',pia,.' v ,T" q „x. i• , i e �,.. • - .fir . _ • , It • , R L ♦r. 26-0" 32'-0" 18'-0" 18'-0" 18'-0" 18'-01, FRONT SETBACK 6'PERFO TED CORRUGATED I -- 27G2'CONCRETE POOL m MTL FENCE,TYP. MTLFEN ORRPGATED PAVERS YARDS,TYP. EQUIPMENT PROPERTY LINE 01) �s i d ILU W' LLI TYP.GATECJ Q MAILBOXES I �- PAVED ROADWAY W/OPEN I CARPORT ROOF STRUCTURE. INTO PRIVATE T UNITS - F c LU I _ _ BACK YARD UNIT E1 Y = C Q v! - _ U U _4 ¢ 11 1� I• ilti TYPE4 \ - : ,`° U W<..I-'' 1 \ U) - ¢ ORTH BUIDLIN Q "'• - -- 0 LIJ 26'-0" 5 UNITS TRELLIS,TYP. - 1 \ �X� C- i DRIVEAISLE :` Q LLI Z UNIT E2 _ .•a U 0 Q r"�i' " PARKING: v TYPE 1 TYPE 2 UNIT N11 UNIT N2 PE UNIT NJ UNIT N4 UNIT N5 PE 2 TYPE 2TYPE 3 - ___ _ '`• X.�_ SBACEQSEE 1,j 3 BED 2 BED 4 BEiD2 4 BED 2 BED 6'TALL SOLID 2 BED Z - SUMMARY - CORRUGATED ._,3' _•_-, Q BELOW) ._E.E.NCEJYR EIEDREEN— ° w UNITS AT EAST � B DG.RACK Y —_ CAR CHARGING '• - YARDS - -- STATION Of �,. '-+-,'� UNIT EJ r` �•,� TYPE 3 f _ .: fi } t" --_- _- Y ,` 1-- TRASH AND Lu ti. F C -__ - +'k, r l \ , _ � RECYCLING a � < e 4 l; 1 ti -11L ENCLOSURE uai ENTRY GAT - ,„ \ �3 I _ \ 1 .— --. a - G TALL PINTO MASONRY 4 Y I� POOL BY UNIT E4 J Z WALL ti OTHERS SP c. TYPE 3 - Q Z 28ED ' - _ I NEW,SIDEWALK - ll i/ TRELLIS _ -� I O r„ _ UNITES Ir �o, I 0 Q Lu Cc f - '� i ( TYPE 3 �, U d l OOw 1 000 C. 5'TALL IRON PICKET s 0_ Z "- SIDEWALK ., !' FENCE UNIT ! U Z IY IY AT POOL DECK PERIMETER Q 0 I = 6'TALL STUCCO T In`2 BED Q WALL F a N Iw J 0- OUTH BUIDLINJ EXISTING SIDEWALK C-, •�''� I � 0_ PAVED ROADWAY W/ UNIT S4 \ � Q ORBRORT ROOF UNIT S7 UNIT S2 UNIT S3 y y _ r _ 5 UNITS 1 UNIT SS UNIT E7 TYPE 4 �.I TYPE 1 TYPE 2 TYPE 2 TYPE 2 TYPE 2 2 BED STRUCTURE 3 BED 2 BED 2 BED 2 BED 2 BED ^ /\ A - t V 1, �_ ✓ - `_ F� __ __—_ __ r� C�� = DESERTMODERN LANDSCAPE DESIGN Syr } w ELECTRICAL NOTES - LIGHTING SCHEDULE c CONSTRUCTIONINC. ME THE DESIGNER SHALL INSAFETY NOWAY O HELD RESPONSIBLE FOR THE METHODS AND 1.D ELECTRICIAN IS TO PROVIDE ALL NECESSARY PLANS,SPECIFICATIONS AND MEANS LI INSTALLATION,SAFETY IPERF OR ABOUT THE SITE,PERFORMANCE OF WORK DOCUMENTS,ETC.AND OBTAIN ALL REQUIRED APPROVALS AND PERMITS. OR TIMELINESS IN WHICH WORK IS PERFORMED. .SYMBOL OT-Y. FIXTURE COMMENTS 2. UNLESS OTHERWISE PROVIDED BY CONTRACTOR,ELECTRICIAN IS TO SIZE AND 11 THE INSTALLING CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE Radiax LED LED TREE FLOOD LIGHT FIXTURES AT NIGHT TO ELIMINATE GLARE AND INSURE OPTIMUM LIGHTING EFFECT. 1 SCALE 1'�iR REVISION CIRCUIT ALL ELECTRICAL CLOCKS,IRRIGATION SHOWNNT PLANS,CONTROLLERS, E.LIGHTS,PUMPS, Model:16006 AZT 27,6.5 W Textured Architectural t I.10-16 POOLS EQUIPMENT,TIME CLOCKS,IRRIGATION CONTROLLERS.ETC..) 12. ALL WIRE SHOULD RUN WHEN PO E POSSIBLE. HARD SURFACES,SUCH AS SIDEWALKS, ��/J- 9 •.•« w•^...•.••�, •Finl6hed MASTER LED LANDSCAPE CONTRACTOR IS TO PROVIDE AS BUILTS. 13. COORDINATE ALL WORK,N POSSIBLE. Electrical: 12V 2700 K Warm White 13. COORDINATEA O WORK,ESPECIALLY RY SUBCONTRACTORS TRENCHING AND BACKFILLING 7-24-i1 3.ALL MATERIALS AND ES AND A SHIP SHALL CONFORM TO ALL GOVERNING WITH IRRIGATION,CONCRETE AND MASONRY SUBCONTRACTORS IN REQUIRED. LED PALM UPLIGHT CODES AND ORDINANCES AND ACCEPTABLE STANDARDS H PRACTICE. THE INSTALLING CONTRACTOR SHALL 1-RESPONSIBLE FOR PLACING SLEEVES Radiax 1: LED Textured Architectural LIGHTING PLAN - UNDER THE HARD SURFACES,USING A 1-INCH PIPE MINIMUM. MOdeI:16OO7 AZT 27,6.5 W score scPLE 1""10' 4.COORDINATE ALL WORK,ESPECIALLY MASONRY S N C TRENCHING AND BACKFILLING 34 Bronze Finished WITH IRRIGATION,CONCRETE AND MASONRY SUBCONTRACTORS AS REQUIRED. 14. ALL 120 VOLT OUTSIDE ELECTRICAL OUTLETS SHALL BE PROTECTED BY THE EI6CtTICBI: 12V ••••••� GFI AS PER NATIONAL ELECTRICAL CODE. "2700 K"WaTm White NOTES: 5. LIGHTING CONTROLLERS WILL BE LOCATED ADJACENT TO IRRIGATION 15. THE LIGHTING PLAN IS DIAGRAMMATIC AND IS NOT INTENDED TO SHOW EXACT Radiax LED ACCENTS CONTROLLERS WHENEVER POSSIBLE, LOCATION OF CABLE RUNS.THE INSTALLING CONTRACTOR SHALL RUN WIRES TO BEST SUIT 1.THIS SHEET IS'FOR REFERENCE ONLY AND THESE LIGHTING 6. ELECTRICIAN IS TO CONFIRM EXACT TREE LOCATION SO AS TO INSURE FIELD CONDITIONS.AN AS-BUILT PLAN IS TO BE COMPLETED AND LEFT WITH THE OWNER. 10 Model: 16004 AZT 27,4 W LED ACCENT LIGHT................Textured Architectural REQUIREMENTS ARE INCORPORATED ON THE ELECTRICAL PLAN. PROPOER INSTALLATION OF LIGHT FIXTURES. SETBACK NOTES Bronze Finished 2.LIGHTING CONTRACTOR TO CONTACT KICHLER LIGHTING FOR 7.ALL JUNCTION BOXES WITHOUT A LIGHT FIXTURE WILL BE PUT IN A CARSON Electrical: 12V 2700 K Warm White ANY TYPE OF ASSISTANCE IN LAYOUT OF W IRE AND SIZE. SHEET BELOW GRADE. 1. LOCATE LIGHT FIXTURES A MIN.OF 4'-O"FROM EDGE OF TREE. 8.JUNCTION BOXES ON WALK LIGHTS ARE TO BE 6'TO W ABOVE FINISH GRADE 2. LOCATE LIGHT FIXTURES 1'-0"FROM EDGE OF PALMS. M — Model: 15-PR-400 3.LIGHTING CONTRACTOR TO COORDINATE WITH IRRIGATION L2.O MEASURED TO THE BOTTOM OF THE BOX. THESE NEED TO BE 5'MIN-AWAY FROM 3. THESE MEASUREMENTS AREA SUPERSEEDED ONLY WHEN T 1 Electrical: 12V TRANSFORMER CONTRACTOR FOR LOCATION OF IRRIGATION CLOCK AND THE EDGE OF THE CONCRETE DECKING. FIELD CONDITIONS WARRANT CHANGE BY LANDSCAPE ARCHITECT. LIGHTING TRANFORMER(S)AWAY FROM PUBLIC VIEW. 9. LIGHT FIXTURES LOCATED WITHIN(10)TEN FEET FROM EDGE OF WATERFEATURES Lights are available Please contact LIGHTING CONTRACTOR TO VERIFY LIGHTING COUNT BEFORE ORDERING FIXTURES. 4.PROVIDE LIGHTING TRANSFORMERS WATTAGE AS NECESSARY : Chuck ARE TO BE EQUIPPED WITH A GFCI PER ELECTRICAL ENGINEERS PLAN O-SATELLITE HUB(WIRE JUNCTION MANIFOLD) WITH PHOTOCELL. AND PER LOCAL AND COUNTY CODES. through CH Sales,Inc uck Hoover for questions.www.chsaleslne.com Cell:(818)519-0247 PHOTOCELLS ARE TO BELOCATED IN SUN ACCESSIBLE AREAS. Added Conditions of Approval Case 3.3989-MAJ Glenwood Management Group 7-Unit Apartment Complex 2150 North Zanjero Road September 6, 2017 CONDITIONS OF APPROVAL PLANNING DEPARTMENT: PLN 7. All HVAC equipment shall be ground-mounted and shall be screened pursuant to PSZC Chapter 93. No rooftop HVAC equipment shall be permitted. PLN 8. The perimeter walls for the development shall be as follows: • East wall: 6' high masonry block wall with stucco smooth coat finish; stucco pilasters and gated entries per the spacing as shown on Plan A- 001. • North and south walls: 6' high corrugated metal fence with concealed support posts. • West wall: 6' high masonry block wall with stucco smooth coat finish; central portion of wall shall be 6' iron picket fence with central gate per Plan A-001. PLN 9. All carport structures shall conform to the setback requirements of the R-2 zoning district. Carport structures shall conform to the construction details as shown on Plan A-409. PLN 10. The parking lot shall be screened in accordance with requirements of PSZC Section 93.06.00(C)(12). Parking spaces shall conform to the design and construction standards of PSZC Section 93.06.00(E). PLN 11. The trash enclosure shall be subject to review by Palm Springs Disposal Services, and the location and construction of the enclosure shall be subject to review and approval by the Director of Planning Services. PLN 12. Solar panels shall be provided over the central carport structure as shown on Plan A-001. M:\Projecrs\1605.00 Palm Springs Indian Canyon\01 DrevnngsW2 LmtNPalmSpdngs SR.M r w F� C7 0 x 1 m - gi Z� IR 2 IS - T-P RHHANGMG 1 N OVE OVERHANG it O II II D II II 11 II II C) � II II fi It II II m II II m N o e I ti II I II A, l 1 II I II q \ II II % II II O11 it � II II 90 II I 4 II I I \ II I \ II I I II �I II I II 4 \ II 'I II I I II II � II I II � it II I II n n II I II II I II II II II I II II II II II II II II II vi R II I II II L! II \ II n II I II II II II I II II I II O II \ l I s 7 f8 �4 n Nyn � o ass CA N K Z n o g O o M -0 0 Z c N $ " p z s � z z D N " `n o- > m D cn ➢ z R° M z O �m � p Cl) �^ s �LJ crn D z