HomeMy WebLinkAbout10/4/2017 - STAFF REPORTS - 1.D.DATE: October 4, 2017 City Council Staff Report CONSENT CALENDAR SUBJECT: APPROVAL OF PLANS, SPECIFICATIONS AND ESTIMATE (PS&E) AND AUTHORIZATION TO BID THE MEASURE J COMMUNITY PROJECTS — SIDEWALK GAP CLOSURE IMPROVEMENTS, CITY PROJECT NO. 15-31 FROM: David H. Ready, City Manager BY: Engineering Services Department uuG:l The construction documents (plans, specifications and estimate) have been completed, and in accordance with Section 7.03.040 of the Procurement and Contracting Code the City Council is required to approve and adopt plans, specifications and working details, and authorize the bid request for all public projects in excess of $100,000. Approval of this action will allow staff to proceed with bidding of Measure J Community Projects — Sidewalk Gap Closure Improvements, City Project 15-31 (the "Project"), with engineer's estimate of construction cost of $1,464,000. RECOMMENDATION: Approve the plans, specifications and estimates and authorize staff to advertise and solicit bids for the Measure J Community Projects — Sidewalk Gap Closure Improvements, City Project No. 15-31. STAFF ANALYSIS: Measure J Community Projects At its September 17, 2015 meeting, the Measure J Commission recommended to City Council a list of Community Projects under the theme of "Pedestrian, Bicycle and Traffic Hot Spots" to be funded through the Measure J Capital Project Fund over a three fiscal year period. The Measure J Commission's recommendation is the culmination of a lengthy evaluation process, resulting from their solicitation of community projects from anyone in the Palm Springs community. ITEM NO. 1 • D. City Council Staff Report October 4, 2017 -- Page 2 Authorization to Bid, Measure J Community Projects Sidewalk Gap Closure Improvements (CP 15-31) On October 21, 2015, the City Council approved Measure J recommended a list of three year 'Community Projects' subject to review, studies, and further evaluation from the Public Works and Engineering Department, now the Engineering Services Department (Engineering). Engineering analyzed the entire list, grouped the projects into similar categories, and identified in Table 1 resolutions to provide the most cost effective and efficient delivery of the projects. Many projects that did not need detailed engineering plans were completed earlier on; while some projects were removed or deferred (to be completed by private development or other capital improvement projects). The design for the remaining Community Projects covering fiscal year 2015/2016 thru 2017/2018 is now complete and authorization to bid the Project requires approval by City Council. Project Title 2015-2016 FISCAL YEAR Alvarado/E. Alejo Amado/Alvarado Arenas/Baristo btw. Belardo & Tennis Club Hotel/Baristo Baristo btw. Farrell & Sunrise Baristo from Belardo to Spencers Restaurant Camino Real/Twin Palms by ACE Hotel Camino Real between S. Riverside/Indian Trail E. Palm Canyon, s/s from Deepwell to Marcos TABLE 1 Project Description Budget Red Curbs needed at intersection to improve visibility/safety Stop Signs Sidewalks and Lighting Sidewalks Sidewalks and Lighting Extend red curbs; Improve Intersection visibility/safety Cahuilla Elementary: curbs, sidewalks (w/s Camino Real) Sidewalks: fill in pedestrian corridor $625 $2,500 $33,750 $96,250 Status Completed - By Street Maintenance Work Order. Completed - Stop sign not warranted per WEBB study. Deleted at request of property owners Included with City Project 15-31, Bid Opening Nov. 9, 2017 $96,250 Deleted at request of property owners $625 Completed - By Street Maintenance Work Order. Included with City Project 15-31, Bid $273,500 Opening Nov. 9, 2017 Included with City Project 15-31, Bid $89,100 Opening Nov. 9, 2017 7 L City Council Staff Report October 4, 2017 -- Page 3 Authorization to Bid, Measure J Community Projects Sidewalk Gap Closure Improvements (CP 15-31) Indian Cyn. btw Sidewalks fill in gaps $96,250 Included with City Project 15-31, Bid Mel & Vista Chino Opening Nov. 9, 2017 Ryan Snyder Traffic Traffic Calming Study Project deferred to City's Traffic Calming Study for various listed $60,000 Calming Program and on a case by locations case basis. Signage caution or Saturmino/Arenas slow children, $16,000 Included with City Project 15-31, Bid Speeding Clear Opening Nov. 9, 2017 Vegetation Sonora btw Farell Signs/limiting vehicle $1,250 Project deferred to City's Traffic and El Cielo weight on street Calming Program. Sunny Dunes Sidewalks & Bike City Project 15-31, except along between Palm Cyn. Lanes consistency / $256,250 business frontage (R/W easements and Calle Amigo traffic calming not provided). Signage for dip as Completed - Street Maintenance Tachevah / Sunrise Tachevah enters and $625 Work Order. exits Sunrise Red curbs at 4 Tahquitz Cyn. corners of $625 Completed - By Street Maintenance Way/Caballeros intersection for Work Order. visibility Tamarisk / Indian _ Red curbs for I $625 Completed - By Street Maintenance Canyon Drive increased visibility Work Order. Via Escuela / N. Warrant analysis for City Project 17-05, New Traffic Signal Palm Canyon potential signal $3,000 in Design, funded CVAG and s. Caltrans. 2016-2017 FISCAL YEAR Amado btw. Farrell Sidewalks (north $213,750 Included with City Project 15-31, Bid and Sunrise side) Opening Nov. 9, 2017 Andreas Hills Drive Replace Yield signs $2,500 Completed - By Street Maintenance with Stop sign Work Order. E. Palm Cyn. / Right turn on red $625 Included with City Project 15-31, Bid Laverne/Sunrise after stop Opening Nov. 9, 2017 E. Palm Canyon/S. Crosswalk - mid -block City Project 17-09, EPC/SPC Palm Canyon with beacons $43,750 Pedestrian Enhancements, funded by NAG grant. Eastgate/Rosa Traffic Calming and 4- $2'S00 Completed - Stop sign not warranted Parks Way Stop sign per WEBB study. n J City Council Staff Report October 4, 2017 -- Page 4 Authorization to Bid, Measure J Community Projects Sidewalk Gap Closure Improvements (CP 15-31) Farrell / Ramon Mesquite Country $75 000 Included with City Project 15-31, Bid Club trail crossing Opening Nov. 9, 2017 Farrell/ San yellow signs with Completed - City Project 15-02, black arrows (flashing $12,500 restriping of roadway from 4 to 2 Joaquin beacon) lanes resolved the issue. La Verne/ Lilliana Crosswalk and stop $7,500 Completed - Stop sign not warranted (at 5 Palm Canyon) sign per WEBB study. La Verne / S. Palm I 4-way stop $2,500 Completed - Stop sign not warranted Canyon per WEBB study. Traffic Signal to La Verne/ Twin facilitate pedestrian 000 $200,warranted Completed - Traffic Signal not Palms and/or bicycle per WEBB study. crossing Murray Canyon / S. 3-Way Stop Sign $3,750 Completed - Stop sign not warranted Palm Canyon per WEBB study. Murray Canyon / S. Sidewalks, Kings to $173,750 Deleted at request of property owners Palm Canyon Toledo Palo Fierro btw Twin Palms/La Traffic Calming $15,000 Project deferred to City's Traffic Verne Calming Program. Racquet Club % Crosswalks $5,000 deferred until street improvements Indian constructed at NW corner Racquet Club btw. City Project 15-23, SB 821 Sidewalk Farrell and Cerritos Sidewalks - fill in gaps $54,900 Gap Closure in construction, part funded by SB 821 grant. S. Palm Canyon City Council approved Class 3 bike Bike Lanes, sidewalks $26,200 route for S. Palm Canyon Dr in July Drive 2016. Crosswalk & Completed - Preliminary analysis from Sonora /Sunrise Pedestrian Grassing $68,750 Engineering indicates Crosswalk not Light I warranted due to high vehicular counts. Sonora % Palo 4-Way Stop $3,750 Completed - Stop sign not warranted Fierro per WEBB study. Tahquitz Cyn. Drive Pedestrian Lighting Deferred to private development to / Indian to continuous along $51,750 implement as part of Section 14 Renaissance Hotel sidewalk Master Plan. Via Escuela (Albertson's Right Turn Only $625 Completed - By Street Maintenance Parking Lot) / Work Order. Sunrise Way City Council Staff Report October 4, 2017 -- Page 5 Authorization to Bid, Measure J Community Projects Sidewalk Gap Closure Improvements (CP 15-31) 2017-2018 FISCAL YEAR Crossley / 34th Marked Crosswalk $ 5 000 Deferred to CV -Link Project to install traffic signal and crosswalk. Sidewalks along Deferred due to limited right-of-way, Crossley / Dinah Crossley S of Dinah $327,700 Tribal lands, existing street is interim Shore Shore width subject to future widening at the time Tribal lands are developed Deferred due to limited funding; preliminary estimate is $750k to Paseo El Mirador btw. Sunrise and Sidewalks & bike $252 800 construct curb/gutter/sidewalk; Class Caballeros lanes; traffic calming II bike lanes will eliminate on -street parking, Class 3 route is recommended (i.e. Via Escuela) Racquet Club / Traffic Signal $375,000 ( Completed -Traffic Signal not Cerritos warranted per WEBB study. Racquet Club from N. Palm Cyn. to Sidewalks $76,250 Included with City Project 15-31, Bid Cardillo Opening Nov. 9, 2017 Racquet Club from City Project 15-23, SB 821 Sidewalk Sidewalks $96,125 Gap Closure in construction, part Sunrise to Cerritos funded by SB 821 grant. S. Riverside Drive Project deferred to City's Traffic from Sunrise to S. Traffic Calming $20,000 Calming Program. Random Road Sonora / Capri ADA Curb Cuts on $8,000 Completed - By Street Maintenance Circle Sidewalks Work Order. Sonora / Farrell Crosswalk - mid -block $41,250 Deferred for ped crossing warrant with beacons i analysis Total Budget $3,193,450 Projects deleted at request from neighborhood residents Property Owners affected by this project were invited to an 'Open House' format meeting on April 13, 2017, at the City Hall. Subsequently, staff received letters and e- mail communications from concerned property owners who opposed sidewalk installation in front of their respective properties; furthermore, the City did not receive the necessary 'Right of Entry and Temporary Construction Agreement' that would be required from some of the property owners and therefore, gap closure sidewalk installation at the locations as shown in Table 2 will not be advancing to construction. 5 City Council Staff Report October 4, 2017 -- Page 6 Authorization to Bid, Measure J Community Projects Sidewalk Gap Closure Improvements (CP 15-31) TABLE 2 No. STREET BETWEEN COMMENT 1 Arenas Road Belardo Road and Tennis Club Road Both sides 2 Baristo Road Belardo Road and Tennis Club Road Both sides except between S Lugo Road and 150' west of S Lugo Road — North Side 3 Murray Canyon Dr. Kings Road and Toledo Ave. North side 4 Sunny Dunes Road S. Palm Canyon and Calle Palo Fierro North side Locations Removed from Construction City Project 15-31, Measure J Community Projects - Sidewalk Gap Closure Improvements The proposed work of the remaining projects primarily includes installation of missing sidewalks, but also includes the construction of curbs, upgrade of nonconforming curb ramps and driveways, signing and striping, traffic signal modification and all other appurtenant work at the project locations shown in Table 3: TABLE 3 STREET BETWEEN COMMENT Alejo Road Indian Canyon Drive and Calle El Segundo South side Amado Road Sunrise Way and Farrell Drive North side Baristo Road S. Lugo Road and 150' West of S Lugo North Side Road Baristo Road Sunrise Way and Farrell Drive North side Camino Real Indian Trail and South Riverside Drive West side E. Palm Canyon Drive Deepwell Road and Calle Marcus South side N Indian Canyon Drive Mel Avenue and Vista Chino Both sides Racquet Club Road Cardillo Avenue and N Palm Canyon Drive North side Sunny Dunes Road Calle Palo Fierro and Calle Amigo North side Locations Recommended for Construction The Project also includes improvements at three Community Project locations where various 'Pedestrian, Bicycle and Traffic Hot Spots' issues will be addressed: • At Saturmino Drive between Tahquitz Canyon Way and Baristo Road and at Arenas Road between Sunrise Way and Saturmino Drive; to implement traffic calming measures; a 25 MPH speed limit signs will be posted; a STOP sign will replace an existing YIELD sign at the intersection of Arenas/Calle Lelita and Saturmino and the street will be striped to delineate travel way and parking. 0 City Council Staff Report October 4, 2017 -- Page 7 Authorization to Bid, Measure J Community Projects Sidewalk Gap Closure Improvements (CP 15-31) • At Sunrise Way and East Palm Canyon Drive signalized intersection; to help improve the intersection level of service; the existing north bound number two lane will be converted to a dedicated right turn lane to facilitate high demand for right turn from north bound Sunrise Way to east bound E Palm Canyon Drive. • At Farrell Drive between Mesquite Avenue and Ramon Road; signs will be posted advising appropriate crossing locations to pedestrians and bicyclists. With City Council's approval, staff will advertise the project for bids in the Desert Sun, submit the Notice Inviting Bids to plan rooms, and provide the bid documents available free of charge to prospective bidders. Copies of the construction drawings and contract specifications for the Project are on file with the Engineering Services Department. The following tentative schedule has been identified for the bid process: Notice Inviting Bids posted and issued: October 7, 2017 Deadline for receipt of bids: 3:00 PM, November 9, 2017 Contract awarded by City Council: December 6, 2017 ENVIRONMENTAL IMPACT: Section 21084 of the California Public Resources Code requires Guidelines for Implementation of the California Environmental Quality Act ("CEQA"). The Guidelines are required to include a list of classes of projects which have been determined not to have a significant effect on the environment and which are exempt from the provisions of CEQA. In response to that mandate, the Secretary for Resources identified classes of projects that do not have a significant effect on the environment, and are declared to be categorically exempt from the requirement for the preparation of environmental documents. In accordance with Section 15301 "Existing Facilities," Class 1 projects consist of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public structures, facilities, mechanical equipment involving negligible or no expansion of use beyond that existing at the time of the lead agency's determination. Therefore, in accordance with Section 15301(a), staff determined that the Measure J Community Projects — Sidewalk Gap Closure Improvements City Project No. 15-31 is considered categorically exempt from CEQA and a Notice of Exemption was prepared and filed with the Riverside County Clerk and is included as Attachment 1. FISCAL IMPACT: Sufficient funds are budgeted and available in the Measure J Capital Project Fund. The estimated total construction cost of the project is $1,464,000. Table 4 summarizes the Project budget and the estimated expenditures. TABLE 4 City Council Staff Report October 4, 2017 -- Page 8 Authorization to Bid, Measure J Community Projects Sidewalk Gap Closure Improvements (CP 15-31) Table of Project Costs FY 15/16 Measure J Fund (260) FY 16/17 Measure J Funds (260) FY 17/18 Measure J Fund (260) Design Costs (through 8/17/17) Project Administration (through 8/17/17) — (Includes analysis, evaluation, and implementation of other community projects). Project Administration (Estimated) Right of Way Cost — 1962 E Baristo (Estimated) Construction Engineering/Design Support and Inspection (Estimated) Construction Contract (Estimated) Contingency (10%) Sub -Total Local Match for SB 821 Sidewalk Project (CP 15-23) Local Match for 2017 CVAG Bike and Ped. Grant Total SUBMITTED f Thomas Garcia, P.E. City Engineer David H. Ready, Esq., Ph.D City Manager Attachment: 1. Notice of Exemption. Amount $1,027,225 $911,725 $1,202,125 ($227,020) ($90,110) ($36,000) (12,000) ($120,000) ($1,464,000) ($146,400) $1,045,545 $602,000 $300,000 $143,545 Marcus L. Fuller, MPA, P.E., P.L.S Assistant City Manager 8 ATTACHMENT 1 9 F I L E D/ P O S T E D County of Riverside Peter Aldana Assessor -County Clerk -Recorder E-201700443 04/17/2017 03:56 PM Fee: $ 50.00 Page 1 of 2 MAY 7 4 201I Remloved:I �By: Deputy search From: ,III 07��ii��l�'IiYdlii�yr �IIII 1121 ® Clerk of the Board County of Riverside P.O. Box 751 Riverside, CA 92502-0751 NOTICE OF EXEMPTION City of Palm Springs 3200 E. Tahquitz Canyon Way Palm Springs, CA 92262 Project Title: Measure J Community Proiects — Sidewalk Gan Closure Improvements, Citv Proiect No. 15-31 Project Applicant: Citv of Palm Sorinas Project Location (Specific): Street Alejo Road Amado Road Arenas Road Baristo Road Baristo Road Camino Real E. Palm Canyon Farrell Drive Indian Canyon Drive Indian Canyon Drive Indian Canyon Drive Murray Canyon Dr, Racquet Club Road Racquet Club Road Racquet Club Sunny Dunes Road Between Calle Encilia and Calls El Segundo Farrell Drive and Sunrise Way Belardo Road and Tennis Club Road Belardo Road and Tennis Club Road Farrell Drive and Sunrise Way So. Riverside and Indian Trail Driftwood Drive and Calle Rolph Racquet Club and Vista Chino . Mel and Vista Chino Racquet Club and Via Olivera San Rafael Drive and Simms Road Kings Road and Toledo Ave. Sunrise to Cerritos Drive Cerritos Drive and Farrell Drive Cardillo to North Palm Canyon S. Palm Canyon and Calle Amigo Project Location (City): Citv of Palm Sorinas Project Location (County): Riverside Project Description: Installation of Concrete Curb and Gutter, Driveways, Sidewalks and Access Ramps. Name of Public Agency Approving Project: City of Palm Springs Name of Person or Agency Carrying Our Project: City of Palm Springs, Engineering Services Department 3200 E. Tahquitz Canyon Way, Palm Springs, CA 92262 Exempt Status: (check one) ❑ Ministerial (Sec. 21080(b) (1); 15268); ❑ Declared Emergency (Sec. 21080(b) (3); 15269(a)); ❑ Emergency Project (Sec. 21080(b) (4); 15269 (b)(c)); ® Categorical Exemption. State type and section number: ❑ Statutory Exemptions. State code number: 15301 Class 1(c) — Existing Facilities Reasons why project is exempt: Class 1 consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alternation of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of use beyond that existing at the time of the lead agency's determination. The type of "existing facilities" to be considered exempt is determined by whether the project involves negligible or no expansion of an existing use, and includes existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities. Therefore, Measure J Community Projects — Sidewalk Gap Closure Improvements, City Project No. 15-31, is considered categorically exempt from CEQA for the locations identified. Lead Agency Contact Person: Marcus L. Fuller, PE, PLS Area Code/Telephone/Extension: (760) 322-8380 If filed by applicant: 1.Attach certified document of exemption finding. 2. Has a Notice of Exemption been filed by the public agency approving the project? ❑ Yes ❑ No Signature: 4/"J Date: Title: Asst Citv Manaoer/City Enaineer ® Signed by Lead Agency ❑Signed by Applicant Authority cited: Sections 21083 and 21110, Public Resources Code Date received for filing at OPR: Reference: Sections 21108, 21152, and 21152.1, Public Resources Code.