12/13/2017 - STAFF REPORTS - 1.V.
iy A 0 Y N • Aa9 � Cq<<Fioa City Council Staff Report Date: December 13, 2017 CONSENT CALENDAR Subject: ACCEPTANCE OF THE AIRPORT TAXIWAY J PAVEMENT RECONSTRUCTION PROJECT (IFB 17-06) From: David H. Ready, City Manager Initiated by: Department of Aviation SUMMARY This action allows the City Council to formally accept as complete the Taxiway J Pavement Reconstruction Project, IFB No. 17-06, and allows the City's filing of a Notice of Completion with the Riverside County Recorder in accordance with Section 9200 of the California Civil Code. RECOMMENDATION: 1) Accept the public works improvement identified as the Taxiway J Rehabilitation Project, IFB No. 17-06, as completed in accordance with the plans and specifications; and 2) Approve Change Order #2 in the amount of $2,323.20 and Change Order #3 in the amount of $7,465.79, for a total contract amount of $291,982.99 with All American Asphalt, a California corporation (A6999); 3) Authorize the Director, Department of Aviation, to execute and file for recordation with the Riverside County Recorder a Notice of Completion for the Taxiway J Pavement Reconstruction Project, IFB No. 17-06; and 4) Authorize the City Manager to execute all documents. BUSINESS PRINCIPAL DISCLOSURE: A search of records available through the Secretary of State of California shows that as of February 28, 2013, All American Asphalt was a California corporation with the following corporate officers: Mark Luer (CEO) and Michael Farkas (Secretary/CFO), with the following additionally listed Director: Thomas Toscas. ITEM NO.� �_ City Council Staff Report December 13, 2017— Page 2 Acceptance of City Project No. 17-06 STAFF ANALYSIS: On September 6, 2017, the City Council ratified the award of a construction contract for the Taxiway J Pavement Reconstruction Project, IFB No. 17-06, at Palm Springs International Airport, (Project), to the successful low bidder All American Asphalt, a California corporation, (Contractor), in the amount of $258,265. The scope of the Project consisted of removing and replacing the full depth of old existing asphalt on Taxiway J and applying the necessary required surface markings to meet Federal Aviation Administration standards. An aerial map of the site is identified here: '4LL Location Map On July 19, 2017, the City Council authorized the City Manager to approve and execute construction contract change orders up to a cumulative amount of 10% of the contract amount of $258,265 with all change orders reported to the City Council. During construction of the Project three contract change orders were required as follows: • On November 1, 2017, the City Manager approved Construction Contract Change Order 1 (CC01), in the amount of $23,929, to add aggregate rock as base material to provide the required structural foundation underneath the new asphalt pavement. Upon removal of the old asphalt pavement, it was then revealed the lack of sufficient aggregate rock base necessary to stabilize the surface asphalt of the taxiway. Unit pricing from the specification was used to calculate the cost. • Contract Change Order 2 (CCO2) in the amount of $2,323.20 is recommended for approval to compensate the Contractor for additional paint material required to paint 5" wide chevron markings versus 3" wide chevrons as required by the FAA. 4 . 02 City Council Staff Report December 13, 2017—Page 3 Acceptance of City Project No. 17-06 • Contract Change Order #3 (CCO3) in the amount of $7,465.79 is recommended to accommodate payment of final constructed quantities required to complete the Project in accordance with the bid items and quantities listed in the contract documents, as shown in Table 1. ITEM NO. Bid Quantity Actual Quantity Quantity Diff. Unit Price +/- Amount 102 600 Tons 624.5 Tons 24,5 Tons $50.00 $1,226.50 107 1 .64 -0.36 $10,000 -$3,631.85 111 12,000 s.f. 11,968.32 s.f. -31.68 s.f. $1.00 -$31.68 112 300 c. . 297 c. . 3c. . $50.00 $150.00 113 12,000 s.f. 11,968 s.f. -31.68 s.f. $1.00 -$31.68 114 250 Tons 292.70 Tons 42.7 Tons $300.00 $12,810.00 115 350 Tons 331 .83 Tons -18.17 Tons $150.00 -$2,275.50 Net Increase $7,465.79 Table 1 The final cost of the Project increased by $33,717.99 from the original awarded contract amount of$258,265 as follows: Change Order#1 $23,929.00 Change Order#2 $ 2,323.20 Change Order#3 $ 7,465.79 Net Increase $33,717.99 As a result, the total closeout contract amount will increase to $291,982.99. However, the Airport will deduct a fee of$500 required in cleanup of the project area performed by the Airport. The final increase for the three Contract Change Orders is 13.06% of the original base contract amount. A copy of each of the Change Orders is included as Attachment 1. As determined by contracted Construction Manager from URS, the Project was substantially completed and the Contractor satisfactorily finished the Project in accordance with the specifications on October 30, 2017. Staff recommends that the City Council accept the Project as required by Section 9200 of the California Civil Code, and authorize the Director of Aviation to file and record a Notice of Completion within 15 days of the City Council's action. A copy of the Notice of Completion to be submitted to the County is included as Attachment 2. ENVIRONMENTAL IMPACT: Section 21084 of the California Public Resources Code requires Guidelines for Implementation of the California Environmental Quality Act ("CEQA"). The Master Plan Update for the Palm Springs International Airport ("Master Plan") is considered a "Project", and in accordance with the CEQA Guidelines, the City acting as "Lead Agency' pursuant to CEQA, previously completed an environmental analysis of the potential impacts resulting from implementation of the Master Plan. A Notice of r,rle►,t to 03 City Council Staff Report December 13, 2017- Page 4 Acceptance of City Project No. 17-06 Adopt a Mitigated Negative Declaration ("MND") was previously filed, and on October 21, 2015, the City Council held a public hearing, and independently reviewed and considered the information contained in the MND prior to its review and approval of the Master Plan, and adopted Resolution No. 23908, adopting and ordering the filing of a Mitigated Negative Declaration for the Master Plan. The Taxiway J Pavement Reconstruction Project, IFB No. 17-06, further implements the Master Plan, and no further environmental analysis pursuant to CEQA is necessary. FISCAL IMPACT: On July 19, 2017, the City Council authorized the City Manager to accept FAA Airport Improvement Grant AIP 3-06-0181-055-2017 for partial funding of three airport capital projects, to include the Taxiway J Pavement Reconstruction Project, IFB No. 17-06. The AIP Grant will cover 90.66% of the total project cost. The remaining percentage is considered a local match and will be paid from the City's Airport Fund. Sufficient funds are budgeted and available in the Airport Capital Improvement Fund, Accounts 416-6401-56186 and 416-6601-56186. Table 2 below is a summary of the total costs incurred for the Project. Phase Final Cost Design & Construction Administration $36,550.00 Construction Management $35,619.00 Construction Contract $258,265.00 Contract Change Orders(including Deduct $33,217.99 Total Cost $363,651.99 Table 2 The Project was funded through the following sources as shown in Table 3: Fund Name Account Actual AIP 3-06-0181-055-2017 Capital Projects 416-6401-56186 $33,964.99 Capital Projects 416-6601-56186 $329,687.00 Total Expenditures for Project $363,651.99 Project Budget $363,651.99 Remaining Balance -0- Table 3 04 City Council Staff Report December 13, 2017— Page 5 Acceptance of City Project No. 17-06 The City is holding retention of $14,574.15 for All American Asphalt, pending acceptance of the improvements and filing of the Notice of Completion with the County Recorder's office. SUBMITTED "Y , 4 Marcus L. Fuller, MPA, P.E., P.L.S. Thomas Nolan, AAE Assistant City Manager Executive Director of Aviation David H. Ready, Esq., . . City Manager Attachments: 1. Change Order 1 2. Change Order 2 3. Change Order 3 4. Notice of Completion 05� Attachment 1 •�' os CHANGE ORDER 01 PROJECT TITLE: T#k;t I WAY T R9H*0I L.(TA-r100 ?Q64T-GT AIP No. 3-06-0181-055-2017(Construction) INVITATION FOR BIDS(IFB) 17-06 CONTRACT No.2017-06 The following changes are hereby made to the Contract Documents: Change per this change order is to bid item 113 providing a more structurally sound and uniform aggregate base under the asphalt taxiway as specified in the contract documents.This will also add to a more maintenance free taxiway for the airport. Justification:After the removal of the existing asphalt it was discovered that there was little to no aggregate base under the taxiway asphalt causing the asphalt to rut and break apart providing a hazardous condition for air planes using the taxiway, CHANGE TO CONTRACT PRICE: Original Contract Price: $258,265.00 Current contract price, as adjusted by previous Change Orders: $258,265.00 The Contract Price due to this Change Order will be increased by$23,929.00 4 The new Contract Price due to this Change Order will be: $282,194.00_ CHANGE TO CONTRACT TIME: The Contract Time will be increased by 0 calendar days. The date for completion of all work under the contract will be: October 31, 2017 Approvals Required: To be effective, this order must be approved by the Owner if @ changes the scope of the objective of the project,or as may otherwise be required under the terms of the Contract,General Provisions or Special Provisions. Requested by date Recommended by date 140/7//12 Ordered by date 16121117 Accepted by date CITY OF PALM SPRINGS,RIVERSIDE COUNTY All VIII-e CONTRACT ADMINISTRATION FORMS PALM SPRINGS INTERNATIONAL AIRPORT BID DOCUMENTS AIRFIELD LIGKnNG PROJECT CONFORMED 07 City of Palm Springs International Airport POTENTIAL CHANGE ORDER NUMBER 01 Change Order Summary of Negotiations CONTRACT CHANGE ORDER NUMBER 9 rY 9 01 AIP PROJECT NUMBER EAHAmerican TOR PROJECTTM-E 3-08-0181-055-2017ME1 Asphalt TAXIWAY J DESCRIPTION OF CHANGE: Remove V or native material under laxlway shape and compact&Install W of class 11 base and compact. Proposed Change Change Order Justification Order Type Requested By Code X Lump Sum 1 Contractor Q Design ErrorJOrrrssion 1 0 1 Owner im ect Not-to-Exeeed X I Designer = scm Change I ReaulatontChange Force Account Airport Autho' X Unforeseen Conditions I X I Other Unit Price 0 1 Tenant Engines s Estimate Contractor's Proposal Ne otiated A regiment Estimated Cost $25,000.00 Proposed Cost $35,929.00 Agreed Cost $23,929.00 Estimated Time 0 calendar days Proposed Time 5 calendar days Agreed Time 0 calendar days Prepared By Bob Denning Date Prepared 10/27117 Date Received 10/25/17 Date Negotiated 10/26/17 SUMMARY OF NEGOTIATIONS Contractor did not account for the bid item#113 of$12,000.00 in his proposal.Re-submitted with credit. ADDITIONAL REMARKS NONE The above constitutes the summary of formal negotiations held on the date listed for the change item described.To the best of my knowledge,this negotlated settlement provides fair and reasonable compensation for the noa item described. SIGNATURE DATE WNATURE DATE 10127/2017 PRINTED NAME AND TITLE of Load N99004 r PRMRED NAME of mw"w Bob Denning/Senior Construction Manager Bob Dennin l Senior Canst coon Mana er Page 1 of ie 08 .ALL AMERICAN ASPHALT- TO. CITY OF PALMSPRINGS DEPT OFAYIATION DATE., 10124117 3400 TAX =CAiVYON WAY,SUITE OFC RFI No: 002 PALMSPRINGS CA 92262 AAA JOB IVO. #29610 An,. ROBW DENNING Re: Taxiway d Rehabilitation Pro'ect, Contract No.A6999,"No. 3-06-0181-055-2017 Invitation for Bids 1TFB)17--06 QUESTION After removing the existing asphalt it has been found that there is very little to no base rock In the subgrade. The plans and specs state that there should be at least 6"of CAB_ Please direct. RESPONSE: Remove 6"of native soi4 haul off site disposedofpropedy and provide 6"of3/,"minus base rock material(p208)compacted to 100'0/a RESPONDED BY, REQUESTED BY, �.va�C/ JCliannn�rs+.��+ U 1RS, GORDON MVE ------------------------------------------------------------- 09 ALL AMERIC.AN ASP HALT To: CITY 0FPALMSPRINGSDEPTOFAVL4T10N TseNssmruDATE.' 10125117 3400TAN2=CANYON WAY,SUITEOFC COR Na.- 001 PALMSPRINGS CA 92262 AM JOB No: 429610 A,Try. ROBERTDENNING Re: Taxiway JRehabtittationProject,contractNo.A6999,ALPNo.3-06-0181-055-2017 Invitatian.forBids aM 17-06 17rmNo. DEscxrmoN: QVANTm: Utyrreasr TOTAL: Remove 6"of Native Materiel do Install 6"of Class 9Base on Taxiway J 1, Subgrade Preparation&Remove 6"of Native Material 12,500SF $0.55 $6,87S,00 2. Haul&Dispose of Native Material 230 CY $81.40 $18,722.00 3. Install 6"of Class 11 Base 420 77V $24.60 S 10,33200 4. Credit for Being Paid line Item 0113 per Contract 12,000SF ($1.00) ($I2,000.00) Total Change Order Request Prke $23,929.00 Please add 1 working day to the contract for this wark :r APPROVED REVISE&MUBWT APPROVED AS NOTED REJECTED COMMENTS RECEIVED BY, TRANSMITTED BY, tIRS GORDON KUNE PUBLIC WORKS EST'IAMTOR/PROJECT MANAGER 0 ALL AMERICAN ASPHALT ALL AMERICAN AGGREGATES ENGINEERING-CONTRACTORS-ASPHALT PAVING ALL AMERICAN P.O.BOX 2229.CORONA.CA 92878-22239 ASPHALT STATE CONTRACTORS LICENSEp267073-ADIR#1000001051 Item Price Summary Project Name: X29610 COR#001-Remove&Place 6"Class II Customer. Cary of Palm Springs Base Job Number, Bailing Address: 3200 E Tatz Canyon Way Bid As: Prime Paim Springs,CA 92262 Estimator. KLINE,GORDON Phone: 7603238253 Project Address Contact: Completion pate: Desciptlon Job Cost ID Task JCID Bid Quantity UM Unit Bid Price Total Bid Price 0 i-Subgrade Preparation&Remove 6"Of Native 12,500.00 SF $0.55 $6,8710G Material in 2-Haul&Dispose Of Native Material 230.00 Cy $81.40 $18,722.00 3-DuM 6"Of aaz It Base 420.00 TON $24.60 $10,332.00 Pay Items Total: $35,929.00 10(25J2017 10:37:34 AM Page 1 of 1 11 ALL AMERICAN ASPHALT ALL AMERICAN AGGREGATES ENGINEERING-CONTRACTORS-ASPHALT PAVING ALL AMERICAN P.O. BOX 2229.CORONA.CA 92878.22?9 ASPHALT STATE CONTRACTORS LICENSE 40-67073-A DIR#1000001051 Cost Detail Project Name: #29610 CDR#001-Remove&Place 6°am 11 1 Customer: City of palm Springs Base .lob Number. B81ing Address: 3200 E Tahquitz Canyon Way Bid As: Prime Palm Springs,CA 92262 Estimator. KLINE,GORDON Phone: 7603238253 Project Address: Contact Completion Date: Unit Total Description Quantity UM Direct Cost DkIect cost 1-Subgrade Preparation&Remove 6"Of Native Material 12,500.00 SF $0.46 $5,756.96 Q Grade Skip 12,500.00 SF $D.46 $5,75696 ® Grade Skip(12,500.00 SF/DY,1.00 DY) 12,500.DO SF $038 $4,756.96 Roger,Pup 8.00 MR $30.00 $240.00 ® Skip Loader 8.00 MR $30.00 $240.00 ■ Laborer,General(1) 8.00 MR $64.84 $518.72 ■ Operator,Grade Checker(VIII) 8.50 HR $89.25 $757.75 ■ Operator,Skip(M) 8.50 MR $68.31 $750.66 ® Operated Water Truck B.00 MR $65.00 $520.00 ® Thick,Pickup 8.00 MR $15.00 $120.00 ■ Operator,Foreman(Public Works) 9.00 MR $94.83 $853.48 ■ Operator,Rollennan(VI) 8.50 MR $8898 $756.35 (� EQUIPMENT MOVE 1.00 EACH $1,0Dom $1,000,00 2-Haul&Dispose Of Native Material 230.00 CY $69.43 $16,014.05 Removals Loader 230.00 CY $69.63 $16,01,1.05 ■ Removals Loader(230.00 CY/DY,1.00 DY) 230M CY $42.67 $9A14.05 ® Rental Loader,Cat 965 8.00 MR $107.00 $856.00 ® Truck,5 Axle[8] 8.00 MR $120.00 $7,680.00 Laborer,General(1) 8.00 MR $64,84 $518.72 ■ Operator,Loader(X) 8.50 MR $8933 $75933 ® Dump Fees 26.00 EACH $200.00 $5,200.00 ® EQUIPMENTMOVE 1.00 EACH $1,000.00 $1,D00.00 © 3-Install 6"Of Class n Base 420.00 TOM $20.74 $8,7=76 Base Rode Sk!p 420.00 TON $20.74 $8,711.76 ® Base Skip Crew(420.0D TON/DY,1.00 DY) 420.OD TON $11.80 $4,956.96 ® Operated Water Thick 8.00 MR $65.00 $520.00 ® Roger,Grade SAO MR $55.00 $44D.00 ® Skip Loader 8.0D MR $30.Q0 $240.00 ■ Laborer,General(1) B.00 MR $64.84 $518.72 10/25/201710:37:59 AM Page 1 or 3 12 Unit Total Description Quantity UN Direct cost Direct Cost (Item.3'-ra5ta Air 8"Of©assaBase continued) ■ Operator,Grade Checker(HIII) 8.50 HR $89.15 $757.75 ■ Operator,Rollennen(VI) 8.50 HR $W.98 $75635 ■ Operator,Skip 8.50 HR $8831 $750.66 Truck,Pickup 8.00 HR $15.00 $120.00 ® Operator,Foreman(Public Wes) 9.00 HR $94.83 $853.48 ® dess 2 ease 420.00 TON $6.94 $3,754.80 • 1005j201710:3759 AM #29610 MR#001-Remove&Place V class 118ase Page 2 of 3 13 Percent of Amount Direct Cost Labor: $8,551,97 28.06% 7EqufpmentOwne* $9,080.00 29.79% Equipment Ranted: $1,896,00 6.22% Materials Owned: $0.00 0.00% Materials Purchased: $3,754.80 12.32% Subcontracted: $0.00 0.D0% Trucking Owned: $0.00 0.00% Trucking FOred: $0.00 0.00% Miscellaneous: $7,200.00 23.62% Plug: $0.00 0.00% Direct Cost: $30,482.77 Pay Item Summary Percent of Amount Bid Price Total Direct Cost: $30,482.77 84.84% Total DC Adds/Cuts: $0.00 0.00% Total Indirect Cost; $0.00 0.00% Total Bond: $449,15 1.25% Total Overall Cost: $30,931.92 86.09% Total Overhead; $0.00 0.00% Total Profit: $4,997.08 13,91% Total Margin: $4,997.08 13.91% Total Bid Price: $35,929.00 10125/2G1710:3759 AM t29610 COR A001-Remove&Phce 6"Class II Base Page 3 of 3 0 ^ 14 DESERT RECYCLING, INC. 27-105 Sierra Del Sol,Thousand Palms,Ca. 92276 Mailing: P.O.Box 207,Thousand Palms,Ca.92276 Plant:760-343-0095 Fax:760-343-2436 www.desertrecycling.net AGGREGATE BASE QUOTATION DELIVERED IN TRANSFERS DATE: 10/25/17 QUOTE BY: DIANA CHAVEZ TO: Gordan Kline COMPANY: All American Asphalt PHONE:951-736-7600 EMAIL:gkiine@aflamericanasphalt.com PROJECT: PS Airport 3400 East Tahquitz Canyon Way Palm Springs PRICES GOOD THROUGH: January 2018 PRODUCT TONS PRICENOB TAX HAUL TOTAL PRICE TYPE PLANT RATE PER TON CLASS H 440 2.50 .19 $6.25 $8.94 DELIVERED PRICE WITH TAX INCLUDED: $3,933.60 TERMS & CONDITIONS SPECIAL PROVISIONS AND CONDITIONS: CUSTOMER AGREES TO PURCHASE MATERIAL FOR THE PLANT. TRANSPORTATSON IS A SERVICE SUPPLIED BY THE PRODUCER AND SELLER PRICE INCLUDES DELIVERY AND TAX ON MATERIAL. ALL PRICES QUOTED ARE DELIVERED IN BOTTOM DUMPS. AMSO.00 PER TONFORYYtUCKAm TRANSFER DELiVISRY, THERE WILL BE AN ADDITIONAL CHARGE FOR TRUCKS NOT USED FOR A MEWAUM OF 4 HOURS. THERE WILL BE A STANDBY CHARGE OF SI-50 PER MINUTE FOR TRUCKS HELD OVER 20 MINUTES FOR UNLOADING AND TRUCK TRANSFERS HELD OVER 30 MINUTES. SUITABLE AND SAFE JOB SITE ENTRY AND EXIT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR CUSTOMER RESERVES THE RIGHT TO PURCHASE THE MATERIAL FOR OUR THOUSAND PALMS PLANT. THE MATERIAL IS BEING SOLD BY THE LOAD ESTIMATED AT 25 TONS EACH. MATERIALS ARE QUOTED ON AN AS AVAILABLE BASIS. PLEASE NOTE: THE CRUSHED MISCELLANEOUS BASE QUOTED ABOVE MEETS THE GREEN BOOK SPECIFICATIONS,SSPWC SEC.200-2.41 CMB FINE.CALTRANS CLASS IL DUNA CHAVEZ ACCEPTED BY 15 Earth Systems Southwest 79.8118 Country Cub Drive 8em+uda Dunes,CA 92203.1244 Ph:760.345-SS88 Fas:760345.7315 www.earthsyuems.com April 27,2017 File No.:08676-02 Document No.:17-04-721 Desert Recycling,Inc. P.O. Box 207 Thousand Palms,California 92276 Attention: Mr. Bob Mehring Project: Quality Control Subject: Laboratory Test Results Crushed Miscellaneous Base This report presents the results of laboratory tests performed on one sample of crushed miscellaneous base. The aggregate was sampled from the Thousand Palms pit stockpile on April 19,2017. Per your request the following tests were performed utilizing the current test procedures listed: 1) LA Abrasion (ASTM C-131/Cal-211) 2) Sand Equivalent(ASTM D-2419/Cal-217) 3) Durability Index Coarse(ASTM D-3744/Cal-229) 4) Maximum Density/Optimal Moisture(ASTM D-1557) 5) Resistance R-Value(ASTM D-2844/Cal-301) Limitations The results summarized in this report represents only the sample tested. We have striven to provide these results In accordance with generally accepted material testing practices in this community at the time our services are performed. No warranty or guarantee,either express or implied is made. All test results should be reviewed and accepted by the project engineer and contractor for conformance to the project specifications. Test results or observations reported may not be the same or comparable at other times or other samples. Our scope of work was to present our client with the results of testing. Our test results presented are not insurance, nor do they guarantee construction of any type. In all cases, the contractor shall retain sole responsibility for the deficiencies or omissions, regardless of when they are found. We do not undertake the guarantee of construction or production of a completed project conforming to the project plans and specifications as the results of the opinions expressed in this report are based on a limited scope of services. if additional information becomes available, we must be consulted to review the effect of the information on our results. ` r 16 April 27,2017 -2- File No.:08676-02 Doc.No.:17-04-721 A summary of our laboratory test results is attached. We trust this meets your current needs. if you have any questions or need further assistance please contact us. Respectfully Submitted, EARTH SYSTEMS SOUTHWEST Mark Houghton Materials and Testing Supervisor Distribution: 2/Desert Recycling 1/BD File EARTH SYSTEMS SOMW M 17 April 27, 2017 -3- File No.:08676-02 Doc. No.: 17-04-721 Summary of Laboratory Test Results Crushed Miscellaneous Base Sample Location:Stockpile at Thousand Palms Plant 1) LA Abrasion Loss 100 Revolutions=12% 15 Max(SSPWC"Greenbook"Spec) 500 Revolutions=40% 52 Max(SSPWC"Greenbook"Spec) 2)Sand Eauivalent(Average of Three Points) SE=57 35 Minimum (SSPWC"Greenbook"Spec) 25 Minimum Operating Range (Cal-Trans Class II Spec) 22 Minimum Contract Compliance(Cal-Trans Class 11 Spec) 3)Durability Index Coarse DI=80 35 Minimum (Cal-Trans Class 11 &SSPWC"Greenbook"Spec) 4)Maximum Dry Density/Optimum Moisture Max Dry Density=124.8 pef Optimum Moisture=8.9% 5)R-Value(ED 300 psi Exudation R-Value=80 78 Minimum (Cal-Trans Class 11 &SSPWC"Greenbook"Spec) EARTH SYSMW SOUTH W M 18 File No.:08676-02 4/12/2017 Lab No.: 17-048 SIEVE ANALYSIS ASTM D6913 Job Name: Desert Recycling Sample ID: Sampled on 3-22-17 Cal Trans Description: CMB Cal Trans Class ii (3/4") Green Book Class it (3/4") Contract Sieve Size % Passing CMB- Fine Operating Range Compliance 3" 100 - 2" 100 - 1-1/2" 100 100 - 1" 100 - 100 100 3/4" 93 87-100 90-100 87-100 1/2" 77 - - - 3/8" 68 55-75 - - #4 52 35.60 35-60 30-65 #10 42 - - - #16 33 - - - #30 25 10-30 10-30 5-35 #40 18 - - - #100 11 - - - #200 6.0 2-9 2-9 0-12 100 c�.. Fft cnwi �b 4lhaium n"l.M Sibs rd 90 80 70 60 c 50 a 40 30 20 10 0 100 10 1 0.1 0.01 SIEVE Size,mm % Coarse Gravel: %Coarse Sand: 11 % Fine Gravel: %Medium Sand: 24 Cu: 49 % Fine Sand: 12 Cc: 1 Gradation %Total Gravel %Total Sand 46 %Fines: ##I Poorly Graded sw=Does Not Meet Specification EARTH SYSTEMS SOUTHWEST 19 q. ALL AMERICAN ASPHALT- TO: C17YOFPALMSPRINGSDEPTOFAVIATION Tk4mm7TALDA7E: 10/25117 3400TAHOUIIZCANYONWAY.SUITEOFC CORNo: 001 PALM SPRINGS CA 92262 AAA JOB No., 929610 AMW ROBERTDENNING Re: Taxiway JRehabilitation Project,contract No.A6999,Alp No.3-06-0181-055-2017 Invitation for Bids aFB) 17-06 LTEMNO, DESCRIPTION: ouANnTP; Uwcarr zS v Remove 6"of NativeMatedal A Install 6"ofClass II Bate on Taxiway J L Subgrade Preparation&Remove 6"of Native Material 12,500SF S 0.55 $6,875.00 2. Haul&Dispose afNadve Material 230 CY $81.40 $18,722.00 3. Install 6"of Class 11 Base 420 TN I Z4.60 $10,332.00 Total Change Order Request Price $35,929.00 Please add 5 working days to the project for this work due to rescheduling of the paving&striping after this work APPROVED REVISE&RFS11BUrT APPROVEDASNOTF.D REJECTED COMMENTS RECEIVED BY, TRANSMITTED BY, r�� GORDONKLINE 0 Denning, Robert From: Ingraham,Clinton <Curtingraham@wsp.com> Sent Wednesday, October 25,2017 1:11 PM To: Denning, Robert cc: King,laneece Subject Re 3/4" Base I am fine with base as a p208 alternative will send email tomorrow Sent from my iPhone On Oct 25,2017,at 11:36 AM,penning,Robert<robert.denninaPaecom.com>wrote: Rush Order Bob Denning,PMP Senior Construction Manager C:541-324-7321 +1-908-559-4899 robert.denninetmaecom.com This e-mail may contain confidential or proprietary materials for the sole use of the intended recipient.Any review, use,distribution or disclosure by others is strictly prohibited.if you are not the intended recipient,or authorized to receive the Information from the recipient,please contact the sender by reply e-mail and delete all copies of this message. <#29610.gk.subinitte1.007.base.pdf> t 21 BIDDER'S BtD/BID PRICE DETAIL Item Oescrl Non ItemP U.AA. �� Un8 Pr1ce Total 101 5.11 ATION,BONDS AND INSURANCE(G-1a0- LS I f5,t�oa ig D�� 5.1 102 PROVIDE QUALi1Y CONTROL TESTING FOR P-401 .IN 600 AND P-4031TEM5 G•101-5.1 Q� 103 CONTRACtOR'S YARD(G-104-4.1) LS 1 20 000 Toil Norusl D 105 FINISHNGAIRPORT(GA05-4.1) LS i 00 106 SAFETY AND SECURITY(G -4.1) IS 1 zorn 147 PERSONNEL AND VFNICLESECURRYTRAIAl1NG{G- Allow 1 $10,000.00 $10000.00 2 108 1 FURNISH LOW-PROFAE BARRICADE G-200.4.3) EA 50 ,'z 70 109 OPERATE AND MAINTAIN OWNER FURNISHED LIGHTED'X' G-200-4.4 EA 2 Z D00 000 170 ENVIRONMENTAL COMPLIANCE(G-201-B.I) IS 1 p Ono III REMOVE EXISTING AC PAVEMENT(G-300-4.1) SF 12,000 1.-- 0 D 712 EXPORT AND DISPOSE OF EXCESS REMOVED AC PAVEMENT G-300-42 CY 300 SO I$ 000 MMEM(IMGAPIU _ A . SF 12.000 �._ 114 CONSTRUCT P 40t FINISH PAVEMENT(P 40t 9.1J IN 250 S 0 ITS CONSTRUCT P-403,RAP BASE PAVEMENT IP-403-11 7N 350 !Jr0 600 PLACESTRIPING WITH BEADS(YELLOW-TWO I16 COA P-620-5.1 SF 2,000 1'&0; 3 200 117 PLACE Phi STRIPING WITH BEADS{WHITE-TWO COATS)511 SF 2,000 PLACE BLACK STRIPING WITHOUT BEADS(TWO 116 COATS)IP-620-5.3 SF 1.500 p ss"' 2-5 PLACESURFACE PAINTED HOLD POSITION SIGNS 119 WITH BEADS(ONE COATI (P-620-5.41 EA T 12D I RESTORE CONTRACTORS YARDIG-104-4.3) L5 1 f rjQ — 1 ,500 14�^ Total Base Bid $ 2-S`b 1 zus. 0 C Total Base Bid r 1 I(1 oilers) QQ clal(afs ana° -em c-en-cs. CITY OF PALM SPRINGS.RIVERSIDE COUNTY 111.3 BID FORMS PALM SPRINGS INTERNATIONAL AIRPORT BID DOCUMENTS TAXIWAYJ RERABIUMATiON PROJECT ADDENDUM NO.1 22 Attachment 2 23 CHANGE ORDER 02 PROJECT TITLE:-rAXtvJAJ J ftEHAt31L11'0T►bv PtzbSBcT AIP No. 3-06-0181-055-2017(Construction) INVITATION FOR BIDS(IFEI)17-06 CONTRACT No. 2017-06 The following changes are hereby made to the Contract Documents: Change per this change order is to bid item 116 providing extra width to the blast pad chevrons and maintaining better sight visibility for pilots. Justification:Perthe conformed drawing document details the chevrons were specified as being 3' in width.The existing condition of the chevrons measure 5'in width as preferred by the airport authorities. CHANGE TO CONTRACT PRICE: Original Contract Price: $258,265.00 Current contract price,as adjusted by previous Change Orders: $282,194.00 The Contract Price due to this Change Order will be increased by$2.323.20 The new Contract Price due to this Change Order will be:$284,517.20 _ CHANGE TO CONTRACT TIME: The Contract Time will be increased by 0 calendar days. The date for completion of all work under the contract will be: October 31,2017 Approvals Required: To be effective,this order must be approved by the Owner if it changes the scope of the objective of the project,or as may otherwise be required under the terms of the Contract,General Provisions or Special Provisions ' Requested by — r- GYLn IZLV-,A= date 3 7 Recommended by date 101,31 h�- Ordered by date / Accepted by date -777 :',• CITY OF PALM SPRINGS,RIVERSID VnlB CONTRACT ADMINISTRATION FORMS PALM SPRINGS INTERNATIONAL AI RT BID DOCUMENTS AIRFIELD LIGHTING PROJECT Pr CONFORMED 24 ALL AMERICAN ASPHALT To: CnTOFP"SPRNGSDEPTOFAYIATION DATP: 10113117 3400mHounzc"roxwAysunEOFc RFINO. 001 PALMSPRoms,,cA 92262 AAA Joe NO: #29610 AM: ROBEUDFNYM Re: TartwayJRehabilitation Project, Contract No,A6999,ALP No. 3-06-0181-055-1017 &Wtadon for Bids gB217-06 QUESTION: TBt mm7TNGOVBRRUNC6VRONM4RBAYwAm 6'wmF,RUrrms FBOJatrm.4mctu OUTS'WML WBAWUMET=BM QUANVTY SONLY FOR 3'WMF-ITMARSSSNSEW REPAMTTB£FMIUOVBRRUNCBMONAND NOTJUUOFfT BUT nM MAY BEA QWNYTIYBUST.PMUEDMICTON WFAT WMTH#T ARETOPAOrP IM OVBRRONCBMONS RESPONSE: Contractor to match existing Chevron Width. Paint entire chevron - not a portion to provide a clean finished appearance. Line item is paid by the SF unit price- no additional cost other than the unit price per sf of applied paint should apply.Affects bid item 116 and 118. PSP may elect to paint a single coat of paint in lieu of two. CCINVSP 1 011 912 01 7 RESPONDEDBY, REQUESTED BY, 25 3 2 3 /^ 4 5 �w ww[a•.wr•rw ratli r s+n ( /n�✓S p va Ywtrd Yt r•'�I N Q9. tt''pp�1pp11 V q/ att '.. �� aottuax (JrYS�A( � c / d YELL TAXIWAMAXILANE �iJ b VIA? CI YELLOW TAXIWAY EDG 9e • KIs E I MARKI AIL yai t NTER x 3 TAXIWAY 5HOULDERMARKINGS 6t, Ys�(wv cE,.+�,. r.o,•. Ste, V{II Qar � a (M RiNWAY EDGE t �S e� a c - -- - - - a ZMSH=BAR it KIs ••Ivmtr �iawa� rwrta•n Wo[ 1 M tolwl W M•qM1(MQ WI Ii•t 14 19t AS Wi P.•4I?Ld4 1••IYt • •rLL tW1 Mp fOML I•trla•OI•Ra11Y1wiY rYYOrS tQ K IIp/}It}IS �. a oawrt we r•tllm Inlnr alo a wt a.at r.e r tK tw•a uwurwr. n's'�ul•ot�mq o�ac +r°�w roc r.a wn tmem a ual r.no E BLAST PAD MARKING DETAIL B w s. F IIR ru•aw TAXIWAY EDGE 5 T S I T , D a } •ur r :ppr t Z br b Y' tom' IW(1 t�10a I.e1�D a�Mw��a 110 tIT•.MU[wu y 'r!JOE�L Y 13L'31R—MARS TAXIWAY MARKINGICA DETAIL ' {IYPICAL)K (TYPL)au rMM: Kt•awt r••r am•m r MM .0 rwom a r ria rw•um r= r tta•A £ IN DAM bIt p wIRIR Owl IN QUMK w L'11RUNWAYO EI&NATION spy ©t N UMBER•13' ER N 1 2 KtxklC 'L^ a 3 4 5 YELLOW PAINT QUANTITY Blast Pad Marking Contract drawing detail shows the blast pad chevrons being 3"in width. Actual field conditions for the chevrons measures 5' in width for the yellow. As shown on drawing detail--3 chevrons at 363 SF each= 1089 SF Bid Actual field measured-- 3 chevrons at 605 SF each=1815 SF Difference=726 SF Delta owed contractor=726 SF X S 1.60(unit price)-$1,161.60 X 2 coats=S2323.20 Bob Denning,Resident Engineer URS Corp. Date: 10/30/2017 27 8113DER'S 111D/BTD ARICE ETA1L eld its Ds=kWon U.M. Bid Uc�B Price Total 101 MOBILIZATION,BONDS AND INSi1RANCE(G-100- I 5.1 LS Sl000 is Doo 102 PROVIDE QUALITY CONTROL TESTING FOR P-401 AND P-403 9B& Cr10i-5.i TN 6D O0 103 CONTRACTOR'S YARD(G-104.4.11 is 1 2 0 DOO 104 NOT IJSS1 105 FINISHING AIRPORT(G-105-4.1) LS 1 O 106 SAFETI'AND SECURITY(G-2C0.4,1) LS i _ 107 I'E,4S6101 ANO VROCLE SECUW MOWING-(G- 1 S10,OQ0.Q0 $iQ 000 00 IDB FURNISH LOW-PROFILE BARRICADE(G200-4.3) EA 50 210 t0p OPERATE AND MAINTAIN OWNER FURNISHED 2 LIGHTED' ' G-200�t.4 2 DO0 Opp 110 ENVIRONMENTAL COMPLIANCE(G-201-0.i) LS I 111 1 REMOVE EXISTING AC PAVEMENT C 300-4.1) SF 12,000 I-- 1611001D 112 EXPORT AND DISPOSE OF EXCESS REMOVED AC PAVEMENT G900.4.2 CY 300 SO — is 000 IF 1Z000 -- 114 CONSTRUCT P 401 HNISH PAVEMENT{P-401 8.t) TN 250 7S D 11S CONSTRUCT P 403,RAP BASE PAVEMENT(P-403 8.1 TN 350 150 r 52 boo 1T6 PLACESTRIPlNGWTDi BEADS(Yf3LOW-TWO IF ?,000 � coAn P-a2as.1 1j&0= 3 200 117 F 62COE5IPING WFTH BEADS(WHITE-TWO COATS) IF ?000 1 ;(OO... Da 118 PLACE BLACX ITHUT BEADS(TWO STRIPING WO COATS e3 P-62D-COATS) T,�a 1it PLACE SURFACE PAINTED HOLD POSITION SIGNS ,! WITH BEADS P-62D-5.41 EA 1 120 1 RESTORE CONTRACTORS YARD G-104.4.31 iLs 1 ( SQ t,� Total Base Bid $ an1 225.O a Total Base Btd �r V oNarsj St-4,4 1�2 d13 l(airs A Z PYtI C-e t1jS. CITY OF PALM SPPJNGS,R1VEMIDECOUNTY pia DID FORMS PALM SPRINGS INTERNAMONN.AIRPORT BID DOCUMENTS TAXIWAY J REHABILITATION PROJECT ADDENDUM NO.I 28 Attachment 3 29 CHANGE ORDER 03 PROJECT TITLE- TA)OWAY'J' REHABILITATION PROJECT AIP No, 3-06-0181-055-2017 (Construction) INVITATION FOR BIDS (IFB) 17-06 CONTRACT No,2017-06 The following changes are hereby made to the Contract Documents: Changes per this change order are to bid items 102, 107, 111, 112, 113, 114 and 115 and is intended as a 'Final Balancing Change Order' to adjust the quantity values per the Contract Documents `Bid Price Detail' as shown in section 111-3. (see attached quantity sheet) Justification: This Contract adjustment is to show the final contract quantities both over run and under run as determined by actual field measured placement.This adjustment is typical for all unit priced contracts to adjust all quantities for final payment. CHANGE TO CONTRACT PRICE: Original Contract Price: $258,265.00 Current contract price, as adjusted by previous Change Orders: $2 84,517,2 0 The Contract Price due to this Change Order will be increased by $7,465-79 The new Contract Price due to this Change Order will be: $291,98Z99 CHANGE TO CONTRACT TIME: The Contract Time will be increased by 0 calendar days. The date for completion of all work under the contract will be: October 31, 2017 Approvals Required: To be effective, this order must be approved by the Owner if it changes the scope of the objective of the project, or as may otherwise be required under the terms of the Contract, General Provisions or Special Provisions,Requested by date ? Recommended by .—date Ordered by —date Accepted by —date CITY OF PALM SPRINGS,RIVERSIDE COUNTY VIII-6 CONTRACT ADMINISTRATION FORMS PALM SPRINGS INTERNATIONAL AIRPORT BID DOCUMENTS AIRFIELD LIGHTING PROJECT 30 QUANTITY ADJUSTMENT Taxiway T Rehabilitation Proiect Change Order No. 03 Attachment Item No. Bid Quantity Actual Quantity Quantity Diff. Unit Price +/-Amount 102 600 Tn 624.53 Tn 24.53 Tn $50.00 $1,226.50 107 $10,000.00 $6,368.15 -0.36 SF $10,000.00 ($3,631.85) 111 12,000 SF 11,968.32 SF -31.68 SF $1.00 ($31.68) 112 300 CY 297 CY 3 CY $50.00 ($150.00) 113 12,000 SF 11,968.32 SF -31.68 SF $1.00 ($31.68) 114 250 Tn 292.70 Tn 42.7 Tn $300.00 $12,810.00 115 350 Tn 331.83 Tn -18.17 Tn $150.00 ($2,725.50) Net Increase $7,465.79 31 Attachment 4 32 Recording Requested By All American Asphalt And City of Palm Springs When Recorded Return To: City of Palm Springs-Attn:City Clerk P.O. Box 2743, Palm Springs, CA 92263-2743 NOTICE OF COMPLETION NOTICE IS HEREBY given that: I. The City of Palm Springs, California, is a municipal corporation,organized and incorporated pursuant to the laws of the State of California. 2. The City Clerk of the City of Palm Springs is authorized and directed to execute,on behalf of said City, any and all Notices of Completion. 3. The address of the City of Palm Springs is City Hall, 3200 E.Tahquitz Canyon Way, Palm Springs, California(P.O. Box 2743,Palm Springs, CA 92263-2743). 4. The public work of improvement on the hereinafter referred to real property within the city was COMPLETED on the 3W1 day of October,2017. 5.The name of the contractor(if named)for such work of improvement was:All American Asphalt The public work of improvement,which was completed in the City of Palm Springs, County of Riverside, State of California, is described as follows:Taxiway'J' Rehabilitation Nature of Interest: Fee Owner The property address or location of said property is: 3400 E.Tahquitz Canyon Way, Palm Springs, California,92262. INVITATION FOR BIDS(IFB) 17-06,Agreement Number:A6999, Minute Order Number: _ CITY OF PALM SPRINGS: REVIEWED BY: DATED: BY: DATED: Thomas Nolan, Executive Director of Aviation Kathie Hart, being duly sworn,says: That she is the Interim City Clerk of the aforesaid City of Palm Springs,California,the corporation that executed the foregoing notice;that she makes this verification on behalf of said corporation;that she has read the foregoing Notice of Completion, and knows the contents thereof, and that the facts stated therein are true; that as said Interim City Clerk,she makes this verification on behalf of said municipal corporation. Interim City Clerk—Kathie Hart Index No. 33