HomeMy WebLinkAbout2/21/2018 - STAFF REPORTS - 1.F. Q p LM sA� s� w � v n k �C,OIOIIAFO`•' 4 c°`'F°"N`P City Council Staff Report Date: February 21, 2018 CONSENT CALENDAR Subject: ACCEPTANCE OF THE PALM SPRINGS SWIM CENTER REPLASTER AND POOL REPAIR PROJECT, CITY PROJECT NO. 16-06 From: David H. Ready, City Manager Initiated by: Engineering Services Department SUMMARY Formal City Council acceptance of the Palm Springs Swim Center Replaster and Pool Repair Project, City Project No. 16-06, is required to document the completion of the public works improvement, and to allow the City's filing of a Notice of Completion with the Riverside County Recorder in accordance with Section 9200 of the California Civil Code. RECOMMENDATION: 1) Accept the public works improvement identified as the Palm Springs Swim Center Replaster and Pool Repair Project, City Project No. 16-06, as completed in accordance with the plans and specifications; and 2) Authorize the City Engineer to execute and file for recordation with the Riverside County Recorder a Notice of Completion for the Palm Springs Swim Center Replaster and Pool Repair Project, City Project No. 16-06. STAFF ANALYSIS: On September 26, 2017, the City Council awarded a construction contract to Condor, Inc., in the amount of $384,000 for the Palm Springs Swim Center Replaster and Pool Repair Project, City Project No. 16-06, (Project). The scope of the Project comprised draining of the pool, removing existing plaster to the gunite, removing and reinstalling existing bulk-head, replacing existing expansion joints and joint tiles, crack and leak repairs, high-pressure water blasting, hypo washing, surface preparation, plastering, minor tile work (as-needed), curing, clean-up, filing of the pool, and all appurtenant work. An aerial map of the site is identified on the subsequent page. ITEM NO. - City Council Staff Report February 21, 2018—Page 2 Acceptance of City Project No. 16-06 Aa- 4 s r _ a t� i a �t Location Map Throughout construction of the Project one contract change order was approved as follows: • Construction Contract Change Order 1 (CCO1) in the amount of $24,312.95 was approved by the City Manager on January 31, 2018, to include additional equipment such as new deck anchors, light rings, bond/replace light fixtures, bulkhead and rail anchors, and hand rails. The final cost of the Project was increased by $24,312.95 from the original awarded contract amount of $384,000 for a final contract amount of $408,312.95; a copy of CCO1 is included as Attachment 1. As determined by City staff, the Contractor satisfactorily completed the Project on January 17, 2018. Staff recommends that the City Council accept the Project as required by Section 9200 of the California Civil Code, and authorize the City Engineer to file and record a Notice of Completion within 15 days of the City Council's action. A copy of the Notice of Completion to be submitted to the County is included as Attachment 2. 02 City Council Staff Report February 21, 2018—Page 3 Acceptance of City Project No. 16-06 ENVIRONMENTAL IMPACT: Section 21084 of the California Public Resources Code requires Guidelines for Implementation of the California Environmental Quality Act ("CEQA"). The Guidelines are required to include a list of classes of projects which have been determined not to have a significant effect on the environment and which are exempt from the provisions of CEQA. In response to that mandate, the Secretary for Resources identified classes of projects that do not have a significant effect on the environment, and are declared to be categorically exempt from the requirement for the preparation of environmental documents. In accordance with Section 15301 "Existing Facilities," Class 1 projects consist of repair, maintenance, or minor alteration of existing public facilities involving negligible or no expansion; therefore, the Palm Springs Swim Center Replaster and Pool Repair Project, City Project No. 16-06, is considered categorically exempt from CEQA, and a Notice of Exemption has been prepared and filed with the Riverside County Clerk. FISCAL IMPACT: As part of the 2016/2017 fiscal year budget, the City Council appropriated a budget of $250,000 from the Measure J Capital Project Fund (Fund 260) to replaster and perform pool repairs at the swim center. On September 26, 2017, the City Council appropriated an additional $230,193 from the Capital Projects Fund (Fund 261) to award a construction contract to Condor, Inc. A total of $480,193 has been appropriated for the Project to date. Table 1 below is a summary of the total costs incurred for the Project. FY 16/17 FY 17/18 Phase Expenditure Expenditure Final Cost Administration $9,894.82 $3,281.62 $13,176.44 Design $19,979.00 $1,986.00 $21,965.00 Inspection $2,264.73 $2,264.73 Construction Contract $384,000.00 $384,000.00 Contract Change Orders $24,312.95 $24,312.95 Total Cost $29,873.82 $415,845.30 $445,719.12 Table 1 03 City Council Staff Report February 21, 2018—Page`i Acceptance of City Project No. 16-06 The Project was funded through the following sources as shown in Table 2: Fund Name Account Actual Measure J 260-4500-59490 $250,000.00 Capital Projects 261-1395-59490 $230,193.00 Total Expenditures for Project $445,719.12 Project Budget $480,193.00 Remaining Balance $34,473.88 Table 2 The City is holding retention of $10,207.83 for Condor, Inc., pending acceptance of the improvements and filing of the Notice of Completion with the County Recorder's office. The Finance Department will add the cost of this project to the City's fixed asset system to include the creation of these assets in compliance with Governmental Accounting Standard Board (GASB) 34 Standards for Financial Reporting of Infrastructure Assets. SUBMITTED r` Tl16mas Garcia, P.E. Marcus L. Fuller, MPA, P.E., P.L.S. City Engineer Assistant City Manager David H. Ready, Esq., P City Manager Attachments: 1. Change Order 2. Notice of Completion 04 Attachment 1 05 fpA�MSA4'y CITY OF PALM SPRINGS CONTRACT CHANGE ORDER c9<OR�P To: Candor, Inc. Date: December 22, 2017 300 Durfee Ave. Project No: 16-06 El Monte, CA 91732 Project: Swim Center RePlaster/Repair Change Order One (1) Purchase Order 18-0714 CHANGES IN WORK: New Items: A. Deck Anchors At the request of Swim Center staff the contractor was asked to provide pricing for installing equipment anchors in the pool deck. The Contractor will core drill the pool decking and install nine (9) equipment anchors (anchors provided by City), at various locations as directed. This new item of work is inclusive of all labor, materials and equipment necessary to complete the work, including but not necessarily limited to, coring the existing pool deck, setting anchors in place vertically at deck elevation, installation of bonding clamps and wire, installation of cementitious setting materials and any other appurtenant labor or materials as needed to install the anchors. This work will be performed at the Lump Sum/Agreed Price of$3,416.00. B. Provide and Install 30 New Light Rings Existing pool lighting fixtures were installed without mounting rings leaving underwater pool light un-secure. The Contractor will provide and install new light rings that can be used to properly attach the existing underwater light fixtures. This new item of work is inclusive of all labor, materials and equipment necessary to complete the work, including but not necessarily limited to, providing new brass light rings for all existing fixtures, installation of bonding wire, and all other fasteners, inserts, setting materials and any other appurtenant labor, materials or equipment as needed to install and bond the light rings in accordance with all applicable industry standards. This work will be completed at the Lump SumlAgreed Price of$6,617.00. C. Remove and Re-Install (30) Light Fixtures Bonding Fixtures to Deck Pull Boxes Existing pool light fixtures were installed without bonding wires. Bonding is the practice of intentionally electrically connecting exposed metallic items not designed to cant'electricity as a protection from electric shock. The Contractor will bond all existing underwater lighting fixtures by installing bonding wire from the underwater light fixtures to the nearest deck pull box. The Contractor will also replace electrical cables for light cables that are too short to be placed on the pool deck for service. This item also includes the full replacement of five (5) LED light fixtures and light cables that are inoperable. This new item is inclusive of removal of the light fixtures, installation of bonding wires, extension of light cables where necessary, supplying and installing 5 new fixtures, including niche compounds, mechanical lugs, wire pulling, and any other appurtenant labor, 06 Contract Change Order No. 001 DATE: 12/22/17 Page 2 materials or equipment necessary to complete the in accordance with all applicable codes and industry standards. This work will be performed at the Lump Sum/Agreed Price of$8,670.00 D. Remove and Replace Bulkhead and Handrail Anchors Prior to re-installing the existing bulkhead it is necessary for the anchors that hold the bulkhead down to be removed and replaced. The existing anchors are oxidized, bent and in various states of disrepair. Some handrail anchors are in the same condition and require removal and replacement with new escutcheon plates. This new item of work is inclusive of all labor, materials and equipment necessary to complete the work, including but necessarily limited to core drilling to remove the old anchors, replacement utilizing 5/8"x 4 %" Hilti anchors, installation of bronze wedge anchors, installation of any required bonding clamps and bonding wires, installation of stainless steel escutcheon plates, cementitious setting materials and any other appurtenant labor or materials. This work will be performed at the Lump Sum/Agreed Price of$2,070.00. E. New Handrail The handrail at the entry into the shallow end is bent and in poor condition. It will be replaced at the Lump Sum/Agreed Price of$424.00. Note: All items are inclusive of all applicable mark ups and no additional compensation will be made for the completion of the additional work indicated herein. CHANGES IN COST: New Items: Item Description Quantity Unit Unit Cost A Deck Anchors 1 LS $3 928.40 B Light Rings 1 LS $7 609.55 C Lighting Bonding/Replacement 1 LS $9,970.50 D R/R Bulkhead and Rail Anchors 1 LS $2 380.50 E New Hand Rail 1 LS $424.00 Total $24,312.95 Total Net Change Order Amount: $24,312.95 CHANGES TO CONTRACT TIME: Five (5) Working Days will be added to the contract for the work indicated herein. It is agreed that agreed completion date of January 5, 2018 will not be delayed in order to complete this work. 07 Contract Change Order No. 001 DATE: 12/22/17 Page 3 SOURCE OF FUNDS: 123-,88 95 will be debited from account No. 261-1395-59490 �-�Z`131Z.01 S SUMMARY OF COSTS: Original Contract Amount: $ 384,000.00 Original Completion 30 Days This Change Order: $ 24,312.95 Days Added 5 Previous Change Order(s): $ 0.00 Previous Days Added: 0 Revised Contract Amount: $ 408,312.95 Revised Completion 35 Days [SIGNATURES ON NEXT PAGE] 0 � Contract Change Order No. 001 DATE: 12/22/17 Page 4 1 have received a copy of this Change Ord t above AGREED PRICES are acceptable to Condor, Inc. Signatylua — Date Printed Name and Title Citv of Palm Sorinas Recommended Bv: l tIS thomas Garcia, City Engineer Date Approved Bv: i q311N �avidH. Ready, City Manager Date Attest Bv: X4 I Okl3fll b thony Me r date Distribution: Original Conformed Com: Conformed - File Copy: Contractor (1) Engineering Pay File (1) City Clerk (1) Project City File (1) Purchasing (1) Finance (1) t� APPROVED B�Y CITY �MANAGER 3 Attachment 2 ! 10 Recording Requested By: City of Palm Springs When Recorded Mail To: Name Anthony J.Mejia,City Clerk Street Address 3200 E.Tahquitz Canyon Way City&State Palm Springs,CA 92262 SPACE ABOVE THIS LINE FOR RECORDERS USE NOTICE OF COMPLETION (CA Civil Code§§8180-8190,8100-8118,9200-9208) NOTICE IS HEREBY GIVEN THAT: 1. The undersigned is an owner of an interest of estate in the hereinafter described real property,the nature of which interest or estate is: Fee (e.g.fee, leasehold,joint tenancy,etc.) 2. The full name and address of the undersigned owner or reputed owner and of all co-owners or reputed co-owners are: Name Street and No. City State City of Palm Springs 3200 E.Tahquitz Canyon Way Palm Springs CA 3. The name and address of the direct contractor for the work of improvement as a whole is: Condor,Inc.,3000 Durfee Avenue,El Monte,CA 91732 4. This notice is given for(check one): 0 Completion of the work of improvement as a whole. ❑ Completion of a contract for a particular portion of the work of improvement(per CA Civ.Code§8186). 5. If this notice is given only of completion of a contract for a particular portion of the work of improvement(as provided in CA Civ.Code § B186),the name and address of the direct contractor under that contract is: Not Applicable, 6. The name and address of the construction lender,if any,is: Not Applicable. 7. On the 17th day of January 2018,there was completed upon the herein described property a work of improvement as a whole(or a particular portion of the work of improvement as provided in CA Civ.Code§8186)a general description of the work provided: City Project 16-06,Swim Center Replaster and Pool Repairs 8. The real property herein referred to is situated in the City of Palm Springs County of Riverside State of California,and is described as follows: APN:502-200-002 9. The street address of said property is: 405 S.Pavilion Way 10. If this Notice of Completion is signed by the owner's successor in interest,the name and address of the successor's transferor is: Not applicable I certify(or declare)under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Date: By: Signature of Owner or Owner's Authorized Agent-City Engineer for City of Palm Springs Thomas Garcia,City Engineer ©Porter Law Group,Inc 2013 Print Name,and Title Page 1 of 2 1 I VERIFICATION I, Thomas Garcia state: I am the City Engineer _("Owner","President", "Authorized Agent","Partner",etc.)of the Owner identified in the foregoing Notice of Completion.I have read said Notice of Completion and know the contents thereof;the same is true of my own knowledge. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed on (date),at Palm Springs (City), CA (state). Signature of Owner or Owner's Authorized Agent Thomas Garcia, City Engineer A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached,and not the truthfulness,accuracy,or validity of that document. STATE OF CALIFORNIA COUNTY OF On (date), before me, Notary Public(name and title of officer) personally appeared who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) islare subscribed to the within instrument and acknowledged to me that helshelthey executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s),or the entity upon behalf of which the person(s)acted,executed the instrument. I certify under PENALTY OF PURJURY under the laws of the State of California that the foregoing paragraph is true and correct. Witness my hand and official seal. Page 2 of 2 Signature 12